Proposal:H.010973.6
Parish:Jefferson
Description:VETERANS BLVD LIGHTING (AIRPORT-LOYOLA)
Type Construction:CLEARING AND GRUBBING, TREATED TIMBER PILES, LIGHTING, AND RELATED WORK.
Estimated Construction Cost:$755,536.00
| Rank | License | Bidder | Construction Bid |
| 1 | 00448 | WALTER J. BARNES ELECTRIC CO., INC. | $619,293.00 |
| 2 | 51053 | APC Construction, LLC | $652,990.99 |
| 3 | 25666 | PREFERRED ELECTRIC INC. | $699,138.82 |
| 4 | 05473 | Jack B. Harper Electrical LLC | $846,231.06 |
| 5 | 08470 | Diamond Electrical Co., Inc. | $995,750.72 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - WALTER J. BARNES ELECTRIC CO., INC. | - 2 - APC Construction, LLC | - 3 - PREFERRED ELECTRIC INC. | - 4 - Jack B. Harper Electrical LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.15 | LUMP | 5,550.00 | 5,550.00 | 30,900.00 | 30,900.00 | 4,500.00 | 4,500.00 | 11,461.13 | 11,461.13 | | 0002 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 282 | SQYD | 15.00 | 4,230.00 | 16.75 | 4,723.50 | 35.00 | 9,870.00 | 38.94 | 10,981.08 | | 0003 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 282 | SQYD | 50.00 | 14,100.00 | 60.20 | 16,976.40 | 65.00 | 18,330.00 | 102.16 | 28,809.12 | | 0004 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 18,500.00 | 18,500.00 | 45,400.00 | 45,400.00 | 24,015.00 | 24,015.00 | 30,321.20 | 30,321.20 | | 0005 | 727-01-00100 | Mobilization | 1 | LUMP | 27,000.00 | 27,000.00 | 1,800.00 | 1,800.00 | 48,000.00 | 48,000.00 | 62,911.97 | 62,911.97 | | 0006 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,400.00 | 6,400.00 | 1,400.00 | 1,400.00 | 4,977.82 | 4,977.82 | 5,924.30 | 5,924.30 | | 0007 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) (40' Treated Timber Pile) (Class B) | 1,680 | LNFT | 48.90 | 82,152.00 | 49.35 | 82,908.00 | 62.00 | 104,160.00 | 64.55 | 108,444.00 | | 0008 | 822-01-00100 | Trenching and Backfilling | 6,200 | LNFT | 6.70 | 41,540.00 | 6.69 | 41,478.00 | 6.00 | 37,200.00 | 6.02 | 37,324.00 | | 0009 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (Schedule 40 PVC) | 6,200 | LNFT | 7.00 | 43,400.00 | 5.15 | 31,930.00 | 5.75 | 35,650.00 | 4.72 | 29,264.00 | | 0010 | 822-02-02500 | Conduit w Conductors (Rigid Galv Steel) (2") 2" Schedule 80 Rigid Steel | 300 | LNFT | 20.50 | 6,150.00 | 26.33 | 7,899.00 | 11.00 | 3,300.00 | 43.58 | 13,074.00 | | 0011 | 822-04-00200 | Jacked or Bored Casing (6" Dia) (PVC/HDPE) | 760 | LNFT | 46.10 | 35,036.00 | 30.89 | 23,476.40 | 26.00 | 19,760.00 | 31.38 | 23,848.80 | | 0012 | 822-05-02100 | Light Pole (30' Aluminum Pole)(2 Arm Bracket) | 42 | EACH | 4,100.00 | 172,200.00 | 3,181.60 | 133,627.20 | 3,950.00 | 165,900.00 | 6,250.63 | 262,526.46 | | 0013 | 822-07-02800 | Luminaire (LED Luminaire (F1) IES Type III Distr.) | 76 | EACH | 340.00 | 25,840.00 | 450.00 | 34,200.00 | 350.00 | 26,600.00 | 393.84 | 29,931.84 | | 0014 | 822-07-02800 | Luminaire (LED Luminaire (F2) IES Type III Distr.) | 4 | EACH | 340.00 | 1,360.00 | 450.00 | 1,800.00 | 350.00 | 1,400.00 | 393.84 | 1,575.36 | | 0015 | 822-07-02800 | Luminaire (LED Luminaire (F3) IES Type IV Distr.) | 4 | EACH | 340.00 | 1,360.00 | 450.00 | 1,800.00 | 350.00 | 1,400.00 | 393.84 | 1,575.36 | | 0016 | 822-08-00200 | Electrical Service Point (Structure) | 7 | EACH | 950.00 | 6,650.00 | 7,928.25 | 55,497.75 | 3,150.00 | 22,050.00 | 5,643.00 | 39,501.00 | | 0017 | 822-16-00200 | Underground Junction Box (11" x 18") JB-2 | 33 | EACH | 360.00 | 11,880.00 | 499.43 | 16,481.19 | 670.00 | 22,110.00 | 505.85 | 16,693.05 | | 0018 | 822-16-00300 | Underground Junction Box (13" x 24") JB-3 | 29 | EACH | 