Proposal:H.012422.6
Parish:East Baton Rouge
Routes:I-110
Description:I-110: INTERCHANGE MODIFICATION @ TERRACE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE (STEEL GIRDER SPAN), GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, PORTLAND CEMENT CONCRETE PAVEMENT, DRILLED SHAFTS, GIRDER SPAN BRIDGE, CONCRETE APPROACH SLABS, INTELLIGENT TRANSPORTATION SYSTEM, AND RELATED WORK.
Estimated Construction Cost:$10,317,046.24
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$5,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 55950 | Brown Industrial Construction, LLC | $8,789,230.50 | 300.00 | $10,289,230.50 |
| 2 | 39462 | JB JAMES CONSTRUCTION LLC | $9,641,012.53 | 300.00 | $11,141,012.53 |
| 3 | 34567 | James Construction Group LLC | $9,207,419.24 | 425.00 | $11,332,419.24 |
| 4 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $10,112,868.84 | 400.00 | $12,112,868.84 |
| 5 | 26435 | C.E.C., Inc. | $12,195,201.67 | 365.00 | $14,020,201.67 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Brown Industrial Construction, LLC | - 2 - JB JAMES CONSTRUCTION LLC | - 3 - James Construction Group LLC | - 4 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.2 | LUMP | 550,000.00 | 550,000.00 | 400,000.00 | 400,000.00 | 11,500.00 | 11,500.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 39,000.00 | 39,000.00 | 100,000.00 | 100,000.00 | 4,508.48 | 4,508.48 | 50,000.00 | 50,000.00 | | 0003 | 202-02-00020 | Removal of Base Course | 726 | SQYD | 5.00 | 3,630.00 | 13.00 | 9,438.00 | 12.00 | 8,712.00 | 20.00 | 14,520.00 | | 0004 | 202-02-04500 | Removal of Bridge (Steel Girder Span) | 4,843 | SQFT | 10.00 | 48,430.00 | 50.00 | 242,150.00 | 40.00 | 193,720.00 | 22.00 | 106,546.00 | | 0005 | 202-02-04510 | Removal of Bridge Deck (Hydro Demolition) (I-110) | 6,646 | SFIN | 10.00 | 66,460.00 | 10.00 | 66,460.00 | 20.00 | 132,920.00 | 20.00 | 132,920.00 | | 0006 | 202-02-04520 | Removal of Bridge Component (Cap) | 29 | LNFT | 220.00 | 6,380.00 | 500.00 | 14,500.00 | 1,300.00 | 37,700.00 | 250.00 | 7,250.00 | | 0007 | 202-02-04520 | Removal of Bridge Component (Column) | 25 | LNFT | 125.00 | 3,125.00 | 500.00 | 12,500.00 | 300.00 | 7,500.00 | 75.00 | 1,875.00 | | 0008 | 202-02-04520 | Removal of Bridge Component (Pile) | 9 | LNFT | 170.00 | 1,530.00 | 750.00 | 6,750.00 | 700.00 | 6,300.00 | 400.00 | 3,600.00 | | 0009 | 202-02-04540 | Removal of Bridge Component (Footing) | 1 | EACH | 1,800.00 | 1,800.00 | 90,000.00 | 90,000.00 | 7,800.00 | 7,800.00 | 2,000.00 | 2,000.00 | | 0010 | 202-02-04540 | Removal of Bridge Component (Riser) | 7 | EACH | 350.00 | 2,450.00 | 5,000.00 | 35,000.00 | 230.00 | 1,610.00 | 350.00 | 2,450.00 | | 0011 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 63.3 | LNFT | 18.00 | 1,139.40 | 16.00 | 1,012.80 | 50.00 | 3,165.00 | 25.00 | 1,582.50 | | 0012 | 202-02-06100 | Removal of Concrete Walks and Drives | 421 | SQYD | 12.00 | 5,052.00 | 20.00 | 8,420.00 | 15.00 | 6,315.00 | 15.00 | 6,315.00 | | 0013 | 202-02-26300 | Removal of Median / Island | 262 | SQYD | 12.00 | 3,144.00 | 12.00 | 3,144.00 | 25.00 | 6,550.00 | 15.00 | 3,930.00 | | 0014 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 737 | SQYD | 14.00 | 10,318.00 | 8.00 | 5,896.00 | 20.00 | 14,740.00 | 15.00 | 11,055.00 | | 0015 | 202-02-38220 | Removal of Sign Supports | 1 | EACH | 550.00 | 550.00 | 500.00 | 500.00 | 225.00 | 225.00 | 1,000.00 | 1,000.00 | | 0016 | 202-02-38300 | Removal of Sign and U-Channel Post | 11 | EACH | 30.00 | 330.00 | 25.00 | 275.00 | 50.00 | 550.00 | 50.00 | 550.00 | | 0017 | 202-02-38320 | Removal of Sign Supports (Overhead) | 1 | EACH | 120.00 | 120.00 | 2,100.00 | 2,100.00 | 5,000.00 | 5,000.00 | 120.00 | 120.00 | | 0018 | 202-02-38360 | Removal of Sign Faces | 11 | EACH | 170.00 | 1,870.00 | 150.00 | 1,650.00 | 220.00 | 2,420.00 | 175.00 | 1,925.00 | | 0019 | 203-01-00100 | General Excavation | 212 | CUYD | 25.00 | 5,300.00 | 45.00 | 9,540.00 | 55.00 | 11,660.00 | 50.00 | 10,600.00 | | 0020 | 203-03-00100 | Embankment | 587 | CUYD | 30.00 | 17,610.00 | 55.00 | 32,285.00 | 55.00 | 32,285.00 | 50.00 | 29,350.00 | | 0021 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0022 | 204-02-00100 | Temporary Hay Bales | 15 | EACH | 15.00 | 225.00 | 20.00 | 300.00 | 25.00 | 375.00 | 20.00 | 300.00 | | 0023 | 204-06-00100 | Temporary Silt Fencing | 2,056 | LNFT | 2.00 | 4,112.00 | 2.00 | 4,112.00 | 2.50 | 5,140.00 | 1.75 | 3,598.00 | | 0024 | 302-02-08000 | Class II Base Course (8" Thick) . | 552.8 | SQYD | 30.00 | 16,584.00 | 30.00 | 16,584.00 | 50.00 | 27,640.00 | 45.00 | 24,876.00 | | 0025 | 304-01-00100 | Lime | 7.83 | TON | 250.00 | 1,957.50 | 250.00 | 1,957.50 | 500.00 | 3,915.00 | 300.00 | 2,349.00 | | 0026 | 304-05-00100 | Lime Treatment (Type E) | 553 | SQYD | 10.00 | 5,530.00 | 13.00 | 7,189.00 | 15.00 | 8,295.00 | 12.00 | 6,636.00 | | 