Proposal:H.008411.6
Parish:Terrebonne
Routes:LA 660
Description:BAYOU TERREBONNE BRIDGE (LA 660)
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PERMANENT SHEETING (STEEL), AND RELATED WORK.
Estimated Construction Cost:$1,447,309.60
| Rank | License | Bidder | Construction Bid |
| 1 | 34263 | La Contracting Enterprise LLC | $1,319,813.55 |
| 2 | 12198 | Byron E. Talbot Contractor, Inc. | $1,435,277.51 |
| 3 | 36827 | Shavers-Whittle Construction LLC | $1,447,428.14 |
| 4 | 44187 | Palmisano Construction LLC | $1,483,186.34 |
| 5 | 36961 | Cycle Construction Co. L.L.C. | $1,622,159.26 |
| 6 | 08503 | RIVER/ROAD CONSTRUCTION, INC. | $1,795,776.59 |
| 7 | 48896 | Command Construction Industries LLC | $1,798,666.00 |
| 8 | 39462 | JB JAMES CONSTRUCTION LLC | $1,916,891.49 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - La Contracting Enterprise LLC | - 2 - Byron E. Talbot Contractor, Inc. | - 3 - Shavers-Whittle Construction LLC | - 4 - Palmisano Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.3 | LUMP | 7,000.00 | 7,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,000.00 | 7,000.00 | 5,000.00 | 5,000.00 | 2,260.00 | 2,260.00 | 7,500.00 | 7,500.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 500.3 | SQYD | 16.00 | 8,004.80 | 10.00 | 5,003.00 | 25.00 | 12,507.50 | 7.00 | 3,502.10 | | 0004 | 202-02-04500 | Removal of Bridge (Structure No. 02558550700021) (76' x 24' Precast Concrete Slab Unit) | 1,824 | SQFT | 40.00 | 72,960.00 | 37.50 | 68,400.00 | 15.00 | 27,360.00 | 20.00 | 36,480.00 | | 0005 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 1,200.00 | 1,200.00 | 750.00 | 750.00 | 950.00 | 950.00 | 250.00 | 250.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 9 | SQYD | 20.00 | 180.00 | 10.00 | 90.00 | 20.00 | 180.00 | 40.00 | 360.00 | | 0007 | 202-02-14500 | Removal of Guard Rail | 356 | LNFT | 25.00 | 8,900.00 | 8.70 | 3,097.20 | 8.00 | 2,848.00 | 8.00 | 2,848.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) (8" RCP at Sta. 101+23) | 25 | LNFT | 11.00 | 275.00 | 20.00 | 500.00 | 20.00 | 500.00 | 35.00 | 875.00 | | 0009 | 203-01-00100 | General Excavation | 324.7 | CUYD | 16.00 | 5,195.20 | 18.50 | 6,006.95 | 15.00 | 4,870.50 | 42.00 | 13,637.40 | | 0010 | 203-02-00100 | Drainage Excavation | 3,056 | CUYD | 11.00 | 33,616.00 | 22.15 | 67,690.40 | 21.00 | 64,176.00 | 15.00 | 45,840.00 | | 0011 | 203-03-00100 | Embankment | 101 | CUYD | 38.00 | 3,838.00 | 45.00 | 4,545.00 | 75.00 | 7,575.00 | 30.00 | 3,030.00 | | 0012 | 203-04-00300 | Nonplastic Embankment (Stone) | 2,666.6 | CUYD | 78.00 | 207,994.80 | 96.00 | 255,993.60 | 100.00 | 266,660.00 | 72.00 | 191,995.20 | | 0013 | 203-08-00100 | Geotextile Fabric | 1,465.3 | SQYD | 1.70 | 2,491.01 | 1.80 | 2,637.54 | 1.50 | 2,197.95 | 2.00 | 2,930.60 | | 0014 | 204-02-00100 | Temporary Hay Bales | 21 | EACH | 22.00 | 462.00 | 22.00 | 462.00 | 22.00 | 462.00 | 20.00 | 420.00 | | 0015 | 302-02-08000 | Class II Base Course (8" Thick) | 433.5 | SQYD | 35.00 | 15,172.50 | 25.50 | 11,054.25 | 45.00 | 19,507.50 | 29.00 | 12,571.50 | | 0016 | 502-01-00100 | Asphalt Concrete | 709.6 | TON | 120.00 | 85,152.00 | 110.00 | 78,056.00 | 115.00 | 81,604.00 | 115.00 | 81,604.