Proposal:H.001146.6
Parish:Natchitoches
Routes:LA 120
Description:LA 120: BRIDGES NEAR PROVENCAL
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER TRESTLE BRIDGES, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, PRECAST CONCRETE SLAB SPAN BRIDGES, AND RELATED WORK.
Estimated Construction Cost:$7,056,512.41
| Rank | License | Bidder | Construction Bid |
| 1 | 08815 | W. E. MCDONALD & SON, LLC. | $5,188,195.89 |
| 2 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $5,534,580.77 |
| 3 | 49239 | WL Bass Construction Inc. | $6,086,186.81 |
| 4 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $6,341,828.99 |
| 5 | 55505 | MERRICK, LLC | $6,378,876.46 |
| 6 | 39462 | JB JAMES CONSTRUCTION LLC | $7,028,716.65 |
| 7 | 34567 | James Construction Group LLC | $7,554,312.96 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - W. E. MCDONALD & SON, LLC. | - 2 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 3 - WL Bass Construction Inc. | - 4 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 17 | LUMP | 115,000.00 | 115,000.00 | 46,000.00 | 46,000.00 | 50,000.00 | 50,000.00 | 150,000.00 | 150,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 12,000.00 | 12,000.00 | 2,000.00 | 2,000.00 | 20,000.00 | 20,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 4,716.6 | SQYD | 3.00 | 14,149.80 | 5.00 | 23,583.00 | 4.00 | 18,866.40 | 5.00 | 23,583.00 | | 0004 | 202-02-04000 | Removal of Bridge (STA. 117+63.21; 24' x 135' TIMBER TRESTLE BRIDGE; STR. NO. 08350420508791) | 1 | EACH | 25,000.00 | 25,000.00 | 16,000.00 | 16,000.00 | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | | 0005 | 202-02-04000 | Removal of Bridge (STA. 213+59.07; 19' x 59' TIMBER TRESTLE BRIDGE, STR. NO. 08350420701771) | 1 | EACH | 8,500.00 | 8,500.00 | 11,000.00 | 11,000.00 | 8,400.00 | 8,400.00 | 8,000.00 | 8,000.00 | | 0006 | 202-02-04000 | Removal of Bridge (STA. 312+74.90; 28'x 58' TIMBER TRESTLE BRIDGE; STR. NO. 08350420703651) | 1 | EACH | 8,500.00 | 8,500.00 | 11,000.00 | 11,000.00 | 8,400.00 | 8,400.00 | 8,000.00 | 8,000.00 | | 0007 | 202-02-04000 | Removal of Bridge (STA. 411+15.78; 19' x 59' TIMBER TRESTLE BRIDGE, STR. NO. 08350420708591) | 1 | EACH | 8,500.00 | 8,500.00 | 11,000.00 | 11,000.00 | 8,450.00 | 8,450.00 | 8,000.00 | 8,000.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 1,891 | LNFT | 10.00 | 18,910.00 | 5.00 | 9,455.00 | 4.00 | 7,564.00 | 8.00 | 15,128.00 | | 0009 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 8,773.8 | SQYD | 2.75 | 24,127.95 | 6.20 | 54,397.56 | 4.50 | 39,482.10 | 10.00 | 87,738.00 | | 0010 | 203-01-00100 | General Excavation | 14,815 | CUYD | 3.45 | 51,111.75 | 5.95 | 88,149.25 | 6.50 | 96,297.50 | 11.00 | 162,965.00 | | 0011 | 203-02-00100 | Drainage Excavation | 1,719.15 | CUYD | 7.00 | 12,034.05 | 10.65 | 18,308.95 | 12.50 | 21,489.38 | 16.00 | 27,506.40 | | 0012 | 203-03-00100 | Embankment | 44,710.52 | CUYD | 10.00 | 447,105.20 | 9.25 | 413,572.31 | 10.00 | 447,105.20 | 19.00 | 849,499.88 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 79 | EACH | 115.50 | 9,124.50 | 120.00 | 9,480.00 | 150.00 | 11,850.00 | 120.00 | 9,480.