Proposal:H.010040.6
Parish:Morehouse
Description:BUD ROAD AND BONNE IDEE ROAD BRIDGES
Type Construction:SITE 1: BRIDGE REMOVAL, PILING, CAST-IN-PLACE CONCRETE SLAB SPAN BRIDGE, CONCRETE RAILING (STANDARD BARRIER), AND RELATED WORK.
SITE 2: CMP REMOVAL (AT FORMER 3-SPAN TIMBER BRIDGE), STEEL SHEET PILE WALL, PILING, CAST-IN-PLACE CONCRETE SLAB SPAN BRIDGE, CONCRETE RAILING (STANDARD BARRIER), CLASS II BASE COURSE (STONE), SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$1,581,787.60
| Rank | License | Bidder | Construction Bid |
| 1 | 14788 | Louisiana Bridge, Inc. | $1,212,973.50 |
| 2 | 49239 | WL Bass Construction Inc. | $1,224,735.50 |
| 3 | 23112 | BEN ALLEN, INC. | $1,278,731.90 |
| 4 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $1,386,538.00 |
| 5 | 18546 | C W & W Contractors, Inc. | $1,500,584.00 |
| 6 | 49864 | Terral Construction L.L.C. | $1,508,345.70 |
| 7 | 34567 | James Construction Group LLC | $1,607,305.00 |
| 8 | 39462 | JB JAMES CONSTRUCTION LLC | $1,733,527.70 |
| 9 | 55519 | Key, LLC Of Mississippi | $1,987,972.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Louisiana Bridge, Inc. | - 2 - WL Bass Construction Inc. | - 3 - BEN ALLEN, INC. | - 4 - SPECIALTY TRACKHOE & DOZER SERV.INC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 22,000.00 | 22,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 7,000.00 | 7,000.00 | | 0002 | 202-02-04000 | Removal of Bridge (STA 150+00.00, 24' X 76' TIMBER BRIDGE ON TIMBER PILE BENTS) | 1 | EACH | 5,500.00 | 5,500.00 | 17,000.00 | 17,000.00 | 5,000.00 | 5,000.00 | 4,600.00 | 4,600.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (2-72" dia. x 36' long CMP) | 72 | LNFT | 32.00 | 2,304.00 | 60.00 | 4,320.00 | 56.00 | 4,032.00 | 50.00 | 3,600.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 37,000.00 | 37,000.00 | 35,000.00 | 35,000.00 | 45,000.00 | 45,000.00 | 44,500.00 | 44,500.00 | | 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 24 | EACH | 10.00 | 240.00 | 15.00 | 360.00 | 15.00 | 360.00 | 23.00 | 552.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 2,028 | LNFT | 3.00 | 6,084.00 | 2.25 | 4,563.00 | 3.00 | 6,084.00 | 3.75 | 7,605.00 | | 0007 | 302-01-00700 | Class II Base Course (Stone) (CRUSHED) | 364.2 | CUYD | 105.00 | 38,241.00 | 128.00 | 46,617.60 | 108.00 | 39,333.60 | 111.50 | 40,608.30 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 110.1 | CUYD | 105.00 | 11,560.50 | 55.00 | 6,055.50 | 108.00 | 11,890.80 | 119.00 | 13,101.90 | | 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 105.00 | 5,250.00 | 25.00 | 1,250.00 | 50.00 | 2,500.00 | 1.00 | 50.00 | | 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 201.9 | TON | 180.00 | 36,342.00 | 165.00 | 33,313.50 | 175.00 | 35,332.50 | 155.00 | 31,294.50 | | 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 21.1 | TON | 185.00 | 3,903.50 | 265.00 | 5,591.50 | 200.00 | 4,220.00 | 230.00 | 4,853.00 | | 0012 | 704-03-00100 | Blocked Out Guard Rail | 100 | LNFT | 24.50 | 2,450.00 | 21.50 | 2,150.00 | 23.00 | 2,300.00 | 21.50 | 2,150.00 | | 0013 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 71.00 | 14,200.00 | 62.50 | 12,500.00 | 65.00 | 13,000.00 | 62.50 | 12,500.00 | | 0014 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 3,000.00 | 24,000.00 | 2,500.00 | 20,000.00 | 2,600.00 | 20,800.00 | 2,500.00 | 20,000.00 | | 0015 | 711-01-03040 | Riprap (30 lb, 24" Thick) | 584 | SQYD | 60.00 | 35,040.00 | 79.00 | 46,136.00 | 65.00 | 37,960.00 | 72.00 | 42,048.00 | | 0016 | 711-04-00100 | Geotextile Fabric | 584 | SQYD | 3.00 | 1,752.00 | 2.55 | 1,489.20 | 3.00 | 1,752.00 | 1.50 | 876.