Proposal:H.012576.6
Parish:Lafayette
Routes:LA 1096
Description:LA 1096: LA 95 - ACADIA P/L
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, IN-PLACE CEMENT TREATED SUBGRADE, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, CONCRETE DRIVE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,068,602.86
| Rank | License | Bidder | Construction Bid |
| 1 | 51821 | Elliott Construction, LLC | $1,135,005.70 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $1,180,131.86 |
| 3 | 00481 | COASTAL BRIDGE CO., L.L.C. | $1,229,029.52 |
| 4 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $1,248,608.98 |
| 5 | 34356 | Prairie Contractors Inc. | $1,273,625.75 |
| 6 | 33663 | Glenn Lege Construction Inc | $1,420,995.61 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elliott Construction, LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - COASTAL BRIDGE CO., L.L.C. | - 4 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 7,500.00 | 7,500.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 32 | SQYD | 25.00 | 800.00 | 0.01 | 0.32 | 30.00 | 960.00 | 65.00 | 2,080.00 | | 0003 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 2,500.00 | 2,500.00 | 4,350.00 | 4,350.00 | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 73 | SQYD | 20.00 | 1,460.00 | 15.00 | 1,095.00 | 25.20 | 1,839.60 | 30.00 | 2,190.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 321.8 | LNFT | 9.50 | 3,057.10 | 27.00 | 8,688.60 | 25.00 | 8,045.00 | 18.00 | 5,792.40 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" - 42" CMPAs) | 199 | LNFT | 20.00 | 3,980.00 | 12.00 | 2,388.00 | 70.00 | 13,930.00 | 15.00 | 2,985.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (24" CMP) | 184 | LNFT | 20.00 | 3,680.00 | 13.00 | 2,392.00 | 30.00 | 5,520.00 | 15.00 | 2,760.00 | | 0008 | 202-02-38200 | Removal of Signs | 25 | EACH | 22.00 | 550.00 | 60.00 | 1,500.00 | 25.00 | 625.00 | 30.00 | 750.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 15,000.00 | 15,000.00 | 14,432.58 | 14,432.58 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | | 0010 | 204-02-00100 | Temporary Hay Bales | 7 | EACH | 30.00 | 210.00 | 50.00 | 350.00 | 50.00 | 350.00 | 60.00 | 420.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 16 | EACH | 138.00 | 2,208.00 | 165.00 | 2,640.00 | 125.00 | 2,000.00 | 150.00 | 2,400.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 20 | LNFT | 5.00 | 100.00 | 5.00 | 100.00 | 100.00 | 2,000.00 | 100.00 | 2,000.00 | | 0013 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 15,398 | SQYD | 7.00 | 107,786.00 | 6.25 | 96,237.50 | 8.25 | 127,033.50 | 9.25 | 142,431.50 | | 0014 | 303-02-00100 | Removal of Existing Patches | 1,250 | SQYD | 12.00 | 15,000.00 | 9.00 | 11,250.00 | 35.00 | 43,750.00 | 10.00 | 12,500.00 | | 0015 | 304-01-00100 | Lime | 60.6 | TON | 235.00 | 14,241.00 | 220.00 | 13,332.00 | 250.00 | 15,150.00 | 300.00 | 18,180.00 | | 0016 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 7,699 | SQYD | 2.25 | 17,322.75 | 4.50 | 34,645.50 | 5.75 | 44,269.25 | 3.00 | 23,097.00 | | 0017 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 15,398 | SQYD | 7.25 | 111,635.50 | 7.25 | 111,635.50 | 8.50 | 130,883.00 | 9.25 | 142,431.50 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 675 | CUYD | 85.00 | 57,375.00 | 38.00 | 25,650.00 | 55.00 | 37,125.00 | 70.00 | 47,250.00 | | 0019 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 40 | CUYD | 25.00 | 1,000.00 | 77.00 | 3,080.00 | 100.00 | 4,000.00 | 70.00 | 2,800.00 | | 0020 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 30 | CUYD | 25.00 | 750.00 | 77.00 | 2,310.00 | 50.00 | 1,500.00 | 70.00 | 2,100.