Proposal:H.011502.6
Parish:Ascension
Routes:LA 621, US 61
Description:US 61: TURN LANE IMPROVEMENTS @ LA 621
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, LIME TREATMENT, PAVEMENT WIDENING, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE, AND RELATED WORK.
Estimated Construction Cost:$808,442.35
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $596,610.64 |
| 2 | 05693 | Industrial Enterprises, Inc. | $674,695.56 |
| 3 | 00481 | COASTAL BRIDGE CO., L.L.C. | $682,777.11 |
| 4 | 55950 | Brown Industrial Construction, LLC | $769,589.64 |
| 5 | 00046 | Barber Bros. Contracting Co., L.L.C | $836,801.65 |
| 6 | 57931 | KCR CONTRACTORS, LLC | $845,703.37 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Industrial Enterprises, Inc. | - 3 - COASTAL BRIDGE CO., L.L.C. | - 4 - Brown Industrial Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 112 | SQYD | 8.75 | 980.00 | 6.00 | 672.00 | 25.00 | 2,800.00 | 30.00 | 3,360.00 | | 0002 | 202-02-06060 | Removal of Concrete Catch Basin | 4 | EACH | 600.00 | 2,400.00 | 300.00 | 1,200.00 | 500.00 | 2,000.00 | 900.00 | 3,600.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 143 | SQYD | 9.25 | 1,322.75 | 14.40 | 2,059.20 | 25.00 | 3,575.00 | 35.00 | 5,005.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) . | 24 | LNFT | 10.00 | 240.00 | 7.20 | 172.80 | 10.00 | 240.00 | 29.00 | 696.00 | | 0005 | 202-02-32140 | Removal of Pipe (Storm Drain) . | 353 | LNFT | 10.00 | 3,530.00 | 7.20 | 2,541.60 | 12.00 | 4,236.00 | 29.00 | 10,237.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 805.9 | SQYD | 22.50 | 18,132.75 | 12.00 | 9,670.80 | 12.00 | 9,670.80 | 16.00 | 12,894.40 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 18,000.00 | 18,000.00 | 49,375.00 | 49,375.00 | 20,000.00 | 20,000.00 | 45,000.00 | 45,000.00 | | 0008 | 203-10-00100 | Cleaning Existing Ditches | 629 | LNFT | 2.50 | 1,572.50 | 9.60 | 6,038.40 | 12.00 | 7,548.00 | 21.00 | 13,209.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 9 | EACH | 18.00 | 162.00 | 16.50 | 148.50 | 15.00 | 135.00 | 15.00 | 135.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 244 | LNFT | 5.50 | 1,342.00 | 5.45 | 1,329.80 | 5.00 | 1,220.00 | 4.95 | 1,207.80 | | 0011 | 304-01-00100 | Lime | 32.8 | TON | 300.00 | 9,840.00 | 200.00 | 6,560.00 | 200.00 | 6,560.00 | 206.00 | 6,756.80 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 2,314 | SQYD | 4.50 | 10,413.00 | 1.50 | 3,471.00 | 5.50 | 12,727.00 | 20.00 | 46,280.00 | | 0014 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 150 | CUYD | 45.00 | 6,750.00 | 66.00 | 9,900.00 | 25.00 | 3,750.00 | 110.00 | 16,500.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 1,355.8 | TON | 98.00 | 132,868.40 | 102.82 | 139,403.36 | 150.00 | 203,370.00 | 97.00 | 131,512.60 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 62 | TON | 150.00 | 9,300.00 | 174.90 | 10,843.80 | 150.00 | 9,300.00 | 165.00 | 10,230.00 | | 0017 | 502-03-00300 | Asphalt Concrete (6" Thick) | 2,314 | SQYD | 26.50 | 61,321.00 | 30.74 | 71,132.36 | 40.00 | 92,560.00 | 29.00 | 67,106.00 | | 0018 | 509-01-00100 | Milling Asphalt Pavement | 3,532 | SQYD | 9.25 | 32,671.00 | 10.00 | 35,320.00 | 4.00 | 14,128.00 | 10.00 | 35,320.00 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -149 | CUYD | 16.00 | -2,384.00 | 0.10 | -14.90 | 0.01 | -1.49 | 18.00 | -2,682.00 | | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 250 | SQYD | 90.00 | 22,500.00 | 105.80 | 26,450.00 | 110.00 | 27,500.00 | 92.00 | 23,000.00 | | 0021 | 510-02-00100 | Pavement Widening | 44 | SQYD | 125.00 | 5,500.00 | 148.50 | 6,534.00 | 100.00 | 4,400.00 | 135.00 | 5,940.00 | | 0022 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 244 | LNFT | 65.00 | 15,860.00 | 60.13 | 14,671.72 | 65.00 | 15,860.00 | 90.00 | 21,960.00 | | 0023 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 384 | LNFT | 81.50 | 31,296.00 | 69.79 | 26,799.36 | 75.00 | 28,800.00 | 104.00 | 39,936.00 | | 0024 | 701-07-00500 | Yard Drain Pipe (12") | 8 | LNFT | 50.00 | 400.00 | 57.13 | 457.04 | 20.00 | 160.00 | 88.00 | 704.00 | | 0025 | 701-14-00100 | Cleaning Existing Pipes | 542 | LNFT | 10.00 | 5,420.00 | 9.60 | 5,203.20 | 15.00 | 8,130.00 | 30.00 | 16,260.00 | | 0026 | 702-03-00100 | Catch Basins (CB-01) | 9 | EACH | 3,000.00 | 27,000.00 | 2,906.40 | 26,157.60 | 1,200.00 | 10,800.00 | 4,500.00 | 40,500.00 | | 0027 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 3,800.00 | 3,800.00 | 2,490.00 | 2,490.00 | 2,500.00 | 2,500.00 | 4,500.00 | 4,500.00 | | 0028 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 131.3 | SQYD | 90.00 | 11,817.00 | 210.00 | 27,573.00 | 29.00 | 3,807.70 | 75.00 | 9,847.50 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 31,935.60 | 31,935.60 | 45,000.00 | 45,000.00 | 17,000.00 | 17,000.00 | | 0030 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 100 | LNFT | 0.35 | 35.00 | 0.39 | 39.00 | 2.00 | 200.00 | 0.50 | 50.00 | | 0031 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 74.3 | LNFT | 1.10 | 81.73 | 1.10 | 81.73 | 2.00 | 148.60 | 1.00 | 74.30 | | 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.837 | MILE | 630.00 | 527.31 | 687.50 | 575.44 | 700.00 | 585.90 | 950.00 | 795.15 | | 0033 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 2 | EACH | 75.00 | 150.00 | 55.00 | 110.00 | 50.00 | 100.00 | 30.00 | 60.00 | | 0034 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 2 | EACH | 50.00 | 100.00 | 60.50 | 121.00 | 55.00 | 110.00 | 50.00 | 100.00 | | 0035 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 50.00 | 200.00 | 49.50 | 198.00 | 45.00 | 180.00 | 50.00 | 200.00 | | 0036 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.169 | MILE | 600.00 | 101.40 | 671.00 | 113.40 | 4,733.73 | 800.00 | 610.00 | 103.09 | | 0037 | 726-01-00100 | Bedding Material | 66.1 | CUYD | 1.00 | 66.10 | 82.50 | 5,453.25 | 80.00 | 5,288.00 | 77.00 | 5,089.70 | | 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 68,984.00 | 68,984.00 | 50,000.00 | 50,000.00 | 80,000.00 | 80,000.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 303 | EACH | 6.00 | 1,818.00 | 7.15 | 2,166.45 | 6.50 | 1,969.50 | 5.00 | 1,515.00 | | 0040 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 223 | LNFT | 2.50 | 557.50 | 2.75 | 613.25 | 2.50 | 557.50 | 1.50 | 334.50 | | 0041 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 392 | LNFT | 6.00 | 2,352.00 | 6.60 | 2,587.20 | 6.00 | 2,352.00 | 5.00 | 1,960.00 | | 0042 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 148.6 | LNFT | 7.00 | 1,040.20 | 7.70 | 1,144.22 | 7.00 | 1,040.20 | 7.00 | 1,040.20 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.343 | MILE | 2,900.00 | 3,894.70 | 3,300.00 | 4,431.90 | 300.00 | 402.90 | 3,200.00 | 4,297.60 | | 0044 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.109 | MILE | 4,100.00 | 446.90 | 4,400.00 | 479.60 | 4,000.00 | 436.00 | 2,200.00 | 239.80 | | 0045 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 6 | EACH | 300.00 | 1,800.00 | 330.00 | 1,980.00 | 400.00 | 2,400.00 | 175.00 | 1,050.00 | | 0046 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 12 | EACH | 245.00 | 2,940.00 | 269.50 | 3,234.00 | 300.00 | 3,600.00 | 150.00 | 1,800.00 | | 0047 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 200.00 | 800.00 | 275.00 | 1,100.00 | 250.00 | 1,000.00 | 200.00 | 800.00 | | 0048 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 475.00 | 475.00 | 550.00 | 550.00 | 500.00 | 500.00 | 450.00 | 450.00 | | 0049 | 732-05-00100 | Removal of Existing Markings | 0.104 | MILE | 5,000.00 | 520.00 | 5,500.00 | 572.00 | 5,000.00 | 520.00 | 10,000.00 | 1,040.00 | | 0050 | 739-01-00100 | Hydro-Seeding | 0.15 | ACRE | 6,000.00 | 900.00 | 11,500.00 | 1,725.00 | 8,500.00 | 1,275.00 | 8,400.00 | 1,260.00 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 10,715.00 | 10,715.00 | 6,000.00 | 6,000.00 | 15,000.00 | 15,000.00 | | 0052 | NS-201-00002 | Tree and Stump Removal (Over 36" - 48" Diameter) | 1 | EACH | 2,400.00 | 2,400.00 | 1,200.00 | 1,200.00 | 2,750.00 | 2,750.00 | 5,000.00 | 5,000.00 | | 0053 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 26,216 | INLF | 0.50 | 13,108.00 | 0.88 | 23,070.08 | 0.50 | 13,108.00 | 0.90 | 23,594.40 | | 0054 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 928 | INLF | 0.80 | 742.40 | 1.10 | 1,020.80 | 3.00 | 2,784.00 | 1.10 | 1,020.80 | | 0055 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 6 | EACH | 2,500.00 | 15,000.00 | 1,897.50 | 11,385.00 | 4,000.00 | 24,000.00 | 2,200.00 | 13,200.00 | | 0056 | NS-MSC-00120 | Drainage Structure CATCH BASIN TO MANHOLE TOP CONVERSION | 3 | EACH | 2,500.00 | 7,500.00 | 2,400.00 | 7,200.00 | 5,500.00 | 16,500.00 | 6,000.00 | 18,000.00 | | 0057 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 50 | SQYD | 100.00 | 5,000.00 | 115.00 | 5,750.00 | 67.87 | 3,393.50 | 110.00 | 5,500.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 596,610.64 | | 674,695.56 | | 682,777.11 | | 769,589.64 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Barber Bros. Contracting Co., L.L.C | - 6 - KCR CONTRACTORS, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 112 | SQYD | 25.00 | 2,800.00 | 37.26 | 4,173.12 | | 0002 | 202-02-06060 | Removal of Concrete Catch Basin | 4 | EACH | 600.00 | 2,400.00 | 575.00 | 2,300.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 143 | SQYD | 35.00 | 5,005.00 | 13.80 | 1,973.40 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) . | 24 | LNFT | 40.00 | 960.00 | 11.50 | 276.00 | | 0005 | 202-02-32140 | Removal of Pipe (Storm Drain) . | 353 | LNFT | 25.00 | 8,825.00 | 11.50 | 4,059.50 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 805.9 | SQYD | 8.00 | 6,447.20 | 11.50 | 9,267.85 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 50,000.00 | 50,000.00 | 74,750.00 | 74,750.00 | | 0008 | 203-10-00100 | Cleaning Existing Ditches | 629 | LNFT | 10.00 | 6,290.00 | 11.50 | 7,233.50 | | 0009 | 204-02-00100 | Temporary Hay Bales | 9 | EACH | 50.00 | 450.00 | 17.25 | 155.25 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 244 | LNFT | 5.00 | 1,220.00 | 5.69 | 1,388.36 | | 0011 | 304-01-00100 | Lime | 32.8 | TON | 285.00 | 9,348.00 | 230.00 | 7,544.00 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 2,314 | SQYD | 3.00 | 6,942.00 | 5.75 | 13,305.50 | | 0014 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 150 | CUYD | 75.00 | 11,250.00 | 103.50 | 15,525.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 1,355.8 | TON | 120.00 | 162,696.00 | 111.55 | 151,239.49 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 62 | TON | 150.00 | 9,300.00 | 189.75 | 11,764.79 | | 0017 | 502-03-00300 | Asphalt Concrete (6" Thick) | 2,314 | SQYD | 50.00 | 115,700.00 | 47.15 | 109,105.10 | | 0018 | 509-01-00100 | Milling Asphalt Pavement | 3,532 | SQYD | 6.50 | 22,958.00 | 11.50 | 40,618.00 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -149 | CUYD | 0.00 | 0.00 | 1.15 | -171.35 | | 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 250 | SQYD | 120.00 | 30,000.00 | 105.80 | 26,450.00 | | 0021 | 510-02-00100 | Pavement Widening | 44 | SQYD | 200.00 | 8,800.00 | 155.25 | 6,831.00 | | 0022 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 244 | LNFT | 75.00 | 18,300.00 | 74.75 | 18,239.00 | | 0023 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 