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,500.00 | 12,500.00 | 13,500.00 | 13,500.00 | 10,000.00 | 10,000.00 | 7,500.00 | 7,500.00 | | 0018 | 716-01-00100 | Mulch (Vegetative) | 1.5 | TON | 2,000.00 | 3,000.00 | 1,250.00 | 1,875.00 | 1,200.00 | 1,800.00 | 4,000.00 | 6,000.00 | | 0019 | 717-01-00100 | Seeding | 21 | LB | 30.00 | 630.00 | 16.00 | 336.00 | 25.00 | 525.00 | 30.00 | 630.00 | | 0020 | 718-01-00100 | Fertilizer | 672 | LB | 1.50 | 1,008.00 | 0.85 | 571.20 | 2.00 | 1,344.00 | 1.50 | 1,008.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 118,000.00 | 118,000.00 | 80,000.00 | 80,000.00 | 105,000.00 | 105,000.00 | | 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 97.00 | 776.00 | 85.00 | 680.00 | 100.00 | 800.00 | 85.00 | 680.00 | | 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 25,000.00 | 25,000.00 | 8,000.00 | 8,000.00 | 20,000.00 | 20,000.00 | | 0024 | 803-03-00100 | Steel Sheet Pile Wall | 6,240 | SQFT | 40.00 | 249,600.00 | 28.00 | 174,720.00 | 46.00 | 287,040.00 | 47.50 | 296,400.00 | | 0025 | 804-01-00300 | Precast Concrete Piles (16") | 3,120 | LNFT | 63.00 | 196,560.00 | 75.00 | 234,000.00 | 65.00 | 202,800.00 | 75.00 | 234,000.00 | | 0026 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 1.00 | 2.00 | 1.00 | 2.00 | 0.00 | 0.00 | 1.00 | 2.00 | | 0027 | 805-10-02220 | Bridge Superstructure and Substructure (28' Clear Roadway; 75 Degree Crossing) (Cast-in-Place) | 10 | SPAN | 35,000.00 | 350,000.00 | 32,000.00 | 320,000.00 | 36,000.00 | 360,000.00 | 38,800.00 | 388,000.00 | | 0028 | 810-01-00100 | Concrete Railing (Standard Barrier) | 400 | LNFT | 98.00 | 39,200.00 | 90.00 | 36,000.00 | 90.00 | 36,000.00 | 80.00 | 32,000.00 | | 0029 | 813-01-00100 | Concrete Approach Slabs | 161.1 | SQYD | 255.00 | 41,080.50 | 300.00 | 48,330.00 | 280.00 | 45,108.00 | 363.00 | 58,479.30 | | 0030 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 150 | INLF | 5.00 | 750.00 | 2.50 | 375.00 | 5.00 | 750.00 | 10.00 | 1,500.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,212,973.50 | | 1,224,735.50 | | 1,278,731.90 | | 1,386,538.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - C W & W Contractors, Inc. | - 6 - Terral Construction L.L.C. | - 7 - James Construction Group LLC | - 8 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 37,500.00 | 37,500.00 | 29,000.00 | 29,000.00 | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-02-04000 | Removal of Bridge (STA 150+00.00, 24' X 76' TIMBER BRIDGE ON TIMBER PILE BENTS) | 1 | EACH | 9,000.00 | 9,000.00 | 6,000.00 | 6,000.00 | 50,000.00 | 50,000.00 | 55,000.00 | 55,000.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (2-72" dia. x 36' long CMP) | 72 | LNFT | 75.00 | 5,400.00 | 44.00 | 3,168.00 | 100.00 | 7,200.00 | 350.00 | 25,200.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 49,500.00 | 49,500.00 | 60,000.00 | 60,000.00 | 60,000.00 | 60,000.00 | 55,000.00 | 55,000.00 | | 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 24 | EACH | 30.00 | 720.00 | 116.00 | 2,784.00 | 20.00 | 480.00 | 15.00 | 360.