Proposal:H.010039.6
Parish:Jackson
Description: VERNON-EROS ROAD & ZOAR ROAD BRIDGES
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASPHALT CONCRETE OVERLAY, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGES, CONCRETE APPROACH SLABS AND RELATED WORK.
Estimated Construction Cost:$1,319,528.50
| Rank | License | Bidder | Construction Bid |
| 1 | 49864 | Terral Construction L.L.C. | $848,460.53 |
| 2 | 23112 | BEN ALLEN, INC. | $976,780.50 |
| 3 | 08815 | W. E. MCDONALD & SON, LLC. | $991,218.43 |
| 4 | 14788 | Louisiana Bridge, Inc. | $1,021,719.50 |
| 5 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $1,167,665.20 |
| 6 | 34567 | James Construction Group LLC | $1,232,300.75 |
| 7 | 18546 | C W & W Contractors, Inc. | $1,259,740.00 |
| 8 | 49239 | WL Bass Construction Inc. | $1,377,050.13 |
| 9 | 12487 | Diamond B Construction Co., L.L.C. | $1,383,824.50 |
| 10 | 00044 | Guinn Construction, LLC | $1,419,286.90 |
| 11 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $1,421,047.90 |
| 12 | 39462 | JB JAMES CONSTRUCTION LLC | $1,508,631.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Terral Construction L.L.C. | - 2 - BEN ALLEN, INC. | - 3 - W. E. MCDONALD & SON, LLC. | - 4 - Louisiana Bridge, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 30,000.00 | 30,000.00 | 12,000.00 | 12,000.00 | 6,000.00 | 6,000.00 | 30,000.00 | 30,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions (4-104" DIA.X40' STEEL RAIL CARS) | 1 | LUMP | 3,960.00 | 3,960.00 | 12,000.00 | 12,000.00 | 9,500.00 | 9,500.00 | 7,000.00 | 7,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 1,058.9 | SQYD | 3.74 | 3,960.29 | 6.00 | 6,353.40 | 3.50 | 3,706.15 | 5.00 | 5,294.50 | | 0004 | 202-02-04000 | Removal of Bridge (STA 100+00; 16.1' X 37' TIMBER BRIDGE WITH WOODEN BULKHEAD) | 1 | EACH | 1,650.00 | 1,650.00 | 3,500.00 | 3,500.00 | 2,750.00 | 2,750.00 | 4,500.00 | 4,500.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 26,400.00 | 26,400.00 | 36,000.00 | 36,000.00 | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | | 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 40 | EACH | 44.00 | 1,760.00 | 10.00 | 400.00 | 52.50 | 2,100.00 | 18.00 | 720.00 | | 0007 | 204-03-00100 | Temporary Slope Drains | 80 | LNFT | 24.75 | 1,980.00 | 10.00 | 800.00 | 27.00 | 2,160.00 | 15.00 | 1,200.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 513.33 | 1,539.99 | 30.00 | 90.00 | 262.50 | 787.50 | 250.00 | 750.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 2,119 | LNFT | 1.45 | 3,081.03 | 3.00 | 6,357.00 | 2.60 | 5,509.40 | 3.00 | 6,357.00 | | 0010 | 302-01-00700 | Class II Base Course (Stone) (CRUSHED) | 300.4 | CUYD | 115.00 | 34,546.00 | 108.00 | 32,443.20 | 115.00 | 34,546.00 | 110.00 | 33,044.00 | | 0011 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 224.8 | CUYD | 120.00 | 26,976.00 | 108.00 | 24,278.40 | 60.00 | 13,488.00 | 110.00 | 24,728.00 | | 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 239.3 | TON | 200.00 | 47,860.00 | 175.00 | 41,877.50 | 183.75 | 43,971.38 | 230.00 | 55,039.00 | | 0013 | 701-05-02040 | Side Drain Pipe (Erosion) (18" PP/CMP) | 90 | LNFT | 50.11 | 4,509.90 | 65.00 | 5,850.00 | 45.00 | 4,050.00 | 39.00 | 3,510.00 | | 0014 | 704-03-00100 | Blocked Out Guard Rail | 100 | LNFT | 20.00 | 2,000.00 | 22.00 | 2,200.00 | 21.00 | 2,100.00 | 25.00 | 2,500.00 | | 0015 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 60.00 | 12,000.00 | 66.00 | 13,200.00 | 63.00 | 12,600.00 | 70.00 | 14,000.00 | | 0016 