Proposal:H.011743.6
Parish:Ouachita
Description:40 OAKS FARM RD (ARK RD - STANDARD REED)
Type Construction:CLEARING AND GRUBBING, REMOVAL OF CONCRETE AND TIMBER BRIDGE, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT SURFACE TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE BOX CULVERTS, AND RELATED WORK.
Estimated Construction Cost:$1,260,495.66
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $904,729.20 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $1,015,229.82 |
| 3 | 49239 | WL Bass Construction Inc. | $1,275,150.70 |
| 4 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $1,279,975.75 |
| 5 | 49864 | Terral Construction L.L.C. | $1,377,671.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - WL Bass Construction Inc. | - 4 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 | 2,360.00 | 2,360.00 | 6,000.00 | 6,000.00 | | 0003 | 202-02-04500 | Removal of Bridge (17' X 29' Concrete and Timber Bridge) | 493 | SQFT | 6.00 | 2,958.00 | 10.00 | 4,930.00 | 25.00 | 12,325.00 | 21.00 | 10,353.00 | | 0004 | 202-02-32000 | Removal of Paved Ditches | 69 | SQYD | 6.00 | 414.00 | 8.00 | 552.00 | 6.00 | 414.00 | 35.00 | 2,415.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 500 | CUYD | 30.00 | 15,000.00 | 35.00 | 17,500.00 | 25.00 | 12,500.00 | 30.00 | 15,000.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 80 | LNFT | 10.00 | 800.00 | 20.00 | 1,600.00 | 32.00 | 2,560.00 | 120.00 | 9,600.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 500 | LNFT | 3.00 | 1,500.00 | 3.50 | 1,750.00 | 4.00 | 2,000.00 | 6.00 | 3,000.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 100 | CUYD | 100.00 | 10,000.00 | 37.00 | 3,700.00 | 86.00 | 8,600.00 | 130.00 | 13,000.00 | | 0009 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 150 | CUYD | 65.00 | 9,750.00 | 88.00 | 13,200.00 | 85.00 | 12,750.00 | 100.00 | 15,000.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 3,567.7 | TON | 90.00 | 321,093.00 | 87.00 | 310,389.90 | 88.00 | 313,957.60 | 110.00 | 392,447.00 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 236.6 | TON | 130.00 | 30,758.00 | 195.00 | 46,137.00 | 195.00 | 46,137.00 | 110.00 | 26,026.00 | | 0012 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 10,439 | GAL | 2.65 | 27,663.35 | 2.90 | 30,273.10 | 5.50 | 57,414.50 | 2.75 | 28,707.25 | | 0013 | 507-02-00200 | Aggregate (S2) | 15,352 | SQYD | 1.40 | 21,492.80 | 1.50 | 23,028.00 | 2.50 | 38,380.00 | 1.50 | 23,028.00 | | 0014 | 507-02-00300 | Aggregate (S3) | 15,352 | SQYD | 1.20 | 18,422.40 | 1.30 | 19,957.60 | 2.50 | 38,380.00 | 1.30 | 19,957.60 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 15,297 | SQYD | 2.45 | 37,477.65 | 2.70 | 41,301.90 | 3.70 | 56,598.90 | 3.00 | 45,891.00 | | 0016 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,479 | SQYD | 80.00 | 118,320.00 | 88.00 | 130,152.00 | 140.00 | 207,060.00 | 100.00 | 147,900.00 | | 0017 | 701-01-01080 | Cross Drain Pipe (48" RCP/PP) | 108 | LNFT | 215.00 | 23,220.00 | 285.00 | 30,780.00 | 140.00 | 15,120.00 | 250.00 | 27,000.00 | | 0018 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 76 | LNFT | 125.00 | 9,500.00 | 165.00 | 12,540.00 | 195.00 | 14,820.00 | 270.00 | 20,520.00 | | 0019 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 38 | LNFT | 130.00 | 4,940.00 | 175.00 | 6,650.00 | 250.00 | 9,500.00 | 360.00 | 13,680.00 | | 0020 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 100.00 | 800.00 | 125.00 | 1,000.00 | 135.00 | 1,080.00 | 360.00 | 2,880.00 | | 0021 | 701-15-00100 | Concrete Collar | 1 | EACH | 700.00 | 700.00 | 900.00 | 900.00 | 1,600.00 | 1,600.00 | 3,100.00 | 3,100.