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 2,028 | LNFT | 3.00 | 6,084.00 | 4.00 | 8,112.00 | 2.25 | 4,563.00 | 4.00 | 8,112.00 | | 0007 | 302-01-00700 | Class II Base Course (Stone) (CRUSHED) | 364.2 | CUYD | 100.00 | 36,420.00 | 95.00 | 34,599.00 | 140.00 | 50,988.00 | 100.00 | 36,420.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 110.1 | CUYD | 100.00 | 11,010.00 | 137.00 | 15,083.70 | 160.00 | 17,616.00 | 110.00 | 12,111.00 | | 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 100.00 | 5,000.00 | 163.00 | 8,150.00 | 150.00 | 7,500.00 | 110.00 | 5,500.00 | | 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 201.9 | TON | 180.00 | 36,342.00 | 180.00 | 36,342.00 | 155.00 | 31,294.50 | 155.00 | 31,294.50 | | 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 21.1 | TON | 265.00 | 5,591.50 | 180.00 | 3,798.00 | 230.00 | 4,853.00 | 230.00 | 4,853.00 | | 0012 | 704-03-00100 | Blocked Out Guard Rail | 100 | LNFT | 25.00 | 2,500.00 | 20.00 | 2,000.00 | 21.50 | 2,150.00 | 22.00 | 2,200.00 | | 0013 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 72.00 | 14,400.00 | 60.00 | 12,000.00 | 62.50 | 12,500.00 | 62.50 | 12,500.00 | | 0014 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 2,875.00 | 23,000.00 | 2,150.00 | 17,200.00 | 2,500.00 | 20,000.00 | 2,500.00 | 20,000.00 | | 0015 | 711-01-03040 | Riprap (30 lb, 24" Thick) | 584 | SQYD | 85.00 | 49,640.00 | 140.00 | 81,760.00 | 95.00 | 55,480.00 | 75.00 | 43,800.00 | | 0016 | 711-04-00100 | Geotextile Fabric | 584 | SQYD | 3.00 | 1,752.00 | 2.00 | 1,168.00 | 7.00 | 4,088.00 | 2.50 | 1,460.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 9,500.00 | 9,500.00 | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | | 0018 | 716-01-00100 | Mulch (Vegetative) | 1.5 | TON | 5,060.00 | 7,590.00 | 3,000.00 | 4,500.00 | 1,250.00 | 1,875.00 | 1,250.00 | 1,875.00 | | 0019 | 717-01-00100 | Seeding | 21 | LB | 38.00 | 798.00 | 30.00 | 630.00 | 16.00 | 336.00 | 16.00 | 336.00 | | 0020 | 718-01-00100 | Fertilizer | 672 | LB | 2.00 | 1,344.00 | 1.00 | 672.00 | 1.00 | 672.00 | 0.85 | 571.20 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 199,300.00 | 199,300.00 | 50,000.00 | 50,000.00 | 160,000.00 | 160,000.00 | 170,000.00 | 170,000.00 | | 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 100.00 | 800.00 | 100.00 | 800.00 | 85.00 | 680.00 | 85.00 | 680.00 | | 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,500.00 | 22,500.00 | 12,000.00 | 12,000.00 | 19,500.00 | 19,500.00 | 30,000.00 | 30,000.00 | | 0024 | 803-03-00100 | Steel Sheet Pile Wall | 6,240 | SQFT | 45.00 | 280,800.00 | 42.00 | 262,080.00 | 50.00 | 312,000.00 | 40.00 | 249,600.00 | | 0025 | 804-01-00300 | Precast Concrete Piles (16") | 3,120 | LNFT | 67.50 | 210,600.00 | 89.00 | 277,680.00 | 60.00 | 187,200.00 | 90.00 | 280,800.00 | | 0026 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 1.00 | 2.00 | 0.00 | 0.00 | 15,000.00 | 30,000.00 | 1,500.00 | 3,000.00 | | 0027 | 805-10-02220 | Bridge Superstructure and Substructure (28' Clear Roadway; 75 Degree Crossing) (Cast-in-Place) | 10 | SPAN | 35,000.00 | 350,000.00 | 46,000.00 | 460,000.00 | 40,000.00 | 400,000.00 | 45,000.00 | 450,000.00 | | 0028 | 810-01-00100 | Concrete Railing (Standard Barrier) | 400 | LNFT | 165.00 | 66,000.00 | 145.00 | 58,000.00 | 100.00 | 40,000.00 | 85.00 | 34,000.00 | | 0029 | 813-01-00100 | Concrete Approach Slabs | 161.1 | SQYD | 355.00 | 57,190.50 | 290.00 | 46,719.00 | 345.00 | 55,579.50 | 300.00 | 48,330.00 | | 0030 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 150 | INLF | 2.00 | 300.00 | 14.00 | 2,100.00 | 5.00 | 750.00 | 3.50 | 525.