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 2,199.00 | 17,592.00 | 2,365.00 | 18,920.00 | 2,257.50 | 18,060.00 | 2,500.00 | 20,000.00 | | 0017 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 60 | SQYD | 67.83 | 4,069.80 | 72.00 | 4,320.00 | 83.00 | 4,980.00 | 100.00 | 6,000.00 | | 0018 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 594 | SQYD | 55.38 | 32,895.72 | 67.00 | 39,798.00 | 60.00 | 35,640.00 | 65.00 | 38,610.00 | | 0019 | 711-04-00100 | Geotextile Fabric | 654 | SQYD | 1.69 | 1,104.61 | 3.00 | 1,962.00 | 2.50 | 1,635.00 | 3.00 | 1,962.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 13,200.00 | 13,200.00 | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | 12,000.00 | 12,000.00 | | 0021 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 1,925.00 | 3,850.00 | 500.00 | 1,000.00 | 1,050.00 | 2,100.00 | 2,000.00 | 4,000.00 | | 0022 | 717-01-00100 | Seeding | 44 | LB | 27.50 | 1,210.00 | 15.00 | 660.00 | 52.50 | 2,310.00 | 45.00 | 1,980.00 | | 0023 | 718-01-00100 | Fertilizer | 970 | LB | 1.50 | 1,451.12 | 1.00 | 970.00 | 2.10 | 2,037.00 | 1.50 | 1,455.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 14,850.00 | 14,850.00 | 60,000.00 | 60,000.00 | 80,000.00 | 80,000.00 | 65,000.00 | 65,000.00 | | 0025 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 82.50 | 660.00 | 85.00 | 680.00 | 78.75 | 630.00 | 86.00 | 688.00 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,600.00 | 6,600.00 | 10,000.00 | 10,000.00 | 6,762.00 | 6,762.00 | 8,000.00 | 8,000.00 | | 0027 | 803-03-00100 | Steel Sheet Pile Wall (PZ-35) | 3,255 | SQFT | 42.24 | 137,491.20 | 43.00 | 139,965.00 | 42.00 | 136,710.00 | 48.00 | 156,240.00 | | 0028 | 804-01-00300 | Precast Concrete Piles (16") | 2,628 | LNFT | 56.00 | 147,168.00 | 62.00 | 162,936.00 | 65.00 | 170,820.00 | 65.00 | 170,820.00 | | 0029 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 0.00 | 0.00 | 0.00 | 0.00 | 1.00 | 2.00 | 1.00 | 2.00 | | 0030 | 805-10-01320 | Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) (Cast-in-Place) | 3 | SPAN | 27,000.00 | 81,000.00 | 33,500.00 | 100,500.00 | 35,000.00 | 105,000.00 | 30,000.00 | 90,000.00 | | 0031 | 805-10-02120 | Bridge Superstructure and Substructure (28' Clear Roadway; 60 Degree Crossing) (Cast-in-Place) | 5 | SPAN | 29,999.00 | 149,995.00 | 34,000.00 | 170,000.00 | 35,000.00 | 175,000.00 | 32,000.00 | 160,000.00 | | 0032 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 144 | INLF | 7.64 | 1,099.87 | 5.00 | 720.00 | 6.00 | 864.00 | 30.00 | 4,320.00 | | 0033 | NS-800-00040 | Concrete Approach Slabs (24' Clear Roadway, 90 Deg. Crossing, Curved, WO Asphalt) | 1 | EACH | 8,000.00 | 8,000.00 | 13,000.00 | 13,000.00 | 12,600.00 | 12,600.00 | 12,000.00 | 12,000.00 | | 0034 | NS-800-00040 | Concrete Approach Slabs (24' Clear Roadway, 90 Deg. Crossing, W/O Asphalt) | 1 | EACH | 8,000.00 | 8,000.00 | 13,000.00 | 13,000.00 | 12,600.00 | 12,600.00 | 12,000.00 | 12,000.00 | | 0035 | NS-800-00040 | Concrete Approach Slabs (28' Clear Roadway, 60 Deg. Crossing, W/O Asphalt) | 2 | EACH | 8,000.00 | 16,000.00 | 13,000.00 | 26,000.00 | 12,600.00 | 25,200.00 | 14,000.00 | 28,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 848,460.53 | | 976,780.50 | | 991,218.43 | | 1,021,719.