Proposal:H.012404.6
Parish:Lafayette
Routes:I-10
Description:I-10 OFF RAMPS @ LA 182
Type Construction:GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, SUBGRADE TREATMENT, CLASS II BASE COURSE, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, DRILLED SHAFT FOUNDATIONS, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$994,802.64
| Rank | License | Bidder | Construction Bid |
| 1 | 51821 | Elliott Construction, LLC | $957,012.80 |
| 2 | 55505 | MERRICK, LLC | $1,015,808.85 |
| 3 | 52306 | Cecil Perry Improvements Llc | $1,099,036.74 |
| 4 | 33663 | Glenn Lege Construction Inc | $1,208,436.61 |
| 5 | 55950 | Brown Industrial Construction, LLC | $1,412,158.81 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elliott Construction, LLC | - 2 - MERRICK, LLC | - 3 - Cecil Perry Improvements Llc | - 4 - Glenn Lege Construction Inc | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 750.00 | 750.00 | 1,000.00 | 1,000.00 | 392.00 | 392.00 | 2,055.00 | 2,055.00 | | 0002 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 835 | SQYD | 13.00 | 10,855.00 | 9.00 | 7,515.00 | 10.90 | 9,101.50 | 13.00 | 10,855.00 | | 0003 | 202-02-38240 | Removal of Signs and Supports | 4 | EACH | 190.00 | 760.00 | 75.00 | 300.00 | 180.00 | 720.00 | 168.00 | 672.00 | | 0004 | 202-02-38260 | Removal of Sign Support Footings | 4 | EACH | 300.00 | 1,200.00 | 75.00 | 300.00 | 280.00 | 1,120.00 | 168.00 | 672.00 | | 0005 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,486.9 | SQYD | 10.00 | 14,869.00 | 7.00 | 10,408.30 | 7.30 | 10,854.37 | 14.00 | 20,816.60 | | 0006 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 6,150.00 | 6,150.00 | 9,000.00 | 9,000.00 | 5,810.00 | 5,810.00 | 6,365.00 | 6,365.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 | 31,940.00 | 31,940.00 | 29,810.00 | 29,810.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 50.00 | 400.00 | 45.00 | 360.00 | 119.00 | 952.00 | 168.00 | 1,344.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 70 | LNFT | 3.00 | 210.00 | 1.50 | 105.00 | 3.50 | 245.00 | 5.60 | 392.00 | | 0010 | 302-02-10010 | Class II Base Course (10" Thick) (Soil Cement) | 2,441.4 | SQYD | 27.00 | 65,917.80 | 21.00 | 51,269.40 | 28.50 | 69,579.90 | 26.75 | 65,307.45 | | 0011 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 2,441.4 | SQYD | 14.00 | 34,179.60 | 12.00 | 29,296.80 | 17.35 | 42,358.29 | 15.75 | 38,452.05 | | 0012 | 502-01-00100 | Asphalt Concrete | 180.2 | TON | 130.00 | 23,426.00 | 190.00 | 34,238.00 | 285.00 | 51,357.00 | 235.00 | 42,347.00 | | 0013 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 1,051 | GAL | 3.00 | 3,153.00 | 2.50 | 2,627.50 | 2.55 | 2,680.05 | 2.80 | 2,942.80 | | 0014 | 507-02-00200 | Aggregate (S2) | 1,546 | SQYD | 7.50 | 11,595.00 | 9.00 | 13,914.00 | 22.00 | 34,012.00 | 24.20 | 37,413.20 | | 0015 | 507-02-00300 | Aggregate (S3) | 1,546 | SQYD | 7.00 | 10,822.00 | 9.00 | 13,914.00 | 21.85 | 33,780.10 | 24.00 | 37,104.00 | | 0016 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 85 | SQYD | 135.00 | 11,475.00 | 145.00 | 12,325.00 | 230.60 | 19,601.00 | 140.00 | 11,900.00 | | 0017 | 601-01-00700 | Portland Cement Concrete Pavement (11" Thick) | 1,540.9 | SQYD | 87.50 | 134,828.75 | 80.00 | 123,272.00 | 103.40 | 159,329.06 | 115.00 | 177,203.50 | | 0018 