Proposal:H.000464.6
Parish:Livingston
Routes:LA 1026, US 190
Description:US 190 & LA 1026 (ROUNDABOUT)
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, MILLING ASPHALT PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, TEMPORARY TRAFFIC SIGNAL INSTALLATION, ALTERNATE AA1 (P.C.C. PAVEMENT): ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT; ALTERNATE AA2 (ASPHALT CONCRETE): ASPHALT CONCRETE PAVEMENT; AND RELATED WORK.
Estimated Construction Cost:$6,938,085.80
| Rank | License | Bidder | Construction Bid |
| 1 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $6,249,971.46 |
| 2 | 55505 | MERRICK, LLC | $6,390,332.04 |
| 3 | 57931 | KCR CONTRACTORS, LLC | $6,492,322.66 |
| 4 | 06276 | Barriere Construction Co., LLC | $6,633,333.66 |
| 5 | 55950 | Brown Industrial Construction, LLC | $6,996,700.97 |
| 6 | 39462 | JB JAMES CONSTRUCTION LLC | $8,454,610.88 |
| 24901 | Hard Rock Construction LLC | IRREGULAR |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - KORT's CONSTRUCTION SERVICES, INC. | - 2 - MERRICK, LLC | - 3 - KCR CONTRACTORS, LLC | - 4 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 5 | LUMP | 90,000.00 | 90,000.00 | 285,000.00 | 285,000.00 | 185,500.00 | 185,500.00 | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 9,775.00 | 9,775.00 | 1,000.00 | 1,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 3,493 | SQYD | 7.00 | 24,451.00 | 4.50 | 15,718.50 | 2.58 | 9,011.94 | 10.00 | 34,930.00 | | 0004 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 74.9 | LNFT | 8.00 | 599.20 | 10.00 | 749.00 | 4.03 | 301.85 | 5.00 | 374.50 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,037.7 | SQYD | 9.00 | 9,339.30 | 8.00 | 8,301.60 | 8.82 | 9,152.51 | 10.00 | 10,377.00 | | 0006 | 202-02-12000 | Removal of Fence | 367 | LNFT | 4.50 | 1,651.50 | 2.00 | 734.00 | 11.50 | 4,220.50 | 5.00 | 1,835.00 | | 0007 | 202-02-12020 | Removal of Fence (Chain Link) | 740 | LNFT | 4.50 | 3,330.00 | 2.00 | 1,480.00 | 11.50 | 8,510.00 | 5.00 | 3,700.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 344.9 | LNFT | 8.00 | 2,759.20 | 5.00 | 1,724.50 | 11.50 | 3,966.35 | 10.00 | 3,449.00 | | 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) (Sta. 12+09; 6-5' x 5' x 38' RCB) | 38 | LNFT | 450.00 | 17,100.00 | 300.00 | 11,400.00 | 52.16 | 1,982.08 | 500.00 | 19,000.00 | | 0010 | 202-02-32100 | Removal of Pipe (Cross Drain) (Sta. 29+75; 2-3' x 3' x 33' RCB) | 33 | LNFT | 300.00 | 9,900.00 | 250.00 | 8,250.00 | 54.67 | 1,804.11 | 100.00 | 3,300.00 | | 0011 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 853.6 | SQYD | 8.00 | 6,828.80 | 8.00 | 6,828.80 | 6.46 | 5,514.26 | 10.00 | 8,536.00 | | 0012 | 202-02-38240 | Removal of Signs and Supports | 4 | EACH | 150.00 | 600.00 | 200.00 | 800.00 | 575.00 | 2,300.00 | 150.00 | 600.00 | | 0013 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 15,316.7 | SQYD | 11.00 | 168,483.70 | 7.00 | 107,216.90 | 3.94 | 60,347.80 | 8.00 | 122,533.60 | | 0014 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 10,300.00 | 10,300.00 | 5,500.00 | 5,500.00 | 1,154.25 | 1,154.25 | 12,000.00 | 12,000.00 | | 0015 | 202-03-38000 | Relocation of Sign (Lt. of Sta. 18+37; "JONES ELECTRIC SIGNS" Sign on Metal Frame) | 1 | EACH | 6,300.00 | 6,300.00 | 1,000.00 | 1,000.00 | 1,150.00 | 1,150.00 | 5,000.00 | 5,000.00 | | 0016 | 202-03-38000 | Relocation of Sign (Lt. of Sta. 19+22; "AMG SPECIALTY HOSPITAL" Metal Sign on Concrete Slab) | 1 | EACH | 3,200.00 | 3,200.00 | 3,500.00 | 3,500.00 | 1,150.00 | 1,150.00 | 3,000.00 | 3,000.00 | | 0017 | 202-03-38000 | Relocation of Sign (Rt. of Sta. 17+24; "LAMAR" Double Panel Sign on Metal Post) | 1 | EACH | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | 1,150.00 | 1,150.00 | 10,000.00 | 10,000.00 | | 0018 | 202-03-38000 | Relocation of Sign (Rt. of Sta. 22+01; "CONOCO" Metal Sign on Concrete Slab) | 1 | EACH | 3,200.00 | 3,200.00 | 7,000.00 | 7,000.00 | 1,150.00 | 1,150.00 | 2,500.00 | 2,500.00 | | 0019 | 203-01-00100 | General Excavation | 12,823.3 | CUYD | 10.25 | 131,438.83 | 8.00 | 102,586.40 | 9.77 | 125,283.64 | 15.00 | 192,349.50 | | 0020 | 203-02-00100 | Drainage Excavation | 704.9 | CUYD | 10.00 | 7,049.00 | 15.14 | 10,672.19 | 4.22 | 2,974.68 | 25.00 | 17,622.50 | | 0021 | 203-03-00100 | Embankment | 14,647.7 | CUYD | 26.00 | 380,840.20 | 20.00 | 292,954.00 | 15.89 | 232,751.95 | 25.00 | 366,192.50 | | 0022 | 203-10-00100 | Cleaning Existing Ditches | 2,000 | LNFT | 6.00 | 12,000.00 | 6.00 | 12,000.00 | 2.73 | 5,460.00 | 5.00 | 10,000.00 | | 0023 | 204-02-00100 | Temporary Hay Bales | 340 | EACH | 13.00 | 4,420.00 | 15.00 | 5,100.00 | 20.00 | 6,800.00 | 10.00 | 3,400.00 | | 0024 | 204-04-00100 | Temporary Sediment Basins | 12 | EACH | 275.00 | 3,300.00 | 250.00 | 3,000.00 | 287.50 | 3,450.00 | 600.00 | 7,200.00 | | 0025 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 150.00 | 600.00 | 200.00 | 800.00 | 143.75 | 575.00 | 175.00 | 700.00 | | 0026 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 5 | EACH | 250.00 | 1,250.00 | 500.00 | 2,500.00 | 575.00 | 2,875.00 | 550.00 | 2,750.00 | | 0027 | 204-06-00100 | Temporary Silt Fencing | 12,183 | LNFT | 1.60 | 19,492.80 | 2.20 | 26,802.60 | 2.13 | 25,949.79 | 2.00 | 24,366.00 | | 