Search


Bid Tabulations for the Letting of 2/7/2018 LA DOTD Headquarters

Proposal:H.012424.6
Parish:Orleans
Routes:I-610
Description:I-610 AT ST BERNARD AVE
Type Construction:DIAMOND GRINDING CONCRETE PAVEMENT, EPOXY-URETHANE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$670,701.40
Rank License BidderConstruction Bid
1THE17THE TRUESDELL CORPORATION$643,643.00
251519RAM Construction Serv. of Michigan$712,708.78
346547Interstate Improvement, Inc.$730,221.50
451607Total Highway Maintenance Llc$871,323.50


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
THE TRUESDELL CORPORATION
- 2 -
RAM Construction Serv. of Michigan
- 3 -
Interstate Improvement, Inc.
- 4 -
Total Highway Maintenance Llc
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001602-08-00100Diamond Grinding Concrete Pavement 8,056     SQYD18.00145,008.0019.50157,092.0017.00136,952.0026.00209,456.00
0002713-01-00100Temporary Signs and Barricades 1     LUMP62,000.0062,000.0050,400.0050,400.0035,000.0035,000.0050,000.0050,000.00
0003713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 1.704 MILE675.001,150.201,120.001,908.482,222.723,787.511,500.002,556.00
0004713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 1.704 MILE675.001,150.202,400.004,089.602,222.723,787.513,500.005,964.00
0005727-01-00100Mobilization 1     LUMP71,649.0071,649.0072,200.0072,200.0068,000.0068,000.0075,000.0075,000.00
0006731-02-00100Reflectorized Raised Pavement Markers 675     EACH8.005,400.007.845,292.007.805,265.008.505,737.50
0007732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.852 MILE4,800.004,089.606,720.005,725.446,668.175,681.287,500.006,390.00
0008732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.852 MILE1,600.001,363.204,032.003,435.264,000.903,408.775,000.004,260.00
0009732-05-00100Removal of Existing Markings 0.426 MILE5,300.002,257.8016,000.006,816.0017,990.997,664.1622,500.009,585.00
0010740-01-00100Construction Layout 1     LUMP2,000.002,000.002,000.002,000.006,126.876,126.877,500.007,500.00
0011830-07-00100Structural Concrete Patching 40     SQFT80.003,200.00125.005,000.00488.7119,548.40500.0020,000.00
0012NS-830-00900Epoxy-Urethane Overlay 72,500     SQFT4.75344,375.005.50398,750.006.00435,000.006.55474,875.00
             
  CONTRACTOR TOTAL   643,643.00 712,708.78 730,221.50 871,323.50