Proposal:H.003854.6-R1
Parish:Bossier
Description:BOSSIER NORTH-SOUTH CORRIDOR SWAN LAKE RD (I-220 TO FLAT RV)
Type Construction:REMOVAL OF BRIDGE, REMOVAL OF BRIDGE SUPERSTRUCTURE, GRADING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALTIC SURFACE TREATMENT, SUPERPAVE APHALTIC CONCRETE PAVEMENT, PAVEMENT PATCHING, DRAINAGE STRUCTURES, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$14,785,516.00
| Rank | License | Bidder | Construction Bid |
| 1 | 36374 | Best-Yet Builders, Llc | $13,906,955.30 |
| 2 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $13,994,093.21 |
| 3 | 34567 | James Construction Group LLC | $17,276,932.91 |
| 4 | 49239 | WL Bass Construction Inc. | $17,726,791.25 |
| 5 | 39462 | JB JAMES CONSTRUCTION LLC | $20,386,495.45 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Best-Yet Builders, Llc | - 2 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 3 - James Construction Group LLC | - 4 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 11,000.00 | 11,000.00 | 200,000.00 | 200,000.00 | 7,500.00 | 7,500.00 | | 0002 | 202-02-04000 | Removal of Bridge Removal of Bridge each | 1 | EACH | 20,000.00 | 20,000.00 | 52,000.00 | 52,000.00 | 15,000.00 | 15,000.00 | 40,000.00 | 40,000.00 | | 0003 | 202-02-04022 | Removal of Bridge Cap | 20 | LNFT | 1,000.00 | 20,000.00 | 1,100.00 | 22,000.00 | 700.00 | 14,000.00 | 2,000.00 | 40,000.00 | | 0004 | 202-02-04060 | Removal of Bridge Superstructure (Precast Concrete Slab Span) | 3,200 | SQFT | 19.00 | 60,800.00 | 2.75 | 8,800.00 | 5.00 | 16,000.00 | 11.00 | 35,200.00 | | 0005 | 202-02-06000 | Removal of Concrete Approach Slabs | 56 | SQYD | 108.00 | 6,048.00 | 32.50 | 1,820.00 | 200.00 | 11,200.00 | 55.00 | 3,080.00 | | 0006 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 680.1 | LNFT | 7.00 | 4,760.70 | 5.50 | 3,740.55 | 7.00 | 4,760.70 | 6.00 | 4,080.60 | | 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,343 | SQYD | 8.00 | 10,744.00 | 6.90 | 9,266.70 | 5.00 | 6,715.00 | 6.00 | 8,058.00 | | 0008 | 202-02-06140 | Removal of Curbs (Concrete) | 85.4 | LNFT | 10.00 | 854.00 | 8.50 | 725.90 | 5.00 | 427.00 | 6.00 | 512.40 | | 0009 | 202-02-14500 | Removal of Guard Rail | 340 | LNFT | 8.00 | 2,720.00 | 5.50 | 1,870.00 | 25.00 | 8,500.00 | 6.00 | 2,040.00 | | 0010 | 202-02-26300 | Removal of Median / Island | 1,132 | SQYD | 8.00 | 9,056.00 | 6.15 | 6,961.80 | 8.00 | 9,056.00 | 10.00 | 11,320.00 | | 0011 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 737 | SQYD | 10.00 | 7,370.00 | 6.30 | 4,643.10 | 10.00 | 7,370.00 | 12.00 | 8,844.00 | | 0012 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 36,683.5 | SQYD | 3.50 | 128,392.25 | 4.75 | 174,246.63 | 3.75 | 137,563.13 | 5.50 | 201,759.25 | | 0013 | 203-01-00100 | General Excavation | 29,010 | CUYD | 7.00 | 203,070.00 | 3.80 | 110,238.00 | 8.00 | 232,080.00 | 8.75 | 253,837.50 | | 0014 | 203-03-00100 | Embankment | 78,522 | CUYD | 15.00 | 1,177,830.00 | 12.25 | 961,894.50 | 20.00 | 1,570,440.00 | 17.00 | 1,334,874.00 | | 0015 | 203-04-00300 | Nonplastic Embankment (Stone) | 1,404 | CUYD | 70.00 | 98,280.00 | 83.00 | 116,532.00 | 100.00 | 140,400.00 | 76.00 | 106,704.00 | | 0016 | 203-08-00100 | Geotextile Fabric | 1,103 | SQYD | 2.00 | 2,206.00 | 2.20 | 2,426.60 | 3.00 | 3,309.00 | 2.50 | 2,757.50 | | 0017 | 204-02-00100 | Temporary Hay or Straw Bales | 1,264 | EACH | 10.00 | 12,640.00 | 12.00 | 15,168.00 | 10.00 | 12,640.00 | 12.00 | 15,168.00 | | 0018 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 57 | EACH | 100.00 | 5,700.00 | 125.00 | 7,125.00 | 150.00 | 8,550.00 | 126.00 | 7,182.00 | | 0019 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 16 | EACH | 250.00 | 4,000.00 | 450.00 | 7,200.00 | 880.00 | 14,080.00 | 240.00 | 3,840.00 | | 0020 | 204-06-00100 | Temporary Silt Fencing | 42,000 | LNFT | 2.00 | 84,000.00 | 1.75 | 73,500.00 | 2.00 | 84,000.00 | 1.80 | 75,600.00 | | 0021 | 204-07-00100 | Temporary Stone Construction Entrance | 3 | EACH | 1,500.00 | 4,500.00 | 2,500.00 | 7,500.00 | 4,350.00 | 13,050.00 | 10,000.00 | 30,000.00 | | 0022 | 302-02-02101 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 5,945.6 | SQYD | 12.85 | 