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 199.4 | SQYD | 5.50 | 1,096.70 | 5.50 | 1,096.70 | 6.00 | 1,196.40 | 9.00 | 1,794.60 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -11 | CUYD | 0.01 | -0.11 | 0.01 | -0.11 | 0.01 | -0.11 | 0.01 | -0.11 | | 0019 | 701-01-02260 | Cross Drain Pipe (84" RCP or 96" CMP) | 341.1 | LNFT | 315.00 | 107,446.50 | 310.00 | 105,741.00 | 250.00 | 85,275.00 | 480.00 | 163,728.00 | | 0020 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 75.2 | LNFT | 75.00 | 5,640.00 | 75.00 | 5,640.00 | 125.00 | 9,400.00 | 57.00 | 4,286.40 | | 0021 | 701-05-01140 | Side Drain Pipe (48" RCP/PP/CMP) | 48 | LNFT | 210.00 | 10,080.00 | 190.00 | 9,120.00 | 220.00 | 10,560.00 | 205.00 | 9,840.00 | | 0022 | 702-03-00300 | Catch Basins (CB-04) | 1 | EACH | 4,100.00 | 4,100.00 | 4,000.00 | 4,000.00 | 4,500.00 | 4,500.00 | 1,750.00 | 1,750.00 | | 0023 | 704-03-00100 | Blocked Out Guard rail | 106.3 | LNFT | 26.00 | 2,763.80 | 25.75 | 2,737.23 | 24.00 | 2,551.20 | 25.00 | 2,657.50 | | 0024 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 200 | LNFT | 34.00 | 6,800.00 | 26.00 | 5,200.00 | 33.00 | 6,600.00 | 35.00 | 7,000.00 | | 0025 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 105.00 | 661.50 | 121.00 | 762.30 | 100.00 | 630.00 | 125.00 | 787.50 | | 0026 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 1 | EACH | 2,600.00 | 2,600.00 | 3,300.00 | 3,300.00 | 2,600.00 | 2,600.00 | 3,000.00 | 3,000.00 | | 0027 | 704-10-00200 | Guard Rail End Treatment (Tangent) | 1 | EACH | 3,100.00 | 3,100.00 | 2,800.00 | 2,800.00 | 3,000.00 | 3,000.00 | 3,750.00 | 3,750.00 | | 0028 | 708-01-00100 | Right-of-Way Monument | 8 | EACH | 200.00 | 1,600.00 | 80.00 | 640.00 | 80.00 | 640.00 | 320.00 | 2,560.00 | | 0029 | 708-02-00100 | Right-of-Way Monument Witness Post | 8 | EACH | 270.00 | 2,160.00 | 125.00 | 1,000.00 | 175.00 | 1,400.00 | 320.00 | 2,560.00 | | 0030 | 711-01-03040 | Riprap (30 lb, 24" Thick) | 6 | SQYD | 135.00 | 810.00 | 200.00 | 1,200.00 | 500.00 | 3,000.00 | 120.00 | 720.00 | | 0031 | 711-04-00100 | Geotextile Fabric | 12 | SQYD | 4.00 | 48.00 | 2.00 | 24.00 | 10.00 | 120.00 | 2.00 | 24.