Bid Tabulations for the Letting of 12/13/2017 LA DOTD Headquarters

Proposal:H.011532.6
Parish:Morehouse
Description:MOTT LANE BRIDGE / DRAIN TO LAKE IRWIN
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE (STONE), SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$388,928.50
Rank License BidderConstruction Bid
114788Louisiana Bridge, Inc.$308,752.00
249864Terral Construction L.L.C.$321,130.80
323112BEN ALLEN, INC.$338,684.00
418546C W & W Contractors, Inc.$438,504.00
549239WL Bass Construction Inc.$468,657.90
612487Diamond B Construction Co., L.L.C.$520,614.00
739462JB JAMES CONSTRUCTION LLC$693,212.79


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Louisiana Bridge, Inc.
- 2 -
Terral Construction L.L.C.
- 3 -
BEN ALLEN, INC.
- 4 -
C W & W Contractors, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1     LUMP3,000.003,000.0014,000.0014,000.005,000.005,000.007,500.007,500.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP2,000.002,000.004,000.004,000.002,500.002,500.005,000.005,000.00
0003202-02-32100Removal of Pipe (Cross Drain) 2 - 72" X 37' CMP74     LNFT33.002,442.0067.004,958.0050.003,700.0025.001,850.00
0004203-05-00100Excavation and Embankment 1     LUMP10,000.0010,000.0016,000.0016,000.0012,000.0012,000.0026,500.0026,500.00
0005204-02-00100Temporary Hay or Straw Bales 10     EACH10.00100.00100.001,000.0050.00500.0025.00250.00
0006204-05-00100Temporary Sediment Check Dams (Hay) 5     EACH155.00775.0040.00200.0050.00250.00250.001,250.00
0007204-06-00100Temporary Silt Fencing 959     LNFT2.001,918.003.002,877.003.002,877.003.002,877.00
0008302-01-00700Class II Base Course (Stone) 181.2   CUYD105.0019,026.0099.0017,938.80105.0019,026.00100.0018,120.00
0009401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 18     CUYD105.001,890.00155.002,790.00105.001,890.00100.001,800.00
0010502-01-00100Superpave Asphaltic Concrete 143.8   TON180.0025,884.00200.0028,760.00175.0025,165.00165.0023,727.00
0011701-05-02080Side Drain Pipe (Erosion) (30" PP/CMP) 110     LNFT62.006,820.0050.005,500.0070.007,700.00110.0012,100.00
0012704-03-00100Blocked Out Guard Rail 50     LNFT23.001,150.0020.001,000.0022.001,100.0025.001,250.00
0013704-08-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT70.007,000.0062.506,250.0066.006,600.0074.007,400.00
0014704-11-00105Guard Rail End Treatment (Flared, 12' - 6" Length) 4     EACH3,000.0012,000.002,500.0010,000.002,700.0010,800.002,950.0011,800.00
0015711-01-04000Riprap (55 lb, 18" Thick) 432     SQYD58.0025,056.0060.0025,920.0067.0028,944.0090.0038,880.00
0016711-04-00100Geotextile Fabric 432     SQYD3.001,296.003.001,296.003.001,296.003.001,296.00
0017713-01-00100Temporary Signs and Barricades 1     LUMP3,500.003,500.0010,000.0010,000.005,500.005,500.005,000.005,000.00
0018716-01-00100Mulch (Vegetative) 0.5   TON2,000.001,000.003,000.001,500.001,200.00600.002,530.001,265.00
0019717-01-00100Seeding 11     LB30.00330.00100.001,100.0020.00220.0038.00418.00
0020718-01-00100Fertilizer 240     LB1.50360.004.00960.002.00480.004.00960.00
0021727-01-00100Mobilization 1     LUMP19,000.0019,000.0014,000.0014,000.0020,000.0020,000.0065,000.0065,000.00
0022729-16-00300Object Marker Assembly (Type 3) 4     EACH85.00340.00100.00400.0085.00340.00100.00400.00
0023740-01-00100Construction Layout 1     LUMP3,000.003,000.006,000.006,000.004,500.004,500.0010,000.0010,000.00
0024804-01-00200Precast Concrete Piles (14") 944     LNFT56.0052,864.0054.7551,684.0059.0055,696.0065.0061,360.00
0025804-12-00100Loading Permanent Piles 1     EACH1.001.000.000.000.000.001.001.00
0026805-10-01300Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) 3     SPAN29,000.0087,000.0026,999.0080,997.0033,000.0099,000.0035,500.00106,500.00
0027NS-800-00040Concrete Approach Slabs (24' CLEAR ROADWAY, 90 DEG. CROSSING) (W/O ASPHALT)2     EACH10,500.0021,000.006,000.0012,000.0011,500.0023,000.0013,000.0026,000.00
             
