Proposal:H.010081.6
Parish:Winn
Routes:LA 156
Description:LA 156 IMPROVEMENTS (CALVIN TO US 167)
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, SUBGRADE TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$5,176,128.91
| Rank | License | Bidder | Construction Bid |
| 1 | 08584 | Madden Contracting Co., LLC | $4,410,823.75 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $4,466,929.25 |
| 3 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $5,079,992.65 |
| 4 | 08815 | W. E. MCDONALD & SON, LLC. | $5,266,624.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Contracting Co., LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - GILCHRIST CONSTRUCTION CO. LLC | - 4 - W. E. MCDONALD & SON, LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 750.00 | 750.00 | 9,000.00 | 9,000.00 | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,500.00 | 1,500.00 | 30,000.00 | 30,000.00 | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 48 | SQYD | 8.00 | 384.00 | 28.00 | 1,344.00 | 9.00 | 432.00 | 11.00 | 528.00 | | 0004 | 202-05-00100 | Excavation, Disposal and Backfilling of Contaminated Soil | 562.5 | CUYD | 200.00 | 112,500.00 | 225.00 | 126,562.50 | 350.00 | 196,875.00 | 225.00 | 126,562.50 | | 0005 | 203-01-00100 | General Excavation | 1,110 | CUYD | 5.50 | 6,105.00 | 20.00 | 22,200.00 | 7.50 | 8,325.00 | 7.00 | 7,770.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,430 | CUYD | 17.50 | 60,025.00 | 11.50 | 39,445.00 | 17.00 | 58,310.00 | 20.00 | 68,600.00 | | 0007 | 303-02-00100 | Removal of Existing Patches | 500 | SQYD | 5.00 | 2,500.00 | 5.00 | 2,500.00 | 5.50 | 2,750.00 | 5.00 | 2,500.00 | | 0008 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 111,670 | SQYD | 6.00 | 670,020.00 | 6.00 | 670,020.00 | 6.25 | 697,937.50 | 7.00 | 781,690.00 | | 0009 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 57,405 | SQYD | 6.50 | 373,132.50 | 7.50 | 430,537.50 | 7.00 | 401,835.00 | 8.00 | 459,240.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,558 | CUYD | 60.00 | 153,480.00 | 48.00 | 122,784.00 | 60.00 | 153,480.00 | 10.50 | 26,859.00 | | 0011 | 502-01-00100 | Asphalt Concrete | 28,842.3 | TON | 74.50 | 2,148,751.35 | 72.50 | 2,091,066.75 | 80.00 | 2,307,384.00 | 88.00 | 2,538,122.40 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 714.3 | TON | 55.00 | 39,286.50 | 133.00 | 95,001.90 | 80.00 | 57,144.00 | 88.00 | 62,858.40 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 86,294 | SQYD | 1.00 | 86,294.00 | 1.30 | 112,182.20 | 2.00 | 172,588.00 | 2.75 | 237,308.50 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -800 | CUYD | 0.01 | -8.00 | 0.01 | -8.00 | 1.00 | -800.00 | 0.10 | -80.00 | | 0015 | 701-01-02000 | Cross Drain Pipe (24" RCP/PP or 30" CMP) | 512 | LNFT | 104.00 | 53,248.00 | 160.00 | 81,920.00 | 120.00 | 61,440.00 | 160.00 | 81,920.00 | | 0016 | 701-02-02000 | Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) | 192 | LNFT | 104.00 | 19,968.00 | 168.00 | 32,256.00 | 120.00 | 23,040.00 | 160.00 | 30,720.00 | | 0017 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 152 | LNFT | 95.00 | 14,440.00 | 106.00 | 16,112.00 | 110.00 | 16,720.00 | 145.00 | 22,040.00 | | 0018 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 760 | LNFT | 1.00 | 760.00 | 1.00 | 760.00 | 2.00 | 1,520.00 | 2.00 | 1,520.00 | | 0019 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 2,100.00 | 6,300.00 | 1,950.00 | 5,850.00 | 2,600.00 | 7,800.00 | 3,500.00 | 10,500.00 | | 0020 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 400 | LNFT | 72.00 | 28,800.00 | 80.00 | 32,000.00 | 90.00 | 36,000.00 | 100.00 | 40,000.00 | | 0021 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 187.5 | LNFT | 21.00 | 3,937.50 | 22.00 | 4,125.00 | 25.00 | 4,687.50 | 29.00 | 5,437.50 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 12 | EACH | 3,000.00 | 36,000.00 | 3,250.00 | 39,000.00 | 3,200.00 | 38,400.00 | 4,200.00 | 50,400.00 | | 0023 | 712-02-00100 | Sacked Concrete Revetment | 164.8 | SQYD | 275.00 | 45,320.00 | 105.00 | 17,304.00 | 300.00 | 49,440.00 | 380.00 | 62,624.00 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 87,000.00 | 87,000.00 | 15,500.00 | 15,500.