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 | 65,000.00 | 65,000.00 | 60,000.00 | 60,000.00 | | 0033 | 717-01-00100 | Seeding | 4 | LB | 85.00 | 340.00 | 88.00 | 352.00 | 85.00 | 340.00 | 120.00 | 480.00 | | 0034 | 718-01-00100 | Fertilizer | 120 | LB | 7.50 | 900.00 | 6.75 | 810.00 | 6.50 | 780.00 | 9.00 | 1,080.00 | | 0035 | 719-01-01200 | Plants (Tree) (Balled and Burlapped) (6 inch cal) (Quercus virginiana, "Southern Live Oak") | 3 | EACH | 4,000.00 | 12,000.00 | 4,200.00 | 12,600.00 | 4,000.00 | 12,000.00 | 4,750.00 | 14,250.00 | | 0036 | 726-01-00100 | Bedding Material | 462.6 | CUYD | 95.00 | 43,947.00 | 105.00 | 48,573.00 | 125.00 | 57,825.00 | 120.00 | 55,512.00 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 117,500.00 | 117,500.00 | 100,000.00 | 100,000.00 | 140,000.00 | 140,000.00 | 150,000.00 | 150,000.00 | | 0038 | 729-01-00100 | Sign (Type A) | 20.1 | SQFT | 34.00 | 683.40 | 27.50 | 552.75 | 33.00 | 663.30 | 35.00 | 703.50 | | 0039 | 729-08-00200 | Mounting (3 1/2" Size Post) | 1 | EACH | 2,800.00 | 2,800.00 | 1,200.00 | 1,200.00 | 2,600.00 | 2,600.00 | 1,500.00 | 1,500.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 105.00 | 420.00 | 88.00 | 352.00 | 100.00 | 400.00 | 100.00 | 400.00 | | 0041 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 1,100.00 | 1,100.00 | 825.00 | 825.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | | 0042 | 729-21-00100 | U-Channel Post | 3 | EACH | 140.00 | 420.00 | 66.00 | 198.00 | 135.00 | 405.00 | 75.00 | 225.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 6 | EACH | 22.00 | 132.00 | 27.50 | 165.00 | 22.00 | 132.00 | 25.00 | 150.00 | | 0044 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 728 | LNFT | 4.50 | 3,276.00 | 2.20 | 1,601.60 | 4.50 | 3,276.00 | 4.00 | 2,912.00 | | 0045 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 27 | LNFT | 22.00 | 594.00 | 22.00 | 594.00 | 18.00 | 486.00 | 30.00 | 810.00 | | 0046 | 732-05-00100 | Removal of Existing Markings | 0.055 | MILE | 16,000.00 | 880.00 | 11,000.00 | 605.00 | 15,000.00 | 825.00 | 15,000.00 | 825.00 | | 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 7,500.00 | 7,500.00 | 55,000.00 | 55,000.00 | 35,000.00 | 35,000.00 | | 0048 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 1,675.00 | 1,675.00 | 5,000.00 | 5,000.00 | | 0049 | 802-02-00100 | Permanent Sheeting (Steel) | 8,640 | SQFT | 46.00 | 397,440.00 | 44.00 | 380,160.00 | 24.00 | 207,360.00 | 27.50 | 237,600.00 | | 0050 | 805-01-00900 | Class A1 Concrete (Pipe Support Slab) | 97.11 | CUYD | 245.00 | 23,791.95 | 450.00 | 43,699.50 | 650.00 | 63,121.50 | 625.00 | 60,693.75 | | 0051 | 817-03-00100 | Cofferdams | 1 | LUMP | 12,000.00 | 12,000.00 | 95,000.00 | 95,000.00 | 150,000.00 | 150,000.00 | 190,000.00 | 190,000.00 | | 0052 | NS-300-00060 | Geogrid | 874.2 | SQYD | 2.50 | 2,185.50 | 3.00 | 2,622.60 | 2.00 | 1,748.40 | 2.00 | 1,748.40 | | 0053 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 880 | INLF | 1.20 | 1,056.00 | 1.50 | 1,320.00 | 0.75 | 660.00 | 2.50 | 2,200.00 | | 0054 | NS-700-00840 | Impact Attenuator (Reusable, Test Level 3) | 1 | EACH | 30,000.00 | 30,000.00 | 27,500.00 | 27,500.00 | 35,000.00 | 35,000.00 | 27,500.00 | 27,500.00 | | 0055 | NS-P55-00001 | Saddle Branch | 1 | EACH | 3,000.00 | 3,000.00 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 295.00 | 295.