0028 | 302-02-04000 | Class II Base Course (4" Thick) (Stone or Recycled P.C.C.P.) | 29,120.1 | SQYD | 18.00 | 524,161.80 | 7.00 | 203,840.70 | 15.32 | 446,119.93 | 10.00 | 291,201.00 | | 0029 | 302-02-06010 | Class II Base Course (6" Thick) (Soil Cement) | 29,120.1 | SQYD | 6.30 | 183,456.63 | 11.75 | 342,161.18 | 6.90 | 200,928.69 | 10.00 | 291,201.00 | | 0030 | 304-01-00100 | Lime | 412.7 | TON | 200.00 | 82,540.00 | 205.00 | 84,603.50 | 221.15 | 91,268.61 | 40.00 | 16,508.00 | | 0031 | 304-05-00100 | Lime Treatment (Type E) | 29,120.1 | SQYD | 1.90 | 55,328.19 | 1.00 | 29,120.10 | 2.00 | 58,240.20 | 0.50 | 14,560.05 | | 0032 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 500 | CUYD | 90.00 | 45,000.00 | 55.00 | 27,500.00 | 125.00 | 62,500.00 | 20.00 | 10,000.00 | | 0033 | 509-01-00100 | Milling Asphalt Pavement | 2,533 | SQYD | 7.00 | 17,731.00 | 8.00 | 20,264.00 | 7.76 | 19,656.08 | 6.50 | 16,464.50 | | 0034 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -106 | CUYD | 1.00 | -106.00 | 1.00 | -106.00 | 1.15 | -121.90 | 1.00 | -106.00 | | 0035 | 601-01-10000 | Portland Cement Concrete Pavement (Colored)(inch Thick) (12" Thick) | 427.7 | SQYD | 130.00 | 55,601.00 | 115.00 | 49,185.50 | 175.93 | 75,245.26 | 120.00 | 51,324.00 | | 0036 | 701-02-02160 | Cross Drain Pipe Arch (48" Equiv. RCPA or 54" Equiv. CMPA) | 142 | LNFT | 250.00 | 35,500.00 | 170.00 | 24,140.00 | 190.44 | 27,042.48 | 350.00 | 49,700.00 | | 0037 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 608 | LNFT | 60.00 | 36,480.00 | 65.00 | 39,520.00 | 59.33 | 36,072.64 | 65.00 | 39,520.00 | | 0038 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 373 | LNFT | 71.00 | 26,483.00 | 85.00 | 31,705.00 | 131.16 | 48,922.68 | 85.00 | 31,705.00 | | 0039 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,667 | LNFT | 83.00 | 138,361.00 | 88.00 | 146,696.00 | 77.20 | 128,692.40 | 90.00 | 150,030.00 | | 0040 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 624 | LNFT | 98.00 | 61,152.00 | 98.00 | 61,152.00 | 87.07 | 54,331.68 | 140.00 | 87,360.00 | | 0041 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 416 | LNFT | 125.00 | 52,000.00 | 120.00 | 49,920.00 | 115.30 | 47,964.80 | 160.00 | 66,560.00 | | 0042 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 20 | LNFT | 62.00 | 1,240.00 | 70.00 | 1,400.00 | 48.00 | 960.00 | 125.00 | 2,500.00 | | 0043 | 701-03-02060 | Storm Drain Pipe (Outfall) (30" PP or 36" CMP) | 19 | LNFT | 99.00 | 1,881.00 | 100.00 | 1,900.00 | 61.06 | 1,160.14 | 170.00 | 3,230.00 | | 0044 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) | 20 | LNFT | 127.00 | 2,540.00 | 120.00 | 2,400.00 | 65.00 | 1,300.00 | 180.00 | 3,600.00 | | 0045 | 701-03-02120 | Storm Drain Pipe (Outfall) (48" PP or 54" CMP) | 125 | LNFT | 245.00 | 30,625.00 | 125.00 | 15,625.00 | 94.40 | 11,800.00 | 299.00 | 37,375.00 | | 0046 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 76 | LNFT | 185.00 | 14,060.00 | 172.00 | 13,072.00 | 162.27 | 12,332.52 | 180.00 | 13,680.00 | | 0047 | 701-04-01140 | Storm Drain Pipe Arch (54" Equiv. RCPA) | 96 | LNFT | 265.00 | 25,440.00 | 315.00 | 30,240.00 | 164.07 | 15,750.72 | 350.00 | 33,600.00 | | 0048 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 161 | LNFT | 67.00 | 10,787.00 | 70.00 | 11,270.00 | 58.30 | 9,386.30 | 70.00 | 11,270.00 | | 0049 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 287 | LNFT | 78.00 | 22,386.00 | 80.00 | 22,960.00 | 65.05 | 18,669.35 | 75.00 | 21,525.00 | | 0050 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 50 | LNFT | 107.00 | 5,350.00 | 95.00 | 4,750.00 | 73.60 | 3,680.00 | 129.00 | 6,450.00 | | 0051 | 701-05-02080 | Side Drain Pipe (Erosion) (30" PP/CMP) | 14 | LNFT | 120.00 | 1,680.00 | 100.00 | 1,400.00 | 61.61 | 862.54 | 150.00 | 2,100.00 | | 0052 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 75 | LNFT | 82.00 | 6,150.00 | 110.00 | 8,250.00 | 61.92 | 4,644.00 | 120.00 | 9,000.00 | | 0053 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 2,901 | LNFT | 5.00 | 14,505.00 | 1.00 | 2,901.00 | 5.75 | 16,680.75 | 0.01 | 29.01 | | 0054 | 702-02-00200 | Manholes (R-CB-11) | 9 | EACH | 3,700.00 | 33,300.00 | 3,300.00 | 29,700.00 | 2,985.00 | 26,865.00 | 4,500.00 | 40,500.00 | | 0055 | 702-02-00800 | Manholes (R-CB-38) | 2 | EACH | 8,500.00 | 17,000.00 | 4,400.00 | 8,800.00 | 5,164.00 | 10,328.00 | 9,000.00 | 18,000.00 | | 0056 | 702-03-00100 | Catch Basins (CB-01) | 28 | EACH | 3,000.00 | 84,000.00 | 3,100.00 | 86,800.00 | 2,861.00 | 80,108.00 | 3,000.00 | 84,000.00 | | 0057 | 702-03-00500 | Catch Basins (CB-06) | 32 | EACH | 5,100.00 | 163,200.00 | 4,000.00 | 128,000.00 | 3,516.00 | 112,512.00 | 6,500.00 | 208,000.00 | | 0058 | 702-03-00700 | Catch Basins (CB-08) | 5 | EACH | 11,000.00 | 55,000.00 | 6,600.00 | 33,000.00 | 6,754.62 | 33,773.10 | 12,000.00 | 60,000.00 | | 0059 | 703-01-00100 | Shoulder Underdrain Systems | 10,118 | LNFT | 13.00 | 131,534.00 | 8.50 | 86,003.00 | 11.49 | 116,255.82 | 15.00 | 151,770.00 | | 0060 | 705-04-00100 | Single Swinging Driveway Gates | 2 | EACH | 950.00 | 1,900.00 | 550.00 | 1,100.00 | 575.00 | 1,150.00 | 1,000.00 | 2,000.00 | | 0061 | 705-05-00100 | Double Swinging Driveway Gates | 1 | DBGT | 1,575.00 | 1,575.00 | 1,100.00 | 1,100.00 | 1,150.00 | 1,150.00 | 1,500.00 | 1,500.00 | | 0062 | 705-08-02020 | 6-Foot Double Gates for Chain Link Fence (5-Foot Height) | 1 | DBGT | 2,300.00 | 2,300.00 | 1,700.00 | 1,700.00 | 1,725.00 | 1,725.00 | 2,500.00 | 2,500.00 | | 0063 | 705-08-05040 | 12-Foot Double Gates for Chain Link Fence (6-Foot Height) | 1 | DBGT | 2,500.00 | 2,500.00 | 2,200.00 | 2,200.00 | 2,300.00 | 2,300.00 | 3,000.00 | 3,000.00 | | 0064 | 705-09-00100 | Rebuilt Fence | 676 | LNFT | 40.00 | 27,040.00 | 40.00 | 27,040.00 | 41.98 | 28,378.48 | 50.00 | 33,800.00 | | 0065 | 706-01-00100 | Concrete Walk (4" Thick) | 2,462.8 | SQYD | 45.00 | 110,826.00 | 35.00 | 86,198.00 | 44.15 | 108,732.62 | 60.00 | 147,768.00 | | 0066 | 706-02-00200 | Concrete Drive (6" Thick) | 1,038.8 | SQYD | 57.00 | 59,211.60 | 57.00 | 59,211.60 | 61.21 | 63,584.95 | 70.00 | 72,716.00 | | 0067 | 706-02-00400 | Concrete Drive (10" Thick) | 1,591.1 | SQYD | 72.00 | 114,559.20 | 62.00 | 98,648.20 | 79.50 | 126,492.45 | 90.00 | 143,199.00 | | 0068 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 173.5 | SQYD | 60.00 | 10,410.00 | 64.00 | 11,104.00 | 56.76 | 9,847.86 | 70.00 | 12,145.00 | | 0069 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (6" Thick) | 554.3 | SQYD | 95.00 | 52,658.50 | 70.00 | 38,801.00 | 92.35 | 51,189.61 | 80.00 | 44,344.00 | | 0070 | 706-04-00100 | Handicapped Curb Ramps | 20 | EACH | 1,800.00 | 36,000.00 | 850.00 | 17,000.00 | 977.50 | 19,550.00 | 1,500.00 | 30,000.00 | | 0071 | 708-01-00100 | Right-of-Way Monument | 44 | EACH | 255.00 | 11,220.00 | 225.00 | 9,900.00 | 232.61 | 10,234.84 | 150.00 | 6,600.00 | | 0072 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 1,059.5 | SQYD | 80.00 | 84,760.00 | 55.00 | 58,272.50 | 67.53 | 71,548.04 | 75.00 | 79,462.50 | | 0073 | 711-04-00100 | Geotextile Fabric | 1,059.5 | SQYD | 1.00 | 1,059.50 | 1.20 | 1,271.40 | 1.50 | 1,589.25 | 1.00 | 1,059.50 | | 0074 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 170,000.00 | 170,000.00 | 375,000.00 | 375,000.00 | 201,250.00 | 201,250.00 | 100,000.00 | 100,000.00 | | 0075 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 745 | LNFT | 1.00 | 745.00 | 1.20 | 894.00 | 0.29 | 216.05 | 1.00 | 745.00 | | 0076 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.104 | MILE | 620.00 | 684.48 | 330.00 | 364.32 | 2,604.25 | 2,875.09 | 300.00 | 331.20 | | 0077 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.429 | MILE | 600.00 | 8,657.40 | 1,100.00 | 15,871.90 | 690.00 | 9,956.01 | 500.00 | 7,214.50 | | 0078 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 29 | EACH | 40.00 | 1,160.00 | 55.00 | 1,595.00 | 17.25 | 500.25 | 40.00 | 1,160.00 | | 0079 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 752 | EACH | 6.00 | 4,512.00 | 7.00 | 5,264.00 | 4.60 | 3,459.20 | 5.00 | 3,760.00 | | 0080 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 14 | EACH | 1,200.00 | 16,800.00 | 800.00 | 11,200.00 | 411.00 | 5,754.00 | 1,000.00 | 14,000.00 | | 0081 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 13,500.00 | 54,000.00 | 2,500.00 | 10,000.00 | 19,952.50 | 79,810.00 | 10,000.00 | 40,000.00 | | 0082 | 716-01-00100 | Mulch (Vegetative) | 9.9 | TON | 900.00 | 8,910.00 | 800.00 | 7,920.00 | 805.00 | 7,969.50 | 1,000.00 | 9,900.00 | | 0083 | 717-01-00100 | Seeding | 150 | LB | 13.00 | 1,950.00 | 15.00 | 2,250.00 | 14.95 | 2,242.50 | 12.00 | 1,800.00 | | 0084 | 718-01-00100 | Fertilizer | 4,950 | LB | 0.80 | 3,960.00 | 0.60 | 2,970.00 | 0.58 | 2,871.00 | 1.00 | 4,950.00 | | 0085 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,833.8 | SQYD | 1.35 | 3,825.63 | 1.50 | 4,250.70 | 1.44 | 4,080.67 | 2.00 | 5,667.60 | | 0086 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 279 | SQYD | 1.90 | 530.10 | 2.50 | 697.50 | 2.30 | 641.70 | 2.50 | 697.50 | | 0087 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 39 | SQYD | 2.05 | 79.95 | 4.00 | 156.00 | 3.45 | 134.55 | 3.00 | 117.00 | | 0088 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 5,750.00 | 5,750.00 | 12,000.00 | 12,000.00 | | 0089 | 725-01-00100 | Temporary Detour Roads | 2,383.3 | SQYD | 45.00 | 107,248.50 | 80.00 | 190,664.00 | 69.01 | 164,471.53 | 60.00 | 142,998.00 | | 0090 | 726-01-00100 | Bedding Material | 784.95 | CUYD | 75.00 | 58,871.25 | 77.00 | 60,441.15 | 38.53 | 30,244.12 | 60.00 | 47,097.00 | | 0091 | 727-01-00100 | Mobilization | 1 | LUMP | 168,000.00 | 168,000.00 | 620,000.00 | 620,000.00 | 321,353.00 | 321,353.00 | 600,000.00 | 600,000.00 | | 0092 | 729-01-00100 | Sign (Type A) | 550.2 | SQFT | 30.00 | 16,506.00 | 28.00 | 15,405.60 | 28.75 | 15,818.25 | 25.00 | 13,755.00 | | 0093 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 22 | EACH | 90.00 | 1,980.00 | 115.00 | 2,530.00 | 86.25 | 1,897.50 | 100.00 | 2,200.00 | | 0094 | 731-02-00100 | Reflectorized Raised Pavement Markers | 442 | EACH | 7.00 | 3,094.00 | 7.30 | 3,226.60 | 5.75 | 2,541.50 | 10.00 | 4,420.00 | | 0095 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.307 | MILE | 3,500.00 | 11,574.50 | 5,000.00 | 16,535.00 | 4,830.00 | 15,972.81 | 3,500.00 | 11,574.50 | | 0096 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.085 | MILE | 7,000.00 | 595.00 | 16,000.00 | 1,360.00 | 16,675.00 | 