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 6 - James Construction Group LLC | - 7 - C W & W Contractors, Inc. | - 8 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions (4-104" DIA.X40' STEEL RAIL CARS) | 1 | LUMP | 12,000.00 | 12,000.00 | 28,000.00 | 28,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 1,058.9 | SQYD | 8.00 | 8,471.20 | 10.00 | 10,589.00 | 15.00 | 15,883.50 | 0.25 | 264.73 | | 0004 | 202-02-04000 | Removal of Bridge (STA 100+00; 16.1' X 37' TIMBER BRIDGE WITH WOODEN BULKHEAD) | 1 | EACH | 12,000.00 | 12,000.00 | 10,000.00 | 10,000.00 | 7,500.00 | 7,500.00 | 7,000.00 | 7,000.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 55,000.00 | 55,000.00 | 30,000.00 | 30,000.00 | 53,000.00 | 53,000.00 | 30,000.00 | 30,000.00 | | 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 40 | EACH | 25.00 | 1,000.00 | 50.00 | 2,000.00 | 20.00 | 800.00 | 13.00 | 520.00 | | 0007 | 204-03-00100 | Temporary Slope Drains | 80 | LNFT | 60.00 | 4,800.00 | 20.00 | 1,600.00 | 30.00 | 2,400.00 | 45.00 | 3,600.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 200.00 | 600.00 | 250.00 | 750.00 | 250.00 | 750.00 | 130.00 | 390.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 2,119 | LNFT | 2.50 | 5,297.50 | 3.85 | 8,158.15 | 3.00 | 6,357.00 | 1.60 | 3,390.40 | | 0010 | 302-01-00700 | Class II Base Course (Stone) (CRUSHED) | 300.4 | CUYD | 110.00 | 33,044.00 | 100.00 | 30,040.00 | 100.00 | 30,040.00 | 155.00 | 46,562.00 | | 0011 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 224.8 | CUYD | 115.00 | 25,852.00 | 25.00 | 5,620.00 | 100.00 | 22,480.00 | 60.00 | 13,488.00 | | 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 239.3 | TON | 160.00 | 38,288.00 | 150.00 | 35,895.00 | 175.00 | 41,877.50 | 150.00 | 35,895.00 | | 0013 | 701-05-02040 | Side Drain Pipe (Erosion) (18" PP/CMP) | 90 | LNFT | 55.00 | 4,950.00 | 70.00 | 6,300.00 | 85.00 | 7,650.00 | 61.00 | 5,490.00 | | 0014 | 704-03-00100 | Blocked Out Guard Rail | 100 | LNFT | 25.00 | 2,500.00 | 22.64 | 2,264.00 | 23.00 | 2,300.00 | 20.00 | 2,000.00 | | 0015 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 65.00 | 13,000.00 | 71.66 | 14,332.00 | 69.00 | 13,800.00 | 75.00 | 15,000.00 | | 0016 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 2,500.00 | 20,000.00 | 2,446.45 | 19,571.60 | 2,500.00 | 20,000.00 | 2,750.00 | 22,000.00 | | 0017 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 60 | SQYD | 75.00 | 4,500.00 | 65.00 | 3,900.00 | 125.00 | 7,500.00 | 71.00 | 4,260.00 | | 0018 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 594 | SQYD | 61.50 | 36,531.00 | 65.00 | 38,610.00 | 150.00 | 89,100.00 | 89.00 | 52,866.00 | | 0019 | 711-04-00100 | Geotextile Fabric | 654 | SQYD | 2.00 | 1,308.00 | 3.50 | 2,289.00 | 3.00 | 1,962.00 | 3.50 | 2,289.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | | 0021 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 3,000.00 | 6,000.00 | 1,000.00 | 2,000.00 | 2,300.00 | 4,600.00 | 1,100.00 | 2,200.00 | | 0022 | 717-01-00100 | Seeding | 44 | LB | 20.00 | 880.00 | 50.00 | 2,200.00 | 28.75 | 1,265.00 | 14.00 | 616.00 | | 0023 | 718-01-00100 | Fertilizer | 970 | LB | 1.50 | 1,455.00 | 2.00 | 1,940.00 | 1.50 | 1,455.00 | 0.80 | 776.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 120,000.00 | 120,000.00 | 115,000.00 | 115,000.00 | 140,000.00 | 140,000.00 | | 0025 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 100.00 | 800.00 | 80.00 | 640.00 | 100.00 | 800.00 | 100.00 | 800.00 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 18,900.00 | 18,900.00 | 25,000.00 | 25,000.00 | 27,000.00 | 27,000.00 | | 0027 | 803-03-00100 | Steel Sheet Pile Wall (PZ-35) | 3,255 | SQFT | 45.50 | 148,102.50 | 50.00 | 162,750.00 | 46.00 | 149,730.00 | 41.00 | 133,455.00 | | 0028 | 