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,500,584.00 | | 1,508,345.70 | | 1,607,305.00 | | 1,733,527.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Key, LLC Of Mississippi | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 45,000.00 | 45,000.00 | | 0002 | 202-02-04000 | Removal of Bridge (STA 150+00.00, 24' X 76' TIMBER BRIDGE ON TIMBER PILE BENTS) | 1 | EACH | 20,000.00 | 20,000.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (2-72" dia. x 36' long CMP) | 72 | LNFT | 90.00 | 6,480.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 212,000.00 | 212,000.00 | | 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 24 | EACH | 15.00 | 360.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 2,028 | LNFT | 5.25 | 10,647.00 | | 0007 | 302-01-00700 | Class II Base Course (Stone) (CRUSHED) | 364.2 | CUYD | 185.00 | 67,377.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 110.1 | CUYD | 190.00 | 20,919.00 | | 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 230.00 | 11,500.00 | | 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 201.9 | TON | 155.00 | 31,294.50 | | 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 21.1 | TON | 230.00 | 4,853.00 | | 0012 | 704-03-00100 | Blocked Out Guard Rail | 100 | LNFT | 50.00 | 5,000.00 | | 0013 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 50.00 | 10,000.00 | | 0014 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 5,000.00 | 40,000.00 | | 0015 | 711-01-03040 | Riprap (30 lb, 24" Thick) | 584 | SQYD | 145.00 | 84,680.00 | | 0016 | 711-04-00100 | Geotextile Fabric | 584 | SQYD | 4.30 | 2,511.20 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,500.00 | 15,500.00 | | 0018 | 716-01-00100 | Mulch (Vegetative) | 1.5 | TON | 1,250.00 | 1,875.00 | | 0019 | 717-01-00100 | Seeding | 21 | LB | 16.00 | 336.00 | | 0020 | 718-01-00100 | Fertilizer | 672 | LB | 0.85 | 571.20 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 170,000.00 | 170,000.00 | | 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 500.00 | 4,000.00 | | 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 60,000.00 | 60,000.00 | | 0024 | 803-03-00100 | Steel Sheet Pile Wall | 6,240 | SQFT | 48.15 | 300,456.00 | | 0025 | 804-01-00300 | Precast Concrete Piles (16") | 3,120 | LNFT | 85.00 | 265,200.00 | | 0026 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 5,000.00 | 10,000.00 | | 0027 | 805-10-02220 | Bridge Superstructure and Substructure (28' Clear Roadway; 75 Degree Crossing) (Cast-in-Place) | 10 | SPAN | 46,000.00 | 460,000.00 | | 0028 | 810-01-00100 | Concrete Railing (Standard Barrier) | 400 | LNFT | 160.00 | 64,000.00 | | 0029 | 813-01-00100 | Concrete Approach Slabs | 161.1 | SQYD | 375.00 | 60,412.50 | | 0030 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 150 | INLF | 20.00 | 3,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,987,972.40 |
|