0027 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 155.8 | SQYD | 95.00 | 14,801.00 | 125.00 | 19,475.00 | 250.00 | 38,950.00 | 150.00 | 23,370.00 | | 0028 | 601-02-00900 | Portland Cement Concrete Pavement (9" Thick) (Crossovers & Turnouts) | 261.4 | SQYD | 95.00 | 24,833.00 | 130.00 | 33,982.00 | 125.00 | 32,675.00 | 150.00 | 39,210.00 | | 0029 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 1 | EACH | 150.00 | 150.00 | 350.00 | 350.00 | 100.00 | 100.00 | 400.00 | 400.00 | | 0030 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 160 | LNFT | 80.00 | 12,800.00 | 122.00 | 19,520.00 | 115.00 | 18,400.00 | 150.00 | 24,000.00 | | 0031 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 2,500.00 | 7,500.00 | 4,000.00 | 12,000.00 | 5,000.00 | 15,000.00 | 4,000.00 | 12,000.00 | | 0032 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 5,000.00 | 5,000.00 | 7,000.00 | 7,000.00 | 11,500.00 | 11,500.00 | 10,000.00 | 10,000.00 | | 0033 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 2,000.00 | 2,000.00 | 3,500.00 | 3,500.00 | 3,500.00 | 3,500.00 | 3,000.00 | 3,000.00 | | 0034 | 706-01-00100 | Concrete Walk (4" Thick) | 257.5 | SQYD | 46.00 | 11,845.00 | 80.00 | 20,600.00 | 70.00 | 18,025.00 | 65.00 | 16,737.50 | | 0035 | 706-02-00200 | Concrete Drive (6" Thick) | 113 | SQYD | 66.00 | 7,458.00 | 90.00 | 10,170.00 | 105.00 | 11,865.00 | 110.00 | 12,430.00 | | 0036 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 45.9 | SQYD | 75.00 | 3,442.50 | 120.00 | 5,508.00 | 160.00 | 7,344.00 | 90.00 | 4,131.00 | | 0037 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 125.7 | SQYD | 75.00 | 9,427.50 | 130.00 | 16,341.00 | 150.00 | 18,855.00 | 95.00 | 11,941.50 | | 0038 | 706-04-00100 | Handicapped Curb Ramps | 10 | EACH | 1,400.00 | 14,000.00 | 2,300.00 | 23,000.00 | 1,000.00 | 10,000.00 | 3,000.00 | 30,000.00 | | 0039 | 707-01-00200 | Concrete Curb (Barrier) | 402.2 | LNFT | 14.00 | 5,630.80 | 25.00 | 10,055.00 | 30.00 | 12,066.00 | 30.00 | 12,066.00 | | 0040 | 707-03-00100 | Combination Concrete Curb and Gutter | 410.8 | LNFT | 28.00 | 11,502.40 | 39.00 | 16,021.20 | 35.00 | 14,378.00 | 60.00 | 24,648.00 | | 0041 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 23 | SQYD | 85.00 | 1,955.00 | 130.00 | 2,990.00 | 250.00 | 5,750.00 | 300.00 | 6,900.00 | | 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 190,000.00 | 190,000.00 | 300,000.00 | 300,000.00 | 50,000.00 | 50,000.00 | 750,000.00 | 750,000.00 | | 0043 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 3.846 | MILE | 9,200.00 | 35,383.20 | 7,000.00 | 26,922.00 | 5,500.00 | 21,153.00 | 12,000.00 | 46,152.00 | | 0044 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 53 | EACH | 1,100.00 | 58,300.00 | 1,900.00 | 100,700.00 | 1,500.00 | 79,500.00 | 1,600.00 | 84,800.00 | | 0045 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 52 | EACH | 240.00 | 12,480.00 | 1,250.00 | 65,000.00 | 200.00 | 10,400.00 | 50.00 | 2,600.00 | | 0046 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 15,000.00 | 30,000.00 | 30,000.00 | 60,000.00 | 9,000.00 | 18,000.00 | 30,000.00 | 60,000.00 | | 0047 | 714-01-00500 | Slab Sodding (Common Bermuda) | 2,700 | SQYD | 10.00 | 27,000.00 | 5.50 | 14,850.00 | 6.00 | 16,200.00 | 7.00 | 18,900.00 | | 0048 | 715-01-00100 | Topsoil | 502 | CUYD | 28.00 | 14,056.00 | 25.00 | 12,550.00 | 75.00 | 37,650.00 | 50.00 | 25,100.00 | | 0049 | 718-01-00100 | Fertilizer | 300 | LB | 2.00 | 600.00 | 2.00 | 600.00 | 1.00 | 300.00 | 1.25 | 375.00 | | 0050 | 718-02-00100 | Agricultural Lime | 1 | TON | 400.00 | 400.00 | 2,000.00 | 2,000.00 | 600.00 | 600.00 | 800.00 | 800.00 | | 0051 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 70,000.00 | 70,000.00 | 35,000.00 | 35,000.00 | | 0052 | 726-01-00100 | Bedding Material | 16.6 | CUYD | 100.00 | 1,660.00 | 120.00 | 1,992.00 | 315.45 | 5,236.47 | 100.00 | 1,660.00 | | 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 870,000.00 | 870,000.00 | 975,000.00 | 975,000.00 | 930,000.00 | 930,000.00 | 1,000,000.00 | 1,000,000.00 | | 0054 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 403.5 | SQFT | 30.00 | 12,105.00 | 25.50 | 10,289.25 | 25.00 | 10,087.50 | 28.00 | 11,298.00 | | 0055 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 95.5 | SQFT | 30.00 | 2,865.00 | 25.50 | 2,435.25 | 30.00 | 2,865.00 | 28.00 | 2,674.00 | | 0056 | 729-05-00102 | Sign (Type E)(Furnish and Install) | 120 | SQFT | 35.00 | 4,200.00 | 30.50 | 3,660.00 | 35.00 | 4,200.00 | 34.00 | 4,080.00 | | 0057 | 729-06-00102 | Sign (Overhead Mounted)(Furnish and Install) | 617.5 | SQFT | 35.00 | 21,612.50 | 35.75 | 22,075.63 | 35.00 | 21,612.50 | 40.00 | 24,700.00 | | 0058 | 729-08-00200 | Mounting (3 1/2" Size Post) | 4 | EACH | 1,200.00 | 4,800.00 | 1,225.00 | 4,900.00 | 1,200.00 | 4,800.00 | 1,400.00 | 5,600.00 | | 0059 | 729-08-00300 | Mounting (5" Size Post) | 2 | EACH | 1,600.00 | 3,200.00 | 1,525.00 | 3,050.00 | 1,500.00 | 3,000.00 | 1,700.00 | 3,400.00 | | 0060 | 729-08-00310 | Mounting (5" Size Post)(Structure Mount) | 5 | EACH | 2,800.00 | 14,000.00 | 2,550.00 | 12,750.00 | 3,500.00 | 17,500.00 | 3,000.00 | 15,000.00 | | 0061 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 4 | EACH | 1,800.00 | 7,200.00 | 1,785.00 | 7,140.00 | 1,800.00 | 7,200.00 | 2,000.00 | 8,000.00 | | 0062 | 729-08-00610 | Mounting (W6 x 12 Size Post)(Structure Mount) | 1 | EACH | 5,500.00 | 5,500.00 | 5,100.00 | 5,100.00 | 4,000.00 | 4,000.00 | 5,800.00 | 5,800.00 | | 0063 | 729-12-00100 | Mounting (Overhead Cantilever) (Structure Mounted) | 1 | EACH | 50,000.00 | 50,000.00 | 48,500.00 | 48,500.00 | 50,000.00 | 50,000.00 | 65,000.00 | 65,000.00 | | 0064 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 1 | EACH | 11,000.00 | 11,000.00 | 10,200.00 | 10,200.00 | 8,000.00 | 8,000.00 | 12,000.00 | 12,000.00 | | 0065 | 729-19-00300 | Dead End Road Installations (Type C) T Intersection | 1 | EACH | 1,100.00 | 1,100.00 | 920.00 | 920.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | | 0066 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 15 | EACH | 160.00 | 2,400.00 | 150.00 | 2,250.00 | 125.00 | 1,875.00 | 175.00 | 2,625.00 | | 0067 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,140 | EACH | 6.00 | 6,840.00 | 5.00 | 5,700.00 | 6.00 | 6,840.00 | 10.00 | 11,400.00 | | 0068 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 46 | LNFT | 10.00 | 460.00 | 6.00 | 276.00 | 15.00 | 690.00 | 17.00 | 782.00 | | 0069 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.847 | MILE | 4,100.00 | 7,572.70 | 3,400.00 | 6,279.80 | 5,308.61 | 9,805.00 | 5,200.00 | 9,604.40 | | 0070 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.373 | MILE | 8,000.00 | 2,984.00 | 5,300.00 | 1,976.90 | 14,879.36 | 5,550.00 | 11,500.00 | 4,289.50 | | 0071 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.086 | MILE | 42,000.00 | 3,612.00 | 36,000.00 | 3,096.00 | 45,000.00 | 3,870.00 | 81,000.00 | 6,966.00 | | 0072 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.057 | MILE | 3,200.00 | 182.40 | 12,000.00 | 684.00 | 1,000.00 | 57.00 | 1,500.00 | 85.50 | | 0073 | 732-03-02001 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermo 90 mil)(Blk Cont) | 0.775 | MILE | 3,300.00 | 2,557.50 | 6,900.00 | 5,347.50 | 2,781.94 | 2,156.00 | 4,000.00 | 3,100.00 | | 0074 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.386 | MILE | 4,100.00 | 1,582.60 | 6,700.00 | 2,586.20 | 6,103.63 | 2,356.00 | 4,500.00 | 1,737.00 | | 0075 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 300.00 | 1,200.00 | 230.00 | 920.00 | 400.00 | 1,600.00 | 300.00 | 1,200.00 | | 0076 | 732-04-05040 | Plastic Pavement Legends and Symbols (EXIT ONLY) | 2 | EACH | 700.00 | 1,400.00 | 400.00 | 800.00 | 1,200.00 | 2,400.00 | 600.00 | 1,200.00 | | 0077 | 732-05-00100 | Removal of Existing Markings | 0.709 | MILE | 12,000.00 | 8,508.00 | 6,000.00 | 4,254.00 | 8,000.00 | 5,672.00 | 5,700.00 | 4,041.30 | | 0078 | 739-01-00100 | Hydro-Seeding | 0.9 | ACRE | 3,500.00 | 3,150.00 | 2,500.00 | 2,250.00 | 2,300.00 | 2,070.00 | 1,731.60 | 1,558.44 | | 0079 | 740-01-00100 | Construction Layout | 1 | LUMP | 90,000.00 | 90,000.00 | 200,000.00 | 200,000.00 | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | | 0080 | 802-01-00100 | Structural Excavation (Bents) | 46 | CUYD | 100.00 | 4,600.00 | 107.00 | 4,922.00 | 131.02 | 6,026.92 | 50.00 | 2,300.00 | | 0081 | 803-01-00200 | Drilled Shaft (24" Diameter) | 564 | LNFT | 350.00 | 197,400.00 | 450.00 | 253,800.00 | 350.00 | 197,400.00 | 500.00 | 282,000.00 | | 0082 | 803-01-00400 | Drilled Shaft (36" Diameter) | 110 | LNFT | 550.00 | 60,500.00 | 450.00 | 49,500.00 | 600.00 | 66,000.00 | 525.00 | 57,750.00 | | 0083 | 803-01-00600 | Drilled Shaft (48" Diameter) | 200 | LNFT | 700.00 | 140,000.00 | 600.00 | 120,000.00 | 750.00 | 150,000.00 | 550.00 | 110,000.00 | | 0084 | 803-01-01300 | Drilled Shaft (96" Diameter) | 889 | LNFT | 1,100.00 | 977,900.00 | 650.00 | 577,850.00 | 1,400.00 | 1,244,600.00 | 775.00 | 688,975.00 | | 0085 | 803-02-01300 | Test Shaft (96" Diameter) | 105 | LNFT | 1,500.00 | 157,500.00 | 1,600.00 | 168,000.00 | 1,400.00 | 147,000.00 | 4,200.00 | 441,000.00 | | 0086 | 803-07-01300 | Bi-Directional Load Cell Test (96" Diameter) | 1 | EACH | 110,000.00 | 110,000.00 | 300,000.00 | 300,000.00 | 78,000.00 | 78,000.00 | 385,000.00 | 385,000.00 | | 0090 | 803-08-01300 | Crosshole Sonic Log Test (96" Diameter) | 10 | EACH | 4,500.00 | 45,000.00 | 9,000.00 | 90,000.00 | 4,000.00 | 40,000.00 | 13,000.00 | 130,000.00 | | 0091 | 803-10-00200 | Permanent Casing (24" Diameter) | 240 | LNFT | 140.00 | 33,600.00 | 75.00 | 18,000.00 | 130.00 | 31,200.00 | 85.00 | 20,400.00 | | 0092 | 803-10-01300 | Permanent Casing (96" Diameter) | 