Bid Tabulations for the Letting of 11/8/2017 LA DOTD Headquarters

Proposal:H.010039.6
Parish:Jackson
Description: VERNON-EROS ROAD & ZOAR ROAD BRIDGES
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASPHALT CONCRETE OVERLAY, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGES, CONCRETE APPROACH SLABS AND RELATED WORK.
Estimated Construction Cost:$1,319,528.50
Rank License BidderConstruction Bid
149864Terral Construction L.L.C.$848,460.53
223112BEN ALLEN, INC.$976,780.50
308815W. E. MCDONALD & SON, LLC.$991,218.43
414788Louisiana Bridge, Inc.$1,021,719.50
540615SPECIALTY TRACKHOE & DOZER SERV.INC$1,167,665.20
634567James Construction Group LLC$1,232,300.75
718546C W & W Contractors, Inc.$1,259,740.00
849239WL Bass Construction Inc.$1,377,050.13
912487Diamond B Construction Co., L.L.C.$1,383,824.50
1000044Guinn Construction, LLC$1,419,286.90
1112312GILCHRIST CONSTRUCTION CO. LLC$1,421,047.90
1239462JB JAMES CONSTRUCTION LLC$1,508,631.90


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Terral Construction L.L.C.
- 2 -
BEN ALLEN, INC.
- 3 -
W. E. MCDONALD & SON, LLC.
- 4 -
Louisiana Bridge, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 2     LUMP30,000.0030,000.0012,000.0012,000.006,000.006,000.0030,000.0030,000.00
0002202-01-00100Removal of Structures and Obstructions (4-104" DIA.X40' STEEL RAIL CARS)1     LUMP3,960.003,960.0012,000.0012,000.009,500.009,500.007,000.007,000.00
0003202-02-02020Removal of Asphalt Pavement 1,058.9   SQYD3.743,960.296.006,353.403.503,706.155.005,294.50
0004202-02-04000Removal of Bridge (STA 100+00; 16.1' X 37' TIMBER BRIDGE WITH WOODEN BULKHEAD)1     EACH1,650.001,650.003,500.003,500.002,750.002,750.004,500.004,500.00
0005203-05-00100Excavation and Embankment 1     LUMP26,400.0026,400.0036,000.0036,000.0025,000.0025,000.0040,000.0040,000.00
0006204-02-00100Temporary Hay or Straw Bales 40     EACH44.001,760.0010.00400.0052.502,100.0018.00720.00
0007204-03-00100Temporary Slope Drains 80     LNFT24.751,980.0010.00800.0027.002,160.0015.001,200.00
0008204-05-00100Temporary Sediment Check Dams (Hay) 3     EACH513.331,539.9930.0090.00262.50787.50250.00750.00
0009204-06-00100Temporary Silt Fencing 2,119     LNFT1.453,081.033.006,357.002.605,509.403.006,357.00
0010302-01-00700Class II Base Course (Stone) (CRUSHED)300.4   CUYD115.0034,546.00108.0032,443.20115.0034,546.00110.0033,044.00
0011403-01-00100Aggregate Roadway Surfacing (Vehicular Measurement) 224.8   CUYD120.0026,976.00108.0024,278.4060.0013,488.00110.0024,728.00
0012502-01-00100Superpave Asphaltic Concrete 239.3   TON200.0047,860.00175.0041,877.50183.7543,971.38230.0055,039.00
0013701-05-02040Side Drain Pipe (Erosion) (18" PP/CMP) 90     LNFT50.114,509.9065.005,850.0045.004,050.0039.003,510.00
0014704-03-00100Blocked Out Guard Rail 100     LNFT20.002,000.0022.002,200.0021.002,100.0025.002,500.00
