Proposal:H.011705.6
Parish:Orleans
Routes:US 11
Description:US 11: LAKE PONTCHARTRAIN BRIDGE REHAB PHASE 2 (HBI)
Type Construction:PRECAST CONCRETE PILES, TREATED TIMBER PILES, STEEL PILES, STRUCTURAL METAL WORK, BRIDGE REPAIRS, AND RELATED WORK.
Estimated Construction Cost:$26,091,656.70
| Rank | License | Bidder | Construction Bid |
| 1 | 35836 | American Bridge Co. | $28,360,002.30 |
| 2 | 51422 | PCL CIVIL CONSTRUCTORS INC | $29,734,267.50 |
| 3 | 58134 | Johnson Bros. Corp. A Southland Co. | $30,027,774.12 |
| 4 | 26435 | C.E.C., Inc. | $35,970,480.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - American Bridge Co. | - 2 - PCL CIVIL CONSTRUCTORS INC | - 3 - Johnson Bros. Corp. A Southland Co. | - 4 - C.E.C., Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of Bridge Access Platform | 4 | EACH | 225.00 | 900.00 | 7,000.00 | 28,000.00 | 5,000.00 | 20,000.00 | 13,600.00 | 54,400.00 | | 0002 | 202-02-00010 | Removal of Concrete Anchors | 100 | EACH | 215.00 | 21,500.00 | 150.00 | 15,000.00 | 180.00 | 18,000.00 | 350.00 | 35,000.00 | | 0003 | 202-02-00010 | Removal of Counterweight Steel Shims | 14 | EACH | 1,150.00 | 16,100.00 | 325.00 | 4,550.00 | 1,000.00 | 14,000.00 | 2,100.00 | 29,400.00 | | 0004 | 202-02-00010 | Removal of Counterweight Timber Stop Blocks | 8 | EACH | 1,310.00 | 10,480.00 | 440.00 | 3,520.00 | 600.00 | 4,800.00 | 1,600.00 | 12,800.00 | | 0005 | 202-02-00010 | Removal of Electrical Access | 4 | EACH | 4,260.00 | 17,040.00 | 8,000.00 | 32,000.00 | 5,000.00 | 20,000.00 | 3,100.00 | 12,400.00 | | 0006 | 202-02-00010 | Removal of Existing Operator and Generator House Partition | 4 | EACH | 3,330.00 | 13,320.00 | 22,000.00 | 88,000.00 | 1,900.00 | 7,600.00 | 45,000.00 | 180,000.00 | | 0007 | 202-02-00010 | Removal of Existing Steel Lateral System | 4 | EACH | 33,000.00 | 132,000.00 | 18,000.00 | 72,000.00 | 14,000.00 | 56,000.00 | 32,000.00 | 128,000.00 | | 0008 | 202-02-00010 | Removal of Live Load Bearing Plate | 8 | EACH | 5,600.00 | 44,800.00 | 5,000.00 | 40,000.00 | 1,300.00 | 10,400.00 | 14,000.00 | 112,000.00 | | 0009 | 202-02-00010 | Removal of Timber Piles | 220 | EACH | 1,500.00 | 330,000.00 | 875.00 | 192,500.00 | 3,000.00 | 660,000.00 | 2,200.00 | 484,000.00 | | 0010 | 202-02-00010 | Removal of Trunion Bearing Stiffener | 1 | EACH | 1,150.00 | 1,150.00 | 1,050.00 | 1,050.00 | 550.00 | 550.00 | 9,000.00 | 9,000.00 | | 0011 | 202-02-00010 | Removal of Warning Gate | 4 | EACH | 1,450.00 | 5,800.00 | 2,000.00 | 8,000.00 | 650.00 | 2,600.00 | 7,500.00 | 30,000.00 | | 0012 | 202-02-00030 | Removal of Existing Hand Rail | 152 | LNFT | 125.00 | 19,000.00 | 142.00 | 21,584.00 | 40.00 | 6,080.00 | 150.00 | 22,800.00 | | 0013 | 202-02-00030 | Removal of Steel Barriers | 328 | LNFT | 50.00 | 16,400.00 | 120.00 | 39,360.00 | 145.00 | 47,560.00 | 420.00 | 