Proposal:H.009573.6
Parish:St. Bernard
Routes:LA 39
Description:LA 39: LAKE BORGNE CANAL BR - LA 46
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$2,783,251.30
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $2,022,163.96 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,187,548.93 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $2,519,460.08 |
| 4 | 62139 | HUEY P. STOCKSTILL, LLC | $2,756,153.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - Boh Bros. Construction Co., LLC. | - 4 - HUEY P. STOCKSTILL, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) 84" CMP | 200 | LNFT | 50.00 | 10,000.00 | 32.00 | 6,400.00 | 25.00 | 5,000.00 | 45.00 | 9,000.00 | | 0002 | 202-02-38300 | Removal of Sign and U-Channel Post | 5 | EACH | 1.00 | 5.00 | 50.00 | 250.00 | 100.00 | 500.00 | 50.00 | 250.00 | | 0003 | 203-06-00100 | Excavation and Embankment | 753 | LNFT | 5.00 | 3,765.00 | 4.00 | 3,012.00 | 5.00 | 3,765.00 | 11.00 | 8,283.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,180 | CUYD | 15.00 | 17,700.00 | 45.00 | 53,100.00 | 20.00 | 23,600.00 | 29.00 | 34,220.00 | | 0005 | 502-01-00100 | Asphalt Concrete | 15,962.2 | TON | 60.00 | 957,732.00 | 75.00 | 1,197,165.00 | 77.00 | 1,229,089.40 | 86.00 | 1,372,749.20 | | 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 598.2 | TON | 170.00 | 101,694.00 | 150.00 | 89,730.00 | 97.00 | 58,025.40 | 150.00 | 89,730.00 | | 0007 | 509-01-00100 | Milling Asphalt Pavement | 140,582 | SQYD | 2.75 | 386,600.50 | 1.55 | 217,902.10 | 1.50 | 210,873.00 | 2.00 | 281,164.00 | | 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,594 | CUYD | 0.01 | -55.94 | 13.60 | -76,078.40 | 0.00 | 0.00 | 0.00 | 0.00 | | 0009 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 1,347 | SQYD | 71.00 | 95,637.00 | 120.00 | 161,640.00 | 90.00 | 121,230.00 | 200.00 | 269,400.00 | | 0010 | 701-01-01160 | Cross Drain Pipe (84" RCP) | 200 | LNFT | 540.00 | 108,000.00 | 790.00 | 158,000.00 | 1,050.00 | 210,000.00 | 540.00 | 108,000.00 | | 0011 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 200 | LNFT | 5.00 | 1,000.00 | 113.00 | 22,600.00 | 690.00 | 138,000.00 | 585.00 | 117,000.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 16,000.00 | 16,000.00 | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | 88,000.00 | 88,000.00 | | 0016 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 920 | LNFT | 0.35 | 322.00 | 0.35 | 322.00 | 0.50 | 460.00 | 0.10 | 92.00 | | 0017 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 96 | LNFT | 1.00 | 96.00 | 1.00 | 96.00 | 1.00 | 96.00 | 0.30 | 28.80 | | 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.936 | MILE | 50.00 | 596.80 | 400.00 | 4,774.40 | 10.00 | 119.36 | 200.00 | 2,387.20 | | 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.936 | MILE | 50.00 | 596.80 | 0.01 | 0.12 | 10.00 | 119.36 | 300.00 | 3,580.80 | | 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 26.048 | MILE | 50.00 | 1,302.40 | 275.00 | 7,163.20 | 20.00 | 520.96 | 400.00 | 10,419.20 | | 0021 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 3 | EACH | 1.00 | 3.00 | 50.00 | 150.00 | 25.00 | 75.00 | 50.00 | 150.00 | | 0022 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 2 | EACH | 1.00 | 2.00 | 55.00 | 110.00 | 25.00 | 50.00 | 50.00 | 100.00 | | 0023 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 2 | EACH | 1.00 | 2.00 | 45.00 | 90.00 | 25.00 | 50.00 | 50.00 | 100.00 | | 0024 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 150 | EACH | 40.00 | 6,000.00 | 165.00 | 24,750.00 | 100.00 | 15,000.00 | 225.00 | 33,750.00 | | 0025 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 150 | EACH | 20.00 | 3,000.00 | 58.00 | 8,700.00 | 15.00 | 2,250.00 | 115.00 | 17,250.00 | | 0026 | 717-01-00100 | Seeding | 277 | LB | 5.00 | 1,385.00 | 12.00 | 3,324.00 | 13.00 | 3,601.00 | 14.00 | 3,878.00 | | 0027 | 718-01-00100 | Fertilizer | 9,245 | LB | 0.25 | 2,311.25 | 0.75 | 6,933.75 | 0.90 | 8,320.50 | 1.00 | 9,245.00 | | 0028 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10 | MILE | 250.00 | 2,500.00 | 265.00 | 2,650.00 | 650.00 | 6,500.00 | 620.00 | 6,200.00 | | 0029 | 726-01-00100 | Bedding Material | 79 | CUYD | 80.00 | 6,320.00 | 88.00 | 6,952.00 | 200.00 | 15,800.00 | 112.00 | 8,848.