76,400.96 | 14.50 | 86,211.20 | 25.00 | 148,640.00 | 21.95 | 130,505.92 | | 0023 | 302-02-06020 | Class II Base Course (12" Thick) (Soil Cement) | 46,155.9 | SQYD | 12.00 | 553,870.80 | 13.25 | 611,565.68 | 20.00 | 923,118.00 | 23.00 | 1,061,585.70 | | 0024 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 47,094.5 | SQYD | 25.69 | 1,209,857.71 | 26.00 | 1,224,457.00 | 40.00 | 1,883,780.00 | 33.60 | 1,582,375.20 | | 0025 | 304-05-00100 | Lime Treatment (Type E) | 700 | TON | 185.00 | 129,500.00 | 375.00 | 262,500.00 | 380.00 | 266,000.00 | 300.00 | 210,000.00 | | 0026 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 342 | CUYD | 91.00 | 31,122.00 | 111.00 | 37,962.00 | 95.00 | 32,490.00 | 50.00 | 17,100.00 | | 0027 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 3,000 | CUYD | 50.00 | 150,000.00 | 75.00 | 225,000.00 | 75.00 | 225,000.00 | 40.00 | 120,000.00 | | 0028 | 502-01-00100 | Superpave Asphaltic Concrete | 24,390.2 | TON | 90.75 | 2,213,410.65 | 90.00 | 2,195,118.00 | 90.00 | 2,195,118.00 | 91.50 | 2,231,703.30 | | 0029 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 2,014 | TON | 90.50 | 182,267.00 | 150.00 | 302,100.00 | 150.00 | 302,100.00 | 151.00 | 304,114.00 | | 0030 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 31,386 | GAL | 2.25 | 70,618.50 | 2.25 | 70,618.50 | 2.50 | 78,465.00 | 2.25 | 70,618.50 | | 0031 | 507-02-00200 | Aggregate (S2) | 46,156 | SQYD | 1.10 | 50,771.60 | 1.10 | 50,771.60 | 2.50 | 115,390.00 | 1.10 | 50,771.60 | | 0032 | 507-02-00300 | Aggregate (S3) | 46,156 | SQYD | 0.90 | 41,540.40 | 0.90 | 41,540.40 | 2.00 | 92,312.00 | 0.90 | 41,540.40 | | 0033 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,619 | SQYD | 100.00 | 161,900.00 | 95.00 | 153,805.00 | 110.00 | 178,090.00 | 112.00 | 181,328.00 | | 0034 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 142 | LNFT | 90.50 | 12,851.00 | 58.00 | 8,236.00 | 210.00 | 29,820.00 | 112.00 | 15,904.00 | | 0035 | 701-01-01020 | Cross Drain Pipe (30" RCP/PP) | 104 | LNFT | 128.50 | 13,364.00 | 74.00 | 7,696.00 | 230.00 | 23,920.00 | 158.00 | 16,432.00 | | 0036 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 234 | LNFT | 111.00 | 25,974.00 | 67.00 | 15,678.00 | 180.00 | 42,120.00 | 138.00 | 32,292.00 | | 0037 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 168 | LNFT | 157.70 | 26,493.60 | 91.00 | 15,288.00 | 200.00 | 33,600.00 | 142.00 | 23,856.00 | | 0038 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 86 | LNFT | 207.30 | 17,827.80 | 112.00 | 9,632.00 | 225.00 | 19,350.00 | 207.00 | 17,802.00 | | 0039 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 2,951 | LNFT | 24.25 | 71,561.75 | 43.00 | 126,893.00 | 70.00 | 206,570.00 | 38.00 | 112,138.00 | | 0040 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 1,147 | LNFT | 34.75 | 39,858.25 | 51.00 | 58,497.00 | 80.00 | 91,760.00 | 47.00 | 53,909.00 | | 0041 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 3,061 | LNFT | 62.65 | 191,771.65 | 58.00 | 177,538.00 | 100.00 | 306,100.00 | 52.00 | 159,172.00 | | 0042 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 2,247 | LNFT | 85.95 | 193,129.65 | 74.00 | 166,278.00 | 125.00 | 280,875.00 | 67.00 | 150,549.00 | | 0043 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 1,366 | LNFT | 125.75 | 171,774.50 | 94.00 | 128,404.00 | 165.00 | 225,390.00 | 85.00 | 116,110.00 | | 0044 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 557 | LNFT | 158.60 | 88,340.20 | 120.00 | 66,840.00 | 190.00 | 105,830.00 | 95.00 | 52,915.00 | | 0045 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 178 | LNFT | 196.75 | 35,021.50 | 150.00 | 26,700.00 | 250.00 | 44,500.00 | 132.00 | 23,496.00 | | 0046 | 701-03-02000 | Storm Drain Pipe (Outfall) (15" PP or 18" CMP) | 20 | LNFT | 24.25 | 485.00 | 43.00 | 860.00 | 75.00 | 1,500.00 | 35.00 | 700.00 | | 0047 | 701-03-02060 | Storm Drain Pipe (Outfall) (30" PP or 36" CMP) | 225 | LNFT | 85.95 | 19,338.75 | 74.00 | 16,650.00 | 70.00 | 15,750.00 | 75.00 | 16,875.00 | | 0048 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) | 388 | LNFT | 125.90 | 48,849.20 | 94.00 | 36,472.00 | 100.00 | 38,800.00 | 91.00 | 35,308.00 | | 0049 | 