1,417.38 | 6,000.00 | 510.00 | | 0097 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.02 | MILE | 20,000.00 | 400.00 | 35,000.00 | 700.00 | 40,250.00 | 805.00 | 18,000.00 | 360.00 | | 0098 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.442 | MILE | 40,000.00 | 17,680.00 | 65,000.00 | 28,730.00 | 51,750.00 | 22,873.50 | 35,000.00 | 15,470.00 | | 0099 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.276 | MILE | 1,200.00 | 331.20 | 1,700.00 | 469.20 | 1,437.50 | 396.75 | 1,250.00 | 345.00 | | 0100 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.183 | MILE | 1,300.00 | 237.90 | 4,500.00 | 823.50 | 4,025.00 | 736.58 | 1,400.00 | 256.20 | | 0101 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.324 | MILE | 3,500.00 | 1,134.00 | 7,000.00 | 2,268.00 | 7,475.00 | 2,421.90 | 3,250.00 | 1,053.00 | | 0102 | 732-03-02050 | Plastic Pavement Striping (Dotted Line)(12" W)(2' L)(Thermo 90 mil) | 0.052 | MILE | 9,300.00 | 483.60 | 14,000.00 | 728.00 | 9,775.00 | 508.30 | 8,500.00 | 442.00 | | 0103 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 275.00 | 550.00 | 360.00 | 720.00 | 402.50 | 805.00 | 275.00 | 550.00 | | 0104 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 12 | EACH | 275.00 | 3,300.00 | 360.00 | 4,320.00 | 402.50 | 4,830.00 | 275.00 | 3,300.00 | | 0105 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 3 | EACH | 450.00 | 1,350.00 | 380.00 | 1,140.00 | 747.50 | 2,242.50 | 400.00 | 1,200.00 | | 0106 | 732-04-01130 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LTRC) | 1 | EACH | 900.00 | 900.00 | 900.00 | 900.00 | 1,437.50 | 1,437.50 | 1,000.00 | 1,000.00 | | 0107 | 732-04-01131 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type LTC) | 3 | EACH | 900.00 | 2,700.00 | 900.00 | 2,700.00 | 1,437.50 | 4,312.50 | 1,000.00 | 3,000.00 | | 0108 | 732-04-01132 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TRC) | 1 | EACH | 900.00 | 900.00 | 900.00 | 900.00 | 1,437.50 | 1,437.50 | 1,000.00 | 1,000.00 | | 0109 | 732-04-01133 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LC) | 1 | EACH | 900.00 | 900.00 | 900.00 | 900.00 | 1,437.50 | 1,437.50 | 1,000.00 | 1,000.00 | | 0110 | 735-01-00100 | Mailboxes | 36 | EACH | 15.00 | 540.00 | 10.00 | 360.00 | 17.25 | 621.00 | 5.00 | 180.00 | | 0111 | 735-02-00100 | Mailbox Supports (Single) | 36 | EACH | 125.00 | 4,500.00 | 185.00 | 6,660.00 | 132.25 | 4,761.00 | 130.00 | 4,680.00 | | 0112 | 736-16-00000 | Temporary Traffic Signal Installation (Intersection) | 1 | EACH | 63,000.00 | 63,000.00 | 65,000.00 | 65,000.00 | 50,690.35 | 50,690.35 | 70,000.00 | 70,000.00 | | 0113 | 740-01-00100 | Construction Layout | 1 | LUMP | 65,000.00 | 65,000.00 | 50,000.00 | 50,000.00 | 143,750.00 | 143,750.00 | 50,000.00 | 50,000.00 | | 0114 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 | 102,400.00 | 102,400.00 | 5,000.00 | 5,000.00 | | 0115 | 802-03-00100 | Temporary Sheeting (Steel) | 2,300 | SQFT | 25.00 | 57,500.00 | 13.00 | 29,900.00 | 54.78 | 125,994.00 | 20.00 | 46,000.00 | | 0116 | 805-13-02300 | Reinforced Concrete Box Culverts (Cast-In-Place or Precast) (10' x 8') | 240 | LNFT | 1,000.00 | 240,000.00 | 985.00 | 236,400.00 | 1,295.00 | 310,800.00 | 1,500.00 | 360,000.00 | | 0117 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (Lt. & Rt. of Sta. 12+11.70; 11'-10" X 69'-10") | 2 | EACH | 42,000.00 | 84,000.00 | 60,000.00 | 120,000.00 | 58,000.00 | 116,000.00 | 70,000.00 | 140,000.00 | | 0118 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 8,506 | INLF | 1.00 | 8,506.00 | 1.50 | 12,759.00 | 1.05 | 8,931.30 | 1.00 | 8,506.00 | | 0119 | NS-700-00800 | Impact Attenuator (Construction Zone)(Test Level 2) | 2 | EACH | 6,000.00 | 12,000.00 | 8,000.00 | 16,000.00 | 16,050.00 | 32,100.00 | 8,000.00 | 16,000.00 | | 0120 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad - Soil | 31 | EACH | 600.00 | 18,600.00 | 625.00 | 19,375.00 | 626.75 | 19,429.25 | 600.00 | 18,600.00 | | 0121 | NS-729-00030 | Breakaway Square Tubing Sign Support - Wet Concrete | 14 | EACH | 600.00 | 8,400.00 | 210.00 | 2,940.00 | 626.75 | 8,774.50 | 200.00 | 2,800.00 | | 0122 | NS-MSC-00120 | Drainage Structure (Pipe Headwall)(Lt. of Sta. 29+75.00; 6'-10" x 32'-4") | 1 | EACH | 25,000.00 | 25,000.00 | 22,000.00 | 22,000.00 | 24,725.00 | 24,725.00 | 30,000.00 | 30,000.00 | | 0123 | NS-MSC-00120 | Drainage Structure (Pipe Headwall)(Rt. of Sta. 29+75.00; 6'-10" x 32'-4") | 1 | EACH | 25,000.00 | 25,000.00 | 22,000.00 | 22,000.00 | 24,725.00 | 24,725.00 | 30,000.00 | 30,000.00 | | 0124 | NS-MSC-00120 | Drainage Structure Paved Gutter Drain (Type 1) | 17 | EACH | 3,800.00 | 64,600.00 | 2,300.00 | 39,100.00 | 2,242.50 | 38,122.50 | 3,000.00 | 51,000.00 | | | | SUBTOTAL GENERAL | | | | 4,773,016 | | 5,034,727 | | 4,922,961 | | 5,181,106 | | | | | | | | | | | | | | | | | Alternate AA1 | Alternate AA1 (P.C.C. Pavement) | | | | | | | | | | | | | | | | | | | | | | | | | | 0125 | 502-01-00100 | Asphalt Concrete | 6,407.9 | TON | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0126 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 14,173.8 | SQYD | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0127 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 19 | EACH | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0128 | 707-01-00200 | Concrete Curb (Barrier) (6") | 1,658.5 | LNFT | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0129 | 707-01-00300 | Concrete Curb (Mountable) (3") | 1,529.6 | LNFT | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0130 | 707-01-00300 | Concrete Curb (Mountable) (4") | 4,903.6 | LNFT | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0131 | 707-03-00100 | Combination Concrete Curb and Gutter (Mountable)(4") | 1,419.4 | LNFT | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | SUBTOTAL ALT AA1 | | | | 00 | | 00 | | 00 | | 00 | | | | | | | | | | | | | | | | | Alternate AA2 | Alternate AA2 (Asphalt Concrete) | | | | | | | | | | | | | | | | | | | | | | | | | | 0132 | 502-01-00100 | Asphalt Concrete | 13,443 | TON | 93.00 | 1,250,199.00 | 91.00 | 1,223,313.00 | 92.40 | 1,242,133.20 | 87.50 | 1,176,262.50 | | 0133 | 707-01-00200 | Concrete Curb (Barrier) | 216.8 | LNFT | 17.00 | 3,685.60 | 10.00 | 2,168.00 | 15.79 | 3,423.27 | 20.00 | 4,336.00 | | 0134 | 707-03-00100 | Combination Concrete Curb and Gutter (Barrier) (6") | 1,441.7 | LNFT | 24.00 | 34,600.80 | 14.00 | 20,183.80 | 38.48 | 55,476.62 | 25.00 | 36,042.50 | | 0135 | 707-03-00100 | Combination Concrete Curb and Gutter (Mountable) (3") | 1,529.6 | LNFT | 24.00 | 36,710.40 | 14.00 | 21,414.40 | 36.73 | 56,182.21 | 30.00 | 45,888.00 | | 0136 | 707-03-00100 | Combination Concrete Curb and Gutter (Mountable) (4") | 6,323.3 | LNFT | 24.00 | 151,759.20 | 14.00 | 88,526.20 | 33.55 | 212,146.72 | 30.00 | 189,699.00 | | | | SUBTOTAL ALT AA2 | | | | 1,476,955.00 | | 1,355,605.40 | | 1,569,362.02 | | 1,452,228.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,249,971.46 | | 6,390,332.04 | | 6,492,322.66 | | 6,633,333.66 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Brown Industrial Construction, LLC | - 6 - JB JAMES CONSTRUCTION LLC | Hard Rock Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 5 | LUMP | 100,000.00 | 100,000.00 | 300,000.00 | 300,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 84,000.00 | 84,000.00 | 89,000.00 | 89,000.00 | 21,000.00 | 21,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 3,493 | SQYD | 7.00 | 24,451.00 | 18.00 | 62,874.00 | 12.00 | 41,916.00 | | 0004 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 74.9 | LNFT | 30.00 | 2,247.00 | 80.00 | 5,992.00 | 10.00 | 749.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,037.7 | SQYD | 11.00 | 11,414.70 | 37.00 | 38,394.90 | 12.00 | 12,452.40 | | 0006 | 202-02-12000 | Removal of Fence | 367 | LNFT | 5.00 | 1,835.00 | 4.00 | 1,468.00 | 8.00 | 2,936.00 | | 0007 | 202-02-12020 | Removal of Fence (Chain Link) | 740 | LNFT | 6.00 | 4,440.00 | 4.00 | 2,960.00 | 8.00 | 5,920.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 344.9 | LNFT | 6.00 | 2,069.40 | 7.75 | 2,672.98 | 8.00 | 2,759.20 | | 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) (Sta. 12+09; 6-5' x 5' x 38' RCB) | 38 | LNFT | 32.00 | 1,216.00 | 375.00 | 14,250.00 | 872.00 | 33,136.00 | | 0010 | 202-02-32100 | Removal of Pipe (Cross Drain) (Sta. 29+75; 2-3' x 3' x 33' RCB) | 33 | LNFT | 37.00 | 1,221.00 | 110.00 | 3,630.00 | 335.00 | 11,055.00 | | 0011 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 853.6 | SQYD | 14.00 | 11,950.40 | 55.00 | 46,948.00 | 10.00 | 8,536.00 | | 0012 | 202-02-38240 | Removal of Signs and Supports | 4 | EACH | 350.00 | 1,400.00 | 125.00 | 500.00 | 137.00 | 548.00 | | 0013 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 15,316.7 | SQYD | 5.00 | 76,583.50 | 21.00 | 321,650.70 | 10.00 | 153,167.00 | | 0014 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 18,395.00 | 18,395.00 | 5,000.00 | 5,000.00 | 20,000.00 | 20,000.00 | | 0015 | 202-03-38000 | Relocation of Sign (Lt. of Sta. 18+37; "JONES ELECTRIC SIGNS" Sign on Metal Frame) | 1 | EACH | 1,700.00 | 1,700.00 | 35,000.00 | 35,000.00 | 16,500.00 | 16,500.00 | | 0016 | 202-03-38000 | Relocation of Sign (Lt. of Sta. 19+22; "AMG SPECIALTY HOSPITAL" Metal Sign on Concrete Slab) | 1 | EACH | 2,500.00 | 2,500.00 | 4,000.00 | 4,000.00 | 5,500.00 | 5,500.00 | | 0017 | 202-03-38000 | Relocation of Sign (Rt. of Sta. 17+24; "LAMAR" Double Panel Sign on Metal Post) | 1 | EACH | 5,500.00 | 5,500.00 | 15,000.00 | 15,000.00 | 27,500.00 | 27,500.00 | | 0018 | 202-03-38000 | Relocation of Sign (Rt. of Sta. 22+01; "CONOCO" Metal Sign on Concrete Slab) | 1 | EACH | 5,500.00 | 5,500.00 | 5,000.00 | 5,000.00 | 11,000.00 | 11,000.00 | | 0019 | 203-01-00100 | General Excavation | 12,823.3 | CUYD | 13.00 | 166,702.90 | 15.00 | 192,349.50 | 15.00 | 192,349.50 | | 0020 | 203-02-00100 | Drainage Excavation | 704.9 | CUYD | 16.00 | 11,278.40 | 25.00 | 17,622.50 | 35.00 | 24,671.50 | | 0021 | 203-03-00100 | Embankment | 14,647.7 | CUYD | 28.00 | 410,135.60 | 29.00 | 424,783.30 | 20.00 | 292,954.00 | | 0022 | 203-10-00100 | Cleaning Existing Ditches | 2,000 | LNFT | 10.00 | 20,000.00 | 5.00 | 10,000.00 | 2.70 | 5,400.00 | | 0023 | 204-02-00100 | Temporary Hay Bales | 340 | EACH | 12.00 | 4,080.00 | 10.00 | 3,400.00 | 13.00 | 4,420.00 | | 0024 | 204-04-00100 | Temporary Sediment Basins | 12 | EACH | 250.00 | 3,000.00 | 250.00 | 3,000.00 | 280.00 | 3,360.00 | | 0025 