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 9,125 | LNFT | 2.05 | 18,706.25 | 2.00 | 18,250.00 | 2.75 | 25,093.75 | 2.10 | 19,162.50 | | 0015 | 302-02-06000 | Class II Base Course (12" Thick) | 21,004.7 | SQYD | 18.00 | 378,084.60 | 13.35 | 280,412.75 | 19.00 | 399,089.30 | 17.50 | 367,582.25 | | 0016 | 304-05-00100 | Lime Treatment (Type E) | 53.85 | TON | 650.00 | 35,002.50 | 505.00 | 27,194.25 | 212.00 | 11,416.20 | 600.00 | 32,310.00 | | 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 32 | CUYD | 100.00 | 3,200.00 | 168.00 | 5,376.00 | 105.00 | 3,360.00 | 73.00 | 2,336.00 | | 0018 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,000 | CUYD | 3.00 | 3,000.00 | 75.00 | 75,000.00 | 31.00 | 31,000.00 | 30.00 | 30,000.00 | | 0021 | 704-03-00100 | Blocked Out Guard Rail | 562.5 | LNFT | 22.50 | 12,656.25 | 20.00 | 11,250.00 | 21.00 | 11,812.50 | 21.00 | 11,812.50 | | 0022 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 64.00 | 19,200.00 | 60.00 | 18,000.00 | 47.00 | 14,100.00 | 47.00 | 14,100.00 | | 0023 | 704-11-00100 | Guard Rail End Treatment (Flared) | 12 | EACH | 2,152.00 | 25,824.00 | 2,050.00 | 24,600.00 | 2,600.00 | 31,200.00 | 2,600.00 | 31,200.00 | | 0024 | 705-01-00100 | Barbed Wire Fence | 3,700 | LNFT | 6.50 | 24,050.00 | 5.00 | 18,500.00 | 3.00 | 11,100.00 | 6.50 | 24,050.00 | | 0025 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 578.00 | 578.00 | 1,000.00 | 1,000.00 | 900.00 | 900.00 | 600.00 | 600.00 | | 0026 | 708-01-00100 | Right-of-Way Monument | 41 | EACH | 125.00 | 5,125.00 | 200.00 | 8,200.00 | 220.00 | 9,020.00 | 210.00 | 8,610.00 | | 0027 | 708-02-00100 | Right-of-Way Monument Witness Post | 41 | EACH | 125.00 | 5,125.00 | 200.00 | 8,200.00 | 1.00 | 41.00 | 210.00 | 8,610.00 | | 0028 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 210 | SQYD | 69.00 | 14,490.00 | 50.00 | 10,500.00 | 65.00 | 13,650.00 | 93.00 | 19,530.00 | | 0029 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,421.66 | SQYD | 74.00 | 179,202.84 | 45.00 | 108,974.70 | 70.00 | 169,516.20 | 56.00 | 135,612.96 | | 0030 | 711-04-00100 | Geotextile Fabric | 210 | SQYD | 4.50 | 945.00 | 1.50 | 315.00 | 10.00 | 2,100.00 | 10.00 | 2,100.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | | 0032 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 12 | LNFT | 0.55 | 6.60 | 10.00 | 120.00 | 0.50 | 6.00 | 11.00 | 132.00 | | 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.065 | MILE | 315.00 | 335.48 | 1,000.00 | 1,065.00 | 300.00 | 319.50 | 200.00 | 213.00 | | 0034 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.065 | MILE | 450.00 | 479.25 | 1,000.00 | 1,065.00 | 300.00 | 319.50 | 1,000.00 | 1,065.00 | | 0035 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.257 | MILE | 630.00 | 2,051.91 | 1,000.00 | 3,257.00 | 600.00 | 1,954.20 | 1,200.00 | 3,908.40 | | 0036 | 716-01-00100 | Mulch (Vegetative) | 34 | TON | 685.00 | 23,290.00 | 800.00 | 27,200.00 | 600.00 | 20,400.00 | 700.00 | 23,800.00 | | 0037 | 717-01-00100 | Seeding | 1,360 | LB | 10.50 | 14,280.00 | 10.00 | 13,600.00 | 14.00 | 19,040.00 | 11.00 | 14,960.00 | | 0038 | 718-01-00100 | Fertilizer | 17,000 | LB | 0.50 | 8,500.00 | 0.75 | 12,750.00 | 0.80 | 13,600.00 | 0.50 | 8,500.00 | | 0039 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,920 | SQYD | 2.10 | 6,132.00 | 2.00 | 5,840.00 | 1.80 | 5,256.00 | 2.10 | 6,132.00 | | 0040 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 780 | SQYD | 3.65 | 2,847.00 | 5.00 | 3,900.00 | 2.30 | 1,794.00 | 3.60 | 2,808.00 | | 0041 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 37,500.00 | 37,500.00 | 3,500.00 | 3,500.00 | 6,500.00 | 6,500.00 | | 0042 | 725-01-00100 | Temporary Detour Roads | 12,590.8 | SQYD | 55.00 | 692,494.00 | 63.00 | 793,220.40 | 83.00 | 1,045,036.40 | 55.00 | 692,494.00 | | 0043 | 725-02-00100 | Temporary Detour Bridging | 160 | LNFT | 1,400.00 | 224,000.00 | 2,075.00 | 332,000.00 | 1,930.00 | 308,800.00 | 2,300.00 | 368,000.00 | | 0044 | 726-01-00100 | Bedding Material | 212.3 | CUYD | 65.00 | 13,799.50 | 100.00 | 21,230.00 | 100.00 | 21,230.00 | 120.00 | 25,476.00 | | 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 150,000.00 | 150,000.00 | 325,000.00 | 325,000.00 | 600,000.00 | 600,000.00 | 410,000.00 | 410,000.00 | | 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 78.49 | 941.88 | 75.00 | 900.00 | 90.00 | 1,080.00 | 95.00 | 1,140.00 | | 0047 | 731-02-00100 | Reflectorized Raised Pavement Markers | 282 | EACH | 5.25 | 1,480.50 | 10.00 | 2,820.00 | 5.00 | 1,410.00 | 5.25 | 1,480.50 | | 0048 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 10.50 | 126.00 | 50.00 | 600.00 | 10.00 | 120.00 | 27.00 | 324.00 | | 0049 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.527 | MILE | 2,830.00 | 9,981.41 | 5,000.00 | 17,635.00 | 2,700.00 | 9,522.90 | 3,000.00 | 10,581.00 | | 0050 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.527 | MILE | 1,035.00 | 545.45 | 4,000.00 | 2,108.00 | 1,000.00 | 527.00 | 1,600.00 | 843.20 | | 0051 | 735-01-00100 | Mailboxes | 1 | EACH | 42.00 | 42.00 | 150.00 | 150.00 | 1.00 | 1.00 | 100.00 | 100.00 | | 0052 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 367.50 | 367.50 | 150.00 | 150.00 | 150.00 | 150.00 | 200.00 | 200.00 | | 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 80,000.00 | 80,000.00 | 95,000.00 | 95,000.00 | 35,000.00 | 35,000.00 | | 0054 | 804-01-00300 | Precast Concrete Piles (16") | 4,136 | LNFT | 67.00 | 277,112.00 | 63.00 | 260,568.00 | 65.00 | 268,840.00 | 62.00 | 256,432.00 | | 0055 | 804-01-00600 | Precast Concrete Piles (24") | 1,890 | LNFT | 125.00 | 236,250.00 | 139.00 | 262,710.00 | 100.00 | 189,000.00 | 105.00 | 198,450.00 | | 0056 | 804-12-00100 | Loading Permanent Piles | 3 | EACH | 1.00 | 3.00 | 1.00 | 3.00 | 1.00 | 3.00 | 500.00 | 1,500.00 | | 0057 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 54 | CUYD | 1,500.00 | 81,000.00 | 1,000.00 | 54,000.00 | 1,100.00 | 59,400.00 | 1,500.00 | 81,000.00 | | 0058 | 805-02-00400 | Class A(M) Concrete (Bents) | 191.02 | CUYD | 1,000.00 | 191,020.00 | 1,350.00 | 257,877.00 | 1,200.00 | 229,224.00 | 1,200.00 | 229,224.00 | | 0059 | 805-04-00100 | Class AA(M) Concrete | 628.88 | CUYD | 700.00 | 440,216.00 | 720.00 | 452,793.60 | 650.00 | 408,772.00 | 900.00 | 565,992.00 | | 0060 | 805-12-06000 | Reinforced Concrete Box Culverts (9' x 9') | 264 | LNFT | 750.00 | 198,000.00 | 715.00 | 188,760.00 | 770.00 | 203,280.00 | 850.00 | 224,400.00 | | 0061 | 806-01-00100 | Deformed Reinforcing Steel | 163,735 | LB | 0.80 | 130,988.00 | 0.75 | 122,801.25 | 1.00 | 163,735.00 | 1.10 | 180,108.50 | | 0062 | 810-01-00100 | Concrete Railing (Standard Barrier) | 360.1 | LNFT | 74.00 | 26,647.40 | 70.00 | 25,207.00 | 80.00 | 28,808.00 | 110.00 | 39,611.00 | | 0063 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 479.9 | LNFT | 85.00 | 40,791.50 | 80.00 | 38,392.00 | 80.00 | 38,392.00 | 110.00 | 52,789.00 | | 0064 | 813-01-00100 | Concrete Approach Slabs | 915.56 | SQYD | 242.00 | 221,565.52 | 225.00 | 206,001.00 | 203.00 | 185,858.68 | 290.00 | 