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,319,813.55 | | 1,435,277.51 | | 1,447,428.14 | | 1,483,186.34 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Cycle Construction Co. L.L.C. | - 6 - RIVER/ROAD CONSTRUCTION, INC. | - 7 - Command Construction Industries LLC | - 8 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.3 | LUMP | 11,000.00 | 11,000.00 | 44,000.00 | 44,000.00 | 143,464.50 | 143,464.50 | 125,000.00 | 125,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 18,500.00 | 18,500.00 | 6,000.00 | 6,000.00 | 25,000.00 | 25,000.00 | 6,000.00 | 6,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 500.3 | SQYD | 27.00 | 13,508.10 | 16.00 | 8,004.80 | 10.00 | 5,003.00 | 31.00 | 15,509.30 | | 0004 | 202-02-04500 | Removal of Bridge (Structure No. 02558550700021) (76' x 24' Precast Concrete Slab Unit) | 1,824 | SQFT | 25.00 | 45,600.00 | 33.00 | 60,192.00 | 25.00 | 45,600.00 | 92.50 | 168,720.00 | | 0005 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 500.00 | 500.00 | 1,800.00 | 1,800.00 | 250.00 | 250.00 | 3,500.00 | 3,500.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 9 | SQYD | 23.00 | 207.00 | 200.00 | 1,800.00 | 1.00 | 9.00 | 47.08 | 423.72 | | 0007 | 202-02-14500 | Removal of Guard Rail | 356 | LNFT | 8.00 | 2,848.00 | 10.00 | 3,560.00 | 1.00 | 356.00 | 7.00 | 2,492.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) (8" RCP at Sta. 101+23) | 25 | LNFT | 24.00 | 600.00 | 72.00 | 1,800.00 | 10.00 | 250.00 | 23.00 | 575.00 | | 0009 | 203-01-00100 | General Excavation | 324.7 | CUYD | 30.00 | 9,741.00 | 19.00 | 6,169.30 | 10.00 | 3,247.00 | 25.00 | 8,117.50 | | 0010 | 203-02-00100 | Drainage Excavation | 3,056 | CUYD | 23.50 | 71,816.00 | 12.00 | 36,672.00 | 25.00 | 76,400.00 | 17.50 | 53,480.00 | | 0011 | 203-03-00100 | Embankment | 101 | CUYD | 70.00 | 7,070.00 | 70.00 | 7,070.00 | 25.00 | 2,525.00 | 77.00 | 7,777.00 | | 0012 | 203-04-00300 | Nonplastic Embankment (Stone) | 2,666.6 | CUYD | 91.00 | 242,660.60 | 120.00 | 319,992.00 | 75.00 | 199,995.00 | 111.00 | 295,992.60 | | 0013 | 203-08-00100 | Geotextile Fabric | 1,465.3 | SQYD | 3.00 | 4,395.90 | 3.00 | 4,395.90 | 1.00 | 1,465.30 | 2.50 | 3,663.25 | | 0014 | 204-02-00100 | Temporary Hay Bales | 21 | EACH | 25.00 | 525.00 | 40.00 | 840.00 | 1.00 | 21.00 | 75.00 | 1,575.00 | | 0015 | 302-02-08000 | Class II Base Course (8" Thick) | 433.5 | SQYD | 43.00 | 18,640.50 | 32.00 | 13,872.00 | 50.00 | 21,675.00 | 36.50 | 15,822.75 | | 0016 | 502-01-00100 | Asphalt Concrete | 709.6 | TON | 130.00 | 92,248.00 | 110.00 | 78,056.00 | 100.00 | 