180 | LNFT | 600.00 | 108,000.00 | 525.00 | 94,500.00 | 550.00 | 99,000.00 | 600.00 | 108,000.00 | | 0093 | 804-18-00100 | Vibration Monitoring | 1 | DAY | 2,000.00 | 2,000.00 | 10,000.00 | 10,000.00 | 750.00 | 750.00 | 10,000.00 | 10,000.00 | | 0094 | 805-01-00200 | Class A1 Concrete (Deck) | 552.08 | CUYD | 950.00 | 524,476.00 | 1,200.00 | 662,496.00 | 1,000.00 | 552,080.00 | 1,000.00 | 552,080.00 | | 0095 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 2.33 | CUYD | 13,000.00 | 30,290.00 | 9,300.00 | 21,669.00 | 11,000.00 | 25,630.00 | 15,000.00 | 34,950.00 | | 0096 | 805-04-00100 | Class MASS(A1) Concrete (Bent Cap) | 256.91 | CUYD | 1,500.00 | 385,365.00 | 1,400.00 | 359,674.00 | 1,500.00 | 385,365.00 | 1,500.00 | 385,365.00 | | 0097 | 805-04-00200 | Class MASS(A1) Concrete (Column) | 108.7 | CUYD | 790.00 | 85,873.00 | 1,100.00 | 119,570.00 | 1,800.00 | 195,660.00 | 1,500.00 | 163,050.00 | | 0098 | 805-04-00300 | Class MASS(A1) Concrete (Footing) | 32.73 | CUYD | 750.00 | 24,547.50 | 900.00 | 29,457.00 | 2,500.00 | 81,825.00 | 750.00 | 24,547.50 | | 0099 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 8,753 | SQFT | 0.60 | 5,251.80 | 1.00 | 8,753.00 | 2.00 | 17,506.00 | 4.00 | 35,012.00 | | 0100 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 24,384 | SQFT | 0.70 | 17,068.80 | 1.50 | 36,576.00 | 3.00 | 73,152.00 | 4.00 | 97,536.00 | | 0101 | 806-01-00100 | Deformed Reinforcing Steel | 300,396 | LB | 1.10 | 330,435.60 | 1.50 | 450,594.00 | 1.50 | 450,594.00 | 1.20 | 360,475.20 | | 0102 | 807-01-00200 | Structural Metalwork (Grade 50) | 649,371 | LUMP | 1,750,000.00 | 1,750,000.00 | 1,400,000.00 | 1,400,000.00 | 1,788,306.00 | 1,788,306.00 | 1,450,000.00 | 1,450,000.00 | | 0103 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 2,164 | LUMP | 52,000.00 | 52,000.00 | 40,000.00 | 40,000.00 | 31,617.43 | 31,617.43 | 31,000.00 | 31,000.00 | | 0104 | 810-01-00100 | Concrete Bridge Railing (Standard) | 1,055 | LNFT | 65.00 | 68,575.00 | 82.00 | 86,510.00 | 65.00 | 68,575.00 | 75.00 | 79,125.00 | | 0105 | 810-01-00100 | Concrete Bridge Railing (Standard) (TL-5) | 171 | LNFT | 480.00 | 82,080.00 | 180.00 | 30,780.00 | 90.00 | 15,390.00 | 125.00 | 21,375.00 | | 0106 | 810-01-00400 | Concrete Bridge Railing (Transition) | 100 | LNFT | 480.00 | 48,000.00 | 250.00 | 25,000.00 | 150.00 | 15,000.00 | 500.00 | 50,000.00 | | 0107 | 810-05-00400 | Concrete Roadway Barrier (Transition) | 80 | LNFT | 680.00 | 54,400.00 | 500.00 | 40,000.00 | 500.00 | 40,000.00 | 500.00 | 40,000.00 | | 0108 | 811-01-00100 | Cleaning and Painting (Connections) | 1 | LUMP | 30,000.00 | 30,000.00 | 140,000.00 | 140,000.00 | 133,000.00 | 133,000.00 | 160,000.00 | 160,000.00 | | 0109 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,050 | SQFT | 40.00 | 42,000.00 | 70.00 | 73,500.00 | 104.44 | 109,662.00 | 75.00 | 78,750.00 | | 0110 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 305 | SFIN | 100.00 | 30,500.00 | 440.00 | 134,200.00 | 157.32 | 47,982.60 | 100.00 | 30,500.00 | | 0111 | 815-01-00300 | Unsealed Expansion Joint (Sliding Plate) | 148 | LNFT | 1,100.00 | 162,800.00 | 1,200.00 | 177,600.00 | 792.00 | 117,216.00 | 1,500.00 | 222,000.00 | | 0112 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 180 | LNFT | 300.00 | 54,000.00 | 490.00 | 88,200.00 | 470.30 | 84,654.00 | 500.00 | 90,000.00 | | 0113 | 816-01-00100 | Bridge Deck Drainage System (Collection) | 1 | LUMP | 240,000.00 | 240,000.00 | 200,000.00 | 200,000.00 | 100,000.00 | 100,000.00 | 230,000.00 | 230,000.00 | | 0114 | 822-01-00100 | Trenching and Backfilling | 80 | LNFT | 14.00 | 1,120.00 | 14.00 | 1,120.00 | 5.73 | 458.40 | 16.00 | 1,280.00 | | 0115 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (EMPTY) | 240 | LNFT | 3.50 | 840.00 | 3.00 | 720.00 | 3.93 | 943.20 | 4.00 | 960.00 | | 0116 | 822-02-01100 | Conduit w Conductors (Rigid Alum) (3/4") (Conduit C; 2#10, 1#10 Green Insulated Ground) | 300 | LNFT | 11.00 | 3,300.00 | 10.00 | 3,000.00 | 25.87 | 7,761.00 | 11.00 | 3,300.00 | | 0117 | 822-02-01400 | Conduit w Conductors (Rigid Alum) (1-1/2") (Conduit B; 2#6, 1#6 Green Insulated Ground) | 745 | LNFT | 14.00 | 10,430.00 | 14.00 | 10,430.00 | 28.83 | 21,478.35 | 16.00 | 11,920.00 | | 0118 | 822-02-03100 | Conduit w Conductors (Liq Tight Flexible Metal) (3/4") (Conduit D; 2#10, 1#10 Green Insulated Ground) | 18 | LNFT | 17.00 | 306.00 | 17.00 | 306.00 | 85.88 | 1,545.84 | 20.00 | 360.00 | | 0119 | 822-02-03400 | Conduit w Conductors (Liq Tight Flexible Metal) (1-1/2") (Conduit A; 2#6, 1#6 Green Insulated Ground) | 18 | LNFT | 25.00 | 450.00 | 25.00 | 450.00 | 86.91 | 1,564.38 | 28.00 | 504.00 | | 0120 | 822-05-02100 | Light Pole (35') (Alum) (Single Arm) | 6 | EACH | 3,600.00 | 21,600.00 | 4,600.00 | 27,600.00 | 4,115.32 | 24,691.92 | 8,200.00 | 49,200.00 | | 0121 | 822-07-00700 | Luminaire (100 Watt) (High Pressure Sodium) (Lowmast) | 6 | EACH | 550.00 | 3,300.00 | 556.00 | 3,336.00 | 439.24 | 2,635.44 | 600.00 | 3,600.00 | | 0122 | 822-07-00700 | Luminaire (100 Watt) (High Pressure Sodium) (Underpass) | 6 | EACH | 800.00 | 4,800.00 | 793.00 | 4,758.00 | 822.02 | 4,932.12 | 900.00 | 5,400.00 | | 0123 | 822-09-00100 | Electrical System (IP ADDRESSABLE PDU) | 1 | LUMP | 700.00 | 700.00 | 677.00 | 677.00 | 7,758.59 | 7,758.59 | 750.00 | 750.00 | | 0124 | 822-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 2,200.00 | 2,200.00 | 2,200.00 | 2,200.00 | 4,562.43 | 4,562.43 | 2,500.00 | 2,500.00 | | 0125 | 822-14-00100 | Removal and Disposal of Luminaire | 2 | EACH | 110.00 | 220.00 | 111.00 | 222.00 | 65.38 | 130.76 | 125.00 | 250.00 | | 0126 | 822-17-00400 | Structure Junction Box (Stainless Steel) (10" x 4" x 4") | 11 | EACH | 850.00 | 9,350.00 | 860.00 | 9,460.00 | 728.73 | 8,016.03 | 980.00 | 10,780.00 | | 0127 | 822-20-00200 | Disconnect (Underpass) | 2 | EACH | 1,200.00 | 2,400.00 | 1,187.00 | 2,374.00 | 3,748.66 | 7,497.32 | 1,300.00 | 2,600.00 | | 0128 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 80 | LNFT | 1.00 | 80.00 | 1.00 | 80.00 | 0.82 | 65.60 | 1.00 | 80.00 | | 0129 | 830-07-00100 | Structural Concrete Patching | 24 | SQFT | 260.00 | 6,240.00 | 460.00 | 11,040.00 | 520.54 | 12,492.96 | 600.00 | 14,400.00 | | 0130 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 5,899 | INLF | 1.20 | 7,078.80 | 1.50 | 8,848.50 | 1.00 | 5,899.00 | 1.50 | 8,848.50 | | 0131 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 1 | EACH | 25,000.00 | 25,000.00 | 8,600.00 | 8,600.00 | 8,600.00 | 8,600.00 | 15,000.00 | 15,000.00 | | 0132 | NS-700-00840 | Impact Attenuator (Test Level 3) (Kinetic) | 1 | EACH | 15,000.00 | 15,000.00 | 27,500.00 | 27,500.00 | 27,500.00 | 27,500.00 | 35,000.00 | 35,000.00 | | 0133 | NS-729-00010 | Bridge-Mounted Sign Struct Found Retrofit (Steel) Sign Cant | 1 | EACH | 75,000.00 | 75,000.00 | 32,000.00 | 32,000.00 | 68,000.00 | 68,000.00 | 40,000.00 | 40,000.00 | | 0134 | NS-729-00031 | Breakaway Square Tubing Sign Support - Hard Concrete | 3 | EACH | 450.00 | 1,350.00 | 450.00 | 1,350.00 | 125.00 | 375.00 | 520.00 | 1,560.00 | | 0135 | NS-ENH-03000 | Catch Basin Top ADA Grate | 1 | EACH | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | 1,000.00 | 1,000.00 | 2,000.00 | 2,000.00 | | 0136 | NS-ITS-01241 | CCTV C/Assembly, Install with PTZ, Digital | 2 | EACH | 550.00 | 1,100.00 | 556.00 | 1,112.00 | 1,000.00 | 2,000.00 | 630.00 | 1,260.00 | | 0137 | NS-ITS-03501 | CCTV Camera Site, Remove | 1 | EACH | 7,100.00 | 7,100.00 | 7,200.00 | 7,200.00 | 8,000.00 | 8,000.00 | 8,200.00 | 8,200.00 | | 0138 | NS-ITS-04290 | Fiber Optic Patch Cord, SM, 2 Strand, Furnish & Install | 2 | EACH | 85.00 | 170.00 | 86.00 | 172.00 | 85.00 | 170.00 | 98.00 | 196.00 | | 0139 | NS-ITS-06020 | Pullbox, In-ground, Furnish & Install - New | 1 | EACH | 3,200.00 | 3,200.00 | 3,220.00 | 3,220.00 | 3,500.00 | 3,500.00 | 3,600.00 | 3,600.00 | | 0140 | NS-ITS-08101 | Pole, Foundation & Lowering Device, >= 100', Furnish & Install (110') | 1 | EACH | 122,000.00 | 122,000.00 | 122,000.00 | 122,000.00 | 215,000.00 | 215,000.00 | 265,000.00 | 265,000.00 | | 0141 | NS-ITS-09100 | Local Ethernet Switch, Install | 1 | EACH | 350.00 | 350.00 | 355.00 | 355.00 | 550.00 | 550.00 | 400.00 | 400.00 | | 0142 | NS-ITS-10220 | Power Surge Suppressor, Furnish & Install | 2 | EACH | 360.00 | 720.00 | 365.00 | 730.00 | 400.00 | 800.00 | 410.00 | 820.00 | | 0143 | NS-ITS-10340 | Data Surge Suppressor, Furnish & Install | 4 | EACH | 390.00 | 1,560.00 | 395.00 | 1,580.00 | 300.00 | 1,200.00 | 450.00 | 1,800.00 | | 0144 | NS-ITS-12020 | TMC Integration | 1 | LUMP | 9,000.00 | 9,000.00 | 9,091.00 | 9,091.00 | 8,200.00 | 8,200.00 | 10,000.00 | 10,000.00 | | 0145 | NS-ITS-13080 | Maintenance Procedures Manuals | 1 | LUMP | 1,700.00 | 1,700.00 | 10,000.00 | 10,000.00 | 3,000.00 | 3,000.00 | 1,900.00 | 1,900.00 | | 0146 | NS-ITS-13200 | As-Builts | 1 | LUMP | 1,700.00 | 1,700.00 | 10,000.00 | 10,000.00 | 3,000.00 | 3,000.00 | 1,900.00 | 1,900.00 | | 0147 | NS-MSC-00120 | Drainage Structure PG-Drain | 1 | EACH | 5,000.00 | 5,000.00 | 7,200.00 | 7,200.00 | 5,500.00 | 5,500.00 | 5,000.00 | 5,000.00 | | 0148 | 803-09-00210 | Non-Destructive Test (24” Diameter) (Thermal Integrity Profiling) | 6 | EACH | 3,200.00 | 19,200.00 | 2,300.00 | 13,800.00 | 3,000.00 | 18,000.00 | 2,600.00 | 15,600.00 | | 0149 | 803-09-00410 | Non-Destructive Test (36” Diameter) (Thermal Integrity Profiling) | 2 | EACH | 3,400.00 | 6,800.00 | 2,500.00 | 5,000.00 | 2,500.00 | 5,000.00 | 2,900.00 | 5,800.00 | | 0150 | 803-09-00610 | Non-Destructive Test (48” Diameter) (Thermal Integrity Profiling) | 2 | EACH | 4,400.00 | 8,800.00 | 4,000.00 | 8,000.00 | 4,100.00 | 8,200.00 | 4,600.00 | 9,200.00 | | 0151 | 803-09-01310 | Non-Destructive Test (96” Diameter) (Thermal Integrity Profiling) | 10 | EACH | 6,500.00 | 65,000.00 | 19,000.00 | 190,000.00 | 6,200.00 | 62,000.00 | 8,700.00 | 87,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,789,230.50 | | 9,641,012.53 | | 9,207,419.24 | | 10,112,868.84 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - C.E.C., Inc. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.2 | LUMP | 9,600.00 | 9,600.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,000.00 | 12,000.00 | | 0003 | 202-02-00020 | Removal of Base Course | 726 | SQYD | 6.30 | 4,573.80 | | 0004 | 202-02-04500 | Removal of Bridge (Steel Girder Span) | 4,843 | SQFT | 8.80 | 42,618.40 | | 0005 | 202-02-04510 | Removal of Bridge Deck (Hydro Demolition) (I-110) | 6,646 | SFIN | 30.00 | 199,380.00 | | 0006 | 202-02-04520 | Removal of Bridge Component (Cap) | 29 | LNFT | 2,900.00 | 84,100.00 | | 0007 | 202-02-04520 | Removal of Bridge Component (Column) | 25 | LNFT | 1,500.00 | 37,500.00 | | 0008 | 202-02-04520 | Removal of Bridge Component (Pile) | 9 | LNFT | 8,400.00 | 75,600.00 | | 0009 | 202-02-04540 | Removal of Bridge Component (Footing) | 1 | EACH | 15,000.00 | 15,000.00 | | 0010 | 202-02-04540 | Removal of Bridge Component (Riser) | 7 | EACH | 4,000.00 | 28,000.00 | | 0011 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 63.3 | LNFT | 6.00 | 379.80 | | 0012 | 202-02-06100 | Removal of Concrete Walks and Drives | 421 | SQYD | 12.00 | 5,052.00 | | 0013 | 202-02-26300 | Removal of Median / Island | 262 | SQYD | 30.00 | 7,860.00 | | 0014 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 737 | SQYD | 12.00 | 8,844.00 | | 0015 | 202-02-38220 | Removal of Sign Supports | 1 | EACH | 270.00 | 270.00 | | 0016 | 202-02-38300 | Removal of Sign and U-Channel Post | 11 | EACH | 60.00 | 660.00 | | 0017 | 202-02-38320 | Removal of Sign Supports (Overhead) | 1 | EACH | 6,000.00 | 6,000.00 | | 0018 | 202-02-38360 | Removal of Sign Faces | 11 | EACH | 264.00 | 2,904.00 | | 0019 | 203-01-00100 | General Excavation | 212 | CUYD | 54.00 | 11,448.00 | | 0020 | 203-03-00100 | Embankment | 587 | CUYD | 55.00 | 32,285.00 | | 0021 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 21,600.00 | 21,600.00 | | 0022 | 204-02-00100 | Temporary Hay Bales | 15 | EACH | 60.00 | 900.00 | | 0023 | 204-06-00100 | Temporary Silt Fencing | 2,056 | LNFT | 2.65 | 5,448.40 | | 0024 | 302-02-08000 | Class II Base Course (8" Thick) . | 552.8 | SQYD | 39.60 | 21,890.88 | | 0025 | 304-01-00100 | Lime | 7.83 | TON | 150.00 | 1,174.50 | | 0026 | 304-05-00100 | Lime Treatment (Type E) | 553 | SQYD | 50.00 | 27,650.00 | | 0027 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 155.8 | SQYD | 144.00 | 22,435.20 | | 0028 | 601-02-00900 | Portland Cement Concrete Pavement (9" Thick) (Crossovers & Turnouts) | 261.4 | SQYD | 144.00 | 37,641.60 | | 0029 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 1 | EACH | 1,800.00 | 1,800.00 | | 0030 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 160 | LNFT | 84.00 | 13,440.00 | | 0031 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 3,000.00 | 9,000.00 | | 0032 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 4,680.00 | 4,680.00 | | 0033 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,560.00 | 1,560.00 | | 0034 | 706-01-00100 | Concrete Walk (4" Thick) | 257.5 | SQYD | 78.00 | 20,085.00 | | 0035 | 706-02-00200 | Concrete Drive (6" Thick) | 113 | SQYD | 115.00 | 12,995.00 | | 0036 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 45.9 | SQYD | 115.00 | 5,278.50 | | 0037 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 125.7 | SQYD | 93.00 | 11,690.10 | | 0038 | 706-04-00100 | Handicapped Curb Ramps | 10 | EACH | 1,270.00 | 12,700.00 | | 0039 | 707-01-00200 | Concrete Curb (Barrier) | 402.2 | LNFT | 27.00 | 10,859.40 | | 0040 | 707-03-00100 | Combination Concrete Curb and Gutter | 410.8 | LNFT | 42.00 | 17,253.60 | | 0041 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 23 | SQYD | 150.00 | 3,450.00 | | 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 285,000.00 | 285,000.00 | | 0043 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 3.846 | MILE | 6,600.00 | 25,383.60 | | 0044 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 53 | EACH | 2,400.00 | 127,200.00 | | 0045 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 52 | EACH | 800.00 | 41,600.00 | | 0046 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 25,000.00 | 50,000.00 | | 0047 | 714-01-00500 | Slab Sodding (Common Bermuda) | 2,700 | SQYD | 6.00 | 16,200.00 | | 0048 | 715-01-00100 | Topsoil | 502 | CUYD | 42.00 | 21,084.00 | | 0049 | 718-01-00100 | Fertilizer | 300 | LB | 2.40 | 720.00 | | 0050 | 718-02-00100 | Agricultural Lime | 1 | TON | 600.00 | 600.00 | | 0051 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 23,000.00 | 23,000.00 | | 