Proposal:H.002169.6
Parish:Iberville
Routes:LA 77
Description:GROSSE TETE SIDEWALKS
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, CONCRETE WALKS, INCIDENTAL CONCRETE PAVING, AND RELATED WORK.
Estimated Construction Cost:$334,852.00
| Rank | License | Bidder | Construction Bid |
| 1 | 05693 | Industrial Enterprises, Inc. | $328,519.97 |
| 2 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $332,999.10 |
| 3 | 55950 | Brown Industrial Construction, LLC | $339,810.65 |
| 4 | 07764 | Grady Crawford Const. Co., Inc. | $345,730.65 |
| 5 | 38466 | Gulf States Contractors LLC | $353,855.00 |
| 6 | 57931 | KCR CONTRACTORS, LLC | $398,274.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Industrial Enterprises, Inc. | - 2 - KORT's CONSTRUCTION SERVICES, INC. | - 3 - Brown Industrial Construction, LLC | - 4 - Grady Crawford Const. Co., Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.95 | LUMP | 2,400.00 | 2,400.00 | 5,000.00 | 5,000.00 | 29,500.00 | 29,500.00 | 15,000.00 | 15,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,100.00 | 2,100.00 | 5,000.00 | 5,000.00 | 1,800.00 | 1,800.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 300.00 | 600.00 | 900.00 | 1,800.00 | 487.00 | 974.00 | 250.00 | 500.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 62 | SQYD | 14.40 | 892.80 | 16.00 | 992.00 | 27.00 | 1,674.00 | 8.00 | 496.00 | | 0005 | 202-02-32000 | Removal of Paved Ditches | 39 | SQYD | 14.40 | 561.60 | 25.00 | 975.00 | 39.00 | 1,521.00 | 8.00 | 312.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (15" & 18" Reinforced Concrete Pipe) | 250 | LNFT | 7.20 | 1,800.00 | 10.00 | 2,500.00 | 14.00 | 3,500.00 | 10.00 | 2,500.00 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (15" Reinforced Concrete Pipe) | 15 | LNFT | 127.20 | 1,908.00 | 10.00 | 150.00 | 19.00 | 285.00 | 10.00 | 150.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 23,184.00 | 23,184.00 | 25,000.00 | 25,000.00 | 11,000.00 | 11,000.00 | 12,000.00 | 12,000.00 | | 0009 | 203-07-00100 | Borrow (Vehicular Measurement) | 3 | CUYD | 18.00 | 54.00 | 35.00 | 105.00 | 233.47 | 700.41 | 100.00 | 300.00 | | 0010 | 204-02-00100 | Temporary Hay Bales | 77 | EACH | 12.00 | 924.00 | 11.00 | 847.00 | 12.00 | 924.00 | 15.00 | 1,155.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 2,806 | LNFT | 1.80 | 5,050.80 | 2.00 | 5,612.00 | 1.55 | 4,349.30 | 1.77 | 4,966.62 | | 0012 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 60.00 | 3,000.00 | 85.00 | 4,250.00 | 112.00 | 5,600.00 | 75.00 | 3,750.00 | | 0013 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 302 | LNFT | 39.04 | 11,790.08 | 60.00 | 18,120.00 | 68.50 | 20,687.00 | 64.20 | 19,388.40 | | 0014 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 57 | LNFT | 59.12 | 3,369.84 | 70.00 | 3,990.00 | 81.50 | 4,645.50 | 74.15 | 4,226.55 | | 0015 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 343 | LNFT | 59.60 | 20,442.80 | 72.00 | 24,696.00 | 85.00 | 29,155.00 | 76.56 | 26,260.08 | | 0016 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 22 | LNFT | 57.13 | 1,256.86 | 60.00 | 1,320.00 | 86.50 | 1,903.00 | 78.86 | 1,734.92 | | 0017 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 80 | LNFT | 72.67 | 5,813.60 | 75.00 | 6,000.00 | 75.00 | 6,000.00 | 81.86 | 6,548.80 | | 0018 | 701-07-00500 | Yard Drain Pipe (12") | 100 | LNFT | 32.00 | 3,200.00 | 15.00 | 1,500.00 | 57.00 | 5,700.00 | 18.50 | 1,850.00 | | 0019 | 701-07-00700 | Yard Drain Pipe (18") | 60 | LNFT | 45.37 | 2,722.20 | 25.00 | 1,500.00 | 75.00 | 4,500.00 | 20.50 | 1,230.00 | | 0020 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 75 | LNFT | 54.12 | 4,059.00 | 60.00 | 4,500.00 | 57.00 | 4,275.00 | 65.50 | 4,912.50 | | 0021 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 12 | LNFT | 51.26 | 615.12 | 65.00 | 780.00 | 116.00 | 1,392.00 | 78.50 | 942.00 | | 0022 | 701-12-01000 | Corrugated Metal Pipe (Extension) (12") | 7 | LNFT | 65.76 | 460.32 | 70.00 | 490.00 | 159.00 | 1,113.00 | 50.00 | 350.00 | | 0023 | 701-12-01020 | Corrugated Metal Pipe (Extension) (15") | 8 | LNFT | 64.70 | 517.60 | 72.00 | 576.00 | 143.00 | 1,144.00 | 55.00 | 440.00 | | 0024 | 701-15-00100 | Concrete Collar | 2 | EACH | 480.00 | 960.00 | 2,000.00 | 4,000.00 | 712.00 | 1,424.00 | 1,500.00 | 3,000.00 | | 0025 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 3,047.50 | 3,047.50 | 5,800.00 | 5,800.00 | 4,150.00 | 4,150.00 | 4,200.00 | 4,200.00 | | 0026 | 702-03-00100 | Catch Basins (CB-01) | 9 | EACH | 2,530.00 | 22,770.00 | 3,200.00 | 28,800.00 | 2,960.00 | 26,640.00 | 3,200.00 | 28,800.00 | | 0027 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 1,800.00 | 1,800.00 | 2,500.00 | 2,500.00 | 2,375.00 | 2,375.00 | 1,500.00 | 1,500.00 | | 0028 | 706-01-00100 | Concrete Walk (4" Thick) | 1,531.5 | SQYD | 71.50 | 109,502.25 | 49.00 | 75,043.50 | 49.00 | 75,043.50 | 55.00 | 84,232.50 | | 0029 | 706-01-00300 | Concrete Walk (6" Thick) | 19.5 | SQYD | 74.75 | 1,457.63 | 60.00 | 1,170.00 | 122.00 | 2,379.00 | 60.00 | 1,170.00 | | 0030 | 706-02-00200 | Concrete Drive (6" Thick) | 142.5 | SQYD | 86.25 | 12,290.63 | 60.00 | 8,550.00 | 77.75 | 11,079.38 | 60.00 | 8,550.00 | | 0031 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 13.5 | SQYD | 50.40 | 680.40 | 105.00 | 1,417.50 | 153.00 | 2,065.50 | 100.00 | 1,350.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 17,250.00 | 17,250.00 | 20,000.00 | 20,000.00 | 4,395.00 | 4,395.00 | 11,800.00 | 11,800.00 | | 0033 | 726-01-00100 | Bedding Material | 101.3 | CUYD | 88.00 | 8,914.40 | 80.00 | 8,104.00 | 71.50 | 7,242.95 | 23.60 | 2,390.68 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 13,052.50 | 13,052.50 | 20,000.00 | 20,000.00 | 34,000.00 | 34,000.00 | 35,000.00 | 35,000.00 | | 0035 | 729-01-00100 | Sign (Type A) | 8.6 | SQFT | 24.20 | 208.12 | 28.00 | 240.80 | 8.60 | 73.96 | 41.50 | 356.90 | | 0036 | 729-01-00103 | Sign (Type A)(Relocate) | 15.7 | SQFT | 16.50 | 259.05 | 19.00 | 298.30 | 15.00 | 235.50 | 71.00 | 1,114.70 | | 0037 | 729-02-00103 | Sign (Type B)(Relocate) | 14 | SQFT | 16.50 | 231.00 | 19.00 | 266.00 | 15.00 | 210.00 | 76.00 | 1,064.00 | | 0038 | 729-08-00200 | Mounting (3 1/2" Size Post) | 2 | EACH | 2,420.00 | 4,840.00 | 2,800.00 | 5,600.00 | 2,200.00 | 4,400.00 | 1,386.00 | 2,772.00 | | 0039 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 5 | EACH | 165.00 | 825.00 | 190.00 | 950.00 | 150.00 | 750.00 | 