Proposal:H.010376.6
Parish:Washington
Routes:LA 25
Description:LA 25: ST. TAMMANY P/L – S. JCT. LA 16
Type Construction:PRECAST REINFORCED CONCRETE BOX CULVERTS, PAVEMENT PATCHING, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,278,923.10
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC. | $2,709,913.60 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,740,627.59 |
| 3 | 10989 | Dickerson & Bowen, Inc. | $3,752,106.12 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC. | - 2 - Diamond B Construction Co., L.L.C. | - 3 - Dickerson & Bowen, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,000.00 | 2,000.00 | 10,500.00 | 10,500.00 | 20,000.00 | 20,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 1,050 | SQYD | 20.00 | 21,000.00 | 8.15 | 8,557.50 | 17.79 | 18,679.50 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 1,400 | SQYD | 8.00 | 11,200.00 | 8.75 | 12,250.00 | 20.01 | 28,014.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 300 | SQYD | 8.00 | 2,400.00 | 11.00 | 3,300.00 | 18.90 | 5,670.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 2,016 | LNFT | 8.00 | 16,128.00 | 6.50 | 13,104.00 | 8.93 | 18,002.88 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 108" EQ CMPA | 40 | LNFT | 10.00 | 400.00 | 61.00 | 2,440.00 | 14.18 | 567.20 | | 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) 54" EQ CMPA | 417 | LNFT | 10.00 | 4,170.00 | 13.00 | 5,421.00 | 14.18 | 5,913.06 | | 0008 | 202-02-32100 | Removal of Pipe (Cross Drain) 66" EQ CMPA | 147 | LNFT | 10.00 | 1,470.00 | 16.50 | 2,425.50 | 14.18 | 2,084.46 | | 0009 | 202-02-32180 | Removal of Pipe Headwalls | 4 | EACH | 6,000.00 | 24,000.00 | 620.00 | 2,480.00 | 3,307.50 | 13,230.00 | | 0010 | 202-02-38300 | Removal of Sign and U-Channel Post | 16 | EACH | 20.00 | 320.00 | 4.50 | 72.00 | 21.00 | 336.00 | | 0011 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,428 | CUYD | 25.00 | 85,700.00 | 34.50 | 118,266.00 | 36.86 | 126,356.08 | | 0012 | 203-10-00100 | Cleaning Existing Ditches | 1,200 | LNFT | 6.00 | 7,200.00 | 8.25 | 9,900.00 | 4.75 | 5,700.00 | | 0013 | 204-02-00100 | Temporary Hay Bales | 120 | EACH | 13.00 | 1,560.00 | 25.00 | 3,000.00 | 13.13 | 1,575.60 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 254 | LNFT | 15.00 | 3,810.00 | 10.00 | 2,540.00 | 6.25 | 1,587.50 | | 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5,633 | CUYD | 5.00 | 28,165.00 | 27.75 | 156,315.75 | 20.34 | 114,575.22 | | 0016 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 500 | CUYD | 30.00 | 15,000.00 | 36.00 | 18,000.00 | 195.53 | 97,765.00 | | 0017 | 502-01-00100 | Asphalt Concrete | 13,444.7 | TON | 63.00 | 847,016.10 | 65.00 | 873,905.50 | 83.52 | 1,122,901.34 | | 0018 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,853.5 | TON | 63.00 | 116,770.50 | 104.00 | 192,764.00 | 140.75 | 260,880.13 | | 0019 | 509-01-00100 | Milling Asphalt Pavement | 120,286 | SQYD | 1.25 | 150,357.50 | 0.99 | 119,083.14 | 1.71 | 205,689.06 | | 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,012 | CUYD | 0.01 | -50.12 | 1.00 | -5,012.00 | 0.01 | -50.12 | | 0021 | 510-01-00400 | Pavement Patching (24" Minimum Thickness) | 377 | SQYD | 170.00 | 64,090.00 | 108.00 | 40,716.00 | 126.64 | 47,743.28 | | 0022 | 701-14-00100 | Cleaning Existing Pipes | 318 | LNFT | 8.00 | 2,544.00 | 48.50 | 15,423.00 | 25.00 | 7,950.00 | | 0023 | 704-01-01020 | Guardrail (Single Thrie Beam) (6'-3" post spacing) | 1,040 | LNFT | 38.00 | 39,520.00 | 40.00 | 41,600.00 | 36.75 | 38,220.00 | | 0024 | 704-03-00100 | Blocked Out Guardrail | 450 | LNFT | 22.00 | 9,900.00 | 21.00 | 9,450.00 | 21.00 | 9,450.00 | | 0025 | 704-07-00200 | Guardrail Transitions (Double Thrie Beam) | 400 | LNFT | 73.00 | 29,200.00 | 62.00 | 24,800.00 | 60.90 | 24,360.00 | | 0026 | 704-10-00100 | Guardrail End Treatment (Flared) | 16 | EACH | 2,500.00 | 40,000.00 | 2,200.00 | 35,200.00 | 2,625.00 | 42,000.00 | | 0027 | 706-02-00200 | Concrete Drive (6" Thick) | 300 | SQYD | 55.00 | 16,500.00 | 61.00 | 18,300.00 | 61.43 | 18,429.00 | | 0028 | 707-04-00100 | Asphalt Curb | 216 | LNFT | 20.00 | 4,320.00 | 45.00 | 9,720.00 | 35.41 | 7,648.56 | | 0029 | 711-02-00300 | Riprap (30 lb) | 12 | CUYD | 300.00 | 3,600.00 | 240.00 | 2,880.00 | 0.95 | 11.40 | | 0030 | 711-04-00100 | Geotextile Fabric | 12 | SQYD | 25.00 | 300.00 | 17.00 | 204.00 | 141.75 | 1,701.