Bid Tabulations for the Letting of 5/9/2018 LA DOTD Headquarters

Proposal:H.008411.6
Parish:Terrebonne
Routes:LA 660
Description:BAYOU TERREBONNE BRIDGE (LA 660)
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PERMANENT SHEETING (STEEL), AND RELATED WORK.
Estimated Construction Cost:$1,447,309.60
Rank License BidderConstruction Bid
134263La Contracting Enterprise LLC$1,319,813.55
212198Byron E. Talbot Contractor, Inc.$1,435,277.51
336827Shavers-Whittle Construction LLC$1,447,428.14
444187Palmisano Construction LLC$1,483,186.34
536961Cycle Construction Co. L.L.C.$1,622,159.26
608503RIVER/ROAD CONSTRUCTION, INC.$1,795,776.59
748896Command Construction Industries LLC$1,798,666.00
839462JB JAMES CONSTRUCTION LLC$1,916,891.49


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
La Contracting Enterprise LLC
- 2 -
Byron E. Talbot Contractor, Inc.
- 3 -
Shavers-Whittle Construction LLC
- 4 -
Palmisano Construction LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 0.3   LUMP7,000.007,000.0010,000.0010,000.0020,000.0020,000.0025,000.0025,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP7,000.007,000.005,000.005,000.002,260.002,260.007,500.007,500.00
0003202-02-02020Removal of Asphalt Pavement 500.3   SQYD16.008,004.8010.005,003.0025.0012,507.507.003,502.10
0004202-02-04500Removal of Bridge (Structure No. 02558550700021) (76' x 24' Precast Concrete Slab Unit)1,824     SQFT40.0072,960.0037.5068,400.0015.0027,360.0020.0036,480.00
0005202-02-06060Removal of Concrete Catch Basin 1     EACH1,200.001,200.00750.00750.00950.00950.00250.00250.00
0006202-02-06100Removal of Concrete Walks and Drives 9     SQYD20.00180.0010.0090.0020.00180.0040.00360.00
0007202-02-14500Removal of Guard Rail 356     LNFT25.008,900.008.703,097.208.002,848.008.002,848.00
0008202-02-32120Removal of Pipe (Side Drain) (8" RCP at Sta. 101+23)25     LNFT11.00275.0020.00500.0020.00500.0035.00875.00
0009203-01-00100General Excavation 324.7   CUYD16.005,195.2018.506,006.9515.004,870.5042.0013,637.40
0010203-02-00100Drainage Excavation 3,056     CUYD11.0033,616.0022.1567,690.4021.0064,176.0015.0045,840.00
0011203-03-00100Embankment 101     CUYD38.003,838.0045.004,545.0075.007,575.0030.003,030.00
0012203-04-00300Nonplastic Embankment (Stone) 2,666.6   CUYD78.00207,994.8096.00255,993.60100.00266,660.0072.00191,995.20
0013203-08-00100Geotextile Fabric 1,465.3   SQYD1.702,491.011.802,637.541.502,197.952.002,930.60
0014204-02-00100Temporary Hay Bales 21     EACH22.00462.0022.00462.0022.00462.0020.00420.00
0015302-02-08000Class II Base Course (8" Thick) 433.5   SQYD35.0015,172.5025.5011,054.2545.0019,507.5029.0012,571.50
0016502-01-00100Asphalt Concrete 709.6   TON120.0085,152.00110.0078,056.00115.0081,604.00115.0081,604.00
0017509-01-00100Milling Asphalt Pavement 199.4   SQYD5.501,096.705.501,096.706.001,196.409.001,794.60
0018509-02-00100Contractor Retained Reclaimed Asphalt Pavement -11     CUYD0.01-0.110.01-0.110.01-0.110.01-0.11
0019701-01-02260Cross Drain Pipe (84" RCP or 96" CMP) 341.1   LNFT315.00107,446.50310.00105,741.00250.0085,275.00480.00163,728.00
0020701-05-01020Side Drain Pipe (15" RCP/PP/CMP) 75.2   LNFT75.005,640.0075.005,640.00125.009,400.0057.004,286.40
0021701-05-01140Side Drain Pipe (48" RCP/PP/CMP) 48     LNFT210.0010,080.00190.009,120.00220.0010,560.00205.009,840.00
0022702-03-00300Catch Basins (CB-04) 1     EACH4,100.004,100.004,000.004,000.004,500.004,500.001,750.001,750.00
0023704-03-00100Blocked Out Guard rail 106.3   LNFT26.002,763.8025.752,737.2324.002,551.2025.002,657.50
0024704-03-00200Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) 200     LNFT34.006,800.0026.005,200.0033.006,600.0035.007,000.00