0052 | 726-01-00100 | Bedding Material | 16.6 | CUYD | 24.00 | 398.40 | | 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 1,100,000.00 | 1,100,000.00 | | 0054 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 403.5 | SQFT | 29.00 | 11,701.50 | | 0055 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 95.5 | SQFT | 35.00 | 3,342.50 | | 0056 | 729-05-00102 | Sign (Type E)(Furnish and Install) | 120 | SQFT | 42.00 | 5,040.00 | | 0057 | 729-06-00102 | Sign (Overhead Mounted)(Furnish and Install) | 617.5 | SQFT | 42.00 | 25,935.00 | | 0058 | 729-08-00200 | Mounting (3 1/2" Size Post) | 4 | EACH | 1,440.00 | 5,760.00 | | 0059 | 729-08-00300 | Mounting (5" Size Post) | 2 | EACH | 1,800.00 | 3,600.00 | | 0060 | 729-08-00310 | Mounting (5" Size Post)(Structure Mount) | 5 | EACH | 4,200.00 | 21,000.00 | | 0061 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 4 | EACH | 2,160.00 | 8,640.00 | | 0062 | 729-08-00610 | Mounting (W6 x 12 Size Post)(Structure Mount) | 1 | EACH | 4,800.00 | 4,800.00 | | 0063 | 729-12-00100 | Mounting (Overhead Cantilever) (Structure Mounted) | 1 | EACH | 100,000.00 | 100,000.00 | | 0064 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 1 | EACH | 9,600.00 | 9,600.00 | | 0065 | 729-19-00300 | Dead End Road Installations (Type C) T Intersection | 1 | EACH | 1,000.00 | 1,000.00 | | 0066 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 15 | EACH | 150.00 | 2,250.00 | | 0067 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,140 | EACH | 7.20 | 8,208.00 | | 0068 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 46 | LNFT | 18.00 | 828.00 | | 0069 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.847 | MILE | 6,300.00 | 11,636.10 | | 0070 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.373 | MILE | 18,000.00 | 6,714.00 | | 0071 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.086 | MILE | 60,000.00 | 5,160.00 | | 0072 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.057 | MILE | 1,200.00 | 68.40 | | 0073 | 732-03-02001 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermo 90 mil)(Blk Cont) | 0.775 | MILE | 3,360.00 | 2,604.00 | | 0074 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.386 | MILE | 7,440.00 | 2,871.84 | | 0075 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 480.00 | 1,920.00 | | 0076 | 732-04-05040 | Plastic Pavement Legends and Symbols (EXIT ONLY) | 2 | EACH | 1,440.00 | 2,880.00 | | 0077 | 732-05-00100 | Removal of Existing Markings | 0.709 | MILE | 9,600.00 | 6,806.40 | | 0078 | 739-01-00100 | Hydro-Seeding | 0.9 | ACRE | 1,800.00 | 1,620.00 | | 0079 | 740-01-00100 | Construction Layout | 1 | LUMP | 210,000.00 | 210,000.00 | | 0080 | 802-01-00100 | Structural Excavation (Bents) | 46 | CUYD | 65.00 | 2,990.00 | | 0081 | 803-01-00200 | Drilled Shaft (24" Diameter) | 564 | LNFT | 640.00 | 360,960.00 | | 0082 | 803-01-00400 | Drilled Shaft (36" Diameter) | 110 | LNFT | 1,430.00 | 157,300.00 | | 0083 | 803-01-00600 | Drilled Shaft (48" Diameter) | 200 | LNFT | 1,750.00 | 350,000.00 | | 0084 | 803-01-01300 | Drilled Shaft (96" Diameter) | 889 | LNFT | 1,800.00 | 1,600,200.00 | | 0085 | 803-02-01300 | Test Shaft (96" Diameter) | 105 | LNFT | 1,700.00 | 178,500.00 | | 0086 | 803-07-01300 | Bi-Directional Load Cell Test (96" Diameter) | 1 | EACH | 93,600.00 | 93,600.00 | | 0090 | 803-08-01300 | Crosshole Sonic Log Test (96" Diameter) | 10 | EACH | 4,800.00 | 48,000.00 | | 0091 | 803-10-00200 | Permanent Casing (24" Diameter) | 240 | LNFT | 156.00 | 37,440.00 | | 0092 | 803-10-01300 | Permanent Casing (96" Diameter) | 180 | LNFT | 660.00 | 118,800.00 | | 0093 | 804-18-00100 | Vibration Monitoring | 1 | DAY | 5,600.00 | 5,600.00 | | 0094 | 805-01-00200 | Class A1 Concrete (Deck) | 552.08 | CUYD | 1,850.00 | 1,021,348.00 | | 0095 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 2.33 | CUYD | 25,000.00 | 58,250.00 | | 0096 | 805-04-00100 | Class MASS(A1) Concrete (Bent Cap) | 256.91 | CUYD | 1,845.00 | 473,998.95 | | 0097 | 805-04-00200 | Class MASS(A1) Concrete (Column) | 108.7 | CUYD | 3,400.00 | 369,580.00 | | 0098 | 805-04-00300 | Class MASS(A1) Concrete (Footing) | 32.73 | CUYD | 2,600.00 | 85,098.00 | | 0099 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 8,753 | SQFT | 3.15 | 27,571.95 | | 0100 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 24,384 | SQFT | 2.75 | 67,056.00 | | 0101 | 806-01-00100 | Deformed Reinforcing Steel | 300,396 | LB | 2.50 | 750,990.00 | | 0102 | 807-01-00200 | Structural Metalwork (Grade 50) | 649,371 | LUMP | 1,500,000.00 | 1,500,000.00 | | 0103 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 2,164 | LUMP | 50,000.00 | 50,000.00 | | 0104 | 810-01-00100 | Concrete Bridge Railing (Standard) | 1,055 | LNFT | 210.00 | 221,550.00 | | 0105 | 810-01-00100 | Concrete Bridge Railing (Standard) (TL-5) | 171 | LNFT | 380.00 | 64,980.00 | | 