137,760.00 | | 0014 | 202-02-00030 | Removal of Steel Stringers | 660 | LNFT | 40.00 | 26,400.00 | 40.00 | 26,400.00 | 140.00 | 92,400.00 | 245.00 | 161,700.00 | | 0015 | 202-02-04540 | Removal of Bridge Component (Movable Leaf) | 2 | EACH | 200,000.00 | 400,000.00 | 175,000.00 | 350,000.00 | 530,000.00 | 1,060,000.00 | 165,000.00 | 330,000.00 | | 0016 | 202-02-10000 | Removal of Existing Steel Grid Deck | 1 | LUMP | 600,000.00 | 600,000.00 | 125,000.00 | 125,000.00 | 150,000.00 | 150,000.00 | 200,000.00 | 200,000.00 | | 0017 | 202-02-12300 | Removal of Fender System | 2 | EACH | 75,000.00 | 150,000.00 | 60,000.00 | 120,000.00 | 100,000.00 | 200,000.00 | 170,000.00 | 340,000.00 | | 0018 | 202-02-38400 | Removal of Structural Concrete (Counterweight) | 1 | LUMP | 70,000.00 | 70,000.00 | 20,000.00 | 20,000.00 | 3,750.00 | 3,750.00 | 65,000.00 | 65,000.00 | | 0019 | 202-02-38400 | Removal of Structural Concrete (Deck Joints) | 1 | LUMP | 10,300.00 | 10,300.00 | 7,000.00 | 7,000.00 | 2,000.00 | 2,000.00 | 35,000.00 | 35,000.00 | | 0020 | 202-02-38400 | Removal of Structural Concrete (Hydraulic System) | 1 | LUMP | 32,000.00 | 32,000.00 | 25,000.00 | 25,000.00 | 21,000.00 | 21,000.00 | 155,000.00 | 155,000.00 | | 0021 | 202-02-38400 | Removal of Structural Concrete (Operator House Platform) | 1 | LUMP | 1,000.00 | 1,000.00 | 5,500.00 | 5,500.00 | 2,750.00 | 2,750.00 | 54,000.00 | 54,000.00 | | 0022 | 202-02-38400 | Removal of Structural Concrete (Pier Roadway) | 1 | LUMP | 35,000.00 | 35,000.00 | 30,000.00 | 30,000.00 | 48,500.00 | 48,500.00 | 200,000.00 | 200,000.00 | | 0023 | 202-02-38400 | Removal of Structural Concrete (Pit Drains) | 1 | LUMP | 16,000.00 | 16,000.00 | 13,000.00 | 13,000.00 | 2,000.00 | 2,000.00 | 105,000.00 | 105,000.00 | | 0024 | 202-02-38400 | Removal of Structural Concrete (Trunnion Removal) | 1 | LUMP | 50,000.00 | 50,000.00 | 13,000.00 | 13,000.00 | 3,000.00 | 3,000.00 | 185,000.00 | 185,000.00 | | 0025 | 202-02-38400 | Removal of Structural Concrete (Warning Gate Platform) | 1 | LUMP | 30,000.00 | 30,000.00 | 10,000.00 | 10,000.00 | 1,500.00 | 1,500.00 | 58,000.00 | 58,000.00 | | 0026 | 202-02-38410 | Removal of Structural Concrete (Hydro Blast) (Live Load Bearing) | 1 | LUMP | 49,725.00 | 49,725.00 | 45,000.00 | 45,000.00 | 31,000.00 | 31,000.00 | 115,000.00 | 115,000.00 | | 0027 | 202-02-38410 | Removal of Structural Concrete (Hydro Blast) (Pier Backwall) | 1 | LUMP | 400,000.00 | 400,000.00 | 175,000.00 | 175,000.00 | 31,000.00 | 31,000.00 | 250,000.00 | 250,000.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 400,000.00 | 400,000.00 | 400,000.00 | 400,000.00 | 250,000.00 | 250,000.00 | 400,000.00 | 400,000.00 | | 0029 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 25,000.00 | 100,000.00 | 20,000.00 | 80,000.00 | 15,000.00 | 60,000.00 | 25,000.00 | 100,000.