0025704-05-00100Guard Rail Anchor Sections (Trailing End) 6.3   LNFT105.00661.50121.00762.30100.00630.00125.00787.50
0026704-10-00120Guard Rail End Treatment, MASH, (TL-3 Flared) 1     EACH2,600.002,600.003,300.003,300.002,600.002,600.003,000.003,000.00
0027704-10-00200Guard Rail End Treatment (Tangent) 1     EACH3,100.003,100.002,800.002,800.003,000.003,000.003,750.003,750.00
0028708-01-00100Right-of-Way Monument 8     EACH200.001,600.0080.00640.0080.00640.00320.002,560.00
0029708-02-00100Right-of-Way Monument Witness Post 8     EACH270.002,160.00125.001,000.00175.001,400.00320.002,560.00
0030711-01-03040Riprap (30 lb, 24" Thick) 6     SQYD135.00810.00200.001,200.00500.003,000.00120.00720.00
0031711-04-00100Geotextile Fabric 12     SQYD4.0048.002.0024.0010.00120.002.0024.00
0032713-01-00100Temporary Signs and Barricades 1     LUMP35,000.0035,000.0040,000.0040,000.0065,000.0065,000.0060,000.0060,000.00
0033717-01-00100Seeding 4     LB85.00340.0088.00352.0085.00340.00120.00480.00
0034718-01-00100Fertilizer 120     LB7.50900.006.75810.006.50780.009.001,080.00
0035719-01-01200Plants (Tree) (Balled and Burlapped) (6 inch cal) (Quercus virginiana, "Southern Live Oak")3     EACH4,000.0012,000.004,200.0012,600.004,000.0012,000.004,750.0014,250.00
0036726-01-00100Bedding Material 462.6   CUYD95.0043,947.00105.0048,573.00125.0057,825.00120.0055,512.00
0037727-01-00100Mobilization 1     LUMP117,500.00117,500.00100,000.00100,000.00140,000.00140,000.00150,000.00150,000.00
0038729-01-00100Sign (Type A) 20.1   SQFT34.00683.4027.50552.7533.00663.3035.00703.50
0039729-08-00200Mounting (3 1/2" Size Post) 1     EACH2,800.002,800.001,200.001,200.002,600.002,600.001,500.001,500.00
0040729-16-00300Object Marker Assembly (Type 3) 4     EACH105.00420.0088.00352.00100.00400.00100.00400.00
0041729-19-00300Dead End Road Installations (Type C) 1     EACH1,100.001,100.00825.00825.001,000.001,000.001,000.001,000.00
0042729-21-00100U-Channel Post 3     EACH140.00420.0066.00198.00135.00405.0075.00225.00
0043731-02-00100Reflectorized Raised Pavement Markers 6     EACH22.00132.0027.50165.0022.00132.0025.00150.00
0044732-01-01000Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 728     LNFT4.503,276.002.201,601.604.503,276.004.002,912.00
0045732-01-01080Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 27     LNFT22.00594.0022.00594.0018.00486.0030.00810.00
0046732-05-00100Removal of Existing Markings 0.055 MILE16,000.00880.0011,000.00605.0015,000.00825.0015,000.00825.00
0047740-01-00100Construction Layout 1     LUMP12,000.0012,000.007,500.007,500.0055,000.0055,000.0035,000.0035,000.00
0048740-02-00100Utility Oversight and Coordination 1     LUMP10,000.0010,000.005,000.005,000.001,675.001,675.005,000.005,000.00
0049802-02-00100Permanent Sheeting (Steel) 8,640     SQFT46.00397,440.0044.00380,160.0024.00207,360.0027.50237,600.00
0050805-01-00900Class A1 Concrete (Pipe Support Slab)97.11  CUYD245.0023,791.95450.0043,699.50650.0063,121.50625.0060,693.75
0051817-03-00100Cofferdams 1     LUMP12,000.0012,000.0095,000.0095,000.00150,000.00150,000.00190,000.00190,000.00
0052NS-300-00060Geogrid 874.2   SQYD2.502,185.503.002,622.602.001,748.402.001,748.40
0053NS-500-00340Saw Cutting Asphalt Concrete Pavement 880     INLF1.201,056.001.501,320.000.75660.002.502,200.00
0054NS-700-00840Impact Attenuator (Reusable, Test Level 3) 1     EACH30,000.0030,000.0027,500.0027,500.0035,000.0035,000.0027,500.0027,500.00
0055NS-P55-00001Saddle Branch 1     EACH3,000.003,000.001,500.001,500.002,000.002,000.00295.00295.00
             
  CONTRACTOR TOTAL   1,319,813.55 1,435,277.51 1,447,428.14 1,483,186.34



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
Cycle Construction Co. L.L.C.