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 150.00 | 600.00 | 125.00 | 500.00 | 137.00 | 548.00 | | 0026 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 5 | EACH | 250.00 | 1,250.00 | 850.00 | 4,250.00 | 777.00 | 3,885.00 | | 0027 | 204-06-00100 | Temporary Silt Fencing | 12,183 | LNFT | 1.30 | 15,837.90 | 2.75 | 33,503.25 | 1.60 | 19,492.80 | | 0028 | 302-02-04000 | Class II Base Course (4" Thick) (Stone or Recycled P.C.C.P.) | 29,120.1 | SQYD | 13.00 | 378,561.30 | 15.00 | 436,801.50 | 28.00 | 815,362.80 | | 0029 | 302-02-06010 | Class II Base Course (6" Thick) (Soil Cement) | 29,120.1 | SQYD | 13.00 | 378,561.30 | 8.25 | 240,240.83 | 9.00 | 262,080.90 | | 0030 | 304-01-00100 | Lime | 412.7 | TON | 160.00 | 66,032.00 | 190.00 | 78,413.00 | 250.00 | 103,175.00 | | 0031 | 304-05-00100 | Lime Treatment (Type E) | 29,120.1 | SQYD | 1.50 | 43,680.15 | 1.75 | 50,960.18 | 6.00 | 174,720.60 | | 0032 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 500 | CUYD | 90.00 | 45,000.00 | 80.00 | 40,000.00 | 72.00 | 36,000.00 | | 0033 | 509-01-00100 | Milling Asphalt Pavement | 2,533 | SQYD | 6.75 | 17,097.75 | 6.75 | 17,097.75 | 7.50 | 18,997.50 | | 0034 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -106 | CUYD | 0.01 | -1.06 | 1.00 | -106.00 | 1.00 | -106.00 | | 0035 | 601-01-10000 | Portland Cement Concrete Pavement (Colored)(inch Thick) (12" Thick) | 427.7 | SQYD | 122.00 | 52,179.40 | 100.00 | 42,770.00 | 130.00 | 55,601.00 | | 0036 | 701-02-02160 | Cross Drain Pipe Arch (48" Equiv. RCPA or 54" Equiv. CMPA) | 142 | LNFT | 185.00 | 26,270.00 | 205.00 | 29,110.00 | 330.00 | 46,860.00 | | 0037 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 608 | LNFT | 75.00 | 45,600.00 | 120.00 | 72,960.00 | 126.00 | 76,608.00 | | 0038 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 373 | LNFT | 75.00 | 27,975.00 | 95.00 | 35,435.00 | 134.00 | 49,982.00 | | 0039 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,667 | LNFT | 85.00 | 141,695.00 | 110.00 | 183,370.00 | 150.00 | 250,050.00 | | 0040 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 624 | LNFT | 100.00 | 62,400.00 | 140.00 | 87,360.00 | 160.00 | 99,840.00 | | 0041 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 416 | LNFT | 125.00 | 52,000.00 | 280.00 | 116,480.00 | 200.00 | 83,200.00 | | 0042 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 20 | LNFT | 150.00 | 3,000.00 | 105.00 | 2,100.00 | 316.00 | 6,320.00 | | 0043 | 701-03-02060 | Storm Drain Pipe (Outfall) (30" PP or 36" CMP) | 19 | LNFT | 185.00 | 3,515.00 | 148.00 | 2,812.00 | 342.00 | 6,498.00 | | 0044 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) | 20 | LNFT | 205.00 | 4,100.00 | 157.00 | 3,140.00 | 363.00 | 7,260.00 | | 0045 | 701-03-02120 | Storm Drain Pipe (Outfall) (48" PP or 54" CMP) | 125 | LNFT | 175.00 | 21,875.00 | 239.00 | 29,875.00 | 291.00 | 36,375.00 | | 0046 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 76 | LNFT | 200.00 | 15,200.00 | 225.00 | 17,100.00 | 308.00 | 23,408.00 | | 0047 | 701-04-01140 | Storm Drain Pipe Arch (54" Equiv. RCPA) | 96 | LNFT | 207.00 | 19,872.00 | 434.00 | 41,664.00 | 525.00 | 50,400.00 | | 0048 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 161 | LNFT | 83.00 | 13,363.00 | 110.00 | 17,710.00 | 136.00 | 21,896.00 | | 0049 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 287 | LNFT | 87.00 | 24,969.00 | 115.00 | 33,005.00 | 151.00 | 43,337.00 | | 0050 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 50 | LNFT | 105.00 | 5,250.00 | 170.00 | 8,500.00 | 170.00 | 8,500.00 | | 0051 | 701-05-02080 | Side Drain Pipe (Erosion) (30" PP/CMP) | 14 | LNFT | 190.00 | 2,660.00 | 165.00 | 2,310.00 | 258.00 | 3,612.00 | | 0052 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 75 | LNFT | 125.00 | 9,375.00 | 120.00 | 9,000.00 | 158.00 | 11,850.00 | | 0053 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 2,901 | LNFT | 8.00 | 23,208.00 | 5.00 | 14,505.00 | 1.20 | 3,481.20 | | 0054 | 702-02-00200 | Manholes (R-CB-11) | 9 | EACH | 3,500.00 | 31,500.00 | 7,500.00 | 67,500.00 | 5,595.00 | 50,355.00 | | 0055 | 702-02-00800 | Manholes (R-CB-38) | 2 | EACH | 5,700.00 | 11,400.00 | 17,000.00 | 34,000.00 | 8,615.00 | 17,230.00 | | 0056 | 702-03-00100 | Catch Basins (CB-01) | 28 | EACH | 2,500.00 | 70,000.00 | 4,000.00 | 112,000.00 | 3,161.00 | 88,508.00 | | 0057 | 702-03-00500 | Catch Basins (CB-06) | 32 | EACH | 4,000.00 | 128,000.00 | 6,000.00 | 192,000.00 | 6,187.00 | 197,984.00 | | 0058 | 702-03-00700 | Catch Basins (CB-08) | 5 | EACH | 6,250.00 | 31,250.00 | 12,000.00 | 60,000.00 | 10,888.00 | 54,440.00 | | 0059 | 703-01-00100 | Shoulder Underdrain Systems | 10,118 | LNFT | 10.00 | 101,180.00 | 14.00 | 141,652.00 | 23.00 | 232,714.00 | | 0060 | 705-04-00100 | Single Swinging Driveway Gates | 2 | EACH | 1,500.00 | 3,000.00 | 500.00 | 1,000.00 | 990.00 | 1,980.00 | | 0061 | 705-05-00100 | Double Swinging Driveway Gates | 1 | DBGT | 2,000.00 | 2,000.00 | 1,000.00 | 1,000.00 | 1,650.00 | 1,650.00 | | 0062 | 705-08-02020 | 6-Foot Double Gates for Chain Link Fence (5-Foot Height) | 1 | DBGT | 1,750.00 | 1,750.00 | 1,500.00 | 1,500.00 | 2,420.00 | 2,420.00 | | 0063 | 705-08-05040 | 12-Foot Double Gates for Chain Link Fence (6-Foot Height) | 