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 3,249.1 | TON | 97.00 | 315,162.70 | 90.00 | 292,419.00 | 78.00 | 253,429.80 | 90.00 | 292,419.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 430 | TON | 115.00 | 49,450.00 | 195.00 | 83,850.00 | 125.00 | 53,750.00 | 90.00 | 38,700.00 | | 0023 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 9,783 | GAL | 2.70 | 26,414.10 | 2.55 | 24,946.65 | 2.45 | 23,968.35 | 3.00 | 29,349.00 | | 0024 | 507-02-00200 | Aggregate (S2) | 14,388 | SQYD | 2.00 | 28,776.00 | 1.88 | 27,049.44 | 1.80 | 25,898.40 | 2.00 | 28,776.00 | | 0025 | 507-02-00300 | Aggregate (S3) | 14,388 | SQYD | 1.75 | 25,179.00 | 1.65 | 23,740.20 | 1.60 | 23,020.80 | 2.00 | 28,776.00 | | 0026 | 509-01-00100 | Milling Asphalt Pavement | 12,955 | SQYD | 2.00 | 25,910.00 | 3.85 | 49,876.75 | 3.00 | 38,865.00 | 3.00 | 38,865.00 | | 0027 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -539 | CUYD | 0.01 | -5.39 | 1.00 | -539.00 | 0.01 | -5.39 | 1.00 | -539.00 | | 0028 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 67 | SQYD | 125.00 | 8,375.00 | 185.00 | 12,395.00 | 100.00 | 6,700.00 | 150.00 | 10,050.00 | | 0029 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 50 | LNFT | 200.00 | 10,000.00 | 160.00 | 8,000.00 | 120.00 | 6,000.00 | 170.00 | 8,500.00 | | 0030 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 50 | LNFT | 250.00 | 12,500.00 | 190.00 | 9,500.00 | 155.00 | 7,750.00 | 200.00 | 10,000.00 | | 0031 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 108 | LNFT | 310.00 | 33,480.00 | 228.00 | 24,624.00 | 200.00 | 21,600.00 | 210.00 | 22,680.00 | | 0032 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 64 | LNFT | 75.00 | 4,800.00 | 110.00 | 7,040.00 | 90.00 | 5,760.00 | 115.00 | 7,360.00 | | 0033 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 50 | LNFT | 95.00 | 4,750.00 | 140.00 | 7,000.00 | 85.00 | 4,250.00 | 140.00 | 7,000.00 | | 0034 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 294 | LNFT | 65.00 | 19,110.00 | 90.00 | 26,460.00 | 75.00 | 22,050.00 | 90.00 | 26,460.00 | | 0035 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 526 | LNFT | 9.00 | 4,734.00 | 8.50 | 4,471.00 | 60.00 | 31,560.00 | 6.00 | 3,156.00 | | 0036 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,200.00 | 3,200.00 | 4,300.00 | 4,300.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | | 0037 | 704-01-01000 | Guardrail (Single Thrie Beam) (3'-1 1/2" post spacing) | 75 | LNFT | 64.00 | 4,800.00 | 43.00 | 3,225.00 | 50.00 | 3,750.00 | 55.00 | 4,125.00 | | 0038 | 704-01-01020 | Guardrail (Single Thrie Beam) (6'-3" post spacing) | 125 | LNFT | 105.00 | 13,125.00 | 62.00 | 7,750.00 | 75.00 | 9,375.00 | 73.00 | 9,125.00 | | 0039 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 62.5 | LNFT | 22.00 | 1,375.00 | 22.00 | 1,375.00 | 25.00 | 1,562.50 | 25.00 | 1,562.50 | | 0040 | 704-10-00105 | Guardrail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 2,420.00 | 2,420.00 | 4,550.00 | 4,550.00 | 2,200.00 | 2,200.00 | 2,400.00 | 2,400.00 | | 0041 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 2,640.00 | 7,920.00 | 2,450.00 | 7,350.00 | 2,600.00 | 7,800.00 | 2,700.00 | 8,100.00 | | 0042 | 706-02-00200 | Concrete Drive (6" Thick) | 72.9 | SQYD | 80.00 | 5,832.00 | 120.00 | 8,748.00 | 95.00 | 6,925.50 | 100.00 | 7,290.00 | | 