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 2,800,000.00 | 2,800,000.00 | 2,930,000.00 | 2,930,000.00 | 2,900,000.00 | 2,900,000.00 | 3,400,000.00 | 3,400,000.00 | | 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers (ASTM D4280 Two Way Yellow) | 36 | EACH | 20.00 | 720.00 | 20.00 | 720.00 | 21.50 | 774.00 | 30.00 | 1,080.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers (ASTM D4280 White / Red) | 36 | EACH | 20.00 | 720.00 | 20.00 | 720.00 | 21.50 | 774.00 | 30.00 | 1,080.00 | | 0033 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) (Solid White) | 249 | LNFT | 3.00 | 747.00 | 3.00 | 747.00 | 3.00 | 747.00 | 2.40 | 597.60 | | 0034 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) (Solid Yellow) | 249 | LNFT | 3.00 | 747.00 | 3.00 | 747.00 | 3.00 | 747.00 | 2.40 | 597.60 | | 0035 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) (Solid White) | 10 | LNFT | 25.00 | 250.00 | 25.00 | 250.00 | 27.00 | 270.00 | 60.00 | 600.00 | | 0036 | 732-05-00100 | Removal of Existing Markings | 0.015 | MILE | 13,333.33 | 200.00 | 10,000.00 | 150.00 | 7,152.00 | 107.28 | 12,000.00 | 180.00 | | 0037 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) (Solid White) | 596 | LNFT | 0.70 | 417.20 | 0.70 | 417.20 | 0.77 | 458.92 | 2.40 | 1,430.40 | | 0038 | 737-03-00100 | Painted Traffic Striping (Solid Line) (4" Width) (Solid Yellow) | 596 | LNFT | 0.70 | 417.20 | 0.70 | 417.20 | 0.77 | 458.92 | 2.40 | 1,430.40 | | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 150,000.00 | 150,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 200,000.00 | 200,000.00 | | 0040 | 804-01-00500 | Precast Concrete Piles (20") | 2,030 | LNFT | 250.00 | 507,500.00 | 180.00 | 365,400.00 | 200.00 | 406,000.00 | 240.00 | 487,200.00 | | 0041 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) | 650 | LNFT | 140.00 | 91,000.00 | 115.00 | 74,750.00 | 130.00 | 84,500.00 | 105.00 | 68,250.00 | | 0042 | 804-03-01800 | Steel Piles (24" Pipe) | 1,170 | LNFT | 450.00 | 526,500.00 | 240.00 | 280,800.00 | 400.00 | 468,000.00 | 600.00 | 702,000.00 | | 0043 | 804-03-02000 | Steel Piles (36" Pipe) | 4,800 | LNFT | 550.00 | 2,640,000.00 | 245.00 | 1,176,000.00 | 450.00 | 2,160,000.00 | 475.00 | 2,280,000.00 | | 0044 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 2,500.00 | 2,500.00 | 25,000.00 | 25,000.00 | 200,000.00 | 200,000.00 | 100,000.00 | 100,000.00 | | 0045 | 804-18-00100 | Vibration Monitoring | 40 | DAY | 300.00 | 12,000.00 | 620.00 | 24,800.00 | 550.00 | 22,000.00 | 1,000.00 | 40,000.00 | | 0046 | 805-01-00200 | Class A1 Concrete (Deck) | 54 | CUYD | 2,300.00 | 124,200.00 | 1,800.00 | 97,200.00 | 1,000.00 | 54,000.00 | 5,100.00 | 275,400.00 | | 0047 | 805-01-00800 | Class A1 Concrete (Counterweight) | 10.72 | CUYD | 7,200.00 | 77,184.00 | 10,500.00 | 112,560.00 | 10,000.00 | 107,200.00 | 4,600.00 | 49,312.00 | | 0048 | 805-01-00900 | Class A1 Concrete (Fender System) | 46.11 | CUYD | 3,550.00 | 163,690.50 | 1,000.00 | 46,110.00 | 300.00 | 13,833.00 | 750.00 | 34,582.50 | | 0049 | 805-01-00900 | Class A1 Concrete (Generator & HPU Platform) | 42.25 | CUYD | 3,800.00 | 160,550.00 | 3,000.00 | 126,750.00 | 5,000.00 | 211,250.00 | 5,100.00 | 215,475.00 | | 0050 | 805-01-00900 | Class A1 Concrete (Live Load Bearing) | 2.96 | CUYD | 1,690.00 | 5,002.40 | 4,400.00 | 13,024.00 | 3,000.00 | 8,880.00 | 20,000.00 | 59,200.00 | | 0051 | 805-01-00900 | Class A1 Concrete (Operator House Platform) | 13.15 | CUYD | 3,700.00 | 48,655.00 | 3,500.00 | 46,025.00 | 3,000.00 | 39,450.00 | 12,300.00 | 161,745.00 | | 0052 | 805-01-00900 | Class A1 Concrete (Pit Drains) | 1.16 | CUYD | 8,000.00 | 9,280.00 | 6,000.00 | 6,960.00 | 3,000.00 | 3,480.00 | 28,000.00 | 32,480.00 | | 0053 | 805-01-00900 | Class A1 Concrete (Warning Gate Platform) | 9.44 | CUYD | 9,000.00 | 84,960.00 | 5,000.00 | 47,200.00 | 4,000.00 | 37,760.00 | 14,000.00 | 132,160.00 | | 0054 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 812 | SQFT | 18.00 | 14,616.00 | 10.00 | 8,120.00 | 2.00 | 1,624.00 | 35.00 | 28,420.00 | | 0055 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 8,507 | SQFT | 5.00 | 42,535.00 | 4.30 | 36,580.10 | 7.00 | 59,549.00 | 13.00 | 110,591.00 | | 0056 | 806-01-00100 | Deformed Reinforcing Steel | 39,936 | LB | 2.00 | 79,872.00 | 2.00 | 79,872.00 | 1.25 | 49,920.00 | 2.40 | 95,846.40 | | 0057 | 806-02-00100 | Deformed Reinforcing Steel (Corrosion Resistant) (Stainless Steel) (ASTM A955, Type 316LN) | 1,382 | LB | 7.00 | 9,674.00 | 12.00 | 16,584.00 | 8.00 | 11,056.00 | 9.00 | 12,438.00 | | 0058 | 807-01-00100 | Structural Metalwork (Grade 36) | 378,243 | LUMP | 2,033,000.00 | 2,033,000.00 | 3,417,000.00 | 3,417,000.00 | 3,000,000.00 | 3,000,000.00 | 2,750,000.00 | 2,750,000.00 | | 0059 | 807-01-00200 | Structural Metalwork (Grade 50) | 414,963 | LUMP | 2,800,000.00 | 2,800,000.00 | 3,905,000.00 | 3,905,000.00 | 3,500,000.00 | 3,500,000.00 | 3,800,000.00 | 3,800,000.00 | | 0060 | 807-01-00800 | Structural Metalwork (S.S. Type 304 / 316) | 220 | LUMP | 10,000.00 | 10,000.00 | 40,000.00 | 40,000.00 | 15,000.00 | 15,000.00 | 40,000.00 | 40,000.00 | | 0061 | 808-01-00100 | Steel Grid Flooring (Heavy Duty) | 5,235 | SQFT | 140.00 | 732,900.00 | 200.00 | 1,047,000.00 | 85.00 | 444,975.00 | 155.00 | 811,425.00 | | 0062 | 808-01-00300 | Steel Grid Flooring (South Bascule Span) | 3,750 | SQFT | 90.00 | 337,500.00 | 100.00 | 375,000.00 | 80.00 | 300,000.00 | 120.00 | 450,000.00 | | 0063 | 811-01-00100 | Cleaning and Painting (North Bascule Span) | 1 | LUMP | 1,300,000.00 | 1,300,000.00 | 1,000,000.00 | 1,000,000.00 | 1,500,000.00 | 1,500,000.00 | 1,500,000.00 | 1,500,000.00 | | 0064 | 811-01-00100 | Cleaning and Painting (South Bascule Span) | 1 | LUMP | 500,000.00 | 500,000.00 | 325,000.00 | 325,000.00 | 750,000.00 | 750,000.00 | 1,100,000.00 | 1,100,000.00 | | 0065 | 811-03-00100 | Navigation Clearance Gauge (Painted) | 2 | EACH | 10,000.00 | 20,000.00 | 20,000.00 | 40,000.00 | 3,000.00 | 6,000.00 | 10,000.00 | 20,000.00 | | 0066 | 812-01-00200 | Treated Timber (Coastal Treatment) (Walers, Remove / Replace) | 6.4 | MFBM | 30,000.00 | 192,000.00 | 22,000.00 | 140,800.00 | 14,000.00 | 89,600.00 | 23,600.00 | 151,040.00 | | 0067 | 818-04-00200 | Reinforced Plastic Composite Marine Timber (8"x12") | 2,010 | LNFT | 150.00 | 301,500.00 | 110.00 | 221,100.00 | 125.00 | 251,250.00 | 106.00 | 213,060.00 | | 0068 | 820-02-00100 | Temporary Operation & Maintenance of Movable Span | 250 | DAY | 500.00 | 125,000.00 | 1,200.00 | 300,000.00 | 750.00 | 187,500.00 | 980.00 | 245,000.00 | | 0069 | 821-03-00100 | Bascule Span Bridge Mechanical System (Machinery) | 1 | LUMP | 4,178,000.00 | 4,178,000.00 | 6,150,000.00 | 6,150,000.00 | 6,650,000.00 | 6,650,000.00 | 6,350,000.00 | 6,350,000.00 | | 0070 | 822-09-00100 | Electrical System | 1 | LUMP | 2,049,750.00 | 2,049,750.00 | 2,500,000.00 | 2,500,000.00 | 2,500,000.00 | 2,500,000.00 | 2,750,000.00 | 2,750,000.00 | | 0071 | 822-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 150,000.00 | 150,000.00 | 250,000.00 | 250,000.00 | 100,000.00 | 100,000.00 | 110,000.00 | 110,000.00 | | 0074 | 830-01-00100 | Bridge Superstructure Repair | 1 | EACH | 32,000.00 | 32,000.00 | 30,000.00 | 30,000.00 | 3,000.00 | 3,000.00 | 230,000.00 | 230,000.00 | | 0075 | 830-02-00100 | Bridge Substructure Repair | 18 | EACH | 30,000.00 | 540,000.00 | 15,000.00 | 270,000.00 | 17,000.00 | 306,000.00 | 36,000.00 | 648,000.00 | | 0076 | 830-07-00100 | Structural Concrete Patching | 892 | SQFT | 200.00 | 178,400.00 | 100.00 | 89,200.00 | 200.00 | 178,400.00 | 200.00 | 178,400.00 | | 0077 | 830-10-00100 | Epoxy Injection | 90 | LNFT | 150.00 | 13,500.00 | 100.00 | 9,000.00 | 100.00 | 9,000.00 | 500.00 | 45,000.00 | | 0078 | 830-11-00100 | Bolt-Rivet Replacement (Structural Steel) | 7,136 | EACH | 100.00 | 713,600.00 | 50.00 | 356,800.00 | 20.00 | 142,720.00 | 75.00 | 535,200.00 | | 0079 | NS-823-00001 | Bridge Operator's House New Construction And Repair/Rehabilitation (North Draw) | 1 | LUMP | 1,200,000.00 | 1,200,000.00 | 1,300,000.00 | 1,300,000.00 | 200,000.00 | 200,000.00 | 1,100,000.00 | 1,100,000.00 | | 0080 | NS-823-00001 | Bridge Operator's House New Construction And Repair/Rehabilitation (South Draw) | 1 | LUMP | 400,000.00 | 400,000.00 | 440,000.00 | 440,000.00 | 200,000.00 | 200,000.00 | 450,000.00 | 450,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 28,360,002.30 | | 29,734,267.50 | | 30,027,774.12 | | 35,970,480.90 |
|