1 | DBGT | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 | 2,640.00 | 2,640.00 | | 0064 | 705-09-00100 | Rebuilt Fence | 676 | LNFT | 17.00 | 11,492.00 | 36.50 | 24,674.00 | 42.00 | 28,392.00 | | 0065 | 706-01-00100 | Concrete Walk (4" Thick) | 2,462.8 | SQYD | 40.00 | 98,512.00 | 64.00 | 157,619.20 | 63.00 | 155,156.40 | | 0066 | 706-02-00200 | Concrete Drive (6" Thick) | 1,038.8 | SQYD | 52.00 | 54,017.60 | 78.00 | 81,026.40 | 78.00 | 81,026.40 | | 0067 | 706-02-00400 | Concrete Drive (10" Thick) | 1,591.1 | SQYD | 72.00 | 114,559.20 | 92.00 | 146,381.20 | 80.00 | 127,288.00 | | 0068 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 173.5 | SQYD | 120.00 | 20,820.00 | 80.00 | 13,880.00 | 60.00 | 10,410.00 | | 0069 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) (6" Thick) | 554.3 | SQYD | 76.00 | 42,126.80 | 95.00 | 52,658.50 | 68.00 | 37,692.40 | | 0070 | 706-04-00100 | Handicapped Curb Ramps | 20 | EACH | 1,200.00 | 24,000.00 | 1,500.00 | 30,000.00 | 1,162.00 | 23,240.00 | | 0071 | 708-01-00100 | Right-of-Way Monument | 44 | EACH | 300.00 | 13,200.00 | 37.00 | 1,628.00 | 222.00 | 9,768.00 | | 0072 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 1,059.5 | SQYD | 70.00 | 74,165.00 | 80.00 | 84,760.00 | 90.00 | 95,355.00 | | 0073 | 711-04-00100 | Geotextile Fabric | 1,059.5 | SQYD | 1.00 | 1,059.50 | 3.00 | 3,178.50 | 1.20 | 1,271.40 | | 0074 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 155,000.00 | 155,000.00 | 150,000.00 | 150,000.00 | 175,000.00 | 175,000.00 | | 0075 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 745 | LNFT | 1.00 | 745.00 | 0.78 | 581.10 | 0.85 | 633.25 | | 0076 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.104 | MILE | 997.00 | 1,100.69 | 287.00 | 316.85 | 315.00 | 347.76 | | 0077 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.429 | MILE | 1,000.00 | 14,429.00 | 688.00 | 9,927.15 | 750.00 | 10,821.75 | | 0078 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 29 | EACH | 50.00 | 1,450.00 | 30.00 | 870.00 | 33.00 | 957.00 | | 0079 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 752 | EACH | 6.50 | 4,888.00 | 2.00 | 1,504.00 | 2.00 | 1,504.00 | | 0080 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 14 | EACH | 473.00 | 6,622.00 | 425.00 | 5,950.00 | 565.00 | 7,910.00 | | 0081 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 10,000.00 | 40,000.00 | 20,000.00 | 80,000.00 | 14,000.00 | 56,000.00 | | 0082 | 716-01-00100 | Mulch (Vegetative) | 9.9 | TON | 350.00 | 3,465.00 | 700.00 | 6,930.00 | 935.00 | 9,256.50 | | 0083 | 717-01-00100 | Seeding | 150 | LB | 12.00 | 1,800.00 | 13.00 | 1,950.00 | 13.00 | 1,950.00 | | 0084 | 718-01-00100 | Fertilizer | 4,950 | LB | 2.00 | 9,900.00 | 0.50 | 2,475.00 | 0.80 | 3,960.00 | | 0085 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,833.8 | SQYD | 1.55 | 4,392.39 | 1.25 | 3,542.25 | 1.40 | 3,967.32 | | 0086 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 279 | SQYD | 1.85 | 516.15 | 2.00 | 558.00 | 2.00 | 558.00 | | 0087 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 39 | SQYD | 2.25 | 87.75 | 3.00 | 117.00 | 2.00 | 78.00 | | 0088 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 80,000.00 | 80,000.00 | | 0089 | 725-01-00100 | Temporary Detour Roads | 2,383.3 | SQYD | 52.00 | 123,931.60 | 125.00 | 297,912.50 | 70.00 | 166,831.00 | | 0090 | 726-01-00100 | Bedding Material | 784.95 | CUYD | 75.00 | 58,871.25 | 100.00 | 78,495.00 | 67.00 | 52,591.65 | | 0091 | 727-01-00100 | Mobilization | 1 | LUMP | 696,000.00 | 696,000.00 | 800,000.00 | 800,000.00 | 392,000.00 | 392,000.00 | | 0092 | 729-01-00100 | Sign (Type A) | 550.2 | SQFT | 25.00 | 13,755.00 | 23.00 | 12,654.60 | 25.00 | 13,755.00 | | 0093 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 22 | EACH | 100.00 | 2,200.00 | 95.00 | 2,090.00 | 104.00 | 2,288.00 | | 0094 | 731-02-00100 | Reflectorized Raised Pavement Markers | 442 | EACH | 5.00 | 2,210.00 | 5.00 | 2,210.00 | 5.00 | 2,210.00 | | 0095 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.307 | MILE | 4,500.00 | 14,881.50 | 2,475.00 | 8,184.83 | 2,700.00 | 8,928.90 | | 0096 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.085 | MILE | 16,000.00 | 1,360.00 | 5,225.00 | 444.13 | 6,100.00 | 518.50 | | 0097 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.02 | MILE | 30,000.00 | 600.00 | 11,000.00 | 220.00 | 12,000.00 | 240.00 | | 0098 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.442 | MILE | 60,000.00 | 26,520.00 | 22,000.00 | 9,724.00 | 23,000.00 | 10,166.00 | | 0099 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.276 | MILE | 1,500.00 | 414.00 | 930.00 | 256.68 | 975.00 | 269.10 | | 0100 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.183 | MILE | 3,900.00 | 713.70 | 1,100.00 | 201.30 | 1,200.00 | 219.60 | | 0101 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.324 | MILE | 5,900.00 | 1,911.60 | 1,800.00 | 583.20 | 2,000.00 | 648.00 | | 0102 | 732-03-02050 | Plastic Pavement Striping (Dotted Line)(12" W)(2' L)(Thermo 90 mil) | 0.052 | MILE | 12,000.00 | 624.00 | 2,450.00 | 127.40 | 2,800.00 | 145.60 | | 0103 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 300.00 | 600.00 | 165.00 | 330.00 | 180.00 | 360.00 | | 0104 