0043 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 63 | SQYD | 130.00 | 8,190.00 | 265.00 | 16,695.00 | 165.00 | 10,395.00 | 260.00 | 16,380.00 | | 0044 | 711-04-00100 | Geotextile Fabric | 63 | SQYD | 5.00 | 315.00 | 1.00 | 63.00 | 6.00 | 378.00 | 2.00 | 126.00 | | 0045 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 15,500.00 | 15,500.00 | 40,000.00 | 40,000.00 | 30,000.00 | 30,000.00 | | 0046 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.144 | MILE | 600.00 | 1,886.40 | 154.00 | 484.18 | 115.00 | 361.56 | 225.00 | 707.40 | | 0047 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.931 | MILE | 495.00 | 460.85 | 1.00 | 0.93 | 500.00 | 465.50 | 525.00 | 488.78 | | 0048 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.491 | MILE | 660.00 | 324.06 | 1.00 | 0.49 | 650.00 | 319.15 | 700.00 | 343.70 | | 0049 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 555 | EACH | 2.75 | 1,526.25 | 2.50 | 1,387.50 | 2.00 | 1,110.00 | 3.00 | 1,665.00 | | 0050 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,000.00 | 5,000.00 | 5,500.00 | 5,500.00 | 1,700.00 | 1,700.00 | 5,000.00 | 5,000.00 | | 0051 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 2.1 | MILE | 2,500.00 | 5,250.00 | 900.00 | 1,890.00 | 650.00 | 1,365.00 | 1,200.00 | 2,520.00 | | 0052 | 726-01-00100 | Bedding Material | 136.4 | CUYD | 95.00 | 12,958.00 | 105.00 | 14,322.00 | 125.00 | 17,050.00 | 100.00 | 13,640.00 | | 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 75,000.00 | 75,000.00 | 95,000.00 | 95,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | | 0054 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 77.5 | SQFT | 22.00 | 1,705.00 | 28.00 | 2,170.00 | 20.00 | 1,550.00 | 22.00 | 1,705.00 | | 0055 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 53 | SQFT | 22.00 | 1,166.00 | 28.00 | 1,484.00 | 25.00 | 1,325.00 | 30.00 | 1,590.00 | | 0056 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 77.00 | 462.00 | 73.00 | 438.00 | 65.00 | 390.00 | 75.00 | 450.00 | | 0057 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 94.00 | 376.00 | 82.00 | 328.00 | 85.00 | 340.00 | 90.00 | 360.00 | | 0058 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 17 | EACH | 83.00 | 1,411.00 | 87.00 | 1,479.00 | 105.00 | 1,785.00 | 120.00 | 2,040.00 | | 0059 | 731-02-00100 | Reflectorized Raised Pavement Markers | 192 | EACH | 8.00 | 1,536.00 | 8.00 | 1,536.00 | 7.50 | 1,440.00 | 8.00 | 1,536.00 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.534 | MILE | 3,245.00 | 8,222.83 | 4,625.00 | 11,719.75 | 3,000.00 | 7,602.00 | 3,200.00 | 8,108.80 | | 0061 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.931 | MILE | 1,400.00 | 1,303.40 | 1,515.00 | 1,410.47 | 1,500.00 | 1,396.50 | 1,400.00 | 1,303.40 | | 0062 | 735-01-00100 | Mailboxes | 19 | EACH | 11.00 | 209.00 | 1.00 | 19.00 | 15.00 | 285.00 | 20.00 | 380.00 | | 0063 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 195.00 | 3,705.00 | 173.00 | 3,287.00 | 115.00 | 2,185.00 | 125.00 | 2,375.00 | | 0064 | 739-01-00100 | Hydro-Seeding | 0.49 | ACRE | 3,135.00 | 1,536.15 | 6,550.00 | 3,209.50 | 2,850.00 | 1,396.50 | 3,200.00 | 1,568.00 | | 0065 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | 13,000.00 | 13,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,135,005.70 | | 1,180,131.86 | | 1,229,029.52 | | 1,248,608.98 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Prairie Contractors Inc. | - 6 - Glenn Lege Construction Inc | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 12,000.00 | 12,000.00 | 3,560.00 | 3,560.