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 205,000.00 | 205,000.00 | 45,000.00 | 45,000.00 | 300,000.00 | 300,000.00 | | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 17.22 | MILE | 250.00 | 4,305.00 | 154.00 | 2,651.88 | 346.01 | 5,958.29 | | 0033 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 12.545 | MILE | 100.00 | 1,254.50 | 1.00 | 12.55 | 472.50 | 5,927.51 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 51.738 | MILE | 100.00 | 5,173.80 | 1.00 | 51.74 | 656.25 | 33,953.06 | | 0035 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 1,000.00 | 2,000.00 | 7,000.00 | 14,000.00 | 1,575.00 | 3,150.00 | | 0036 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 17.22 | MILE | 1,150.00 | 19,803.00 | 515.00 | 8,868.30 | 437.20 | 7,528.58 | | 0037 | 726-01-00100 | Bedding Material | 188.3 | CUYD | 1.00 | 188.30 | 110.00 | 20,713.00 | 64.26 | 12,100.16 | | 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 248,000.00 | 248,000.00 | 131,750.00 | 131,750.00 | 300,000.00 | 300,000.00 | | 0039 | 729-16-00200 | Object Marker Assembly (Type 2) | 24 | EACH | 71.00 | 1,704.00 | 65.00 | 1,560.00 | 42.00 | 1,008.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 81.00 | 1,296.00 | 75.00 | 1,200.00 | 89.25 | 1,428.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,881 | EACH | 6.00 | 11,286.00 | 6.00 | 11,286.00 | 6.30 | 11,850.30 | | 0042 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 25.869 | MILE | 3,200.00 | 82,780.80 | 3,000.00 | 77,607.00 | 3,097.50 | 80,129.23 | | 0043 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.273 | MILE | 755.00 | 4,736.12 | 905.00 | 5,677.07 | 945.00 | 5,927.99 | | 0044 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.088 | MILE | 2,550.00 | 224.40 | 1,820.00 | 160.16 | 2,100.00 | 184.80 | | 0045 | 735-01-00100 | Mailboxes | 107 | EACH | 1.00 | 107.00 | 15.00 | 1,605.00 | 1.05 | 112.35 | | 0046 | 735-02-00100 | Mailbox Supports (Single) | 107 | EACH | 115.00 | 12,305.00 | 110.00 | 11,770.00 | 131.25 | 14,043.75 | | 0047 | 739-01-00100 | Hydro-Seeding | 6.28 | ACRE | 1,400.00 | 8,792.00 | 2,000.00 | 12,560.00 | 1,312.50 | 8,242.50 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 23,000.00 | 23,000.00 | 14,000.00 | 14,000.00 | 21,084.81 | 21,084.81 | | 0049 | 805-01-00900 | Class A1 Concrete (Box Culvert Headwalls) | 103.6 | CUYD | 1,715.00 | 177,674.00 | 2,000.00 | 207,200.00 | 1,441.13 | 149,301.07 | | 0050 | 805-15-00200 | Reinforced Concrete Box Culverts (Precast) (5' x 4') | 56 | LNFT | 630.00 | 35,280.00 | 755.00 | 42,280.00 | 921.38 | 51,597.28 | | 0051 | 805-15-00300 | Reinforced Concrete Box Culverts (Precast) (6' x 4') | 408 | LNFT | 470.00 | 191,760.00 | 520.00 | 212,160.00 | 803.25 | 327,726.00 | | 0052 | 805-15-00600 | Reinforced Concrete Box Culverts (Precast) (5' x 5') | 56 | LNFT | 630.00 | 35,280.00 | 875.00 | 49,000.00 | 968.63 | 54,243.28 | | 0053 | 805-15-02000 | Reinforced Concrete Box Culverts (Precast) (10' x 7') | 72 | LNFT | 1,050.00 | 75,600.00 | 1,400.00 | 100,800.00 | 1,346.63 | 96,957.36 | | 0054 | 806-01-00100 | Deformed Reinforcing Steel | 7,407 | LB | 1.10 | 8,147.70 | 2.50 | 18,517.50 | 0.95 | 7,036.65 | | 0055 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,890 | INLF | 2.50 | 4,725.00 | 0.80 | 1,512.00 | 2.50 | 4,725.00 | | 0056 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 360 | INLF | 2.50 | 900.00 | 3.00 | 1,080.00 | 2.50 | 900.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,709,913.60 | | 2,740,627.59 | | 3,752,106.12 |
|