70,960.00 | 81.50 | 57,832.40 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 199.4 | SQYD | 55.00 | 10,967.00 | 20.00 | 3,988.00 | 5.00 | 997.00 | 6.80 | 1,355.92 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -11 | CUYD | 0.01 | -0.11 | 0.01 | -0.11 | 0.00 | 0.00 | 1.00 | -11.00 | | 0019 | 701-01-02260 | Cross Drain Pipe (84" RCP or 96" CMP) | 341.1 | LNFT | 425.00 | 144,967.50 | 410.00 | 139,851.00 | 500.00 | 170,550.00 | 1,000.00 | 341,100.00 | | 0020 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 75.2 | LNFT | 90.00 | 6,768.00 | 100.00 | 7,520.00 | 100.00 | 7,520.00 | 70.00 | 5,264.00 | | 0021 | 701-05-01140 | Side Drain Pipe (48" RCP/PP/CMP) | 48 | LNFT | 265.00 | 12,720.00 | 378.00 | 18,144.00 | 500.00 | 24,000.00 | 415.00 | 19,920.00 | | 0022 | 702-03-00300 | Catch Basins (CB-04) | 1 | EACH | 6,700.00 | 6,700.00 | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 | | 0023 | 704-03-00100 | Blocked Out Guard rail | 106.3 | LNFT | 51.00 | 5,421.30 | 26.50 | 2,816.95 | 50.00 | 5,315.00 | 22.00 | 2,338.60 | | 0024 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 200 | LNFT | 34.00 | 6,800.00 | 27.00 | 5,400.00 | 50.00 | 10,000.00 | 30.00 | 6,000.00 | | 0025 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 110.00 | 693.00 | 130.00 | 819.00 | 150.00 | 945.00 | 95.00 | 598.50 | | 0026 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 1 | EACH | 2,700.00 | 2,700.00 | 3,450.00 | 3,450.00 | 4,500.00 | 4,500.00 | 2,400.00 | 2,400.00 | | 0027 | 704-10-00200 | Guard Rail End Treatment (Tangent) | 1 | EACH | 3,200.00 | 3,200.00 | 2,900.00 | 2,900.00 | 4,500.00 | 4,500.00 | 2,800.00 | 2,800.00 | | 0028 | 708-01-00100 | Right-of-Way Monument | 8 | EACH | 350.00 | 2,800.00 | 200.00 | 1,600.00 | 375.00 | 3,000.00 | 12.50 | 100.00 | | 0029 | 708-02-00100 | Right-of-Way Monument Witness Post | 8 | EACH | 232.00 | 1,856.00 | 250.00 | 2,000.00 | 125.00 | 1,000.00 | 39.00 | 312.00 | | 0030 | 711-01-03040 | Riprap (30 lb, 24" Thick) | 6 | SQYD | 162.00 | 972.00 | 51.00 | 306.00 | 250.00 | 1,500.00 | 135.00 | 810.00 | | 0031 | 711-04-00100 | Geotextile Fabric | 12 | SQYD | 11.00 | 132.00 | 22.00 | 264.00 | 1.00 | 12.00 | 21.00 | 252.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 45,000.00 | 45,000.00 | 1,000.00 | 1,000.00 | 60,000.00 | 60,000.00 | | 0033 | 717-01-00100 | Seeding | 4 | LB | 90.00 | 360.00 | 100.00 | 400.00 | 5.00 | 20.00 | 100.00 | 400.00 | | 0034 | 718-01-00100 | Fertilizer | 120 | LB | 7.00 | 840.00 | 8.00 | 960.00 | 5.00 | 600.00 | 6.00 | 720.00 | | 0035 | 719-01-01200 | Plants (Tree) (Balled and Burlapped) (6 inch cal) (Quercus virginiana, "Southern Live Oak") | 3 | EACH | 4,300.00 | 12,900.00 | 2,800.00 | 8,400.00 | 4,000.00 | 12,000.00 | 3,000.00 | 9,000.00 | | 0036 | 726-01-00100 | Bedding Material | 462.6 | CUYD | 88.00 | 