701-03-02120 | Storm Drain Pipe (Outfall) (48" PP or 54" CMP) | 37 | LNFT | 196.75 | 7,279.75 | 150.00 | 5,550.00 | 110.00 | 4,070.00 | 181.00 | 6,697.00 | | 0050 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 21 | LNFT | 52.20 | 1,096.20 | 55.00 | 1,155.00 | 100.00 | 2,100.00 | 75.00 | 1,575.00 | | 0051 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 155 | LNFT | 56.25 | 8,718.75 | 60.00 | 9,300.00 | 95.00 | 14,725.00 | 55.00 | 8,525.00 | | 0052 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 611 | LNFT | 76.30 | 46,619.30 | 67.00 | 40,937.00 | 100.00 | 61,100.00 | 65.00 | 39,715.00 | | 0053 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 225 | LNFT | 108.40 | 24,390.00 | 91.00 | 20,475.00 | 115.00 | 25,875.00 | 75.00 | 16,875.00 | | 0054 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 1,772 | LNFT | 34.75 | 61,577.00 | 51.00 | 90,372.00 | 70.00 | 124,040.00 | 43.00 | 76,196.00 | | 0055 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 186 | LNFT | 62.65 | 11,652.90 | 58.00 | 10,788.00 | 110.00 | 20,460.00 | 90.00 | 16,740.00 | | 0056 | 701-05-02040 | Side Drain Pipe (Erosion) (18" PP/CMP) | 215 | LNFT | 50.00 | 10,750.00 | 51.00 | 10,965.00 | 95.00 | 20,425.00 | 46.00 | 9,890.00 | | 0057 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 65 | LNFT | 65.00 | 4,225.00 | 58.00 | 3,770.00 | 120.00 | 7,800.00 | 68.00 | 4,420.00 | | 0058 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 5,000.00 | 5,000.00 | 4,500.00 | 4,500.00 | 5,000.00 | 5,000.00 | 3,500.00 | 3,500.00 | | 0059 | 702-03-00100 | Catch Basins (CB-01) | 69 | EACH | 2,500.00 | 172,500.00 | 3,550.00 | 244,950.00 | 3,000.00 | 207,000.00 | 3,777.00 | 260,613.00 | | 0060 | 702-03-00500 | Catch Basins (CB-06) | 73 | EACH | 3,000.00 | 219,000.00 | 4,500.00 | 328,500.00 | 5,000.00 | 365,000.00 | 4,000.00 | 292,000.00 | | 0061 | 703-03-00100 | Perforated Pipe Underdrains | 10,453 | LNFT | 10.00 | 104,530.00 | 15.00 | 156,795.00 | 15.00 | 156,795.00 | 10.00 | 104,530.00 | | 0062 | 704-03-00100 | Blocked Out Guard Rail | 137.5 | LNFT | 25.00 | 3,437.50 | 25.00 | 3,437.50 | 20.00 | 2,750.00 | 21.00 | 2,887.50 | | 0063 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 65.00 | 6,500.00 | 65.00 | 6,500.00 | 60.00 | 6,000.00 | 60.00 | 6,000.00 | | 0064 | 704-11-00100 | Guard Rail End Treatment (Flared) | 3 | EACH | 2,400.00 | 7,200.00 | 2,400.00 | 7,200.00 | 2,500.00 | 7,500.00 | 2,450.00 | 7,350.00 | | 0065 | 705-01-00100 | Barbed Wire Fence | 913 | LNFT | 8.00 | 7,304.00 | 8.00 | 7,304.00 | 10.00 | 9,130.00 | 11.70 | 10,682.10 | | 0066 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 346 | LNFT | 10.00 | 3,460.00 | 10.00 | 3,460.00 | 12.00 | 4,152.00 | 13.50 | 4,671.00 | | 0067 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 750.00 | 750.00 | 955.00 | 955.00 | | 0068 | 706-01-00100 | Concrete Walk (4" Thick) | 6,532.2 | SQYD | 45.00 | 293,949.00 | 45.00 | 293,949.00 | 30.00 | 195,966.00 | 64.00 | 418,060.80 | | 0069 | 706-02-00200 | Concrete Drive (6" Thick) | 3,004.2 | SQYD | 55.00 | 165,231.00 | 55.00 | 165,231.00 | 50.00 | 150,210.00 | 70.00 | 210,294.00 | | 0070 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 1,123.7 | SQYD | 45.00 | 50,566.50 | 45.00 | 50,566.50 | 20.00 | 22,474.00 | 80.00 | 89,896.00 | | 0071 | 706-04-00100 | Handicapped Curb Ramps | 6 | EACH | 2,000.00 | 12,000.00 | 2,000.00 | 12,000.00 | 1,500.00 | 9,000.00 | 2,100.00 | 12,600.00 | | 0072 | 707-01-00200 | Concrete Curb (Barrier) | 85.4 | LNFT | 20.00 | 1,708.00 | 20.00 | 1,708.00 | 60.00 | 5,124.00 | 55.00 | 4,697.00 | | 0073 | 707-03-00100 | Combination Concrete Curb and Gutter | 21,839.1 | LNFT | 40.00 | 873,564.00 | 22.00 | 480,460.20 | 15.00 | 327,586.50 | 34.00 | 742,529.40 | | 0074 | 708-01-00100 | Right-of-Way Monument | 104 | EACH | 150.00 | 15,600.00 | 150.00 | 15,600.00 | 150.00 | 15,600.00 | 160.00 | 16,640.00 | | 0075 | 708-02-00100 | Right-of-Way Monument Witness Post | 104 | EACH | 150.00 | 15,600.00 | 60.00 | 6,240.00 | 60.00 | 6,240.00 | 60.00 | 6,240.00 | | 0076 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 905 | SQYD | 70.00 | 63,350.00 | 45.00 | 40,725.00 | 80.00 | 72,400.00 | 70.00 | 63,350.00 | | 0077 | 711-04-00100 | Geotextile Fabric | 905 | SQYD | 2.00 | 1,810.00 | 1.50 | 1,357.50 | 5.00 | 4,525.00 | 2.00 | 1,810.00 | | 0078 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 180,000.00 | 180,000.00 | 50,000.00 | 50,000.00 | 133,000.00 | 133,000.00 | | 0079 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 588 | LNFT | 2.00 | 1,176.00 | 2.00 | 1,176.00 | 0.30 | 176.40 | 0.30 | 176.40 | | 0080 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.748 | MILE | 500.00 | 1,874.00 | 500.00 | 1,874.00 | 425.00 | 1,592.90 | 425.00 | 1,592.90 | | 0081 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 50.8 | MILE | 700.00 | 35,560.00 | 700.00 | 35,560.00 | 625.00 | 31,750.00 | 625.00 | 31,750.00 | | 0082 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.1 | MILE | 10,000.00 | 11,000.00 | 10,000.00 | 11,000.00 | 725.00 | 797.50 | 725.00 | 797.50 | | 0083 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 55 | EACH | 50.00 | 2,750.00 | 50.00 | 2,750.00 | 28.00 | 1,540.00 | 28.00 | 1,540.00 | | 0084 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 2 | EACH | 50.00 | 100.00 | 50.00 | 100.00 | 58.00 | 116.00 | 58.00 | 116.00 | | 0085 | 716-01-00100 | Mulch (Vegetative) | 94.4 | TON | 675.00 | 63,720.00 | 550.00 | 51,920.00 | 700.00 | 66,080.00 | 552.00 | 52,108.80 | | 0086 | 717-01-00100 | Seeding | 2,124 | LB | 9.85 | 20,921.40 | 12.00 | 25,488.00 | 12.00 | 25,488.00 | 12.00 | 25,488.00 | | 0087 | 718-01-00100 | Fertilizer | 47,200 | LB | 0.65 | 30,680.00 | 0.60 | 28,320.00 | 0.50 | 23,600.00 | 0.70 | 33,040.00 | | 0088 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 7,374 | SQYD | 1.45 | 10,692.30 | 1.50 | 11,061.00 | 1.50 | 11,061.00 | 1.60 | 11,798.40 | | 0089 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 15,000.00 | 15,000.00 | 115,000.00 | 115,000.00 | 105,000.00 | 105,000.00 | 29,000.00 | 29,000.00 | | 0090 | 725-01-00100 | Temporary Detour Roads | 19,846.7 | SQYD | 25.25 | 501,129.18 | 40.00 | 793,868.00 | 25.00 | 496,167.50 | 86.00 | 1,706,816.20 | | 0091 | 726-01-00100 | Bedding Material | 3,396.5 | CUYD | 72.80 | 247,265.20 | 87.00 | 295,495.50 | 75.00 | 254,737.50 | 120.00 | 407,580.00 | | 0092 | 727-01-00100 | Mobilization | 1 | LUMP | 550,000.00 | 550,000.00 | 900,000.00 | 900,000.00 | 1,700,000.00 | 1,700,000.00 | 1,772,700.00 | 1,772,700.00 | | 0093 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 100.00 | 400.00 | 80.00 | 320.00 | 85.00 | 340.00 | | 0094 | 729-19-00100 | Dead End Road Installations (Type A) | 1 | EACH | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 6,480.00 | 6,480.00 | | 0095 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,237 | EACH | 5.00 | 6,185.00 | 5.00 | 6,185.00 | 5.00 | 6,185.00 | 5.00 | 6,185.00 | | 0096 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 813 | LNFT | 2.00 | 1,626.00 | 2.00 | 1,626.00 | 2.00 | 1,626.00 | 2.22 | 1,804.86 | | 0097 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,456 | LNFT | 10.00 | 14,560.00 | 10.00 | 14,560.00 | 4.00 | 5,824.00 | 4.44 | 6,464.64 | | 0098 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.294 | MILE | 3,300.00 | 53,770.20 | 3,300.00 | 53,770.20 | 2,770.00 | 45,134.38 | 2,788.00 | 45,427.67 | | 0099 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.578 | MILE | 1,500.00 | 5,367.00 | 1,500.00 | 5,367.00 | 950.00 | 3,399.10 | 888.00 | 3,177.26 | | 0100 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.154 | MILE | 10,000.00 | 1,540.00 | 10,000.00 | 1,540.00 | 1,800.00 | 277.20 | 1,888.00 | 290.75 | | 0101 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 48 | EACH | 300.00 | 14,400.00 | 300.00 | 14,400.00 | 165.00 | 7,920.00 | 165.00 | 7,920.00 | | 0102 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 300.00 | 1,200.00 | 300.00 | 1,200.00 | 165.00 | 660.00 | 165.00 | 660.00 | | 0103 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 500.00 | 1,000.00 | 500.00 | 1,000.00 | 300.00 | 600.00 | 300.00 | 600.00 | | 0104 | 732-05-00100 | Removal of Existing Markings | 2.25 | MILE | 5,000.00 | 11,250.00 | 5,000.00 | 11,250.00 | 5,280.00 | 11,880.00 | 5,280.00 | 11,880.00 | | 0105 | 735-01-00100 | Mailboxes | 41 | EACH | 50.00 | 2,050.00 | 10.00 | 410.00 | 1.00 | 41.00 | 1.00 | 41.00 | | 0106 | 735-02-00100 | Mailbox Supports (Single) | 41 | EACH | 75.00 | 3,075.00 | 165.00 | 6,765.00 | 165.00 | 6,765.00 | 165.00 | 6,765.00 | | 0107 | 740-01-00100 | Construction Layout | 1 | LUMP | 250,000.00 | 250,000.00 | 145,000.00 | 145,000.00 | 150,000.00 | 150,000.00 | 195,000.00 | 195,000.00 | | 0108 | 741-09-00100 | Adjusting Water House Connections | 20 | EACH | 975.00 | 19,500.00 | 975.00 | 19,500.00 | 1,000.00 | 20,000.00 | 1,000.00 | 20,000.00 | | 0109 | 741-10-00100 | Adjusting Water Service Lines | 1,000 | LNFT | 22.00 | 22,000.00 | 22.00 | 22,000.00 | 10.00 | 10,000.00 | 15.00 | 15,000.00 | | 0110 | 804-01-00300 | Precast Concrete Piles (16") | 903 | LNFT | 125.00 | 112,875.00 | 79.00 | 71,337.00 | 95.00 | 85,785.00 | 265.00 | 239,295.00 | | 0111 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 5,000.00 | 5,000.00 | 1.00 | 1.00 | 35,000.00 | 35,000.00 | 10,000.00 | 10,000.00 | | 0112 | 804-09-00100 | Loading Test Piles | 1 | EACH | 12,500.00 | 12,500.00 | 1.00 | 1.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | | 0113 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 1,000.00 | 1,000.00 | 1.00 | 1.00 | 1,750.00 | 1,750.00 | 5,000.00 | 5,000.00 | | 0114 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 750.00 | 750.00 | 1.00 | 1.00 | 1,000.00 | 1,000.00 | 1,500.00 | 1,500.00 | | 0115 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1,750.00 | 1,750.00 | 1.00 | 1.00 | 3,000.00 | 3,000.00 | 1,000.00 | 1,000.00 | | 0116 | 804-17-00100 | Dynamic Monitoring | 5 | EACH | 1,500.00 | 7,500.00 | 500.00 | 2,500.00 | 1,500.00 | 7,500.00 | 500.00 | 2,500.00 | | 0117 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 77.97 | CUYD | 700.00 | 54,579.00 | 1,000.00 | 77,970.00 | 1,500.00 | 116,955.00 | 1,500.00 | 116,955.00 | | 0118 | 805-01-00700 | Class A Concrete (Bents) | 33 | CUYD | 2,000.00 | 66,000.00 | 3,800.00 | 125,400.00 | 2,500.00 | 82,500.00 | 4,000.00 | 132,000.00 | | 0119 | 805-04-00100 | Class AA(M) Concrete | 266.52 | CUYD | 1,500.00 | 399,780.00 | 1,150.00 | 306,498.00 | 1,000.00 | 266,520.00 | 650.00 | 173,238.00 | | 0120 | 805-12-07000 | Reinforced Concrete Box Culverts (10' x 10') | 520 | LNFT | 1,545.30 | 803,556.00 | 770.00 | 400,400.00 | 1,400.00 | 728,000.00 | 970.00 | 504,400.00 | | 0121 | 806-01-00100 | Deformed Reinforcing Steel | 78,765 | LB | 1.50 | 118,147.50 | 0.95 | 74,826.75 | 1.50 | 118,147.50 | 1.00 | 78,765.00 | | 0122 | 810-01-00100 | Concrete Railing (Standard Barrier) | 80 | LNFT | 185.00 | 14,800.00 | 83.00 | 6,640.00 | 150.00 | 12,000.00 | 84.00 | 6,720.00 | | 0123 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 160 | LNFT | 195.00 | 31,200.00 | 85.00 | 13,600.00 | 150.00 | 24,000.00 | 86.00 | 13,760.00 | | 0124 | 813-01-00100 | Concrete Approach Slabs | 446.66 | SQYD | 345.00 | 154,097.70 | 330.00 | 147,397.80 | 300.00 | 133,998.00 | 300.00 | 133,998.00 | | 0125 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 97 | LNFT | 25.00 | 2,425.00 | 11.00 | 1,067.00 | 4.50 | 436.50 | 14.00 | 1,358.00 | | 0126 | NS-500-00300 | Traffic Maintenance Superpave Asphaltic Concrete | 750 | TON | 120.00 | 90,000.00 | 125.00 | 93,750.00 | 150.00 | 112,500.00 | 190.00 | 142,500.00 | | 0127 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,826 | INLF | 1.50 | 4,239.00 | 1.50 | 4,239.00 | 0.85 | 2,402.10 | 1.20 | 3,391.20 | | 0128 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,374 | INLF | 1.75 | 4,154.50 | 2.65 | 6,291.10 | 1.00 | 2,374.00 | 1.00 | 2,374.00 | | 0129 | NS-700-00240 | Special Guard Rail Anchor Section | 1 | EACH | 2,320.00 | 2,320.00 | 2,320.00 | 2,320.00 | 1,000.00 | 1,000.00 | 2,500.00 | 2,500.00 | | 0130 | NS-713-00008 | Portable Changeable Message Sign | 2 | EACH | 20,000.00 | 40,000.00 | 32,000.00 | 64,000.00 | 30,000.00 | 60,000.00 | 24,000.00 | 48,000.00 | | 0131 | NS-MSC-00120 | Drainage Structure Special Detail CB-2Open06 | 13 | EACH | 4,000.00 | 52,000.00 | 6,000.00 | 78,000.00 | 12,000.00 | 156,000.00 | 7,500.00 | 97,500.00 | | 0132 | NS-MSC-00120 | Drainage Structure Special Detail PG-Drain 01 | 1 | EACH | 5,000.00 | 5,000.00 | 4,500.00 | 4,500.00 | 5,500.00 | 5,500.00 | 3,900.00 | 3,900.00 | | 0133 | NS-MSC-00120 | Drainage Structure Special Detail PG-Drain 02 | 1 | EACH | 6,000.00 | 6,000.00 | 6,000.00 | 6,000.00 | 5,500.00 | 5,500.00 | 4,200.00 | 4,200.