0106 | 810-01-00400 | Concrete Bridge Railing (Transition) | 100 | LNFT | 500.00 | 50,000.00 | | 0107 | 810-05-00400 | Concrete Roadway Barrier (Transition) | 80 | LNFT | 440.00 | 35,200.00 | | 0108 | 811-01-00100 | Cleaning and Painting (Connections) | 1 | LUMP | 155,000.00 | 155,000.00 | | 0109 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,050 | SQFT | 77.00 | 80,850.00 | | 0110 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 305 | SFIN | 140.00 | 42,700.00 | | 0111 | 815-01-00300 | Unsealed Expansion Joint (Sliding Plate) | 148 | LNFT | 1,435.00 | 212,380.00 | | 0112 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 180 | LNFT | 480.00 | 86,400.00 | | 0113 | 816-01-00100 | Bridge Deck Drainage System (Collection) | 1 | LUMP | 200,000.00 | 200,000.00 | | 0114 | 822-01-00100 | Trenching and Backfilling | 80 | LNFT | 16.80 | 1,344.00 | | 0115 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (EMPTY) | 240 | LNFT | 4.20 | 1,008.00 | | 0116 | 822-02-01100 | Conduit w Conductors (Rigid Alum) (3/4") (Conduit C; 2#10, 1#10 Green Insulated Ground) | 300 | LNFT | 12.25 | 3,675.00 | | 0117 | 822-02-01400 | Conduit w Conductors (Rigid Alum) (1-1/2") (Conduit B; 2#6, 1#6 Green Insulated Ground) | 745 | LNFT | 16.80 | 12,516.00 | | 0118 | 822-02-03100 | Conduit w Conductors (Liq Tight Flexible Metal) (3/4") (Conduit D; 2#10, 1#10 Green Insulated Ground) | 18 | LNFT | 20.40 | 367.20 | | 0119 | 822-02-03400 | Conduit w Conductors (Liq Tight Flexible Metal) (1-1/2") (Conduit A; 2#6, 1#6 Green Insulated Ground) | 18 | LNFT | 30.00 | 540.00 | | 0120 | 822-05-02100 | Light Pole (35') (Alum) (Single Arm) | 6 | EACH | 16,300.00 | 97,800.00 | | 0121 | 822-07-00700 | Luminaire (100 Watt) (High Pressure Sodium) (Lowmast) | 6 | EACH | 660.00 | 3,960.00 | | 0122 | 822-07-00700 | Luminaire (100 Watt) (High Pressure Sodium) (Underpass) | 6 | EACH | 940.00 | 5,640.00 | | 0123 | 822-09-00100 | Electrical System (IP ADDRESSABLE PDU) | 1 | LUMP | 800.00 | 800.00 | | 0124 | 822-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 2,640.00 | 2,640.00 | | 0125 | 822-14-00100 | Removal and Disposal of Luminaire | 2 | EACH | 130.00 | 260.00 | | 0126 | 822-17-00400 | Structure Junction Box (Stainless Steel) (10" x 4" x 4") | 11 | EACH | 6,020.00 | 66,220.00 | | 0127 | 822-20-00200 | Disconnect (Underpass) | 2 | EACH | 1,400.00 | 2,800.00 | | 0128 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 80 | LNFT | 1.00 | 80.00 | | 0129 | 830-07-00100 | Structural Concrete Patching | 24 | SQFT | 93.00 | 2,232.00 | | 0130 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 5,899 | INLF | 1.35 | 7,963.65 | | 0131 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 1 | EACH | 16,000.00 | 16,000.00 | | 0132 | NS-700-00840 | Impact Attenuator (Test Level 3) (Kinetic) | 1 | EACH | 35,000.00 | 35,000.00 | | 0133 | NS-729-00010 | Bridge-Mounted Sign Struct Found Retrofit (Steel) Sign Cant | 1 | EACH | 88,000.00 | 88,000.00 | | 0134 | NS-729-00031 | Breakaway Square Tubing Sign Support - Hard Concrete | 3 | EACH | 1,950.00 | 5,850.00 | | 0135 | NS-ENH-03000 | Catch Basin Top ADA Grate | 1 | EACH | 3,120.00 | 3,120.00 | | 0136 | NS-ITS-01241 | CCTV C/Assembly, Install with PTZ, Digital | 2 | EACH | 660.00 | 1,320.00 | | 0137 | NS-ITS-03501 | CCTV Camera Site, Remove | 1 | EACH | 8,520.00 | 8,520.00 | | 0138 | NS-ITS-04290 | Fiber Optic Patch Cord, SM, 2 Strand, Furnish & Install | 2 | EACH | 102.00 | 204.00 | | 0139 | NS-ITS-06020 | Pullbox, In-ground, Furnish & Install - New | 1 | EACH | 3,820.00 | 3,820.00 | | 0140 | NS-ITS-08101 | Pole, Foundation & Lowering Device, >= 100', Furnish & Install (110') | 1 | EACH | 180,000.00 | 180,000.00 | | 0141 | NS-ITS-09100 | Local Ethernet Switch, Install | 1 | EACH | 420.00 | 420.00 | | 0142 | NS-ITS-10220 | Power Surge Suppressor, Furnish & Install | 2 | EACH | 430.00 | 860.00 | | 0143 | NS-ITS-10340 | Data Surge Suppressor, Furnish & Install | 4 | EACH | 470.00 | 1,880.00 | | 0144 | NS-ITS-12020 | TMC Integration | 1 | LUMP | 10,800.00 | 10,800.00 | | 0145 | NS-ITS-13080 | Maintenance Procedures Manuals | 1 | LUMP | 1,980.00 | 1,980.00 | | 0146 | NS-ITS-13200 | As-Builts | 1 | LUMP | 1,980.00 | 1,980.00 | | 0147 | NS-MSC-00120 | Drainage Structure PG-Drain | 1 | EACH | 3,860.00 | 3,860.00 | | 0148 | 803-09-00210 | Non-Destructive Test (24” Diameter) (Thermal Integrity Profiling) | 6 | EACH | 3,750.00 | 22,500.00 | | 0149 | 803-09-00410 | Non-Destructive Test (36” Diameter) (Thermal Integrity Profiling) | 2 | EACH | 2,940.00 | 5,880.00 | | 0150 | 803-09-00610 | Non-Destructive Test (48” Diameter) (Thermal Integrity Profiling) | 2 | EACH | 4,920.00 | 9,840.00 | | 0151 | 803-09-01310 | Non-Destructive Test (96” Diameter) (Thermal Integrity Profiling) | 10 | EACH | 7,440.00 | 74,400.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 12,195,201.67 |
|