  CONTRACTOR TOTAL   308,752.00 321,130.80 338,684.00 438,504.00



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
WL Bass Construction Inc.
- 6 -
Diamond B Construction Co., L.L.C.
- 7 -
JB JAMES CONSTRUCTION LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1     LUMP15,230.0015,230.008,000.008,000.0055,000.0055,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP3,000.003,000.005,000.005,000.0015,000.0015,000.00
0003202-02-32100Removal of Pipe (Cross Drain) 2 - 72" X 37' CMP74     LNFT15.001,110.00200.0014,800.00160.0011,840.00
0004203-05-00100Excavation and Embankment 1     LUMP7,500.007,500.0026,500.0026,500.0050,000.0050,000.00
0005204-02-00100Temporary Hay or Straw Bales 10     EACH15.00150.0011.00110.0015.00150.00
0006204-05-00100Temporary Sediment Check Dams (Hay) 5     EACH175.00875.00135.00675.00175.00875.00
0007204-06-00100Temporary Silt Fencing 959     LNFT2.702,589.303.002,877.003.213,078.39
0008302-01-00700Class II Base Course (Stone) 181.2   CUYD165.5029,988.60135.0024,462.00150.0027,180.00
0009401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 18     CUYD70.001,260.00150.002,700.00160.002,880.00
0010502-01-00100Superpave Asphaltic Concrete 143.8   TON155.0022,289.00140.0020,132.00143.0020,563.40
0011701-05-02080Side Drain Pipe (Erosion) (30" PP/CMP) 110     LNFT70.007,700.00110.0012,100.00125.0013,750.00
0012704-03-00100Blocked Out Guard Rail 50     LNFT20.001,000.0027.001,350.0020.001,000.00
0013704-08-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT80.008,000.0070.007,000.0062.506,250.00
0014704-11-00105Guard Rail End Treatment (Flared, 12' - 6" Length) 4     EACH2,650.0010,600.002,600.0010,400.002,500.0010,000.00
0015711-01-04000Riprap (55 lb, 18" Thick) 432     SQYD75.0032,400.0095.0041,040.0075.0032,400.00
0016711-04-00100Geotextile Fabric 432     SQYD2.751,188.004.501,944.003.001,296.00
0017713-01-00100Temporary Signs and Barricades 1     LUMP5,500.005,500.0010,000.0010,000.0012,000.0012,000.00
0018716-01-00100Mulch (Vegetative) 0.5   TON2,000.001,000.001,500.00750.002,000.001,000.00
0019717-01-00100Seeding 11     LB30.00330.0022.00242.0030.00330.00
0020718-01-00100Fertilizer 240     LB3.00720.002.80672.003.00720.00
0021727-01-00100Mobilization 1     LUMP46,000.0046,000.0077,000.0077,000.0060,000.0060,000.00
0022729-16-00300Object Marker Assembly (Type 3) 4     EACH100.00400.0084.00336.0075.00300.00
0023740-01-00100Construction Layout 1     LUMP10,000.0010,000.0011,000.0011,000.0020,000.0020,000.00
0024804-01-00200Precast Concrete Piles (14") 944     LNFT74.5070,328.0071.0067,024.00150.00141,600.00
0025804-12-00100Loading Permanent Piles 1     EACH500.00500.00500.00500.002,000.002,000.00
0026805-10-01300Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) 3     SPAN51,000.00153,000.0048,000.00144,000.0060,000.00180,000.00
0027NS-800-00040Concrete Approach Slabs (24' CLEAR ROADWAY, 90 DEG. CROSSING) (W/O ASPHALT)2     EACH18,000.0036,000.0015,000.0030,000.0012,000.0024,000.00
           
  CONTRACTOR TOTAL   468,657.90 520,614.00 693,212.79