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 32 | SQYD | 100.00 | 3,200.00 | 101.00 | 3,232.00 | | 0003 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 6,000.00 | 6,000.00 | 3,560.00 | 3,560.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 73 | SQYD | 50.00 | 3,650.00 | 158.00 | 11,534.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 321.8 | LNFT | 14.00 | 4,505.20 | 10.00 | 3,218.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" - 42" CMPAs) | 199 | LNFT | 30.00 | 5,970.00 | 46.00 | 9,154.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (24" CMP) | 184 | LNFT | 30.00 | 5,520.00 | 19.00 | 3,496.00 | | 0008 | 202-02-38200 | Removal of Signs | 25 | EACH | 30.00 | 750.00 | 70.00 | 1,750.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 20,000.00 | 20,000.00 | 25,600.00 | 25,600.00 | | 0010 | 204-02-00100 | Temporary Hay Bales | 7 | EACH | 60.00 | 420.00 | 60.00 | 420.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 16 | EACH | 150.00 | 2,400.00 | 146.00 | 2,336.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 20 | LNFT | 100.00 | 2,000.00 | 106.00 | 2,120.00 | | 0013 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 15,398 | SQYD | 8.50 | 130,883.00 | 8.50 | 130,883.00 | | 0014 | 303-02-00100 | Removal of Existing Patches | 1,250 | SQYD | 6.00 | 7,500.00 | 16.00 | 20,000.00 | | 0015 | 304-01-00100 | Lime | 60.6 | TON | 280.00 | 16,968.00 | 245.00 | 14,847.00 | | 0016 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 7,699 | SQYD | 2.35 | 18,092.65 | 5.20 | 40,034.80 | | 0017 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 15,398 | SQYD | 7.50 | 115,485.00 | 11.00 | 169,378.00 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 675 | CUYD | 108.00 | 72,900.00 | 103.00 | 69,525.00 | | 0019 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 40 | CUYD | 100.00 | 4,000.00 | 131.00 | 5,240.00 | | 0020 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 30 | CUYD | 100.00 | 3,000.00 | 131.00 | 3,930.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 3,249.1 | TON | 105.30 | 342,130.23 | 85.00 | 276,173.50 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 430 | TON | 130.00 | 55,900.00 | 122.00 | 52,460.00 | | 0023 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 9,783 | GAL | 3.00 | 29,349.00 | 2.85 | 27,881.55 | | 0024 | 507-02-00200 | Aggregate (S2) | 14,388 | SQYD | 2.00 | 28,776.00 | 2.09 | 30,070.92 | | 0025 | 507-02-00300 | Aggregate (S3) | 14,388 | SQYD | 2.00 | 28,776.00 | 1.85 | 26,617.80 | | 0026 | 509-01-00100 | Milling Asphalt Pavement | 12,955 | SQYD | 2.75 | 35,626.25 | 2.30 | 29,796.50 | | 0027 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -539 | CUYD | 0.01 | -5.39 | 0.10 | -53.90 | | 0028 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 67 | SQYD | 150.00 | 10,050.00 | 112.00 | 7,504.00 | | 0029 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 50 | LNFT | 275.00 | 13,750.00 | 310.00 | 15,500.00 | | 0030 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 50 | LNFT | 300.00 | 15,000.00 | 380.00 | 19,000.00 | | 0031 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 108 | LNFT | 350.00 | 37,800.00 | 360.00 | 38,880.00 | | 0032 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 64 | LNFT | 85.00 | 5,440.00 | 100.00 | 6,400.00 | | 0033 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 50 | LNFT | 100.00 | 5,000.00 | 110.00 | 5,500.00 | | 0034 