- 6 -
RIVER/ROAD CONSTRUCTION, INC.
- 7 -
Command Construction Industries LLC
- 8 -
JB JAMES CONSTRUCTION LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 0.3   LUMP11,000.0011,000.0044,000.0044,000.00143,464.50143,464.50125,000.00125,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP18,500.0018,500.006,000.006,000.0025,000.0025,000.006,000.006,000.00
0003202-02-02020Removal of Asphalt Pavement 500.3   SQYD27.0013,508.1016.008,004.8010.005,003.0031.0015,509.30
0004202-02-04500Removal of Bridge (Structure No. 02558550700021) (76' x 24' Precast Concrete Slab Unit)1,824     SQFT25.0045,600.0033.0060,192.0025.0045,600.0092.50168,720.00
0005202-02-06060Removal of Concrete Catch Basin 1     EACH500.00500.001,800.001,800.00250.00250.003,500.003,500.00
0006202-02-06100Removal of Concrete Walks and Drives 9     SQYD23.00207.00200.001,800.001.009.0047.08423.72
0007202-02-14500Removal of Guard Rail 356     LNFT8.002,848.0010.003,560.001.00356.007.002,492.00
0008202-02-32120Removal of Pipe (Side Drain) (8" RCP at Sta. 101+23)25     LNFT24.00600.0072.001,800.0010.00250.0023.00575.00
0009203-01-00100General Excavation 324.7   CUYD30.009,741.0019.006,169.3010.003,247.0025.008,117.50
0010203-02-00100Drainage Excavation 3,056     CUYD23.5071,816.0012.0036,672.0025.0076,400.0017.5053,480.00
0011203-03-00100Embankment 101     CUYD70.007,070.0070.007,070.0025.002,525.0077.007,777.00
0012203-04-00300Nonplastic Embankment (Stone) 2,666.6   CUYD91.00242,660.60120.00319,992.0075.00199,995.00111.00295,992.60
0013203-08-00100Geotextile Fabric 1,465.3   SQYD3.004,395.903.004,395.901.001,465.302.503,663.25
0014204-02-00100Temporary Hay Bales 21     EACH25.00525.0040.00840.001.0021.0075.001,575.00
0015302-02-08000Class II Base Course (8" Thick) 433.5   SQYD43.0018,640.5032.0013,872.0050.0021,675.0036.5015,822.75
0016502-01-00100Asphalt Concrete 709.6   TON130.0092,248.00110.0078,056.00100.0070,960.0081.5057,832.40
0017509-01-00100Milling Asphalt Pavement 199.4   SQYD55.0010,967.0020.003,988.005.00997.006.801,355.92
0018509-02-00100Contractor Retained Reclaimed Asphalt Pavement -11     CUYD0.01-0.110.01-0.110.000.001.00-11.00
0019701-01-02260Cross Drain Pipe (84" RCP or 96" CMP) 341.1   LNFT425.00144,967.50410.00139,851.00500.00170,550.001,000.00341,100.00
0020701-05-01020Side Drain Pipe (15" RCP/PP/CMP) 75.2   LNFT90.006,768.00100.007,520.00100.007,520.0070.005,264.00
0021701-05-01140Side Drain Pipe (48" RCP/PP/CMP) 48     LNFT265.0012,720.00378.0018,144.00500.0024,000.00415.0019,920.00
0022702-03-00300Catch Basins (CB-04) 1     EACH6,700.006,700.004,000.004,000.005,000.005,000.003,000.003,000.00
0023704-03-00100Blocked Out Guard rail 106.3   LNFT51.005,421.3026.502,816.9550.005,315.0022.002,338.60
0024704-03-00200Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) 200     LNFT34.006,800.0027.005,400.0050.0010,000.0030.006,000.00
0025704-05-00100Guard Rail Anchor Sections (Trailing End) 6.3   LNFT110.00693.00130.00819.00150.00945.0095.00598.50
0026704-10-00120Guard Rail End Treatment, MASH, (TL-3 Flared) 1     EACH2,700.002,700.003,450.003,450.004,500.004,500.002,400.002,400.00
0027704-10-00200Guard Rail End Treatment (Tangent) 1     EACH3,200.003,200.002,900.002,900.004,500.004,500.002,800.002,800.00