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | | 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 21.909 | MILE | 350.00 | 7,668.15 | 170.00 | 3,724.53 | 210.00 | 4,600.89 | 415.00 | 9,092.24 | | 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 17.534 | MILE | 250.00 | 4,383.50 | 10.00 | 175.34 | 1.00 | 17.53 | 350.00 | 6,136.90 | | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 59.583 | MILE | 400.00 | 23,833.20 | 10.00 | 595.83 | 1.00 | 59.58 | 555.00 | 33,068.57 | | 0028 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 2,000.00 | 2,000.00 | 4,000.00 | 4,000.00 | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | | 0029 | 726-01-00100 | Bedding Material | 241.1 | CUYD | 94.00 | 22,663.40 | 90.00 | 21,699.00 | 100.00 | 24,110.00 | 133.00 | 32,066.30 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 87,000.00 | 87,000.00 | 70,000.00 | 70,000.00 | 400,000.00 | 400,000.00 | 150,000.00 | 150,000.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 62 | EACH | 85.00 | 5,270.00 | 95.00 | 5,890.00 | 85.00 | 5,270.00 | 118.00 | 7,316.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,175 | EACH | 5.00 | 5,875.00 | 5.50 | 6,462.50 | 5.00 | 5,875.00 | 7.00 | 8,225.00 | | 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 10.00 | 480.00 | 11.00 | 528.00 | 10.00 | 480.00 | 14.00 | 672.00 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 19.861 | MILE | 2,900.00 | 57,596.90 | 3,200.00 | 63,555.20 | 2,900.00 | 57,596.90 | 4,005.00 | 79,543.31 | | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.845 | MILE | 950.00 | 5,552.75 | 1,000.00 | 5,845.00 | 950.00 | 5,552.75 | 1,315.00 | 7,686.18 | | 0036 | 735-01-00100 | Mailboxes | 42 | EACH | 1.00 | 42.00 | 10.00 | 420.00 | 11.00 | 462.00 | 14.00 | 588.00 | | 0037 | 735-02-00100 | Mailbox Supports (Single) | 40 | EACH | 130.00 | 5,200.00 | 110.00 | 4,400.00 | 105.00 | 4,200.00 | 138.00 | 5,520.00 | | 0038 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 165.00 | 165.00 | 165.00 | 165.00 | 160.00 | 160.00 | 205.00 | 205.00 | | 0039 | 739-01-00100 | Hydro-Seeding | 3.5 | ACRE | 3,500.00 | 12,250.00 | 2,000.00 | 7,000.00 | 2,000.00 | 7,000.00 | 2,500.00 | 8,750.00 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 21,000.00 | 21,000.00 | 13,000.00 | 13,000.00 | 5,000.00 | 5,000.00 | | 0041 | 805-16-00100 | Reinforced Concrete Box Culverts (Extension) (4' x 4') | 69 | LNFT | 695.00 | 47,955.00 | 800.00 | 55,200.00 | 715.00 | 49,335.00 | 980.00 | 67,620.00 | | 0042 | 805-16-00700 | Reinforced Concrete Box Culverts (Extension) (6' x 5') | 36 | LNFT | 780.00 | 28,080.00 | 1,200.00 | 43,200.00 | 860.00 | 30,960.00 | 120.00 | 4,320.00 | | 0043 | 805-16-01200 | Reinforced Concrete Box Culverts (Extension) (6' x 6') | 54 | LNFT | 795.00 | 42,930.00 | 1,150.00 | 62,100.00 | 870.00 | 46,980.00 | 1,200.00 | 64,800.00 | | 0044 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) 2'X2' BOX | 19 | LNFT | 500.00 | 9,500.00 | 900.00 | 17,100.00 | 560.00 | 10,640.00 | 760.00 | 14,440.00 | | 0045 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) 3'X2' BOX | 8 | LNFT | 580.00 | 4,640.00 | 1,285.00 | 10,280.00 | 635.00 | 5,080.00 | 865.00 | 6,920.00 | | 0046 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) 3'x3' BOX | 69 | LNFT | 610.00 | 42,090.00 | 550.00 | 37,950.00 | 685.00 | 47,265.00 | 935.00 | 64,515.00 | | 0047 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) 4'X3' BOX | 34 | LNFT | 630.00 | 21,420.00 | 750.00 | 25,500.00 | 700.00 | 23,800.00 | 815.00 | 27,710.00 | | 0048 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 420 | INLF | 4.25 | 1,785.00 | 2.80 | 1,176.00 | 2.00 | 840.00 | 5.50 | 2,310.00 | | 0049 | NS-MSC-00280 | Adjusting Gas Valves and Valve Boxes | 3 | EACH | 650.00 | 1,950.00 | 500.00 | 1,500.00 | 800.00 | 2,400.00 | 1,000.00 | 3,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,410,823.75 | | 4,466,929.25 | | 5,079,992.65 | | 5,266,624.80 |
|