635.00 | 18,415.00 | 562.75 | 16,319.75 | 780.00 | 22,620.00 | 419.83 | 12,175.07 | | 0019 | 822-19-00100 | Modular Breakaway Cable System | 42 | EACH | 1,900.00 | 79,800.00 | 2,067.15 | 86,820.30 | 2,368.00 | 99,456.00 | 1,800.99 | 75,641.58 | | 0020 | 822-20-00100 | Disconnect (Service) 60 AMP NEMA 4X 316 SS | 7 | EACH | 930.00 | 6,510.00 | 1,240.60 | 8,684.20 | 1,960.00 | 13,720.00 | 3,739.98 | 26,179.86 | | 0021 | 822-21-00100 | Duct Marker (Concrete) | 30 | EACH | 190.00 | 5,700.00 | 124.20 | 3,726.00 | 250.00 | 7,500.00 | 249.66 | 7,489.80 | | 0022 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 6,200 | LNFT | 0.35 | 2,170.00 | 0.25 | 1,550.00 | 0.10 | 620.00 | 0.55 | 3,410.00 | | 0023 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 3 | EACH | 850.00 | 2,550.00 | 581.10 | 1,743.30 | 1,750.00 | 5,250.00 | 1,945.41 | 5,836.23 | | 0024 | NS-201-00004 | Arborist Services | 1 | EACH | 800.00 | 800.00 | 1,850.00 | 1,850.00 | 750.00 | 750.00 | 1,331.85 | 1,331.85 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 619,293.00 | | 652,990.99 | | 699,138.82 | | 846,231.06 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Diamond Electrical Co., Inc. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.15 | LUMP | 49,944.00 | 49,944.00 | | 0002 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 282 | SQYD | 18.48 | 5,211.36 | | 0003 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 282 | SQYD | 55.98 | 15,786.36 | | 0004 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 67,322.00 | 67,322.00 | | 0005 | 727-01-00100 | Mobilization | 1 | LUMP | 93,566.00 | 93,566.00 | | 0006 | 740-01-00100 | Construction Layout | 1 | LUMP | 29,137.00 | 29,137.00 | | 0007 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) (40' Treated Timber Pile) (Class B) | 1,680 | LNFT | 58.48 | 98,246.40 | | 0008 | 822-01-00100 | Trenching and Backfilling | 6,200 | LNFT | 7.14 | 44,268.00 | | 0009 | 822-02-00500 | Conduit w Conductors (PVC/HDPE) (2") (Schedule 40 PVC) | 6,200 | LNFT | 5.50 | 34,100.00 | | 0010 | 822-02-02500 | Conduit w Conductors (Rigid Galv Steel) (2") 2" Schedule 80 Rigid Steel | 300 | LNFT | 25.53 | 7,659.00 | | 0011 | 822-04-00200 | Jacked or Bored Casing (6" Dia) (PVC/HDPE) | 760 | LNFT | 41.51 | 31,547.60 | | 0012 | 822-05-02100 | Light Pole (30' Aluminum Pole)(2 Arm Bracket) | 42 | EACH | 4,501.00 | 189,042.00 | | 0013 | 822-07-02800 | Luminaire (LED Luminaire (F1) IES Type III Distr.) | 76 | EACH | 453.00 | 34,428.00 | | 0014 | 822-07-02800 | Luminaire (LED Luminaire (F2) IES Type III Distr.) | 4 | EACH | 453.00 | 1,812.00 | | 0015 | 822-07-02800 | Luminaire (LED Luminaire (F3) IES Type IV Distr.) | 4 | EACH | 453.00 | 1,812.00 | | 0016 | 822-08-00200 | Electrical Service Point (Structure) | 7 | EACH | 4,662.00 | 32,634.00 | | 0017 | 822-16-00200 | Underground Junction Box (11" x 18") JB-2 | 33 | EACH | 1,012.00 | 33,396.00 | | 0018 | 822-16-00300 | Underground Junction Box (13" x 24") JB-3 | 29 | EACH | 1,285.00 | 37,265.00 | | 0019 | 822-19-00100 | Modular Breakaway Cable System | 42 | EACH | 2,259.00 | 94,878.00 | | 0020 | 822-20-00100 | Disconnect (Service) 60 AMP NEMA 4X 316 SS | 7 | EACH | 4,446.00 | 31,122.00 | | 0021 | 822-21-00100 | Duct Marker (Concrete) | 30 | EACH | 590.00 | 17,700.00 | | 0022 | 822-22-00300 | Underground Marker Tape (6")(Detectable) | 6,200 | LNFT | 0.56 | 3,472.00 | | 0023 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 3 | EACH | 2,034.00 | 6,102.00 | | 0024 | NS-201-00004 | Arborist Services | 1 | EACH | 35,300.00 | 35,300.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 995,750.72 |
|