Proposal:H.010625.6
Parish:Livingston
Description:PEA RIDGE ROAD BRIDGE & JOHN BARBER ROAD BRIDGE
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE APPROACH SLABS, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$660,168.50
| Rank | License | Bidder | Construction Bid |
| 1 | 55505 | MERRICK, LLC | $742,964.60 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $870,829.60 |
| 3 | 49864 | Terral Construction L.L.C. | $904,971.60 |
| 4 | 55950 | Brown Industrial Construction, LLC | $983,387.30 |
| 5 | 00044 | GUINN CONSTRUCTION, LLC | $998,736.00 |
| 6 | 57931 | KCR CONTRACTORS, LLC | $1,014,325.91 |
| 7 | 56994 | MATT L GUINN CONSTRUCTION | $1,192,401.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - MERRICK, LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - Terral Construction L.L.C. | - 4 - Brown Industrial Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 53,000.00 | 53,000.00 | 80,000.00 | 80,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,000.00 | 3,000.00 | 3,000.00 | 3,000.00 | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-04000 | Removal of Bridge (STA 100+00, 25.7' X 46.0' TIMBER BRIDGE) | 1 | EACH | 15,000.00 | 15,000.00 | 17,500.00 | 17,500.00 | 9,000.00 | 9,000.00 | 35,000.00 | 35,000.00 | | 0004 | 202-02-04000 | Removal of Bridge (STA 200+00, 26.4 X 33.0 TIMBER BRIDGE) | 1 | EACH | 15,000.00 | 15,000.00 | 12,000.00 | 12,000.00 | 9,000.00 | 9,000.00 | 30,000.00 | 30,000.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (STA 199+54.8, 71' X 47" CMPA) | 42 | LNFT | 90.00 | 3,780.00 | 75.00 | 3,150.00 | 100.00 | 4,200.00 | 18.00 | 756.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 461.9 | SQYD | 5.00 | 2,309.50 | 13.50 | 6,235.65 | 20.00 | 9,238.00 | 8.00 | 3,695.20 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 55,000.00 | 55,000.00 | 65,000.00 | 65,000.00 | 60,000.00 | 60,000.00 | 56,000.00 | 56,000.00 | | 0008 | 204-02-00100 | Temporary Hay or Straw Bales | 20 | EACH | 20.00 | 400.00 | 55.00 | 1,100.00 | 100.00 | 2,000.00 | 15.00 | 300.00 | | 0009 | 204-03-00100 | Temporary Slope Drains | 100 | LNFT | 10.00 | 1,000.00 | 35.00 | 3,500.00 | 30.00 | 3,000.00 | 15.00 | 1,500.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 250.00 | 1,250.00 | 220.00 | 1,100.00 | 300.00 | 1,500.00 | 125.00 | 625.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 988 | LNFT | 1.50 | 1,482.00 | 3.00 | 2,964.00 | 4.00 | 3,952.00 | 2.00 | 1,976.00 | | 0012 | 302-01-00700 | Class II Base Course (Stone) (CRUSHED) | 193.1 | CUYD | 120.00 | 23,172.00 | 85.00 | 16,413.50 | 120.00 | 23,172.00 | 120.00 | 23,172.