66.00 | 330.00 | | 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 49 | LNFT | 7.70 | 377.30 | 64.00 | 3,136.00 | 25.00 | 1,225.00 | 114.00 | 5,586.00 | | 0041 | 739-01-00100 | Hydro-Seeding | 1.95 | ACRE | 2,300.00 | 4,485.00 | 1,600.00 | 3,120.00 | 1,295.00 | 2,525.25 | 3,180.00 | 6,201.00 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,500.00 | 11,500.00 | 15,000.00 | 15,000.00 | 3,000.00 | 3,000.00 | 11,800.00 | 11,800.00 | | 0043 | 807-01-00800 | Structural Metalwork (Sidewalk Drain Cover) | 2,450 | LUMP | 12,347.55 | 12,347.55 | 10,800.00 | 10,800.00 | 12,000.00 | 12,000.00 | 7,500.00 | 7,500.00 | | 0044 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 1 | EACH | 3,450.00 | 3,450.00 | 1,000.00 | 1,000.00 | 800.00 | 800.00 | 1,000.00 | 1,000.00 | | 0045 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 690 | INLF | 0.92 | 634.80 | 1.00 | 690.00 | 0.90 | 621.00 | 8.00 | 5,520.00 | | 0046 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 288 | INLF | 1.09 | 313.92 | 1.00 | 288.00 | 0.90 | 259.20 | 8.00 | 2,304.00 | | 0047 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 522 | INLF | 1.15 | 600.30 | 1.00 | 522.00 | 1.10 | 574.20 | 8.00 | 4,176.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 328,519.97 | | 332,999.10 | | 339,810.65 | | 345,730.65 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Gulf States Contractors LLC | - 6 - KCR CONTRACTORS, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.95 | LUMP | 5,000.00 | 5,000.00 | 4,200.00 | 4,200.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,500.00 | 2,500.00 | 42,001.00 | 42,001.00 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 500.00 | 1,000.00 | 460.00 | 920.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 62 | SQYD | 15.00 | 930.00 | 14.85 | 920.70 | | 0005 | 202-02-32000 | Removal of Paved Ditches | 39 | SQYD | 15.00 | 585.00 | 236.00 | 9,204.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) (15" & 18" Reinforced Concrete Pipe) | 250 | LNFT | 10.00 | 2,500.00 | 7.35 | 1,837.50 | | 0007 | 202-02-32120 | Removal of Pipe (Side Drain) (15" Reinforced Concrete Pipe) | 15 | LNFT | 10.00 | 150.00 | 9.20 | 138.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 22,500.00 | 22,500.00 | 3,925.00 | 3,925.00 | | 0009 | 203-07-00100 | Borrow (Vehicular Measurement) | 3 | CUYD | 50.00 | 150.00 | 526.90 | 1,580.70 | | 0010 | 204-02-00100 | Temporary Hay Bales | 77 | EACH | 9.00 | 693.00 | 14.00 | 1,078.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 2,806 | LNFT | 1.00 | 2,806.00 | 1.80 | 5,050.80 | | 0012 | 402-03-00100 | Non-Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 75.00 | 3,750.00 | 115.00 | 5,750.00 | | 0013 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 302 | LNFT | 95.00 | 28,690.00 | 45.10 | 13,620.20 | | 0014 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 57 | LNFT | 95.00 | 5,415.00 | 56.85 | 3,240.45 | | 0015 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 343 | LNFT | 95.00 | 32,585.00 | 65.25 | 22,380.75 | | 0016 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 22 | LNFT | 95.00 | 2,090.00 | 45.10 | 992.20 | | 0017 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 80 | LNFT | 