Proposal:H.012200.6
Parish:Catahoula, LaSalle
Routes:US 84
Description:US 84: WHITEHALL - LA 28
Type Construction:MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,643,359.80
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $1,983,292.75 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,037,727.85 |
| 3 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $2,189,223.09 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions For Headwall and Pipe Joint Removal | 1 | LUMP | 600.00 | 600.00 | 1,000.00 | 1,000.00 | 1,500.00 | 1,500.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 1,892 | LNFT | 12.00 | 22,704.00 | 15.00 | 28,380.00 | 6.25 | 11,825.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 50.00 | 5,000.00 | 30.00 | 3,000.00 | 45.00 | 4,500.00 | | 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 164 | CUYD | 50.00 | 8,200.00 | 37.00 | 6,068.00 | 78.00 | 12,792.00 | | 0005 | 502-01-00100 | Asphalt Concrete | 14,168.7 | TON | 79.00 | 1,119,327.30 | 75.00 | 1,062,652.50 | 78.00 | 1,105,158.60 | | 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,037 | TON | 79.00 | 81,923.00 | 135.00 | 139,995.00 | 140.00 | 145,180.00 | | 0007 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 41,300 | GAL | 2.00 | 82,600.00 | 2.50 | 103,250.00 | 2.50 | 103,250.00 | | 0008 | 507-02-00300 | Aggregate (S3) | 133,224 | SQYD | 0.95 | 126,562.80 | 1.00 | 133,224.00 | 1.00 | 133,224.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 121,847 | SQYD | 1.00 | 121,847.00 | 1.35 | 164,493.45 | 1.00 | 121,847.00 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,210 | CUYD | 1.00 | -3,210.00 | 0.10 | -321.00 | 1.00 | -3,210.00 | | 0011 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 675 | SQYD | 115.00 | 77,625.00 | 1.00 | 675.00 | 120.00 | 81,000.00 | | 0012 | 510-03-00100 | Pavement Joint Repair | 50 | TON | 350.00 | 17,500.00 | 175.00 | 8,750.00 | 360.00 | 18,000.00 | | 0013 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 150.00 | 1,200.00 | 320.00 | 2,560.00 | 400.00 | 3,200.00 | | 0014 | 701-15-00100 | Concrete Collar | 1 | EACH | 700.00 | 700.00 | 1,350.00 | 1,350.00 | 2,000.00 | 2,000.00 | | 0015 | 704-01-01020 | Guardrail (Single Thrie Beam) (6'-3" post spacing) | 1,264 | LNFT | 35.00 | 44,240.00 | 38.00 | 48,032.00 | 43.00 | 54,352.00 | | 0016 | 704-03-00200 | Blocked Out Guard Rail – 31”, (6’-3” Post Spacing) | 1,050 | LNFT | 22.00 | 23,100.00 | 24.00 | 25,200.00 | 27.00 | 28,350.00 | | 0017 | 704-06-00200 | Guardrail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 50.00 | 2,500.00 | 54.00 | 2,700.00 | 42.00 | 2,100.00 | | 0018 | 704-07-00200 | Guardrail Transitions (Double Thrie Beam) | 400 | LNFT | 65.00 | 26,000.00 | 70.00 | 28,000.00 | 65.00 | 26,000.00 | | 0019 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 16 | EACH | 2,500.00 | 40,000.00 | 2,700.00 | 43,200.00 | 2,800.00 | 44,800.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 22,000.00 | 22,000.00 | | 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.265 | MILE | 200.00 | 2,253.00 | 150.00 | 1,689.75 | 200.00 | 2,253.00 | | 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 10.344 | MILE | 100.00 | 1,034.40 | 350.00 | 3,620.40 | 1.00 | 10.34 | | 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 47.952 | MILE | 1.00 | 47.95 | 600.00 | 28,771.20 | 1.00 | 47.95 | | 0024 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 6 | EACH | 20.00 | 120.00 | 20.00 | 120.00 | 32.00 | 192.00 | | 0025 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 30.00 | 180.00 | 25.00 | 150.00 | 50.00 | 300.00 | | 0026 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 1,489 | EACH | 2.00 | 2,978.00 | 2.20 | 3,275.80 | 2.25 | 3,350.25 | | 0027 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,800 | SQYD | 2.75 | 7,700.00 | 3.00 | 8,400.00 | 1.40 | 3,920.00 | | 0028 | 724-01-00100 | Rumble Strips (Centerline) | 4.963 | MILE | 300.00 | 1,488.90 | 300.00 | 1,488.90 | 800.00 | 3,970.40 | | 0029 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 7.668 | MILE | 300.00 | 2,300.40 | 300.00 | 2,300.40 | 800.00 | 6,134.40 | | 0030 | 726-01-00100 | Bedding Material | 3.1 | CUYD | 100.00 | 310.00 | 265.00 | 821.50 | 135.00 | 418.50 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 48,000.00 | 48,000.00 | 55,000.00 | 55,000.00 | 100,000.00 | 100,000.00 | | 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 75.00 | 150.00 | 75.00 | 150.00 | 47.00 | 94.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 85.00 | 1,360.00 | 85.00 | 1,360.00 | 57.00 | 912.00 | | 0034 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 5,030 | EACH | 6.25 | 31,437.50 | 6.50 | 32,695.00 | 13.00 | 65,390.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 996 | EACH | 5.00 | 4,980.00 | 6.00 | 5,976.00 | 13.00 | 12,948.00 | | 0036 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 495 | LNFT | 4.00 | 1,980.00 | 4.25 | 2,103.75 | 2.10 | 1,039.50 | | 0037 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 213 | LNFT | 11.00 | 2,343.00 | 12.00 | 2,556.00 | 4.25 | 905.25 | | 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.984 | MILE | 3,300.00 | 52,747.20 | 3,500.00 | 55,944.00 | 3,100.00 | 49,550.40 | | 0039 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.448 | MILE | 850.00 | 2,930.80 | 900.00 | 3,103.20 | 1,000.00 | 3,448.00 | | 0040 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 350.00 | 700.00 | 375.00 | 750.00 | 200.00 | 400.00 | | 0041 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 350.00 | 700.00 | 375.00 | 750.00 | 260.00 | 520.00 | | 0042 | 732-05-00100 | Removal of Existing Markings For Bridges Only | 0.371 | MILE | 7,500.00 | 2,782.50 | 8,000.00 | 2,968.00 | 10,500.00 | 3,895.50 | | 0043 | 735-01-00100 | Mailboxes | 5 | EACH | 30.00 | 150.00 | 5.00 | 25.00 | 1.00 | 5.00 | | 0044 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 100.00 | 300.00 | 500.00 | 1,500.00 | 525.00 | 1,575.00 | | 0045 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 150.00 | 150.00 | 500.00 | 500.00 | 525.00 | 525.00 | | 0046 | 739-01-00100 | Hydro-Seeding | 0.3 | ACRE | 2,500.00 | 750.00 | 15,000.00 | 4,500.00 | 4,500.00 | 1,350.00 | | 0047 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 8,200.00 | 8,200.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,983,292.75 | | 2,037,727.85 | | 2,189,223.09 |
|