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 16 | CUYD | 110.00 | 1,760.00 | 15.00 | 240.00 | 120.00 | 1,920.00 | 120.00 | 1,920.00 | | 0014 | 701-05-02040 | Side Drain Pipe (Erosion) (18" PP/CMP) | 65 | LNFT | 65.00 | 4,225.00 | 98.00 | 6,370.00 | 63.00 | 4,095.00 | 85.00 | 5,525.00 | | 0015 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 150 | LNFT | 75.00 | 11,250.00 | 70.00 | 10,500.00 | 73.00 | 10,950.00 | 110.00 | 16,500.00 | | 0016 | 704-03-00100 | Blocked Out Guard Rail | 62.6 | LNFT | 22.00 | 1,377.20 | 22.00 | 1,377.20 | 21.00 | 1,314.60 | 21.00 | 1,314.60 | | 0017 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 83.4 | LNFT | 62.00 | 5,170.80 | 65.00 | 5,421.00 | 60.00 | 5,004.00 | 90.00 | 7,506.00 | | 0018 | 704-11-00100 | Guard Rail End Treatment (Flared) | 2 | EACH | 2,600.00 | 5,200.00 | 2,300.00 | 4,600.00 | 2,150.00 | 4,300.00 | 2,400.00 | 4,800.00 | | 0019 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 349 | SQYD | 72.00 | 25,128.00 | 80.00 | 27,920.00 | 70.00 | 24,430.00 | 86.00 | 30,014.00 | | 0020 | 711-04-00100 | Geotextile Fabric | 349 | SQYD | 1.50 | 523.50 | 1.25 | 436.25 | 5.00 | 1,745.00 | 2.00 | 698.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 22,000.00 | 22,000.00 | | 0022 | 716-01-00100 | Mulch (Vegetative) | 0.7 | TON | 2,500.00 | 1,750.00 | 2,000.00 | 1,400.00 | 3,000.00 | 2,100.00 | 1,800.00 | 1,260.00 | | 0023 | 717-01-00100 | Seeding | 15 | LB | 12.00 | 180.00 | 50.00 | 750.00 | 30.00 | 450.00 | 20.00 | 300.00 | | 0024 | 718-01-00100 | Fertilizer | 351 | LB | 2.00 | 702.00 | 5.00 | 1,755.00 | 2.00 | 702.00 | 2.00 | 702.00 | | 0025 | 726-01-00100 | Bedding Material | 158.5 | CUYD | 95.00 | 15,057.50 | 85.00 | 13,472.50 | 140.00 | 22,190.00 | 85.00 | 13,472.50 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 73,000.00 | 73,000.00 | 84,000.00 | 84,000.00 | 75,000.00 | 75,000.00 | 95,000.00 | 95,000.00 | | 0027 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 50.00 | 200.00 | 70.00 | 280.00 | 100.00 | 400.00 | 75.00 | 300.00 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | 80.00 | 320.00 | 100.00 | 400.00 | 85.00 | 340.00 | | 0029 | 735-01-00100 | Mailboxes | 1 | EACH | 10.00 | 10.00 | 15.00 | 15.00 | 400.00 | 400.00 | 15.00 | 15.00 | | 0030 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 175.00 | 175.00 | 120.00 | 120.00 | 400.00 | 400.00 | 115.00 | 115.00 | | 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 22,000.00 | 22,000.00 | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | | 0032 | 804-01-00300 | Precast Concrete Piles (16") | 960 | LNFT | 90.00 | 86,400.00 | 78.00 | 74,880.00 | 75.00 | 72,000.00 | 120.00 | 115,200.00 | | 0033 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1,000.00 | 1,000.00 | 2,000.00 | 2,000.00 | 0.00 | 0.00 | 100.00 | 100.00 | | 0034 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 54.97 | CUYD | 890.00 | 48,923.30 | 1,150.00 | 63,215.50 | 2,700.00 | 148,419.00 | 1,500.00 | 82,455.00 | | 0035 | 805-10-01320 | Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) (Cast-in-Place) | 3 | SPAN | 37,000.00 | 111,000.00 | 58,000.00 | 174,000.00 | 30,000.00 | 90,000.00 | 48,000.00 | 144,000.00 | | 0036 | 805-12-25020 | Reinforced Concrete Box Culverts (10' x 9') (Precast) (ASTM C 1577) | 114 | LNFT | 865.00 | 98,610.00 | 1,150.00 | 131,100.00 | 899.00 | 102,486.00 | 1,000.00 | 114,000.00 | | 0037 | 806-01-00100 | Deformed Reinforcing Steel (Box Culvert Headwalls) | 4,292 | LB | 1.40 | 6,008.80 | 2.00 | 8,584.00 | 2.00 | 8,584.00 | 2.00 | 8,584.00 | | 0038 | NS-502-01000 | Asphalt Concrete | 166 | TON | 260.00 | 43,160.00 | 185.00 | 30,710.00 | 270.00 | 44,820.00 | 187.00 | 31,042.00 | | 0039 | NS-700-00240 | Special Guard Rail Anchor Section | 2 | EACH | 1,400.00 | 2,800.00 | 1,750.00 | 3,500.00 | 1,600.00 | 3,200.00 | 1,600.00 | 3,200.00 | | 0040 | NS-800-00040 | Concrete Approach Slabs (24' CLR RDWY 90 DEG CROSSING) (W/O ASPHALT) | 2 | EACH | 7,200.00 | 14,400.00 | 11,000.00 | 22,000.00 | 11,000.00 | 22,000.00 | 10,000.00 | 20,000.00 | | 0041 | NS-804-00001 | Vibration Monitoring | 16 | EACH | 315.00 | 5,040.00 | 650.00 | 10,400.00 | 600.00 | 9,600.00 | 500.00 | 8,000.00 | | 0042 | NS-804-00002 | Construction Site Survey | 1 | LUMP | 1,200.00 | 1,200.00 | 12,500.00 | 12,500.00 | 18,000.00 | 18,000.00 | 2,000.00 | 2,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 742,964.60 | | 870,829.60 | | 904,971.60 | | 983,387.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - GUINN CONSTRUCTION, LLC | - 6 - KCR CONTRACTORS, LLC | - 7 - MATT L GUINN CONSTRUCTION | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 30,000.00 | 30,000.00 | 81,500.00 | 81,500.00 | 85,000.00 | 85,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 3,450.00 | 3,450.00 | 12,500.00 | 12,500.00 | | 0003 | 202-02-04000 | Removal of Bridge (STA 100+00, 25.7' X 46.0' TIMBER BRIDGE) | 1 | EACH | 10,000.00 | 10,000.00 | 9,425.00 | 9,425.00 | 38,000.00 | 38,000.00 | | 0004 | 202-02-04000 | Removal of Bridge (STA 200+00, 26.4 X 33.0 TIMBER BRIDGE) | 1 | EACH | 10,000.00 | 10,000.00 | 9,425.00 | 9,425.00 | 38,000.00 | 38,000.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (STA 199+54.8, 71' X 47" CMPA) | 42 | LNFT | 100.00 | 4,200.00 | 17.25 | 724.50 | 150.00 | 6,300.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 461.9 | SQYD | 10.00 | 4,619.00 | 8.15 | 3,764.49 | 15.00 | 6,928.50 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 40,000.00 | 40,000.00 | 75,300.00 | 75,300.00 | 65,000.00 | 65,000.00 | | 0008 | 204-02-00100 | Temporary Hay or Straw Bales | 20 | EACH | 10.00 | 200.00 | 17.25 | 345.00 | 40.00 | 800.00 | | 0009 | 204-03-00100 | Temporary Slope Drains | 100 | LNFT | 1.00 | 100.00 | 11.50 | 1,150.00 | 25.00 | 2,500.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 100.00 | 500.00 | 143.75 | 718.75 | 200.00 | 1,000.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 988 | LNFT | 4.00 | 3,952.00 | 1.15 | 1,136.20 | 4.00 | 3,952.00 | | 0012 | 302-01-00700 | Class II Base Course (Stone) (CRUSHED) | 193.1 | CUYD | 145.00 | 27,999.50 | 188.75 | 36,447.63 | 165.00 | 31,861.50 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 16 | CUYD | 250.00 | 4,000.00 | 1,188.75 | 19,020.00 | 200.00 | 3,200.00 | | 0014 | 701-05-02040 | Side Drain Pipe (Erosion) (18" PP/CMP) | 