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 13,906,955.30 | | 13,994,093.21 | | 17,276,932.91 | | 17,726,791.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 150,000.00 | 150,000.00 | | 0002 | 202-02-04000 | Removal of Bridge Removal of Bridge each | 1 | EACH | 60,000.00 | 60,000.00 | | 0003 | 202-02-04022 | Removal of Bridge Cap | 20 | LNFT | 2,000.00 | 40,000.00 | | 0004 | 202-02-04060 | Removal of Bridge Superstructure (Precast Concrete Slab Span) | 3,200 | SQFT | 20.00 | 64,000.00 | | 0005 | 202-02-06000 | Removal of Concrete Approach Slabs | 56 | SQYD | 150.00 | 8,400.00 | | 0006 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 680.1 | LNFT | 15.00 | 10,201.50 | | 0007 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,343 | SQYD | 20.00 | 26,860.00 | | 0008 | 202-02-06140 | Removal of Curbs (Concrete) | 85.4 | LNFT | 25.00 | 2,135.00 | | 0009 | 202-02-14500 | Removal of Guard Rail | 340 | LNFT | 12.00 | 4,080.00 | | 0010 | 202-02-26300 | Removal of Median / Island | 1,132 | SQYD | 12.00 | 13,584.00 | | 0011 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 737 | SQYD | 20.00 | 14,740.00 | | 0012 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 36,683.5 | SQYD | 10.00 | 366,835.00 | | 0013 | 203-01-00100 | General Excavation | 29,010 | CUYD | 16.00 | 464,160.00 | | 0014 | 203-03-00100 | Embankment | 78,522 | CUYD | 24.00 | 1,884,528.00 | | 0015 | 203-04-00300 | Nonplastic Embankment (Stone) | 1,404 | CUYD | 100.00 | 140,400.00 | | 0016 | 203-08-00100 | Geotextile Fabric | 1,103 | SQYD | 4.00 | 4,412.00 | | 0017 | 204-02-00100 | Temporary Hay or Straw Bales | 1,264 | EACH | 13.00 | 16,432.00 | | 0018 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 57 | EACH | 200.00 | 11,400.00 | | 0019 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 16 | EACH | 435.00 | 6,960.00 | | 0020 | 204-06-00100 | Temporary Silt Fencing | 42,000 | LNFT | 2.80 | 117,600.00 | | 0021 | 204-07-00100 | Temporary Stone Construction Entrance | 3 | EACH | 6,000.00 | 18,000.00 | | 0022 | 302-02-02101 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 5,945.6 | SQYD | 20.00 | 118,912.00 | | 0023 | 302-02-06020 | Class II Base Course (12" Thick) (Soil Cement) | 46,155.9 | SQYD | 15.50 | 715,416.45 | | 0024 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 47,094.5 | SQYD | 35.00 | 1,648,307.50 | | 0025 | 304-05-00100 | Lime Treatment (Type E) | 700 | TON | 380.00 | 266,000.00 | | 0026 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 342 | CUYD | 40.00 | 13,680.00 | | 0027 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 3,000 | CUYD | 70.00 | 210,000.00 | | 0028 | 502-01-00100 | Superpave Asphaltic Concrete | 24,390.2 | TON | 90.00 | 2,195,118.00 | | 0029 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 2,014 | TON | 150.00 | 302,100.00 | | 0030 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 31,386 | GAL | 2.70 | 84,742.20 | | 0031 | 507-02-00200 | Aggregate (S2) | 46,156 | SQYD | 2.70 | 124,621.20 | | 0032 | 507-02-00300 | Aggregate (S3) | 46,156 | SQYD | 2.45 | 113,082.20 | | 0033 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,619 | SQYD | 75.00 | 121,425.00 | | 0034 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 142 | LNFT | 125.00 | 17,750.00 | | 0035 | 701-01-01020 | Cross Drain Pipe (30" RCP/PP) | 104 | LNFT | 175.00 | 18,200.00 | | 0036 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 234 | LNFT | 100.00 | 23,400.00 | | 0037 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 168 | LNFT | 125.00 | 21,000.00 | | 0038 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 86 | LNFT | 140.00 | 12,040.00 | | 0039 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 2,951 | LNFT | 90.00 | 265,590.00 | | 0040 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 1,147 | LNFT | 95.00 | 108,965.00 | | 0041 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 3,061 | LNFT | 100.00 | 306,100.00 | | 0042 