0015704-08-00200Guard Rail Transitions (Double Thrie Beam) 200     LNFT60.0012,000.0066.0013,200.0063.0012,600.0070.0014,000.00
0016704-11-00100Guard Rail End Treatment (Flared) 8     EACH2,199.0017,592.002,365.0018,920.002,257.5018,060.002,500.0020,000.00
0017711-01-03020Riprap (30 lb, 18" Thick) 60     SQYD67.834,069.8072.004,320.0083.004,980.00100.006,000.00
0018711-01-04000Riprap (55 lb, 18" Thick) 594     SQYD55.3832,895.7267.0039,798.0060.0035,640.0065.0038,610.00
0019711-04-00100Geotextile Fabric 654     SQYD1.691,104.613.001,962.002.501,635.003.001,962.00
0020713-01-00100Temporary Signs and Barricades 1     LUMP13,200.0013,200.0015,000.0015,000.0030,000.0030,000.0012,000.0012,000.00
0021716-01-00100Mulch (Vegetative) 2     TON1,925.003,850.00500.001,000.001,050.002,100.002,000.004,000.00
0022717-01-00100Seeding 44     LB27.501,210.0015.00660.0052.502,310.0045.001,980.00
0023718-01-00100Fertilizer 970     LB1.501,451.121.00970.002.102,037.001.501,455.00
0024727-01-00100Mobilization 1     LUMP14,850.0014,850.0060,000.0060,000.0080,000.0080,000.0065,000.0065,000.00
0025729-16-00300Object Marker Assembly (Type 3) 8     EACH82.50660.0085.00680.0078.75630.0086.00688.00
0026740-01-00100Construction Layout 1     LUMP6,600.006,600.0010,000.0010,000.006,762.006,762.008,000.008,000.00
0027803-03-00100Steel Sheet Pile Wall (PZ-35)3,255     SQFT42.24137,491.2043.00139,965.0042.00136,710.0048.00156,240.00
0028804-01-00300Precast Concrete Piles (16") 2,628     LNFT56.00147,168.0062.00162,936.0065.00170,820.0065.00170,820.00
0029804-12-00100Loading Permanent Piles 2     EACH0.000.000.000.001.002.001.002.00
0030805-10-01320Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) (Cast-in-Place) 3     SPAN27,000.0081,000.0033,500.00100,500.0035,000.00105,000.0030,000.0090,000.00
0031805-10-02120Bridge Superstructure and Substructure (28' Clear Roadway; 60 Degree Crossing) (Cast-in-Place) 5     SPAN29,999.00149,995.0034,000.00170,000.0035,000.00175,000.0032,000.00160,000.00
0032NS-500-00340Saw Cutting Asphaltic Concrete Pavement 144     INLF7.641,099.875.00720.006.00864.0030.004,320.00
0033NS-800-00040Concrete Approach Slabs (24' Clear Roadway, 90 Deg. Crossing, Curved, WO Asphalt)1     EACH8,000.008,000.0013,000.0013,000.0012,600.0012,600.0012,000.0012,000.00
0034NS-800-00040Concrete Approach Slabs (24' Clear Roadway, 90 Deg. Crossing, W/O Asphalt)1     EACH8,000.008,000.0013,000.0013,000.0012,600.0012,600.0012,000.0012,000.00
0035NS-800-00040Concrete Approach Slabs (28' Clear Roadway, 60 Deg. Crossing, W/O Asphalt)2     EACH8,000.0016,000.0013,000.0026,000.0012,600.0025,200.0014,000.0028,000.00
             
  CONTRACTOR TOTAL   848,460.53 976,780.50 991,218.43 1,021,719.50



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
SPECIALTY TRACKHOE & DOZER SERV.INC
- 6 -
James Construction Group LLC
- 7 -
C W & W Contractors, Inc.