804-01-00300 | Precast Concrete Piles (16") | 2,628 | LNFT | 63.00 | 165,564.00 | 90.00 | 236,520.00 | 75.00 | 197,100.00 | 84.00 | 220,752.00 | | 0029 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 1.00 | 2.00 | 0.00 | 0.00 | 1.00 | 2.00 | 7,700.00 | 15,400.00 | | 0030 | 805-10-01320 | Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) (Cast-in-Place) | 3 | SPAN | 45,000.00 | 135,000.00 | 40,000.00 | 120,000.00 | 41,200.00 | 123,600.00 | 51,000.00 | 153,000.00 | | 0031 | 805-10-02120 | Bridge Superstructure and Substructure (28' Clear Roadway; 60 Degree Crossing) (Cast-in-Place) | 5 | SPAN | 45,600.00 | 228,000.00 | 43,000.00 | 215,000.00 | 37,500.00 | 187,500.00 | 58,000.00 | 290,000.00 | | 0032 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 144 | INLF | 5.00 | 720.00 | 3.00 | 432.00 | 2.00 | 288.00 | 0.25 | 36.00 | | 0033 | NS-800-00040 | Concrete Approach Slabs (24' Clear Roadway, 90 Deg. Crossing, Curved, WO Asphalt) | 1 | EACH | 13,500.00 | 13,500.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 17,000.00 | 17,000.00 | | 0034 | NS-800-00040 | Concrete Approach Slabs (24' Clear Roadway, 90 Deg. Crossing, W/O Asphalt) | 1 | EACH | 13,500.00 | 13,500.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 22,000.00 | 22,000.00 | | 0035 | NS-800-00040 | Concrete Approach Slabs (28' Clear Roadway, 60 Deg. Crossing, W/O Asphalt) | 2 | EACH | 15,000.00 | 30,000.00 | 11,000.00 | 22,000.00 | 17,500.00 | 35,000.00 | 22,000.00 | 44,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,167,665.20 | | 1,232,300.75 | | 1,259,740.00 | | 1,377,050.13 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Diamond B Construction Co., L.L.C. | - 10 - Guinn Construction, LLC | - 11 - GILCHRIST CONSTRUCTION CO. LLC | - 12 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 80,000.00 | 80,000.00 | 60,000.00 | 60,000.00 | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions (4-104" DIA.X40' STEEL RAIL CARS) | 1 | LUMP | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 1,058.9 | SQYD | 7.50 | 7,941.75 | 6.00 | 6,353.40 | 6.00 | 6,353.40 | 6.00 | 6,353.40 | | 0004 | 202-02-04000 | Removal of Bridge (STA 100+00; 16.1' X 37' TIMBER BRIDGE WITH WOODEN BULKHEAD) | 1 | EACH | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 115,000.00 | 115,000.00 | 75,000.00 | 75,000.00 | 85,000.00 | 85,000.00 | 80,000.00 | 80,000.00 | | 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 40 | EACH | 50.00 | 2,000.00 | 15.00 | 600.00 | 60.00 | 2,400.00 | 15.00 | 600.00 | | 0007 | 204-03-00100 | Temporary Slope Drains | 80 | LNFT | 50.00 | 4,000.00 | 0.00 | 0.00 | 10.00 | 800.00 | 12.00 | 960.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 275.00 | 825.00 | 500.00 | 1,500.00 | 300.00 | 900.00 | 150.00 | 450.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 2,119 | LNFT | 2.75 | 5,827.25 | 3.50 | 7,416.50 | 3.00 | 6,357.00 | 2.70 | 5,721.30 | | 0010 | 302-01-00700 | Class II Base Course (Stone) (CRUSHED) | 300.4 | CUYD | 135.00 | 40,554.00 | 125.00 | 37,550.00 | 170.00 | 51,068.00 | 120.00 | 36,048.00 | | 0011 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 224.8 | CUYD | 80.00 | 17,984.00 | 125.00 | 28,100.00 | 150.00 | 33,720.00 | 100.00 | 22,480.00 | | 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 239.3 | TON | 120.00 | 28,716.00 | 200.00 | 47,860.00 | 180.00 | 43,074.00 | 175.00 | 41,877.50 | | 0013 | 701-05-02040 | Side Drain Pipe (Erosion) (18" PP/CMP) | 90 | LNFT | 135.00 | 12,150.00 | 75.00 | 6,750.00 | 80.00 | 7,200.00 | 100.00 | 