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 12 | EACH | 300.00 | 3,600.00 | 165.00 | 1,980.00 | 180.00 | 2,160.00 | | 0105 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 3 | EACH | 325.00 | 975.00 | 225.00 | 675.00 | 240.00 | 720.00 | | 0106 | 732-04-01130 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LTRC) | 1 | EACH | 750.00 | 750.00 | 450.00 | 450.00 | 495.00 | 495.00 | | 0107 | 732-04-01131 | PlstcPvmtLgnds&Sym(DirArrRndbt-Fshk)(Type LTC) | 3 | EACH | 750.00 | 2,250.00 | 400.00 | 1,200.00 | 440.00 | 1,320.00 | | 0108 | 732-04-01132 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type TRC) | 1 | EACH | 750.00 | 750.00 | 400.00 | 400.00 | 440.00 | 440.00 | | 0109 | 732-04-01133 | Plstc Pvmt Lgnds and Symb (Dir Arr Rndbt - Fshk) (Type LC) | 1 | EACH | 750.00 | 750.00 | 350.00 | 350.00 | 385.00 | 385.00 | | 0110 | 735-01-00100 | Mailboxes | 36 | EACH | 15.00 | 540.00 | 15.00 | 540.00 | 7.00 | 252.00 | | 0111 | 735-02-00100 | Mailbox Supports (Single) | 36 | EACH | 115.00 | 4,140.00 | 115.00 | 4,140.00 | 170.00 | 6,120.00 | | 0112 | 736-16-00000 | Temporary Traffic Signal Installation (Intersection) | 1 | EACH | 83,209.00 | 83,209.00 | 65,000.00 | 65,000.00 | 90,000.00 | 90,000.00 | | 0113 | 740-01-00100 | Construction Layout | 1 | LUMP | 60,000.00 | 60,000.00 | 200,000.00 | 200,000.00 | 30,000.00 | 30,000.00 | | 0114 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 52,000.00 | 52,000.00 | 1.00 | 1.00 | 7,000.00 | 7,000.00 | | 0115 | 802-03-00100 | Temporary Sheeting (Steel) | 2,300 | SQFT | 23.00 | 52,900.00 | 45.00 | 103,500.00 | 1.00 | 2,300.00 | | 0116 | 805-13-02300 | Reinforced Concrete Box Culverts (Cast-In-Place or Precast) (10' x 8') | 240 | LNFT | 900.00 | 216,000.00 | 1,200.00 | 288,000.00 | 2,000.00 | 480,000.00 | | 0117 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (Lt. & Rt. of Sta. 12+11.70; 11'-10" X 69'-10") | 2 | EACH | 39,000.00 | 78,000.00 | 60,000.00 | 120,000.00 | 55,000.00 | 110,000.00 | | 0118 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 8,506 | INLF | 0.75 | 6,379.50 | 0.60 | 5,103.60 | 1.00 | 8,506.00 | | 0119 | NS-700-00800 | Impact Attenuator (Construction Zone)(Test Level 2) | 2 | EACH | 6,900.00 | 13,800.00 | 650.00 | 1,300.00 | 10,000.00 | 20,000.00 | | 0120 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad - Soil | 31 | EACH | 545.00 | 16,895.00 | 525.00 | 16,275.00 | 500.00 | 15,500.00 | | 0121 | NS-729-00030 | Breakaway Square Tubing Sign Support - Wet Concrete | 14 | EACH | 545.00 | 7,630.00 | 175.00 | 2,450.00 | 190.00 | 2,660.00 | | 0122 | NS-MSC-00120 | Drainage Structure (Pipe Headwall)(Lt. of Sta. 29+75.00; 6'-10" x 32'-4") | 1 | EACH | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 28,000.00 | 28,000.00 | | 0123 | NS-MSC-00120 | Drainage Structure (Pipe Headwall)(Rt. of Sta. 29+75.00; 6'-10" x 32'-4") | 1 | EACH | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 28,000.00 | 28,000.00 | | 0124 | NS-MSC-00120 | Drainage Structure Paved Gutter Drain (Type 1) | 17 | EACH | 4,000.00 | 68,000.00 | 8,000.00 | 136,000.00 | 2,600.00 | 44,200.00 | | | | SUBTOTAL GENERAL | | | | 5,201,835 | | 6,965,340 | | 6,343,758 | | | | | | | | | | | | | | | Alternate AA1 | Alternate AA1 (P.C.C. Pavement) | | | | | | | | | | | | | | | | | | | | | | 0125 | 502-01-00100 | Asphalt Concrete | 6,407.9 | TON | 110.00 | 704,869.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0126 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 14,173.8 | SQYD | 59.00 | 836,254.20 | 0.00 | 0.00 | 0.00 | 0.00 | | 0127 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 19 | EACH | 100.00 | 1,900.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0128 | 707-01-00200 | Concrete Curb (Barrier) (6") | 1,658.5 | LNFT | 25.00 | 41,462.50 | 0.00 | 0.00 | 0.00 | 0.00 | | 0129 | 707-01-00300 | Concrete Curb (Mountable) (3") | 1,529.6 | LNFT | 25.00 | 38,240.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0130 | 707-01-00300 | Concrete Curb (Mountable) (4") | 4,903.6 | LNFT | 27.00 | 132,397.20 | 0.00 | 0.00 | 0.00 | 0.00 | | 0131 | 707-03-00100 | Combination Concrete Curb and Gutter (Mountable)(4") | 1,419.4 | LNFT | 28.00 | 39,743.20 | 0.00 | 0.00 | 0.00 | 0.00 | | | | SUBTOTAL ALT AA1 | | | | 1,794,866 | | 00 | | 00 | | | | | | | | | | | | | | | Alternate AA2 | Alternate AA2 (Asphalt Concrete) | | | | | | | | | | | | | | | | | | | | | | 0132 | 502-01-00100 | Asphalt Concrete | 13,443 | TON | 0.00 | 0.00 | 88.00 | 1,182,984.00 | 100.00 | 1,344,300.00 | | 0133 | 707-01-00200 | Concrete Curb (Barrier) | 216.8 | LNFT | 0.00 | 0.00 | 25.00 | 5,420.00 | 13.00 | 2,818.40 | | 0134 | 707-03-00100 | Combination Concrete Curb and Gutter (Barrier) (6") | 1,441.7 | LNFT | 0.00 | 0.00 | 30.00 | 43,251.00 | 37.00 | 53,342.90 | | 0135 | 707-03-00100 | Combination Concrete Curb and Gutter (Mountable) (3") | 1,529.6 | LNFT | 0.00 | 0.00 | 32.00 | 48,947.20 | 37.00 | 56,595.20 | | 0136 | 707-03-00100 | Combination Concrete Curb and Gutter (Mountable) (4") | 6,323.3 | LNFT | 0.00 | 0.00 | 33.00 | 208,668.90 | 37.00 | 233,962.10 | | | | SUBTOTAL ALT AA2 | | | | 0.00 | | 1,489,271.10 | | 1,691,018.60 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,996,700.97 | | 8,454,610.88 | | IRREGULAR |
|