- 8 -
WL Bass Construction Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 2     LUMP20,000.0020,000.0050,000.0050,000.0025,000.0025,000.0025,000.0025,000.00
0002202-01-00100Removal of Structures and Obstructions (4-104" DIA.X40' STEEL RAIL CARS)1     LUMP12,000.0012,000.0028,000.0028,000.0025,000.0025,000.0025,000.0025,000.00
0003202-02-02020Removal of Asphalt Pavement 1,058.9   SQYD8.008,471.2010.0010,589.0015.0015,883.500.25264.73
0004202-02-04000Removal of Bridge (STA 100+00; 16.1' X 37' TIMBER BRIDGE WITH WOODEN BULKHEAD)1     EACH12,000.0012,000.0010,000.0010,000.007,500.007,500.007,000.007,000.00
0005203-05-00100Excavation and Embankment 1     LUMP55,000.0055,000.0030,000.0030,000.0053,000.0053,000.0030,000.0030,000.00
0006204-02-00100Temporary Hay or Straw Bales 40     EACH25.001,000.0050.002,000.0020.00800.0013.00520.00
0007204-03-00100Temporary Slope Drains 80     LNFT60.004,800.0020.001,600.0030.002,400.0045.003,600.00
0008204-05-00100Temporary Sediment Check Dams (Hay) 3     EACH200.00600.00250.00750.00250.00750.00130.00390.00
0009204-06-00100Temporary Silt Fencing 2,119     LNFT2.505,297.503.858,158.153.006,357.001.603,390.40
0010302-01-00700Class II Base Course (Stone) (CRUSHED)300.4   CUYD110.0033,044.00100.0030,040.00100.0030,040.00155.0046,562.00
0011403-01-00100Aggregate Roadway Surfacing (Vehicular Measurement) 224.8   CUYD115.0025,852.0025.005,620.00100.0022,480.0060.0013,488.00
0012502-01-00100Superpave Asphaltic Concrete 239.3   TON160.0038,288.00150.0035,895.00175.0041,877.50150.0035,895.00
0013701-05-02040Side Drain Pipe (Erosion) (18" PP/CMP) 90     LNFT55.004,950.0070.006,300.0085.007,650.0061.005,490.00
0014704-03-00100Blocked Out Guard Rail 100     LNFT25.002,500.0022.642,264.0023.002,300.0020.002,000.00
0015704-08-00200Guard Rail Transitions (Double Thrie Beam) 200     LNFT65.0013,000.0071.6614,332.0069.0013,800.0075.0015,000.00
0016704-11-00100Guard Rail End Treatment (Flared) 8     EACH2,500.0020,000.002,446.4519,571.602,500.0020,000.002,750.0022,000.00
0017711-01-03020Riprap (30 lb, 18" Thick) 60     SQYD75.004,500.0065.003,900.00125.007,500.0071.004,260.00
0018711-01-04000Riprap (55 lb, 18" Thick) 594     SQYD61.5036,531.0065.0038,610.00150.0089,100.0089.0052,866.00
0019711-04-00100Geotextile Fabric 654     SQYD2.001,308.003.502,289.003.001,962.003.502,289.00
0020713-01-00100Temporary Signs and Barricades 1     LUMP5,000.005,000.0010,000.0010,000.0015,000.0015,000.0015,000.0015,000.00
0021716-01-00100Mulch (Vegetative) 2     TON3,000.006,000.001,000.002,000.002,300.004,600.001,100.002,200.00
0022717-01-00100Seeding 44     LB20.00880.0050.002,200.0028.751,265.0014.00616.00
0023718-01-00100Fertilizer 970     LB1.501,455.002.001,940.001.501,455.000.80776.00
0024727-01-00100Mobilization 1     LUMP100,000.00100,000.00120,000.00120,000.00115,000.00115,000.00140,000.00140,000.00
0025729-16-00300Object Marker Assembly (Type 3) 8     EACH100.00800.0080.00640.00100.00800.00100.00800.00
0026740-01-00100Construction Layout 1     LUMP20,000.0020,000.0018,900.0018,900.0025,000.0025,000.0027,000.0027,000.00