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 2,247 | LNFT | 145.00 | 325,815.00 | | 0043 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 1,366 | LNFT | 165.00 | 225,390.00 | | 0044 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 557 | LNFT | 175.00 | 97,475.00 | | 0045 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 178 | LNFT | 350.00 | 62,300.00 | | 0046 | 701-03-02000 | Storm Drain Pipe (Outfall) (15" PP or 18" CMP) | 20 | LNFT | 85.00 | 1,700.00 | | 0047 | 701-03-02060 | Storm Drain Pipe (Outfall) (30" PP or 36" CMP) | 225 | LNFT | 110.00 | 24,750.00 | | 0048 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) | 388 | LNFT | 125.00 | 48,500.00 | | 0049 | 701-03-02120 | Storm Drain Pipe (Outfall) (48" PP or 54" CMP) | 37 | LNFT | 285.00 | 10,545.00 | | 0050 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 21 | LNFT | 140.00 | 2,940.00 | | 0051 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 155 | LNFT | 150.00 | 23,250.00 | | 0052 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 611 | LNFT | 165.00 | 100,815.00 | | 0053 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 225 | LNFT | 175.00 | 39,375.00 | | 0054 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 1,772 | LNFT | 90.00 | 159,480.00 | | 0055 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 186 | LNFT | 110.00 | 20,460.00 | | 0056 | 701-05-02040 | Side Drain Pipe (Erosion) (18" PP/CMP) | 215 | LNFT | 90.00 | 19,350.00 | | 0057 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 65 | LNFT | 115.00 | 7,475.00 | | 0058 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 7,000.00 | 7,000.00 | | 0059 | 702-03-00100 | Catch Basins (CB-01) | 69 | EACH | 3,200.00 | 220,800.00 | | 0060 | 702-03-00500 | Catch Basins (CB-06) | 73 | EACH | 6,000.00 | 438,000.00 | | 0061 | 703-03-00100 | Perforated Pipe Underdrains | 10,453 | LNFT | 10.00 | 104,530.00 | | 0062 | 704-03-00100 | Blocked Out Guard Rail | 137.5 | LNFT | 21.00 | 2,887.50 | | 0063 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 60.00 | 6,000.00 | | 0064 | 704-11-00100 | Guard Rail End Treatment (Flared) | 3 | EACH | 2,450.00 | 7,350.00 | | 0065 | 705-01-00100 | Barbed Wire Fence | 913 | LNFT | 9.50 | 8,673.50 | | 0066 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 346 | LNFT | 12.00 | 4,152.00 | | 0067 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 750.00 | 750.00 | | 0068 | 706-01-00100 | Concrete Walk (4" Thick) | 6,532.2 | SQYD | 56.00 | 365,803.20 | | 0069 | 706-02-00200 | Concrete Drive (6" Thick) | 3,004.2 | SQYD | 70.00 | 210,294.00 | | 0070 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 1,123.7 | SQYD | 50.00 | 56,185.00 | | 0071 | 706-04-00100 | Handicapped Curb Ramps | 6 | EACH | 2,500.00 | 15,000.00 | | 0072 | 707-01-00200 | Concrete Curb (Barrier) | 85.4 | LNFT | 20.00 | 1,708.00 | | 0073 | 707-03-00100 | Combination Concrete Curb and Gutter | 21,839.1 | LNFT | 30.00 | 655,173.00 | | 0074 | 708-01-00100 | Right-of-Way Monument | 104 | EACH | 265.00 | 27,560.00 | | 0075 | 708-02-00100 | Right-of-Way Monument Witness Post | 104 | EACH | 9.00 | 936.00 | | 0076 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 905 | SQYD | 90.00 | 81,450.00 | | 0077 | 711-04-00100 | Geotextile Fabric | 905 | SQYD | 5.00 | 4,525.00 | | 0078 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 700,000.00 | 700,000.00 | | 0079 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 588 | LNFT | 2.00 | 1,176.00 | | 0080 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.748 | MILE | 500.00 | 1,874.00 | | 0081 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 50.8 | MILE | 700.00 | 35,560.00 | | 0082 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.1 | MILE | 10,000.00 | 11,000.00 | | 0083 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 55 | EACH | 50.00 | 2,750.00 | | 0084 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 2 | EACH | 50.00 | 100.00 | | 0085 | 716-01-00100 | Mulch (Vegetative) | 94.4 | TON | 700.00 | 66,080.00 | | 0086 | 717-01-00100 | Seeding | 2,124 | LB | 12.00 | 25,488.00 | | 0087 | 718-01-00100 | Fertilizer | 47,200 | LB | 0.50 | 23,600.00 | | 0088 