265,512.40 | | 0065 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 194 | LNFT | 6.30 | 1,222.20 | 32.00 | 6,208.00 | 7.50 | 1,455.00 | 17.00 | 3,298.00 | | 0066 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,854 | INLF | 1.65 | 3,059.10 | 4.00 | 7,416.00 | 3.00 | 5,562.00 | 1.50 | 2,781.00 | | 0067 | NS-502-01000 | Asphalt Concrete | 4,333.9 | TON | 110.00 | 476,729.00 | 118.50 | 513,567.15 | 125.00 | 541,737.50 | 95.00 | 411,720.50 | | 0068 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 556.6 | TON | 165.00 | 91,839.00 | 146.00 | 81,263.60 | 156.00 | 86,829.60 | 95.00 | 52,877.00 | | 0069 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 104 | LNFT | 10.00 | 1,040.00 | 10.00 | 1,040.00 | 10.00 | 1,040.00 | 30.00 | 3,120.00 | | 0070 | 701-05-02141 | Side Drain Pipe (Erosion) (48" PP) | 104 | LNFT | 135.00 | 14,040.00 | 116.00 | 12,064.00 | 105.00 | 10,920.00 | 110.00 | 11,440.00 | | 0071 | 701-05-01041 | Side Drain Pipe (18" PP) | 32 | LNFT | 85.00 | 2,720.00 | 65.00 | 2,080.00 | 30.00 | 960.00 | 75.00 | 2,400.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,188,195.89 | | 5,534,580.77 | | 6,086,186.81 | | 6,341,828.99 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - MERRICK, LLC | - 6 - JB JAMES CONSTRUCTION LLC | - 7 - James Construction Group LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 17 | LUMP | 100,000.00 | 100,000.00 | 570,000.00 | 570,000.00 | 60,000.00 | 60,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 4,716.6 | SQYD | 5.50 | 25,941.30 | 4.00 | 18,866.40 | 11.50 | 54,240.90 | | 0004 | 202-02-04000 | Removal of Bridge (STA. 117+63.21; 24' x 135' TIMBER TRESTLE BRIDGE; STR. NO. 08350420508791) | 1 | EACH | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 60,000.00 | 60,000.00 | | 0005 | 202-02-04000 | Removal of Bridge (STA. 213+59.07; 19' x 59' TIMBER TRESTLE BRIDGE, STR. NO. 08350420701771) | 1 | EACH | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 51,000.00 | 51,000.00 | | 0006 | 202-02-04000 | Removal of Bridge (STA. 312+74.90; 28'x 58' TIMBER TRESTLE BRIDGE; STR. NO. 08350420703651) | 1 | EACH | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | | 0007 | 202-02-04000 | Removal of Bridge (STA. 411+15.78; 19' x 59' TIMBER TRESTLE BRIDGE, STR. NO. 08350420708591) | 1 | EACH | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 51,000.00 | 51,000.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 1,891 | LNFT | 6.00 | 11,346.00 | 3.00 | 5,673.00 | 4.00 | 7,564.00 | | 0009 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 8,773.8 | SQYD | 8.90 | 78,086.82 | 3.50 | 30,708.30 | 6.50 | 57,029.70 | | 0010 | 203-01-00100 | General Excavation | 14,815 | CUYD | 7.00 | 103,705.00 | 6.00 | 88,890.00 | 6.00 | 88,890.00 | | 0011 | 203-02-00100 | Drainage Excavation | 1,719.15 | CUYD | 11.00 | 18,910.65 | 12.00 | 20,629.80 | 12.00 | 20,629.80 | | 0012 | 203-03-00100 | Embankment | 44,710.52 | CUYD | 13.00 | 581,236.76 | 9.50 | 424,749.94 | 9.50 | 424,749.94 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 79 | EACH | 18.00 | 1,422.00 | 110.00 | 8,690.00 | 150.00 | 11,850.