0027803-03-00100Steel Sheet Pile Wall (PZ-35)3,255     SQFT45.50148,102.5050.00162,750.0046.00149,730.0041.00133,455.00
0028804-01-00300Precast Concrete Piles (16") 2,628     LNFT63.00165,564.0090.00236,520.0075.00197,100.0084.00220,752.00
0029804-12-00100Loading Permanent Piles 2     EACH1.002.000.000.001.002.007,700.0015,400.00
0030805-10-01320Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) (Cast-in-Place) 3     SPAN45,000.00135,000.0040,000.00120,000.0041,200.00123,600.0051,000.00153,000.00
0031805-10-02120Bridge Superstructure and Substructure (28' Clear Roadway; 60 Degree Crossing) (Cast-in-Place) 5     SPAN45,600.00228,000.0043,000.00215,000.0037,500.00187,500.0058,000.00290,000.00
0032NS-500-00340Saw Cutting Asphaltic Concrete Pavement 144     INLF5.00720.003.00432.002.00288.000.2536.00
0033NS-800-00040Concrete Approach Slabs (24' Clear Roadway, 90 Deg. Crossing, Curved, WO Asphalt)1     EACH13,500.0013,500.0010,000.0010,000.0015,000.0015,000.0017,000.0017,000.00
0034NS-800-00040Concrete Approach Slabs (24' Clear Roadway, 90 Deg. Crossing, W/O Asphalt)1     EACH13,500.0013,500.0010,000.0010,000.0015,000.0015,000.0022,000.0022,000.00
0035NS-800-00040Concrete Approach Slabs (28' Clear Roadway, 60 Deg. Crossing, W/O Asphalt)2     EACH15,000.0030,000.0011,000.0022,000.0017,500.0035,000.0022,000.0044,000.00
             
  CONTRACTOR TOTAL   1,167,665.20 1,232,300.75 1,259,740.00 1,377,050.13



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 9 -
Diamond B Construction Co., L.L.C.
- 10 -
Guinn Construction, LLC
- 11 -
GILCHRIST CONSTRUCTION CO. LLC
- 12 -
JB JAMES CONSTRUCTION LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 2     LUMP80,000.0080,000.0060,000.0060,000.0050,000.0050,000.00100,000.00100,000.00
0002202-01-00100Removal of Structures and Obstructions (4-104" DIA.X40' STEEL RAIL CARS)1     LUMP20,000.0020,000.0025,000.0025,000.0015,000.0015,000.0020,000.0020,000.00
0003202-02-02020Removal of Asphalt Pavement 1,058.9   SQYD7.507,941.756.006,353.406.006,353.406.006,353.40
0004202-02-04000Removal of Bridge (STA 100+00; 16.1' X 37' TIMBER BRIDGE WITH WOODEN BULKHEAD)1     EACH15,000.0015,000.0010,000.0010,000.0010,000.0010,000.0020,000.0020,000.00
0005203-05-00100Excavation and Embankment 1     LUMP115,000.00115,000.0075,000.0075,000.0085,000.0085,000.0080,000.0080,000.00
0006204-02-00100Temporary Hay or Straw Bales 40     EACH50.002,000.0015.00600.0060.002,400.0015.00600.00
0007204-03-00100Temporary Slope Drains 80     LNFT50.004,000.000.000.0010.00800.0012.00960.00
0008204-05-00100Temporary Sediment Check Dams (Hay) 3     EACH275.00825.00500.001,500.00300.00900.00150.00450.00
0009204-06-00100Temporary Silt Fencing 2,119     LNFT2.755,827.253.507,416.503.006,357.002.705,721.30
0010302-01-00700Class II Base Course (Stone) (CRUSHED)300.4   CUYD135.0040,554.00125.0037,550.00170.0051,068.00120.0036,048.00
0011403-01-00100Aggregate Roadway Surfacing (Vehicular Measurement) 224.8   CUYD80.0017,984.00125.0028,100.00150.0033,720.00100.0022,480.00