9,000.00 | | 0014 | 704-03-00100 | Blocked Out Guard Rail | 100 | LNFT | 22.00 | 2,200.00 | 25.00 | 2,500.00 | 21.00 | 2,100.00 | 22.00 | 2,200.00 | | 0015 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 65.00 | 13,000.00 | 70.00 | 14,000.00 | 78.00 | 15,600.00 | 65.00 | 13,000.00 | | 0016 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 2,300.00 | 18,400.00 | 2,500.00 | 20,000.00 | 3,000.00 | 24,000.00 | 2,350.00 | 18,800.00 | | 0017 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 60 | SQYD | 90.00 | 5,400.00 | 70.00 | 4,200.00 | 95.00 | 5,700.00 | 85.00 | 5,100.00 | | 0018 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 594 | SQYD | 80.00 | 47,520.00 | 70.00 | 41,580.00 | 85.00 | 50,490.00 | 90.00 | 53,460.00 | | 0019 | 711-04-00100 | Geotextile Fabric | 654 | SQYD | 5.00 | 3,270.00 | 5.00 | 3,270.00 | 2.00 | 1,308.00 | 3.00 | 1,962.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | 22,500.00 | 22,500.00 | 25,000.00 | 25,000.00 | | 0021 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 1,100.00 | 2,200.00 | 3,500.00 | 7,000.00 | 1,100.00 | 2,200.00 | 3,240.00 | 6,480.00 | | 0022 | 717-01-00100 | Seeding | 44 | LB | 55.00 | 2,420.00 | 25.00 | 1,100.00 | 52.00 | 2,288.00 | 9.30 | 409.20 | | 0023 | 718-01-00100 | Fertilizer | 970 | LB | 2.00 | 1,940.00 | 1.00 | 970.00 | 2.25 | 2,182.50 | 0.45 | 436.50 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 112,500.00 | 112,500.00 | 150,000.00 | 150,000.00 | 100,000.00 | 100,000.00 | 140,000.00 | 140,000.00 | | 0025 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 80.00 | 640.00 | 100.00 | 800.00 | 110.00 | 880.00 | 80.00 | 640.00 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | 18,000.00 | 18,000.00 | 20,000.00 | 20,000.00 | | 0027 | 803-03-00100 | Steel Sheet Pile Wall (PZ-35) | 3,255 | SQFT | 37.50 | 122,062.50 | 45.00 | 146,475.00 | 37.00 | 120,435.00 | 42.00 | 136,710.00 | | 0028 | 804-01-00300 | Precast Concrete Piles (16") | 2,628 | LNFT | 85.00 | 223,380.00 | 75.00 | 197,100.00 | 69.00 | 181,332.00 | 100.00 | 262,800.00 | | 0029 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 500.00 | 1,000.00 | 1.00 | 2.00 | 1,000.00 | 2,000.00 | 2,500.00 | 5,000.00 | | 0030 | 805-10-01320 | Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) (Cast-in-Place) | 3 | SPAN | 47,750.00 | 143,250.00 | 48,500.00 | 145,500.00 | 60,000.00 | 180,000.00 | 50,000.00 | 150,000.00 | | 0031 | 805-10-02120 | Bridge Superstructure and Substructure (28' Clear Roadway; 60 Degree Crossing) (Cast-in-Place) | 5 | SPAN | 47,500.00 | 237,500.00 | 52,500.00 | 262,500.00 | 60,000.00 | 300,000.00 | 55,000.00 | 275,000.00 | | 0032 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 144 | INLF | 1.00 | 144.00 | 15.00 | 2,160.00 | 15.00 | 2,160.00 | 1.00 | 144.00 | | 0033 | NS-800-00040 | Concrete Approach Slabs (24' Clear Roadway, 90 Deg. Crossing, Curved, WO Asphalt) | 1 | EACH | 13,000.00 | 13,000.00 | 15,000.00 | 15,000.00 | 19,000.00 | 19,000.00 | 12,000.00 | 12,000.00 | | 0034 | NS-800-00040 | Concrete Approach Slabs (24' Clear Roadway, 90 Deg. Crossing, W/O Asphalt) | 1 | EACH | 13,000.00 | 13,000.00 | 15,000.00 | 15,000.00 | 19,000.00 | 19,000.00 | 12,000.00 | 12,000.00 | | 0035 | NS-800-00040 | Concrete Approach Slabs (28' Clear Roadway, 60 Deg. Crossing, W/O Asphalt) | 2 | EACH | 13,000.00 | 26,000.00 | 17,000.00 | 34,000.00 | 19,000.00 | 38,000.00 | 12,000.00 | 24,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,383,824.50 | | 1,419,286.90 | | 1,421,047.90 | | 1,508,631.90 |
|