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 7,374 | SQYD | 1.50 | 11,061.00 | | 0089 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 40,000.00 | 40,000.00 | | 0090 | 725-01-00100 | Temporary Detour Roads | 19,846.7 | SQYD | 70.00 | 1,389,269.00 | | 0091 | 726-01-00100 | Bedding Material | 3,396.5 | CUYD | 65.00 | 220,772.50 | | 0092 | 727-01-00100 | Mobilization | 1 | LUMP | 1,950,000.00 | 1,950,000.00 | | 0093 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | | 0094 | 729-19-00100 | Dead End Road Installations (Type A) | 1 | EACH | 1,500.00 | 1,500.00 | | 0095 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,237 | EACH | 5.00 | 6,185.00 | | 0096 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 813 | LNFT | 2.00 | 1,626.00 | | 0097 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,456 | LNFT | 10.00 | 14,560.00 | | 0098 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.294 | MILE | 3,300.00 | 53,770.20 | | 0099 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.578 | MILE | 1,500.00 | 5,367.00 | | 0100 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.154 | MILE | 10,000.00 | 1,540.00 | | 0101 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 48 | EACH | 300.00 | 14,400.00 | | 0102 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 300.00 | 1,200.00 | | 0103 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 500.00 | 1,000.00 | | 0104 | 732-05-00100 | Removal of Existing Markings | 2.25 | MILE | 5,000.00 | 11,250.00 | | 0105 | 735-01-00100 | Mailboxes | 41 | EACH | 20.00 | 820.00 | | 0106 | 735-02-00100 | Mailbox Supports (Single) | 41 | EACH | 150.00 | 6,150.00 | | 0107 | 740-01-00100 | Construction Layout | 1 | LUMP | 250,000.00 | 250,000.00 | | 0108 | 741-09-00100 | Adjusting Water House Connections | 20 | EACH | 100.00 | 2,000.00 | | 0109 | 741-10-00100 | Adjusting Water Service Lines | 1,000 | LNFT | 10.00 | 10,000.00 | | 0110 | 804-01-00300 | Precast Concrete Piles (16") | 903 | LNFT | 145.00 | 130,935.00 | | 0111 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 16,000.00 | 16,000.00 | | 0112 | 804-09-00100 | Loading Test Piles | 1 | EACH | 40,000.00 | 40,000.00 | | 0113 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 1,500.00 | 1,500.00 | | 0114 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 1,500.00 | 1,500.00 | | 0115 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1,500.00 | 1,500.00 | | 0116 | 804-17-00100 | Dynamic Monitoring | 5 | EACH | 1,500.00 | 7,500.00 | | 0117 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 77.97 | CUYD | 1,600.00 | 124,752.00 | | 0118 | 805-01-00700 | Class A Concrete (Bents) | 33 | CUYD | 2,700.00 | 89,100.00 | | 0119 | 805-04-00100 | Class AA(M) Concrete | 266.52 | CUYD | 750.00 | 199,890.00 | | 0120 | 805-12-07000 | Reinforced Concrete Box Culverts (10' x 10') | 520 | LNFT | 1,600.00 | 832,000.00 | | 0121 | 806-01-00100 | Deformed Reinforcing Steel | 78,765 | LB | 1.50 | 118,147.50 | | 0122 | 810-01-00100 | Concrete Railing (Standard Barrier) | 80 | LNFT | 125.00 | 10,000.00 | | 0123 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 160 | LNFT | 125.00 | 20,000.00 | | 0124 | 813-01-00100 | Concrete Approach Slabs | 446.66 | SQYD | 350.00 | 156,331.00 | | 0125 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 97 | LNFT | 1.00 | 97.00 | | 0126 | NS-500-00300 | Traffic Maintenance Superpave Asphaltic Concrete | 750 | TON | 75.00 | 56,250.00 | | 0127 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,826 | INLF | 1.00 | 2,826.00 | | 0128 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,374 | INLF | 1.00 | 2,374.00 | | 0129 | NS-700-00240 | Special Guard Rail Anchor Section | 1 | EACH | 1,800.00 | 1,800.00 | | 0130 | NS-713-00008 | Portable Changeable Message Sign | 2 | EACH | 34,500.00 | 69,000.00 | | 0131 | NS-MSC-00120 | Drainage Structure Special Detail CB-2Open06 | 13 | EACH | 10,000.00 | 130,000.00 | | 0132 | NS-MSC-00120 | Drainage Structure Special Detail PG-Drain 01 | 1 | EACH | 7,500.00 | 7,500.00 | | 0133 | NS-MSC-00120 | Drainage Structure Special Detail PG-Drain 02 | 1 | EACH | 7,500.00 | 7,500.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 20,386,495.45 |
|