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 240 | SQYD | 175.00 | 42,000.00 | 165.00 | 39,600.00 | 175.00 | 42,000.00 | 297.00 | 71,280.00 | | 0019 | 602-05-03200 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10" Thick) | 226 | SQYD | 155.00 | 35,030.00 | 145.00 | 32,770.00 | 150.00 | 33,900.00 | 268.00 | 60,568.00 | | 0020 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 100.00 | 800.00 | 78.00 | 624.00 | 49.50 | 396.00 | 90.00 | 720.00 | | 0021 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,150.00 | 1,150.00 | 600.00 | 600.00 | 546.00 | 546.00 | 535.00 | 535.00 | | 0022 | 707-01-00300 | Concrete Curb (Mountable) | 106.6 | LNFT | 25.00 | 2,665.00 | 8.00 | 852.80 | 6.50 | 692.90 | 22.30 | 2,377.18 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,000.00 | 45,000.00 | 45,000.00 | 45,000.00 | 40,000.00 | 40,000.00 | 28,800.00 | 28,800.00 | | 0024 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 3.919 | MILE | 12,960.00 | 50,790.24 | 9,250.00 | 36,250.75 | 9,175.00 | 35,956.83 | 9,500.00 | 37,230.50 | | 0025 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 6 | EACH | 108.00 | 648.00 | 55.00 | 330.00 | 51.00 | 306.00 | 56.00 | 336.00 | | 0026 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 4 | EACH | 216.00 | 864.00 | 60.00 | 240.00 | 56.00 | 224.00 | 112.00 | 448.00 | | 0027 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 4,000.00 | 4,000.00 | 2,500.00 | 2,500.00 | 9,714.00 | 9,714.00 | 14,500.00 | 14,500.00 | | 0028 | 726-01-00100 | Bedding Material | 2.5 | CUYD | 90.00 | 225.00 | 250.00 | 625.00 | 91.00 | 227.50 | 145.00 | 362.50 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 36,000.00 | 36,000.00 | 112,000.00 | 112,000.00 | 100,000.00 | 100,000.00 | 92,000.00 | 92,000.00 | | 0030 | 729-01-00100 | Sign (Type A) | 88.5 | SQFT | 32.00 | 2,832.00 | 30.00 | 2,655.00 | 30.50 | 2,699.25 | 62.00 | 5,487.00 | | 0031 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 113.5 | SQFT | 32.00 | 3,632.00 | 35.00 | 3,972.50 | 42.00 | 4,767.00 | 28.00 | 3,178.00 | | 0032 | 729-08-00200 | Mounting (3 1/2" Size Post) | 10 | EACH | 1,500.00 | 15,000.00 | 1,100.00 | 11,000.00 | 1,425.00 | 14,250.00 | 1,565.00 | 15,650.00 | | 0033 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 60.00 | 360.00 | 125.00 | 750.00 | 56.00 | 336.00 | 85.00 | 510.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 108 | EACH | 8.00 | 864.00 | 10.00 | 1,080.00 | 10.20 | 1,101.60 | 9.00 | 972.00 | | 0035 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,085 | LNFT | 2.70 | 2,929.50 | 2.25 | 2,441.25 | 2.05 | 2,224.25 | 4.50 | 4,882.50 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 134 | LNFT | 11.00 | 1,474.00 | 7.50 | 1,005.00 | 7.15 | 958.10 | 14.50 | 1,943.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.529 | MILE | 8,640.00 | 4,570.56 | 3,500.00 | 1,851.50 | 3,260.00 | 1,724.54 | 8,375.00 | 4,430.38 | | 0038 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.029 | MILE | 10,800.00 | 313.20 | 3,200.00 | 92.80 | 3,050.00 | 88.45 | 13,400.00 | 388.60 | | 0039 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 432.00 | 1,728.00 | 325.00 | 1,300.00 | 305.00 | 1,220.00 | 670.00 | 2,680.00 | | 0040 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 270.00 | 1,080.00 | 250.00 | 1,000.00 | 