Proposal:H.006599.6
Parish:St. Tammany
Routes:US 190
Description:TAMMANY TRACE CAMP SALMEN CONNECTOR
Type Construction:CLEARING AND GRUBBING, GRADING, CLASS II BASE COURSE, DRAINAGE STRUCTURES, ASPHALT CONCRETE PATH, AND RELATED WORK.
Estimated Construction Cost:$643,916.60
| Rank | License | Bidder | Construction Bid |
| 1 | 38466 | Gulf States Contractors LLC | $539,293.63 |
| 2 | 54896 | Magee Excavation & Development LLC | $645,267.08 |
| 3 | 16724 | STRANCO, LLC | $658,587.90 |
| 4 | 16378 | Mcdonald Const. Inc. of Slidell | $673,290.54 |
| 5 | 48896 | Command Construction Industries LLC | $673,760.00 |
| 6 | 30774 | Progressive Construction Co., LLC | $812,098.08 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Gulf States Contractors LLC | - 2 - Magee Excavation & Development LLC | - 3 - STRANCO, LLC | - 4 - Mcdonald Const. Inc. of Slidell | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.75 | LUMP | 55,000.00 | 55,000.00 | 64,000.00 | 64,000.00 | 50,000.00 | 50,000.00 | 44,500.00 | 44,500.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,000.00 | 3,000.00 | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 231 | SQYD | 12.00 | 2,772.00 | 12.00 | 2,772.00 | 12.00 | 2,772.00 | 12.00 | 2,772.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 45,000.00 | 45,000.00 | 64,000.00 | 64,000.00 | 50,000.00 | 50,000.00 | 58,330.00 | 58,330.00 | | 0005 | 203-08-00100 | Geotextile Fabric | 107.2 | SQYD | 5.00 | 536.00 | 10.00 | 1,072.00 | 3.00 | 321.60 | 2.00 | 214.40 | | 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 72 | EACH | 9.00 | 648.00 | 14.50 | 1,044.00 | 15.00 | 1,080.00 | 15.00 | 1,080.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 4,950 | LNFT | 1.00 | 4,950.00 | 1.50 | 7,425.00 | 1.65 | 8,167.50 | 2.00 | 9,900.00 | | 0008 | 302-02-02101 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 6,814 | SQYD | 16.00 | 109,024.00 | 21.50 | 146,501.00 | 18.50 | 126,059.00 | 22.00 | 149,908.00 | | 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 80 | CUYD | 75.00 | 6,000.00 | 60.00 | 4,800.00 | 60.00 | 4,800.00 | 60.00 | 4,800.00 | | 0010 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 16 | LNFT | 75.00 | 1,200.00 | 100.00 | 1,600.00 | 80.00 | 1,280.00 | 72.00 | 1,152.00 | | 0011 | 701-06-01000 | Side Drain Pipe Arch (15" Equiv. RCPA/CMPA) | 24 | LNFT | 70.00 | 1,680.00 | 90.00 | 2,160.00 | 60.00 | 1,440.00 | 58.00 | 1,392.00 | | 0012 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 681 | LNFT | 75.00 | 51,075.00 | 80.00 | 54,480.00 | 80.00 | 54,480.00 | 90.00 | 61,290.00 | | 0013 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 128 | LNFT | 109.00 | 13,952.00 | 100.00 | 12,800.00 | 120.00 | 15,360.00 | 120.00 | 15,360.00 | | 0014 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 2,900.00 | 20,300.00 | 2,200.00 | 15,400.00 | 3,250.00 | 22,750.00 | 2,950.00 | 20,650.00 | | 0015 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 88 | SQYD | 125.00 | 11,000.00 | 100.00 | 8,800.00 | 120.00 | 10,560.00 | 97.50 | 8,580.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 4,200.00 | 4,200.00 | 7,500.00 | 7,500.00 | 10,500.00 | 10,500.00 | | 0017 | 726-01-00100 | Bedding Material | 95.63 | CUYD | 1.00 | 95.63 | 70.00 | 6,694.10 | 60.00 | 5,737.80 | 78.00 | 7,459.14 | | 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 48,000.00 | 48,000.00 | 18,000.00 | 18,000.00 | 42,500.00 | 42,500.00 | 45,000.00 | 45,000.00 | | 0019 | 729-01-00100 | Sign (Type A) | 195.5 | SQFT | 18.00 | 3,519.00 | 22.21 | 4,342.06 | 20.00 | 3,910.00 | 22.00 | 4,301.00 | | 0020 | 729-21-00100 | U-Channel Post | 54 | EACH | 75.00 | 4,050.00 | 92.53 | 4,996.62 | 82.50 | 4,455.00 | 100.00 | 5,400.00 | | 0021 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 210 | LNFT | 3.50 | 735.00 | 4.47 | 938.70 | 10.00 | 2,100.00 | 16.50 | 3,465.00 | | 0022 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 2 | EACH | 400.00 | 800.00 | 223.30 | 446.60 | 450.00 | 900.00 | 1,600.00 | 3,200.00 | | 0023 | 732-04-19100 | Plastic Pavement Legends and Symbols (STOP AHEAD) | 7 | EACH | 400.00 | 2,800.00 | 614.00 | 4,298.00 | 600.00 | 4,200.00 | 1,600.00 | 11,200.00 | | 0024 | 739-01-00100 | Hydro-Seeding | 1.94 | ACRE | 1,300.00 | 2,522.00 | 1,500.00 | 2,910.00 | 2,000.00 | 3,880.00 | 1,800.00 | 3,492.00 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 1,800.00 | 1,800.00 | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 | | 0026 | NS-200-00020 | Cleaning Existing Ditches | 6,800 | LNFT | 0.15 | 1,020.00 | 3.00 | 20,400.00 | 6.00 | 40,800.00 | 5.50 | 37,400.00 | | 0027 | NS-502-01000 | Asphalt Concrete (Level A) (2" Thick) | 684 | TON | 110.00 | 75,240.00 | 123.00 | 84,132.00 | 110.00 | 75,240.00 | 105.00 | 71,820.00 | | 0028 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 109 | TON | 175.00 | 19,075.00 | 203.00 | 22,127.00 | 155.00 | 16,895.00 | 145.00 | 15,805.00 | | 0029 | NS-ENH-02080 | Bollards (Wooden) | 116 | EACH | 100.00 | 11,600.00 | 245.50 | 28,478.00 | 250.00 | 29,000.00 | 220.00 | 25,520.00 | | 0030 | NS-ENH-02100 | Bollards (Removable) (Steel Pipe) | 6 | EACH | 700.00 | 4,200.00 | 1,675.00 | 10,050.00 | 1,650.00 | 9,900.00 | 1,500.00 | 9,000.00 | | 0031 | NS-ENH-08000 | Handrails (Furnished and Installed) | 200 | LNFT | 35.00 | 7,000.00 | 193.00 | 38,600.00 | 250.00 | 50,000.00 | 149.00 | 29,800.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 539,293.63 | | 645,267.08 | | 658,587.90 | | 673,290.54 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Command Construction Industries LLC | - 6 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2.75 | LUMP | 150,000.00 | 150,000.00 | 70,000.00 | 70,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 13,750.00 | 13,750.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 231 | SQYD | 10.00 | 2,310.00 | 49.00 | 11,319.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 50,000.00 | 50,000.00 | 50,700.00 | 50,700.00 | | 0005 | 203-08-00100 | Geotextile Fabric | 107.2 | SQYD | 5.00 | 536.00 | 6.50 | 696.80 | | 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 72 | EACH | 15.00 | 1,080.00 | 14.00 | 1,008.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 4,950 | LNFT | 2.00 | 9,900.00 | 1.75 | 8,662.50 | | 0008 | 302-02-02101 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 6,814 | SQYD | 15.00 | 102,210.00 | 22.75 | 155,018.50 | | 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 80 | CUYD | 10.00 | 800.00 | 92.50 | 7,400.00 | | 0010 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 16 | LNFT | 125.00 | 2,000.00 | 116.00 | 1,856.00 | | 0011 | 701-06-01000 | Side Drain Pipe Arch (15" Equiv. RCPA/CMPA) | 24 | LNFT | 100.00 | 2,400.00 | 77.00 | 1,848.00 | | 0012 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 681 | LNFT | 125.00 | 85,125.00 | 106.50 | 72,526.50 | | 0013 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 128 | LNFT | 175.00 | 22,400.00 | 145.75 | 18,656.00 | | 0014 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 3,000.00 | 21,000.00 | 3,825.00 | 26,775.00 | | 0015 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 88 | SQYD | 100.00 | 8,800.00 | 120.00 | 10,560.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 12,200.00 | 12,200.00 | | 0017 | 726-01-00100 | Bedding Material | 95.63 | CUYD | 50.00 | 4,781.50 | 92.50 | 8,845.78 | | 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 72,600.00 | 72,600.00 | | 0019 | 729-01-00100 | Sign (Type A) | 195.5 | SQFT | 25.00 | 4,887.50 | 20.00 | 3,910.00 | | 0020 | 729-21-00100 | U-Channel Post | 54 | EACH | 100.00 | 5,400.00 | 80.00 | 4,320.00 | | 0021 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 210 | LNFT | 10.00 | 2,100.00 | 3.75 | 787.50 | | 0022 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 2 | EACH | 750.00 | 1,500.00 | 315.00 | 630.00 | | 0023 | 732-04-19100 | Plastic Pavement Legends and Symbols (STOP AHEAD) | 7 | EACH | 750.00 | 5,250.00 | 475.00 | 3,325.00 | | 0024 | 739-01-00100 | Hydro-Seeding | 1.94 | ACRE | 1,000.00 | 1,940.00 | 1,275.00 | 2,473.50 | | 0025 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 | | 0026 | NS-200-00020 | Cleaning Existing Ditches | 6,800 | LNFT | 1.00 | 6,800.00 | 8.25 | 56,100.00 | | 0027 | NS-502-01000 | Asphalt Concrete (Level A) (2" Thick) | 684 | TON | 110.00 | 75,240.00 | 160.00 | 109,440.00 | | 0028 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 109 | TON | 200.00 | 21,800.00 | 190.00 | 20,710.00 | | 0029 | NS-ENH-02080 | Bollards (Wooden) | 116 | EACH | 75.00 | 8,700.00 | 230.00 | 26,680.00 | | 0030 | NS-ENH-02100 | Bollards (Removable) (Steel Pipe) | 6 | EACH | 300.00 | 1,800.00 | 1,600.00 | 9,600.00 | | 0031 | NS-ENH-08000 | Handrails (Furnished and Installed) | 200 | LNFT | 50.00 | 10,000.00 | 116.00 | 23,200.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 673,760.00 | | 812,098.08 |
|