0012502-01-00100Superpave Asphaltic Concrete 239.3   TON120.0028,716.00200.0047,860.00180.0043,074.00175.0041,877.50
0013701-05-02040Side Drain Pipe (Erosion) (18" PP/CMP) 90     LNFT135.0012,150.0075.006,750.0080.007,200.00100.009,000.00
0014704-03-00100Blocked Out Guard Rail 100     LNFT22.002,200.0025.002,500.0021.002,100.0022.002,200.00
0015704-08-00200Guard Rail Transitions (Double Thrie Beam) 200     LNFT65.0013,000.0070.0014,000.0078.0015,600.0065.0013,000.00
0016704-11-00100Guard Rail End Treatment (Flared) 8     EACH2,300.0018,400.002,500.0020,000.003,000.0024,000.002,350.0018,800.00
0017711-01-03020Riprap (30 lb, 18" Thick) 60     SQYD90.005,400.0070.004,200.0095.005,700.0085.005,100.00
0018711-01-04000Riprap (55 lb, 18" Thick) 594     SQYD80.0047,520.0070.0041,580.0085.0050,490.0090.0053,460.00
0019711-04-00100Geotextile Fabric 654     SQYD5.003,270.005.003,270.002.001,308.003.001,962.00
0020713-01-00100Temporary Signs and Barricades 1     LUMP15,000.0015,000.0030,000.0030,000.0022,500.0022,500.0025,000.0025,000.00
0021716-01-00100Mulch (Vegetative) 2     TON1,100.002,200.003,500.007,000.001,100.002,200.003,240.006,480.00
0022717-01-00100Seeding 44     LB55.002,420.0025.001,100.0052.002,288.009.30409.20
0023718-01-00100Fertilizer 970     LB2.001,940.001.00970.002.252,182.500.45436.50
0024727-01-00100Mobilization 1     LUMP112,500.00112,500.00150,000.00150,000.00100,000.00100,000.00140,000.00140,000.00
0025729-16-00300Object Marker Assembly (Type 3) 8     EACH80.00640.00100.00800.00110.00880.0080.00640.00
0026740-01-00100Construction Layout 1     LUMP30,000.0030,000.0020,000.0020,000.0018,000.0018,000.0020,000.0020,000.00
0027803-03-00100Steel Sheet Pile Wall (PZ-35)3,255     SQFT37.50122,062.5045.00146,475.0037.00120,435.0042.00136,710.00
0028804-01-00300Precast Concrete Piles (16") 2,628     LNFT85.00223,380.0075.00197,100.0069.00181,332.00100.00262,800.00
0029804-12-00100Loading Permanent Piles 2     EACH500.001,000.001.002.001,000.002,000.002,500.005,000.00
0030805-10-01320Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) (Cast-in-Place) 3     SPAN47,750.00143,250.0048,500.00145,500.0060,000.00180,000.0050,000.00150,000.00
0031805-10-02120Bridge Superstructure and Substructure (28' Clear Roadway; 60 Degree Crossing) (Cast-in-Place) 5     SPAN47,500.00237,500.0052,500.00262,500.0060,000.00300,000.0055,000.00275,000.00
0032NS-500-00340Saw Cutting Asphaltic Concrete Pavement 144     INLF1.00144.0015.002,160.0015.002,160.001.00144.00
0033NS-800-00040Concrete Approach Slabs (24' Clear Roadway, 90 Deg. Crossing, Curved, WO Asphalt)1     EACH13,000.0013,000.0015,000.0015,000.0019,000.0019,000.0012,000.0012,000.00
0034NS-800-00040Concrete Approach Slabs (24' Clear Roadway, 90 Deg. Crossing, W/O Asphalt)1     EACH13,000.0013,000.0015,000.0015,000.0019,000.0019,000.0012,000.0012,000.00
0035NS-800-00040Concrete Approach Slabs (28' Clear Roadway, 60 Deg. Crossing, W/O Asphalt)2     EACH13,000.0026,000.0017,000.0034,000.0019,000.0038,000.0012,000.0024,000.00
             
  CONTRACTOR TOTAL   1,383,824.50 1,419,286.90 1,421,047.90 1,508,631.90