250.00 | 1,000.00 | 390.00 | 1,560.00 | | 0041 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 270.00 | 540.00 | 250.00 | 500.00 | 250.00 | 500.00 | 390.00 | 780.00 | | 0042 | 732-05-00100 | Removal of Existing Markings | 0.36 | MILE | 16,200.00 | 5,832.00 | 5,100.00 | 1,836.00 | 5,100.00 | 1,836.00 | 8,935.00 | 3,216.60 | | 0043 | 736-01-00100 | Trenching and Backfilling | 410 | LNFT | 5.50 | 2,255.00 | 5.50 | 2,255.00 | 5.10 | 2,091.00 | 5.60 | 2,296.00 | | 0044 | 736-03-00100 | Jacking or Boring Conduit 3 inch HPDE, Sch 80 | 865 | LNFT | 14.00 | 12,110.00 | 14.00 | 12,110.00 | 13.25 | 11,461.25 | 14.50 | 12,542.50 | | 0045 | 736-04-00001 | Signal Pole (Pedestal Pole) | 2 | EACH | 1,404.00 | 2,808.00 | 1,400.00 | 2,800.00 | 1,324.00 | 2,648.00 | 1,450.00 | 2,900.00 | | 0046 | 736-04-10350 | Signal Pole (Single Mast Arm, 35ft) | 1 | EACH | 8,856.00 | 8,856.00 | 9,000.00 | 9,000.00 | 8,465.00 | 8,465.00 | 9,155.00 | 9,155.00 | | 0047 | 736-04-10400 | Signal Pole (Single Mast Arm, 40ft) | 1 | EACH | 9,936.00 | 9,936.00 | 9,800.00 | 9,800.00 | 9,375.00 | 9,375.00 | 10,300.00 | 10,300.00 | | 0048 | 736-04-24035 | Signal Pole (Dual Mast Arm, 40ft-Arm 1, 35ft-Arm 2) | 1 | EACH | 15,336.00 | 15,336.00 | 15,000.00 | 15,000.00 | 14,475.00 | 14,475.00 | 15,900.00 | 15,900.00 | | 0049 | 736-04-24540 | Signal Pole (Dual Mast Arm, 45ft-Arm 1, 40ft-Arm 2) | 1 | EACH | 15,822.00 | 15,822.00 | 15,000.00 | 15,000.00 | 14,930.00 | 14,930.00 | 16,360.00 | 16,360.00 | | 0050 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 12 | EACH | 1,118.00 | 13,416.00 | 1,200.00 | 14,400.00 | 1,055.00 | 12,660.00 | 1,155.00 | 13,860.00 | | 0051 | 736-05-31001 | Signal Hds (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 1 | EACH | 1,171.00 | 1,171.00 | 1,200.00 | 1,200.00 | 1,120.00 | 1,120.00 | 1,215.00 | 1,215.00 | | 0052 | 736-05-41000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 1 | EACH | 1,420.00 | 1,420.00 | 1,500.00 | 1,500.00 | 1,340.00 | 1,340.00 | 1,470.00 | 1,470.00 | | 0053 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 2 | EACH | 1,420.00 | 2,840.00 | 1,500.00 | 3,000.00 | 1,340.00 | 2,680.00 | 1,470.00 | 2,940.00 | | 0054 | 736-05-45000 | Signal Heads (4 Section, 12 inch Led Lens, R, Y, G, RT. G) | 1 | EACH | 1,420.00 | 1,420.00 | 1,500.00 | 1,500.00 | 1,340.00 | 1,340.00 | 1,470.00 | 1,470.00 | | 0055 | 736-06-00100 | Signal Service | 2 | EACH | 1,134.00 | 2,268.00 | 1,200.00 | 2,400.00 | 1,070.00 | 2,140.00 | 1,175.00 | 2,350.00 | | 0056 | 736-06-00500 | Signal Service Pedestal Disconnect | 2 | EACH | 1,863.00 | 3,726.00 | 1,900.00 | 3,800.00 | 1,760.00 | 3,520.00 | 1,925.00 | 3,850.00 | | 0057 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 2 | EACH | 7,020.00 | 14,040.00 | 7,500.00 | 15,000.00 | 6,625.00 | 13,250.00 | 7,260.00 | 14,520.00 | | 0058 | 736-10-00300 | Underground Junction Box (Type F) | 9 | EACH | 518.00 | 4,662.00 | 500.00 | 4,500.00 | 490.00 | 4,410.00 | 540.00 | 4,860.00 | | 0059 | 736-10-00400 | Underground Junction Box (Type G) | 2 | EACH | 972.00 | 1,944.00 | 1,000.00 | 2,000.00 | 915.00 | 1,830.00 | 1,005.00 | 2,010.00 | | 0060 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 60 | LNFT | 4.50 | 270.00 | 4.00 | 240.00 | 4.00 | 240.00 | 4.50 | 270.00 | | 0061 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 