384 | LNFT | 90.00 | 34,560.00 | 77.05 | 29,587.20 | | 0024 | 701-07-00500 | Yard Drain Pipe (12") | 8 | LNFT | 75.00 | 600.00 | 23.00 | 184.00 | | 0025 | 701-14-00100 | Cleaning Existing Pipes | 542 | LNFT | 25.00 | 13,550.00 | 8.05 | 4,363.10 | | 0026 | 702-03-00100 | Catch Basins (CB-01) | 9 | EACH | 3,000.00 | 27,000.00 | 2,705.50 | 24,349.50 | | 0027 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 3,000.00 | 3,000.00 | 2,587.50 | 2,587.50 | | 0028 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 131.3 | SQYD | 60.00 | 7,878.00 | 80.50 | 10,569.65 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 12,824.80 | 12,824.80 | | 0030 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 100 | LNFT | 0.50 | 50.00 | 0.29 | 29.00 | | 0031 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 74.3 | LNFT | 1.25 | 92.88 | 0.58 | 43.09 | | 0032 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.837 | MILE | 800.00 | 669.60 | 1,150.00 | 962.55 | | 0033 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 2 | EACH | 60.00 | 120.00 | 28.75 | 57.50 | | 0034 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 2 | EACH | 65.00 | 130.00 | 40.25 | 80.50 | | 0035 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 100.00 | 400.00 | 40.25 | 161.00 | | 0036 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.169 | MILE | 680.00 | 114.92 | 28,920.12 | 4,887.50 | | 0037 | 726-01-00100 | Bedding Material | 66.1 | CUYD | 150.00 | 9,915.00 | 97.75 | 6,461.28 | | 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 82,100.00 | 82,100.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 303 | EACH | 8.00 | 2,424.00 | 6.90 | 2,090.70 | | 0040 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 223 | LNFT | 3.00 | 669.00 | 4.03 | 898.69 | | 0041 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 392 | LNFT | 7.50 | 2,940.00 | 11.50 | 4,508.00 | | 0042 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 148.6 | LNFT | 8.25 | 1,225.95 | 12.65 | 1,879.79 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.343 | MILE | 3,500.00 | 4,700.50 | 5,175.00 | 6,950.03 | | 0044 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.109 | MILE | 5,000.00 | 545.00 | 4,600.00 | 501.40 | | 0045 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 6 | EACH | 360.00 | 2,160.00 | 402.50 | 2,415.00 | | 0046 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 12 | EACH | 300.00 | 3,600.00 | 402.50 | 4,830.00 | | 0047 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 300.00 | 1,200.00 | 517.50 | 2,070.00 | | 0048 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 600.00 | 600.00 | 862.50 | 862.50 | | 0049 | 732-05-00100 | Removal of Existing Markings | 0.104 | MILE | 6,000.00 | 624.00 | 17,250.00 | 1,794.00 | | 0050 | 739-01-00100 | Hydro-Seeding | 0.15 | ACRE | 6,000.00 | 900.00 | 9,660.00 | 1,449.00 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 23,000.00 | 23,000.00 | | 0052 | NS-201-00002 | Tree and Stump Removal (Over 36" - 48" Diameter) | 1 | EACH | 6,500.00 | 6,500.00 | 4,025.00 | 4,025.00 | | 0053 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 26,216 | INLF | 0.60 | 15,729.60 | 0.81 | 21,234.96 | | 0054 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 928 | INLF | 4.00 | 3,712.00 | 1.29 | 1,197.12 | | 0055 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 6 | EACH | 9,500.00 | 57,000.00 | 11,500.00 | 69,000.00 | | 0056 | NS-MSC-00120 | Drainage Structure CATCH BASIN TO MANHOLE TOP CONVERSION | 3 | EACH | 9,500.00 | 28,500.00 | 1,725.00 | 5,175.00 | | 0057 | 402-02-00100 | Mainline Traffic Maintenance Surfacing (Hard) | 50 | SQYD | 120.00 | 6,000.00 | 130.93 | 6,546.50 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 836,801.65 | | 845,703.37 |
|