40,708.80 | 240.00 | 111,024.00 | 150.00 | 69,390.00 | 86.00 | 39,783.60 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 211,000.00 | 211,000.00 | 118,000.00 | 118,000.00 | 175,000.00 | 175,000.00 | 185,000.00 | 185,000.00 | | 0038 | 729-01-00100 | Sign (Type A) | 20.1 | SQFT | 34.00 | 683.40 | 30.00 | 603.00 | 50.00 | 1,005.00 | 25.00 | 502.50 | | 0039 | 729-08-00200 | Mounting (3 1/2" Size Post) | 1 | EACH | 2,900.00 | 2,900.00 | 1,200.00 | 1,200.00 | 3,000.00 | 3,000.00 | 1,050.00 | 1,050.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 110.00 | 440.00 | 125.00 | 500.00 | 150.00 | 600.00 | 80.00 | 320.00 | | 0041 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 1,100.00 | 1,100.00 | 850.00 | 850.00 | 1,500.00 | 1,500.00 | 950.00 | 950.00 | | 0042 | 729-21-00100 | U-Channel Post | 3 | EACH | 145.00 | 435.00 | 80.00 | 240.00 | 150.00 | 450.00 | 60.00 | 180.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 6 | EACH | 23.00 | 138.00 | 23.00 | 138.00 | 20.00 | 120.00 | 20.00 | 120.00 | | 0044 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 728 | LNFT | 4.00 | 2,912.00 | 5.25 | 3,822.00 | 4.00 | 2,912.00 | 1.25 | 910.00 | | 0045 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 27 | LNFT | 23.00 | 621.00 | 19.25 | 519.75 | 20.00 | 540.00 | 16.75 | 452.25 | | 0046 | 732-05-00100 | Removal of Existing Markings | 0.055 | MILE | 19,000.00 | 1,045.00 | 20,000.00 | 1,100.00 | 10,000.00 | 550.00 | 10,200.00 | 561.00 | | 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 1,000.00 | 1,000.00 | 18,000.00 | 18,000.00 | | 0048 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 | 1,000.00 | 1,000.00 | 9,260.00 | 9,260.00 | | 0049 | 802-02-00100 | Permanent Sheeting (Steel) | 8,640 | SQFT | 35.00 | 302,400.00 | 49.00 | 423,360.00 | 50.00 | 432,000.00 | 28.00 | 241,920.00 | | 0050 | 805-01-00900 | Class A1 Concrete (Pipe Support Slab) | 97.11 | CUYD | 357.00 | 34,668.27 | 500.00 | 48,555.00 | 1,500.00 | 145,665.00 | 360.00 | 34,959.60 | | 0051 | 817-03-00100 | Cofferdams | 1 | LUMP | 125,000.00 | 125,000.00 | 96,000.00 | 96,000.00 | 100,000.00 | 100,000.00 | 118,000.00 | 118,000.00 | | 0052 | NS-300-00060 | Geogrid | 874.2 | SQYD | 5.00 | 4,371.00 | 10.00 | 8,742.00 | 1.00 | 874.20 | 10.00 | 8,742.00 | | 0053 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 880 | INLF | 1.00 | 880.00 | 6.00 | 5,280.00 | 1.00 | 880.00 | 0.50 | 440.00 | | 0054 | NS-700-00840 | Impact Attenuator (Reusable, Test Level 3) | 1 | EACH | 27,000.00 | 27,000.00 | 22,000.00 | 22,000.00 | 12,500.00 | 12,500.00 | 22,900.00 | 22,900.00 | | 0055 | NS-P55-00001 | Saddle Branch | 1 | EACH | 2,200.00 | 2,200.00 | 1,800.00 | 1,800.00 | 1,000.00 | 1,000.00 | 10,000.00 | 10,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,622,159.26 | | 1,795,776.59 | | 1,798,666.00 | | 1,916,891.49 |
|