1,215 | LNFT | 8.50 | 10,327.50 | 8.50 | 10,327.50 | 8.15 | 9,902.25 | 9.00 | 10,935.00 | | 0062 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 510 | LNFT | 3.75 | 1,912.50 | 4.00 | 2,040.00 | 3.60 | 1,836.00 | 4.00 | 2,040.00 | | 0063 | 736-12-06014 | Conductor (6c, #14 awg) | 842 | LNFT | 2.75 | 2,315.50 | 3.00 | 2,526.00 | 2.55 | 2,147.10 | 2.80 | 2,357.60 | | 0064 | 736-12-10014 | Conductor (10c, #14 awg) | 1,441 | LNFT | 3.25 | 4,683.25 | 3.25 | 4,683.25 | 3.05 | 4,395.05 | 3.35 | 4,827.35 | | 0065 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 2 | EACH | 464.00 | 928.00 | 500.00 | 1,000.00 | 438.00 | 876.00 | 480.00 | 960.00 | | 0066 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 4 | EACH | 2,268.00 | 9,072.00 | 2,400.00 | 9,600.00 | 2,140.00 | 8,560.00 | 2,350.00 | 9,400.00 | | 0067 | 739-01-00100 | Hydro-Seeding | 2.25 | ACRE | 1,360.00 | 3,060.00 | 1,500.00 | 3,375.00 | 2,040.00 | 4,590.00 | 1,450.00 | 3,262.50 | | 0068 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 25,000.00 | 25,000.00 | 14,342.00 | 14,342.00 | 8,360.00 | 8,360.00 | | 0069 | 822-01-00100 | Trenching and Backfilling | 970 | LNFT | 5.50 | 5,335.00 | 5.50 | 5,335.00 | 5.00 | 4,850.00 | 5.60 | 5,432.00 | | 0070 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (2#6, 1#6 Bare Stranded Ground) | 970 | LNFT | 7.00 | 6,790.00 | 7.25 | 7,032.50 | 6.65 | 6,450.50 | 7.30 | 7,081.00 | | 0071 | 822-05-00700 | Light Pole (40') (Alum) (Single Arm) | 7 | EACH | 5,400.00 | 37,800.00 | 5,500.00 | 38,500.00 | 5,095.00 | 35,665.00 | 5,600.00 | 39,200.00 | | 0072 | 822-07-01600 | Luminaire (250 Watt) (High Pressure Sodium) | 7 | EACH | 518.00 | 3,626.00 | 550.00 | 3,850.00 | 490.00 | 3,430.00 | 536.00 | 3,752.00 | | 0073 | 822-08-00200 | Electrical Service Point (Structure) (Existing) | 1 | EACH | 2,700.00 | 2,700.00 | 2,800.00 | 2,800.00 | 2,550.00 | 2,550.00 | 2,800.00 | 2,800.00 | | 0074 | 822-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 2,160.00 | 2,160.00 | 2,100.00 | 2,100.00 | 2,030.00 | 2,030.00 | 2,335.00 | 2,335.00 | | 0075 | 822-12-00100 | Removal and Storage of Light Pole (Ground Mount) (Ground Mounted) | 5 | EACH | 432.00 | 2,160.00 | 450.00 | 2,250.00 | 407.00 | 2,035.00 | 450.00 | 2,250.00 | | 0076 | 822-13-00100 | Removal and Disposal of Light Pole Foundation (Lowmast) | 5 | EACH | 1,070.00 | 5,350.00 | 250.00 | 1,250.00 | 255.00 | 1,275.00 | 1,955.00 | 9,775.00 | | 0077 | 822-14-00100 | Removal and Disposal of Luminaire | 5 | EACH | 108.00 | 540.00 | 120.00 | 600.00 | 102.00 | 510.00 | 112.00 | 560.00 | | 0078 | 822-16-00100 | Underground Junction Box (12" x 12") (JB1) | 7 | EACH | 432.00 | 3,024.00 | 450.00 | 3,150.00 | 407.00 | 2,849.00 | 450.00 | 3,150.00 | | 0079 | 822-16-00200 | Underground Junction Box (11" x 18") (JB2) | 3 | EACH | 685.00 | 2,055.00 | 700.00 | 2,100.00 | 650.00 | 1,950.00 | 710.00 | 2,130.00 | | 0080 | 822-16-00300 | Underground Junction Box (13" x 24") (JB3) | 3 | EACH | 815.00 | 2,445.00 | 850.00 | 2,550.00 | 770.00 | 2,310.00 | 850.00 | 2,550.00 | | 0081 | 822-19-00100 | Modular Breakaway Cable System | 7 | EACH | 2,268.00 | 15,876.00 | 2,400.00 | 16,800.00 | 2,140.00 | 14,980.00 | 2,350.00 | 16,450.00 | | 0082 | 822-20-00100 | Disconnect (Service) (Existing) | 1 | EACH | 999.00 | 999.00 | 1,000.00 | 1,000.00 | 945.00 | 945.00 | 1,050.00 | 1,050.00 | | 0083 | 822-21-00100 | Duct Marker (Concrete) | 3 | EACH | 356.00 | 1,068.00 | 350.00 | 1,050.00 | 335.00 | 1,005.00 | 370.00 | 1,110.00 | | 0084 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 970 | LNFT | 0.55 | 533.50 | 0.50 | 485.00 | 0.50 | 485.00 | 0.60 | 582.00 | | 0085 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 6,589 | INLF | 1.10 | 7,247.90 | 2.00 | 13,178.00 | 1.10 | 7,247.90 | 1.20 | 7,906.80 | | 0086 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 6,500.00 | 13,000.00 | 3,500.00 | 7,000.00 | 4,200.00 | 8,400.00 | 9,135.00 | 18,270.00 | | 0087 | NS-736-00001 | GPS | 2 | EACH | 1,123.00 | 2,246.00 | 1,200.00 | 2,400.00 | 1,060.00 | 2,120.00 | 1,165.00 | 2,330.00 | | 0088 | NS-736-00018 | Wireless Magnetometer Vehicle Detection System (WMVDS) (Stop Bar) | 1 | LUMP | 32,400.00 | 32,400.00 | 35,000.00 | 35,000.00 | 30,575.00 | 30,575.00 | 33,495.00 | 33,495.00 | | 0089 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 2 | EACH | 20,520.00 | 41,040.00 | 22,000.00 | 44,000.00 | 19,500.00 | 39,000.00 | 21,215.00 | 42,430.00 | | 0090 | NS-MSC-00120 | Drainage Structure Drainage Structure (Paved Gutter Drain) | 1 | EACH | 3,600.00 | 3,600.00 | 3,600.00 | 3,600.00 | 3,250.00 | 3,250.00 | 2,900.00 | 2,900.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 957,012.80 | | 1,015,808.85 | | 1,099,036.74 | | 1,208,436.61 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Brown Industrial Construction, LLC | | Unit Price | Total Amount | | 0001 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 4,000.00 | 4,000.00 | | 0002 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 835 | SQYD | 23.00 | 19,205.00 | | 0003 | 202-02-38240 | Removal of Signs and Supports | 4 | EACH | 175.00 | 700.00 | | 0004 | 202-02-38260 | Removal of Sign Support Footings | 4 | EACH | 275.00 | 1,100.00 | | 0005 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,486.9 | SQYD | 12.00 | 17,842.80 | | 0006 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 5,700.00 | 5,700.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 140,000.00 | 140,000.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 150.00 | 1,200.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 70 | LNFT | 5.00 | 350.00 | | 0010 | 302-02-10010 | Class II Base Course (10" Thick) (Soil Cement) | 2,441.4 | SQYD | 30.00 | 73,242.00 | | 0011 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 2,441.4 | SQYD | 13.00 | 31,738.20 | | 0012 | 502-01-00100 | Asphalt Concrete | 180.2 | TON | 180.00 | 32,436.00 | | 0013 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 1,051 | GAL | 2.50 | 2,627.50 | | 0014 | 507-02-00200 | Aggregate (S2) | 1,546 | SQYD | 21.65 | 33,470.90 | | 0015 | 507-02-00300 | Aggregate (S3) | 1,546 | SQYD | 21.45 | 33,161.70 | | 0016 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 85 | SQYD | 150.00 | 12,750.00 | | 0017 | 601-01-00700 | Portland Cement Concrete Pavement (11" Thick) | 1,540.9 | SQYD | 110.00 | 169,499.00 | | 0018 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 240 | SQYD | 195.00 | 46,800.00 | | 0019 | 602-05-03200 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10" Thick) | 226 | SQYD | 175.00 | 39,550.00 | | 0020 