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 294 | LNFT | 90.00 | 26,460.00 | 100.00 | 29,400.00 | | 0035 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 526 | LNFT | 15.00 | 7,890.00 | 75.00 | 39,450.00 | | 0036 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 4,000.00 | 4,000.00 | 4,300.00 | 4,300.00 | | 0037 | 704-01-01000 | Guardrail (Single Thrie Beam) (3'-1 1/2" post spacing) | 75 | LNFT | 50.00 | 3,750.00 | 68.00 | 5,100.00 | | 0038 | 704-01-01020 | Guardrail (Single Thrie Beam) (6'-3" post spacing) | 125 | LNFT | 70.00 | 8,750.00 | 111.00 | 13,875.00 | | 0039 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 62.5 | LNFT | 26.00 | 1,625.00 | 23.25 | 1,453.13 | | 0040 | 704-10-00105 | Guardrail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 5,500.00 | 5,500.00 | 2,555.00 | 2,555.00 | | 0041 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 3,000.00 | 9,000.00 | 2,790.00 | 8,370.00 | | 0042 | 706-02-00200 | Concrete Drive (6" Thick) | 72.9 | SQYD | 125.00 | 9,112.50 | 75.00 | 5,467.50 | | 0043 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 63 | SQYD | 150.00 | 9,450.00 | 180.00 | 11,340.00 | | 0044 | 711-04-00100 | Geotextile Fabric | 63 | SQYD | 7.00 | 441.00 | 7.50 | 472.50 | | 0045 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 16,605.00 | 16,605.00 | | 0046 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.144 | MILE | 500.00 | 1,572.00 | 610.00 | 1,917.84 | | 0047 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.931 | MILE | 0.01 | 0.01 | 581.00 | 540.91 | | 0048 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.491 | MILE | 0.01 | 0.00 | 726.00 | 356.47 | | 0049 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 555 | EACH | 3.00 | 1,665.00 | 2.91 | 1,615.05 | | 0050 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 1,500.00 | 1,500.00 | 12,544.20 | 12,544.20 | | 0051 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 2.1 | MILE | 2,000.00 | 4,200.00 | 525.00 | 1,102.50 | | 0052 | 726-01-00100 | Bedding Material | 136.4 | CUYD | 110.00 | 15,004.00 | 101.00 | 13,776.40 | | 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 75,000.00 | 75,000.00 | 152,900.00 | 152,900.00 | | 0054 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 77.5 | SQFT | 35.00 | 2,712.50 | 21.00 | 1,627.50 | | 0055 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 53 | SQFT | 40.00 | 2,120.00 | 24.00 | 1,272.00 | | 0056 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 80.00 | 480.00 | 67.00 | 402.00 | | 0057 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 91.00 | 364.00 | | 0058 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 17 | EACH | 115.00 | 1,955.00 | 86.00 | 1,462.00 | | 0059 | 731-02-00100 | Reflectorized Raised Pavement Markers | 192 | EACH | 10.00 | 1,920.00 | 9.00 | 1,728.00 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.534 | MILE | 5,500.00 | 13,937.00 | 3,485.00 | 8,830.99 | | 0061 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.931 | MILE | 1,800.00 | 1,675.80 | 1,745.00 | 1,624.60 | | 0062 | 735-01-00100 | Mailboxes | 19 | EACH | 10.00 | 190.00 | 31.50 | 598.50 | | 0063 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 180.00 | 3,420.00 | 98.00 | 1,862.00 | | 0064 | 739-01-00100 | Hydro-Seeding | 0.49 | ACRE | 4,000.00 | 1,960.00 | 3,315.00 | 1,624.35 | | 0065 | 740-01-00100 | Construction Layout | 1 | LUMP | 100.00 | 100.00 | 16,910.00 | 16,910.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,273,625.75 | | 1,420,995.61 |
|