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 238 | LNFT | 1.00 | 238.00 | 5.00 | 1,190.00 | 10.00 | 2,380.00 | 45.00 | 10,710.00 | | 0023 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,600.00 | 1,600.00 | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 | 3,500.00 | 3,500.00 | | 0024 | 710-01-00100 | Flowable Fill | 130 | CUYD | 115.00 | 14,950.00 | 150.00 | 19,500.00 | 185.00 | 24,050.00 | 140.00 | 18,200.00 | | 0025 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 67 | SQYD | 70.00 | 4,690.00 | 90.00 | 6,030.00 | 80.00 | 5,360.00 | 150.00 | 10,050.00 | | 0026 | 711-04-00100 | Geotextile Fabric | 67 | SQYD | 3.00 | 201.00 | 3.00 | 201.00 | 3.50 | 234.50 | 1.50 | 100.50 | | 0027 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 69 | SQYD | 75.00 | 5,175.00 | 100.00 | 6,900.00 | 90.00 | 6,210.00 | 150.00 | 10,350.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 18,000.00 | 18,000.00 | 18,000.00 | 18,000.00 | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.304 | MILE | 200.00 | 260.80 | 155.00 | 202.12 | 390.00 | 508.56 | 225.00 | 293.40 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.216 | MILE | 450.00 | 2,347.20 | 525.00 | 2,738.40 | 690.00 | 3,599.04 | 700.00 | 3,651.20 | | 0031 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 344 | EACH | 2.00 | 688.00 | 2.20 | 756.80 | 5.00 | 1,720.00 | 2.25 | 774.00 | | 0032 | 716-01-00100 | Mulch (Vegetative) | 2.6 | TON | 900.00 | 2,340.00 | 1,100.00 | 2,860.00 | 1,100.00 | 2,860.00 | 1,100.00 | 2,860.00 | | 0033 | 717-01-00100 | Seeding | 39 | LB | 15.00 | 585.00 | 55.00 | 2,145.00 | 12.00 | 468.00 | 55.00 | 2,145.00 | | 0034 | 718-01-00100 | Fertilizer | 1,300 | LB | 0.85 | 1,105.00 | 0.65 | 845.00 | 0.70 | 910.00 | 0.70 | 910.00 | | 0035 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 28 | SQYD | 7.00 | 196.00 | 20.00 | 560.00 | 8.80 | 246.40 | 22.00 | 616.00 | | 0036 | 726-01-00100 | Bedding Material | 131.2 | CUYD | 95.00 | 12,464.00 | 125.00 | 16,400.00 | 100.00 | 13,120.00 | 120.00 | 15,744.00 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 40,000.00 | 40,000.00 | 43,000.00 | 43,000.00 | 127,500.00 | 127,500.00 | 113,000.00 | 113,000.00 | | 0038 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 75.00 | 1,200.00 | 85.00 | 1,360.00 | 100.00 | 1,600.00 | 80.00 | 1,280.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 344 | EACH | 6.00 | 2,064.00 | 6.50 | 2,236.00 | 5.00 | 1,720.00 | 8.00 | 2,752.00 | | 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 15.00 | 360.00 | 17.00 | 408.00 | 9.00 | 216.00 | 9.25 | 222.00 | | 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.216 | MILE | 3,500.00 | 18,256.00 | 3,500.00 | 18,256.00 | 3,200.00 | 16,691.20 | 3,300.00 | 17,212.80 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,000.00 | 2,000.00 | 7,000.00 | 7,000.00 | 30,000.00 | 30,000.00 | 5,500.00 | 5,500.00 | | 0043 | 741-11-00100 | Adjusting Water Valve | 3 | EACH | 400.00 | 1,200.00 | 500.00 | 1,500.00 | 400.00 | 1,200.00 | 1,500.00 | 4,500.00 | | 0044 | 805-15-00700 | Reinforced Concrete Box Culverts (Precast) (6' x 5') | 120 | LNFT | 600.00 | 72,000.00 | 840.00 | 100,800.00 | 500.00 | 60,000.00 | 600.00 | 72,000.00 | | 0045 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (43.7' X 8.7') | 2 | EACH | 18,000.00 | 36,000.00 | 23,000.00 | 46,000.00 | 17,000.00 | 34,000.00 | 28,000.00 | 56,000.00 | | 0046 | NS-MSC-00120 | Drainage Structure (INSTALLATION OF 48" (EQUIV.) x 60' CMPA) | 1 | EACH | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 7,000.00 | 7,000.00 | 12,100.00 | 12,100.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 904,729.20 | | 1,015,229.82 | | 1,275,150.70 | | 1,279,975.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Terral Construction L.L.C. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 80,000.00 | 80,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | | 0003 | 202-02-04500 | Removal of Bridge (17' X 29' Concrete and Timber Bridge) | 493 | SQFT | 18.00 | 8,874.00 | | 0004 | 202-02-32000 | Removal of Paved Ditches | 69 | SQYD | 27.00 | 1,863.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 500 | CUYD | 29.00 | 14,500.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 80 | LNFT | 10.00 | 800.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 500 | LNFT | 3.00 | 1,500.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 100 | CUYD | 130.00 | 13,000.00 | | 0009 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 150 | CUYD | 130.00 | 19,500.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 3,567.7 | TON | 120.00 | 428,124.00 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 236.6 | TON | 240.00 | 56,784.00 | | 0012 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 10,439 | GAL | 3.00 | 31,317.00 | | 0013 | 507-02-00200 | Aggregate (S2) | 15,352 | SQYD | 1.62 | 24,870.24 | | 0014 | 507-02-00300 | Aggregate (S3) | 15,352 | SQYD | 1.57 | 24,102.64 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 15,297 | SQYD | 1.50 | 22,945.50 | | 0016 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,479 | SQYD | 127.00 | 187,833.00 | | 0017 | 701-01-01080 | Cross Drain Pipe (48" RCP/PP) | 108 | LNFT | 160.00 | 17,280.00 | | 0018 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 76 | LNFT | 100.00 | 7,600.00 | | 0019 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 38 | LNFT | 100.00 | 3,800.00 | | 0020 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 200.00 | 1,600.00 | | 0021 | 701-15-00100 | Concrete Collar | 1 | EACH | 500.00 | 500.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 238 | LNFT | 48.00 | 11,424.00 | | 0023 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,000.00 | 1,000.00 | | 0024 | 710-01-00100 | Flowable Fill | 130 | CUYD | 120.00 | 15,600.00 | | 0025 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 67 | SQYD | 75.00 | 5,025.00 | | 0026 | 711-04-00100 | Geotextile Fabric | 67 | SQYD | 10.00 | 670.00 | | 0027 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 69 | SQYD | 60.00 | 4,140.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 18,000.00 | 18,000.00 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.304 | MILE | 600.00 | 782.40 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.216 | MILE | 920.00 | 4,798.72 | | 0031 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 344 | EACH | 8.00 | 2,752.00 | | 0032 | 716-01-00100 | Mulch (Vegetative) | 2.6 | TON | 3,500.00 | 9,100.00 | | 0033 | 717-01-00100 | Seeding | 39 | LB | 30.00 | 1,170.00 | | 0034 | 718-01-00100 | Fertilizer | 1,300 | LB | 4.00 | 5,200.00 | | 0035 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 28 | SQYD | 70.00 | 1,960.00 | | 0036 | 726-01-00100 | Bedding Material | 131.2 | CUYD | 148.00 | 19,417.60 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 110,000.00 | 110,000.00 | | 0038 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 120.00 | 1,920.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 344 | EACH | 8.00 | 2,752.00 | | 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 18.00 | 432.00 | | 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.216 | MILE | 3,400.00 | 17,734.40 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | | 0043 | 741-11-00100 | Adjusting Water Valve | 3 | EACH | 1,000.00 | 3,000.00 | | 0044 | 805-15-00700 | Reinforced Concrete Box Culverts (Precast) (6' x 5') | 120 | LNFT | 600.00 | 72,000.00 | | 0045 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (43.7' X 8.7') | 2 | EACH | 32,000.00 | 64,000.00 | | 0046 | NS-MSC-00120 | Drainage Structure (INSTALLATION OF 48" (EQUIV.) x 60' CMPA) | 1 | EACH | 18,000.00 | 18,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,377,671.50 |
|