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 350.00 | 2,800.00 | | 0021 | 701-15-00100 | Concrete Collar | 1 | EACH | 850.00 | 850.00 | | 0022 | 707-01-00300 | Concrete Curb (Mountable) | 106.6 | LNFT | 14.35 | 1,529.71 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 95,000.00 | 95,000.00 | | 0024 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 3.919 | MILE | 12,000.00 | 47,028.00 | | 0025 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 6 | EACH | 100.00 | 600.00 | | 0026 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 4 | EACH | 200.00 | 800.00 | | 0027 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 8,000.00 | 8,000.00 | | 0028 | 726-01-00100 | Bedding Material | 2.5 | CUYD | 475.00 | 1,187.50 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 138,975.00 | 138,975.00 | | 0030 | 729-01-00100 | Sign (Type A) | 88.5 | SQFT | 30.00 | 2,655.00 | | 0031 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 113.5 | SQFT | 44.00 | 4,994.00 | | 0032 | 729-08-00200 | Mounting (3 1/2" Size Post) | 10 | EACH | 1,400.00 | 14,000.00 | | 0033 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 55.00 | 330.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 108 | EACH | 7.50 | 810.00 | | 0035 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,085 | LNFT | 2.50 | 2,712.50 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 134 | LNFT | 10.00 | 1,340.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.529 | MILE | 8,000.00 | 4,232.00 | | 0038 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.029 | MILE | 10,000.00 | 290.00 | | 0039 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 400.00 | 1,600.00 | | 0040 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 250.00 | 1,000.00 | | 0041 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 250.00 | 500.00 | | 0042 | 732-05-00100 | Removal of Existing Markings | 0.36 | MILE | 15,000.00 | 5,400.00 | | 0043 | 736-01-00100 | Trenching and Backfilling | 410 | LNFT | 5.00 | 2,050.00 | | 0044 | 736-03-00100 | Jacking or Boring Conduit 3 inch HPDE, Sch 80 | 865 | LNFT | 13.00 | 11,245.00 | | 0045 | 736-04-00001 | Signal Pole (Pedestal Pole) | 2 | EACH | 1,300.00 | 2,600.00 | | 0046 | 736-04-10350 | Signal Pole (Single Mast Arm, 35ft) | 1 | EACH | 8,200.00 | 8,200.00 | | 0047 | 736-04-10400 | Signal Pole (Single Mast Arm, 40ft) | 1 | EACH | 9,200.00 | 9,200.00 | | 0048 | 736-04-24035 | Signal Pole (Dual Mast Arm, 40ft-Arm 1, 35ft-Arm 2) | 1 | EACH | 14,200.00 | 14,200.00 | | 0049 | 736-04-24540 | Signal Pole (Dual Mast Arm, 45ft-Arm 1, 40ft-Arm 2) | 1 | EACH | 14,650.00 | 14,650.00 | | 0050 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 12 | EACH | 1,035.00 | 12,420.00 | | 0051 | 736-05-31001 | Signal Hds (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 1 | EACH | 1,085.00 | 1,085.00 | | 0052 | 736-05-41000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 1 | EACH | 1,315.00 | 1,315.00 | | 0053 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 2 | EACH | 1,315.00 | 2,630.00 | | 0054 | 736-05-45000 | Signal Heads (4 Section, 12 inch Led Lens, R, Y, G, RT. G) | 1 | EACH | 1,315.00 | 1,315.00 | | 0055 | 736-06-00100 | Signal Service | 2 | EACH | 1,050.00 | 2,100.00 | | 0056 | 736-06-00500 | Signal Service Pedestal Disconnect | 2 | EACH | 