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 9,125 | LNFT | 1.80 | 16,425.00 | 3.00 | 27,375.00 | 4.00 | 36,500.00 | | 0015 | 302-02-06000 | Class II Base Course (12" Thick) | 21,004.7 | SQYD | 21.25 | 446,349.88 | 16.50 | 346,577.55 | 28.00 | 588,131.60 | | 0016 | 304-05-00100 | Lime Treatment (Type E) | 53.85 | TON | 375.00 | 20,193.75 | 570.00 | 30,694.50 | 450.00 | 24,232.50 | | 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 32 | CUYD | 80.00 | 2,560.00 | 100.00 | 3,200.00 | 30.00 | 960.00 | | 0018 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,000 | CUYD | 25.00 | 25,000.00 | 40.00 | 40,000.00 | 30.00 | 30,000.00 | | 0021 | 704-03-00100 | Blocked Out Guard Rail | 562.5 | LNFT | 24.00 | 13,500.00 | 21.00 | 11,812.50 | 20.00 | 11,250.00 | | 0022 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 55.00 | 16,500.00 | 62.00 | 18,600.00 | 60.00 | 18,000.00 | | 0023 | 704-11-00100 | Guard Rail End Treatment (Flared) | 12 | EACH | 3,000.00 | 36,000.00 | 2,500.00 | 30,000.00 | 2,050.00 | 24,600.00 | | 0024 | 705-01-00100 | Barbed Wire Fence | 3,700 | LNFT | 6.50 | 24,050.00 | 6.00 | 22,200.00 | 2.75 | 10,175.00 | | 0025 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 615.00 | 615.00 | 550.00 | 550.00 | 750.00 | 750.00 | | 0026 | 708-01-00100 | Right-of-Way Monument | 41 | EACH | 130.00 | 5,330.00 | 200.00 | 8,200.00 | 200.00 | 8,200.00 | | 0027 | 708-02-00100 | Right-of-Way Monument Witness Post | 41 | EACH | 140.00 | 5,740.00 | 200.00 | 8,200.00 | 25.00 | 1,025.00 | | 0028 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 210 | SQYD | 55.00 | 11,550.00 | 62.00 | 13,020.00 | 60.00 | 12,600.00 | | 0029 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,421.66 | SQYD | 55.00 | 133,191.30 | 76.00 | 184,046.16 | 60.00 | 145,299.60 | | 0030 | 711-04-00100 | Geotextile Fabric | 210 | SQYD | 10.00 | 2,100.00 | 3.00 | 630.00 | 3.00 | 630.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 29,600.00 | 29,600.00 | | 0032 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 12 | LNFT | 0.50 | 6.00 | 0.50 | 6.00 | 0.50 | 6.00 | | 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.065 | MILE | 400.00 | 426.00 | 300.00 | 319.50 | 350.00 | 372.75 | | 0034 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.065 | MILE | 400.00 | 426.00 | 300.00 | 319.50 | 550.00 | 585.75 | | 0035 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.257 | MILE | 800.00 | 2,605.60 | 600.00 | 1,954.20 | 660.00 | 2,149.62 | | 0036 | 716-01-00100 | Mulch (Vegetative) | 34 | TON | 700.00 | 23,800.00 | 650.00 | 22,100.00 | 575.00 | 19,550.00 | | 0037 | 717-01-00100 | Seeding | 1,360 | LB | 11.00 | 14,960.00 | 10.00 | 13,600.00 | 12.00 | 16,320.00 | | 0038 | 718-01-00100 | Fertilizer | 17,000 | LB | 0.55 | 9,350.00 | 0.50 | 8,500.00 | 0.75 | 12,750.00 | | 0039 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,920 | SQYD | 2.30 | 6,716.00 | 2.00 | 5,840.00 | 1.75 | 5,110.00 | | 0040 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 780 | SQYD | 4.00 | 3,120.00 | 3.50 | 2,730.00 | 2.25 | 1,755.00 | | 0041 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 | | 0042 | 725-01-00100 | Temporary Detour Roads | 12,590.8 | SQYD | 55.00 | 692,494.00 | 51.00 | 642,130.80 | 64.00 | 805,811.20 | | 0043 | 725-02-00100 | Temporary Detour Bridging | 160 | LNFT | 2,600.00 | 416,000.00 | 3,490.00 | 558,400.00 | 4,000.00 | 640,000.00 | | 0044 | 726-01-00100 | Bedding Material | 212.3 | CUYD | 115.00 | 24,414.50 | 100.00 | 21,230.00 | 100.00 | 21,230.00 | | 0045 | 727-01-00100 | Mobilization | 1 | LUMP | 634,000.00 | 634,000.00 | 675,000.00 | 675,000.00 | 750,000.00 | 750,000.00 | | 0046 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 