100.00 | 8,000.00 | 67.60 | 5,408.00 | | 0018 | 701-07-00500 | Yard Drain Pipe (12") | 100 | LNFT | 30.00 | 3,000.00 | 25.30 | 2,530.00 | | 0019 | 701-07-00700 | Yard Drain Pipe (18") | 60 | LNFT | 50.00 | 3,000.00 | 28.75 | 1,725.00 | | 0020 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 75 | LNFT | 100.00 | 7,500.00 | 72.50 | 5,437.50 | | 0021 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 12 | LNFT | 110.00 | 1,320.00 | 75.00 | 900.00 | | 0022 | 701-12-01000 | Corrugated Metal Pipe (Extension) (12") | 7 | LNFT | 150.00 | 1,050.00 | 96.15 | 673.05 | | 0023 | 701-12-01020 | Corrugated Metal Pipe (Extension) (15") | 8 | LNFT | 150.00 | 1,200.00 | 96.15 | 769.20 | | 0024 | 701-15-00100 | Concrete Collar | 2 | EACH | 2,000.00 | 4,000.00 | 1,150.00 | 2,300.00 | | 0025 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 3,500.00 | 3,500.00 | 3,250.00 | 3,250.00 | | 0026 | 702-03-00100 | Catch Basins (CB-01) | 9 | EACH | 2,800.00 | 25,200.00 | 2,550.00 | 22,950.00 | | 0027 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,000.00 | 2,000.00 | 1,450.00 | 1,450.00 | | 0028 | 706-01-00100 | Concrete Walk (4" Thick) | 1,531.5 | SQYD | 60.00 | 91,890.00 | 64.18 | 98,291.67 | | 0029 | 706-01-00300 | Concrete Walk (6" Thick) | 19.5 | SQYD | 120.00 | 2,340.00 | 81.72 | 1,593.54 | | 0030 | 706-02-00200 | Concrete Drive (6" Thick) | 142.5 | SQYD | 80.00 | 11,400.00 | 71.25 | 10,153.13 | | 0031 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 13.5 | SQYD | 155.00 | 2,092.50 | 120.00 | 1,620.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 7,965.00 | 7,965.00 | | 0033 | 726-01-00100 | Bedding Material | 101.3 | CUYD | 1.00 | 101.30 | 83.25 | 8,433.23 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | 60,200.00 | 60,200.00 | | 0035 | 729-01-00100 | Sign (Type A) | 8.6 | SQFT | 22.00 | 189.20 | 35.00 | 301.00 | | 0036 | 729-01-00103 | Sign (Type A)(Relocate) | 15.7 | SQFT | 15.00 | 235.50 | 69.90 | 1,097.43 | | 0037 | 729-02-00103 | Sign (Type B)(Relocate) | 14 | SQFT | 15.00 | 210.00 | 74.75 | 1,046.50 | | 0038 | 729-08-00200 | Mounting (3 1/2" Size Post) | 2 | EACH | 2,200.00 | 4,400.00 | 1,351.25 | 2,702.50 | | 0039 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 5 | EACH | 150.00 | 750.00 | 97.75 | 488.75 | | 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 49 | LNFT | 25.00 | 1,225.00 | 28.75 | 1,408.75 | | 0041 | 739-01-00100 | Hydro-Seeding | 1.95 | ACRE | 1,250.00 | 2,437.50 | 1,489.25 | 2,904.04 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 17,250.00 | 17,250.00 | | 0043 | 807-01-00800 | Structural Metalwork (Sidewalk Drain Cover) | 2,450 | LUMP | 15,000.00 | 15,000.00 | 13,910.76 | 13,910.76 | | 0044 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 1 | EACH | 1,000.00 | 1,000.00 | 3,000.00 | 3,000.00 | | 0045 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 690 | INLF | 2.50 | 1,725.00 | 0.85 | 586.50 | | 0046 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 288 | INLF | 5.00 | 1,440.00 | 1.70 | 489.60 | | 0047 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 522 | INLF | 2.50 | 1,305.00 | 1.15 | 600.30 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 353,855.00 | | 398,274.75 |
|