1,725.00 | 3,450.00 | | 0057 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 2 | EACH | 6,500.00 | 13,000.00 | | 0058 | 736-10-00300 | Underground Junction Box (Type F) | 9 | EACH | 480.00 | 4,320.00 | | 0059 | 736-10-00400 | Underground Junction Box (Type G) | 2 | EACH | 900.00 | 1,800.00 | | 0060 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 60 | LNFT | 4.00 | 240.00 | | 0061 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 1,215 | LNFT | 8.00 | 9,720.00 | | 0062 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 510 | LNFT | 3.50 | 1,785.00 | | 0063 | 736-12-06014 | Conductor (6c, #14 awg) | 842 | LNFT | 2.50 | 2,105.00 | | 0064 | 736-12-10014 | Conductor (10c, #14 awg) | 1,441 | LNFT | 3.00 | 4,323.00 | | 0065 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 2 | EACH | 430.00 | 860.00 | | 0066 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 4 | EACH | 2,100.00 | 8,400.00 | | 0067 | 739-01-00100 | Hydro-Seeding | 2.25 | ACRE | 1,260.00 | 2,835.00 | | 0068 | 740-01-00100 | Construction Layout | 1 | LUMP | 80,000.00 | 80,000.00 | | 0069 | 822-01-00100 | Trenching and Backfilling | 970 | LNFT | 5.00 | 4,850.00 | | 0070 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (2#6, 1#6 Bare Stranded Ground) | 970 | LNFT | 6.50 | 6,305.00 | | 0071 | 822-05-00700 | Light Pole (40') (Alum) (Single Arm) | 7 | EACH | 5,000.00 | 35,000.00 | | 0072 | 822-07-01600 | Luminaire (250 Watt) (High Pressure Sodium) | 7 | EACH | 480.00 | 3,360.00 | | 0073 | 822-08-00200 | Electrical Service Point (Structure) (Existing) | 1 | EACH | 2,500.00 | 2,500.00 | | 0074 | 822-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 2,000.00 | 2,000.00 | | 0075 | 822-12-00100 | Removal and Storage of Light Pole (Ground Mount) (Ground Mounted) | 5 | EACH | 400.00 | 2,000.00 | | 0076 | 822-13-00100 | Removal and Disposal of Light Pole Foundation (Lowmast) | 5 | EACH | 730.00 | 3,650.00 | | 0077 | 822-14-00100 | Removal and Disposal of Luminaire | 5 | EACH | 100.00 | 500.00 | | 0078 | 822-16-00100 | Underground Junction Box (12" x 12") (JB1) | 7 | EACH | 400.00 | 2,800.00 | | 0079 | 822-16-00200 | Underground Junction Box (11" x 18") (JB2) | 3 | EACH | 635.00 | 1,905.00 | | 0080 | 822-16-00300 | Underground Junction Box (13" x 24") (JB3) | 3 | EACH | 755.00 | 2,265.00 | | 0081 | 822-19-00100 | Modular Breakaway Cable System | 7 | EACH | 2,100.00 | 14,700.00 | | 0082 | 822-20-00100 | Disconnect (Service) (Existing) | 1 | EACH | 925.00 | 925.00 | | 0083 | 822-21-00100 | Duct Marker (Concrete) | 3 | EACH | 330.00 | 990.00 | | 0084 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 970 | LNFT | 0.50 | 485.00 | | 0085 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 6,589 | INLF | 1.00 | 6,589.00 | | 0086 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 9,200.00 | 18,400.00 | | 0087 | NS-736-00001 | GPS | 2 | EACH | 1,040.00 | 2,080.00 | | 0088 | NS-736-00018 | Wireless Magnetometer Vehicle Detection System (WMVDS) (Stop Bar) | 1 | LUMP | 30,000.00 | 30,000.00 | | 0089 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 2 | EACH | 19,000.00 | 38,000.00 | | 0090 | NS-MSC-00120 | Drainage Structure Drainage Structure (Paved Gutter Drain) | 1 | EACH | 15,000.00 | 15,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,412,158.81 |
|