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 192,000.00 | 192,000.00 | 115,000.00 | 115,000.00 | 230,000.00 | 230,000.00 | 128,000.00 | 128,000.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 13 | EACH | 1.00 | 13.00 | 95.00 | 1,235.00 | 150.00 | 1,950.00 | 100.00 | 1,300.00 | | 0032 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 650.00 | 650.00 | 650.00 | 650.00 | 1,000.00 | 1,000.00 | 650.00 | 650.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 927 | EACH | 7.00 | 6,489.00 | 6.00 | 5,562.00 | 7.00 | 6,489.00 | 7.00 | 6,489.00 | | 0034 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 460 | LNFT | 1.64 | 754.40 | 1.70 | 782.00 | 4.00 | 1,840.00 | 2.00 | 920.00 | | 0035 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 30 | LNFT | 5.80 | 174.00 | 6.00 | 180.00 | 15.00 | 450.00 | 7.00 | 210.00 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 6.76 | 324.48 | 7.00 | 336.00 | 15.00 | 720.00 | 8.00 | 384.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.024 | MILE | 2,000.00 | 26,048.00 | 2,650.00 | 34,513.60 | 3,000.00 | 39,072.00 | 2,700.00 | 35,164.80 | | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.968 | MILE | 500.00 | 2,984.00 | 950.00 | 5,669.60 | 1,200.00 | 7,161.60 | 1,000.00 | 5,968.00 | | 0039 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 289.83 | 579.66 | 300.00 | 600.00 | 400.00 | 800.00 | 310.00 | 620.00 | | 0040 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 236.70 | 236.70 | 245.00 | 245.00 | 400.00 | 400.00 | 250.00 | 250.00 | | 0041 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 236.70 | 473.40 | 245.00 | 490.00 | 400.00 | 800.00 | 250.00 | 500.00 | | 0042 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 241.53 | 483.06 | 250.00 | 500.00 | 400.00 | 800.00 | 250.00 | 500.00 | | 0043 | 732-04-19020 | Plastic Pavement Legends and Symbols (SCHOOL ZONE) | 4 | EACH | 483.05 | 1,932.20 | 500.00 | 2,000.00 | 600.00 | 2,400.00 | 500.00 | 2,000.00 | | 0044 | 735-01-00100 | Mailboxes | 52 | EACH | 5.00 | 260.00 | 5.00 | 260.00 | 10.00 | 520.00 | 5.00 | 260.00 | | 0045 | 735-02-00100 | Mailbox Supports (Single) | 26 | EACH | 150.00 | 3,900.00 | 150.00 | 3,900.00 | 175.00 | 4,550.00 | 150.00 | 3,900.00 | | 0046 | 735-03-00100 | Mailbox Supports (Double) | 6 | EACH | 225.00 | 1,350.00 | 225.00 | 1,350.00 | 250.00 | 1,500.00 | 225.00 | 1,350.00 | | 0047 | 735-04-00100 | Mailbox Supports (Multiple) | 2 | EACH | 500.00 | 1,000.00 | 500.00 | 1,000.00 | 750.00 | 1,500.00 | 500.00 | 1,000.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 1.00 | 1.00 | 13,000.00 | 13,000.00 | 16,500.00 | 16,500.00 | 16,000.00 | 16,000.00 | | 0049 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 20,469 | LNFT | 1.75 | 35,820.75 | 1.15 | 23,539.35 | 1.00 | 20,469.00 | 1.30 | 26,609.70 | | 0050 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 5,440 | LNFT | 1.75 | 9,520.00 | 1.25 | 6,800.00 | 1.00 | 5,440.00 | 1.30 | 7,072.00 | | 0051 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 25,909 | LNFT | 0.50 | 12,954.50 | 0.95 | 24,613.55 | 0.50 | 12,954.50 | 1.30 | 33,681.70 | | 0052 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 666 | INLF | 0.50 | 333.00 | 0.01 | 6.66 | 1.50 | 999.00 | 0.75 | 499.50 | | 0053 | NS-602-00001 | Milling Concrete Pavement | 360 | SQYD | 3.00 | 1,080.00 | 13.00 | 4,680.00 | 20.00 | 7,200.00 | 20.00 | 7,200.00 | | 0054 | NS-MSC-00279 | Adjusting Valve Boxes | 9 | EACH | 32.00 | 288.00 | 100.00 | 900.00 | 100.00 | 900.00 | 200.00 | 1,800.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,022,163.96 | | 2,187,548.93 | | 2,519,460.08 | | 2,756,153.90 |
|