0028708-01-00100Right-of-Way Monument 8     EACH350.002,800.00200.001,600.00375.003,000.0012.50100.00
0029708-02-00100Right-of-Way Monument Witness Post 8     EACH232.001,856.00250.002,000.00125.001,000.0039.00312.00
0030711-01-03040Riprap (30 lb, 24" Thick) 6     SQYD162.00972.0051.00306.00250.001,500.00135.00810.00
0031711-04-00100Geotextile Fabric 12     SQYD11.00132.0022.00264.001.0012.0021.00252.00
0032713-01-00100Temporary Signs and Barricades 1     LUMP50,000.0050,000.0045,000.0045,000.001,000.001,000.0060,000.0060,000.00
0033717-01-00100Seeding 4     LB90.00360.00100.00400.005.0020.00100.00400.00
0034718-01-00100Fertilizer 120     LB7.00840.008.00960.005.00600.006.00720.00
0035719-01-01200Plants (Tree) (Balled and Burlapped) (6 inch cal) (Quercus virginiana, "Southern Live Oak")3     EACH4,300.0012,900.002,800.008,400.004,000.0012,000.003,000.009,000.00
0036726-01-00100Bedding Material 462.6   CUYD88.0040,708.80240.00111,024.00150.0069,390.0086.0039,783.60
0037727-01-00100Mobilization 1     LUMP211,000.00211,000.00118,000.00118,000.00175,000.00175,000.00185,000.00185,000.00
0038729-01-00100Sign (Type A) 20.1   SQFT34.00683.4030.00603.0050.001,005.0025.00502.50
0039729-08-00200Mounting (3 1/2" Size Post) 1     EACH2,900.002,900.001,200.001,200.003,000.003,000.001,050.001,050.00
0040729-16-00300Object Marker Assembly (Type 3) 4     EACH110.00440.00125.00500.00150.00600.0080.00320.00
0041729-19-00300Dead End Road Installations (Type C) 1     EACH1,100.001,100.00850.00850.001,500.001,500.00950.00950.00
0042729-21-00100U-Channel Post 3     EACH145.00435.0080.00240.00150.00450.0060.00180.00
0043731-02-00100Reflectorized Raised Pavement Markers 6     EACH23.00138.0023.00138.0020.00120.0020.00120.00
0044732-01-01000Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 728     LNFT4.002,912.005.253,822.004.002,912.001.25910.00
0045732-01-01080Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 27     LNFT23.00621.0019.25519.7520.00540.0016.75452.25
0046732-05-00100Removal of Existing Markings 0.055 MILE19,000.001,045.0020,000.001,100.0010,000.00550.0010,200.00561.00
0047740-01-00100Construction Layout 1     LUMP50,000.0050,000.00100,000.00100,000.001,000.001,000.0018,000.0018,000.00
0048740-02-00100Utility Oversight and Coordination 1     LUMP3,000.003,000.0010,000.0010,000.001,000.001,000.009,260.009,260.00
0049802-02-00100Permanent Sheeting (Steel) 8,640     SQFT35.00302,400.0049.00423,360.0050.00432,000.0028.00241,920.00
0050805-01-00900Class A1 Concrete (Pipe Support Slab)97.11  CUYD357.0034,668.27500.0048,555.001,500.00145,665.00360.0034,959.60
0051817-03-00100Cofferdams 1     LUMP125,000.00125,000.0096,000.0096,000.00100,000.00100,000.00118,000.00118,000.00
0052NS-300-00060Geogrid 874.2   SQYD5.004,371.0010.008,742.001.00874.2010.008,742.00
0053NS-500-00340Saw Cutting Asphalt Concrete Pavement 880     INLF1.00880.006.005,280.001.00880.000.50440.00
0054NS-700-00840Impact Attenuator (Reusable, Test Level 3) 1     EACH27,000.0027,000.0022,000.0022,000.0012,500.0012,500.0022,900.0022,900.00
0055NS-P55-00001Saddle Branch 1     EACH2,200.002,200.001,800.001,800.001,000.001,000.0010,000.0010,000.00
             
  CONTRACTOR TOTAL   1,622,159.26 1,795,776.59 1,798,666.00 1,916,891.49