115.00 | 1,380.00 | 75.00 | 900.00 | 75.00 | 900.00 | | 0047 | 731-02-00100 | Reflectorized Raised Pavement Markers | 282 | EACH | 5.50 | 1,551.00 | 5.00 | 1,410.00 | 5.00 | 1,410.00 | | 0048 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 11.50 | 138.00 | 10.00 | 120.00 | 10.00 | 120.00 | | 0049 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.527 | MILE | 3,000.00 | 10,581.00 | 2,700.00 | 9,522.90 | 2,500.00 | 8,817.50 | | 0050 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.527 | MILE | 1,200.00 | 632.40 | 1,000.00 | 527.00 | 900.00 | 474.30 | | 0051 | 735-01-00100 | Mailboxes | 1 | EACH | 100.00 | 100.00 | 15.00 | 15.00 | 15.00 | 15.00 | | 0052 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 400.00 | 400.00 | 115.00 | 115.00 | 115.00 | 115.00 | | 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 70,000.00 | 70,000.00 | 70,000.00 | 70,000.00 | 68,000.00 | 68,000.00 | | 0054 | 804-01-00300 | Precast Concrete Piles (16") | 4,136 | LNFT | 80.00 | 330,880.00 | 100.00 | 413,600.00 | 90.00 | 372,240.00 | | 0055 | 804-01-00600 | Precast Concrete Piles (24") | 1,890 | LNFT | 142.04 | 268,455.60 | 160.00 | 302,400.00 | 125.00 | 236,250.00 | | 0056 | 804-12-00100 | Loading Permanent Piles | 3 | EACH | 1,100.00 | 3,300.00 | 2,000.00 | 6,000.00 | 20,000.00 | 60,000.00 | | 0057 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 54 | CUYD | 1,300.00 | 70,200.00 | 1,300.00 | 70,200.00 | 1,200.00 | 64,800.00 | | 0058 | 805-02-00400 | Class A(M) Concrete (Bents) | 191.02 | CUYD | 950.00 | 181,469.00 | 1,400.00 | 267,428.00 | 1,500.00 | 286,530.00 | | 0059 | 805-04-00100 | Class AA(M) Concrete | 628.88 | CUYD | 800.00 | 503,104.00 | 800.00 | 503,104.00 | 750.00 | 471,660.00 | | 0060 | 805-12-06000 | Reinforced Concrete Box Culverts (9' x 9') | 264 | LNFT | 735.00 | 194,040.00 | 1,000.00 | 264,000.00 | 3,000.00 | 792,000.00 | | 0061 | 806-01-00100 | Deformed Reinforcing Steel | 163,735 | LB | 1.00 | 163,735.00 | 1.00 | 163,735.00 | 1.00 | 163,735.00 | | 0062 | 810-01-00100 | Concrete Railing (Standard Barrier) | 360.1 | LNFT | 80.00 | 28,808.00 | 75.00 | 27,007.50 | 90.00 | 32,409.00 | | 0063 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 479.9 | LNFT | 80.00 | 38,392.00 | 85.00 | 40,791.50 | 90.00 | 43,191.00 | | 0064 | 813-01-00100 | Concrete Approach Slabs | 915.56 | SQYD | 200.00 | 183,112.00 | 230.00 | 210,578.80 | 200.00 | 183,112.00 | | 0065 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 194 | LNFT | 7.00 | 1,358.00 | 15.00 | 2,910.00 | 6.00 | 1,164.00 | | 0066 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,854 | INLF | 2.75 | 5,098.50 | 2.00 | 3,708.00 | 1.50 | 2,781.00 | | 0067 | NS-502-01000 | Asphalt Concrete | 4,333.9 | TON | 116.00 | 502,732.40 | 112.00 | 485,396.80 | 112.00 | 485,396.80 | | 0068 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 556.6 | TON | 150.00 | 83,490.00 | 140.00 | 77,924.00 | 140.00 | 77,924.00 | | 0069 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 104 | LNFT | 12.00 | 1,248.00 | 5.00 | 520.00 | 5.00 | 520.00 | | 0070 | 701-05-02141 | Side Drain Pipe (Erosion) (48" PP) | 104 | LNFT | 135.00 | 14,040.00 | 100.00 | 10,400.00 | 100.00 | 10,400.00 | | 0071 | 701-05-01041 | Side Drain Pipe (18" PP) | 32 | LNFT | 80.00 | 2,560.00 | 30.00 | 960.00 | 25.00 | 800.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,378,876.46 | | 7,028,716.65 | | 7,554,312.96 |
|