65 | LNFT | 115.00 | 7,475.00 | 63.50 | 4,127.50 | 65.00 | 4,225.00 | | 0015 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 150 | LNFT | 165.00 | 24,750.00 | 64.00 | 9,600.00 | 100.00 | 15,000.00 | | 0016 | 704-03-00100 | Blocked Out Guard Rail | 62.6 | LNFT | 25.00 | 1,565.00 | 26.85 | 1,680.81 | 28.00 | 1,752.80 | | 0017 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 83.4 | LNFT | 70.00 | 5,838.00 | 80.40 | 6,705.36 | 80.00 | 6,672.00 | | 0018 | 704-11-00100 | Guard Rail End Treatment (Flared) | 2 | EACH | 2,500.00 | 5,000.00 | 2,636.50 | 5,273.00 | 3,000.00 | 6,000.00 | | 0019 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 349 | SQYD | 75.00 | 26,175.00 | 70.00 | 24,430.00 | 80.00 | 27,920.00 | | 0020 | 711-04-00100 | Geotextile Fabric | 349 | SQYD | 5.00 | 1,745.00 | 3.50 | 1,221.50 | 4.00 | 1,396.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 16,560.00 | 16,560.00 | 21,000.00 | 21,000.00 | | 0022 | 716-01-00100 | Mulch (Vegetative) | 0.7 | TON | 8,500.00 | 5,950.00 | 2,070.00 | 1,449.00 | 5,000.00 | 3,500.00 | | 0023 | 717-01-00100 | Seeding | 15 | LB | 25.00 | 375.00 | 23.00 | 345.00 | 30.00 | 450.00 | | 0024 | 718-01-00100 | Fertilizer | 351 | LB | 1.00 | 351.00 | 2.25 | 789.75 | 1.65 | 579.15 | | 0025 | 726-01-00100 | Bedding Material | 158.5 | CUYD | 125.00 | 19,812.50 | 50.00 | 7,925.00 | 175.00 | 27,737.50 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 120,000.00 | 120,000.00 | 98,940.00 | 98,940.00 | 106,000.00 | 106,000.00 | | 0027 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 100.00 | 400.00 | 43.15 | 172.60 | 100.00 | 400.00 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 97.75 | 391.00 | 100.00 | 400.00 | | 0029 | 735-01-00100 | Mailboxes | 1 | EACH | 100.00 | 100.00 | 17.25 | 17.25 | 150.00 | 150.00 | | 0030 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 100.00 | 100.00 | 132.25 | 132.25 | 150.00 | 150.00 | | 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 7,500.00 | 7,500.00 | 20,000.00 | 20,000.00 | | 0032 | 804-01-00300 | Precast Concrete Piles (16") | 960 | LNFT | 90.00 | 86,400.00 | 77.00 | 73,920.00 | 81.00 | 77,760.00 | | 0033 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 250.00 | 250.00 | 1.00 | 1.00 | | 0034 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 54.97 | CUYD | 1,600.00 | 87,952.00 | 796.00 | 43,756.12 | 2,850.00 | 156,664.50 | | 0035 | 805-10-01320 | Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) (Cast-in-Place) | 3 | SPAN | 60,000.00 | 180,000.00 | 60,000.00 | 180,000.00 | 49,000.00 | 147,000.00 | | 0036 | 805-12-25020 | Reinforced Concrete Box Culverts (10' x 9') (Precast) (ASTM C 1577) | 114 | LNFT | 1,100.00 | 125,400.00 | 1,633.00 | 186,162.00 | 1,595.00 | 181,830.00 | | 0037 | 806-01-00100 | Deformed Reinforcing Steel (Box Culvert Headwalls) | 4,292 | LB | 3.00 | 12,876.00 | 1.15 | 4,935.80 | 1.00 | 4,292.00 | | 0038 | NS-502-01000 | Asphalt Concrete | 166 | TON | 250.00 | 41,500.00 | 214.35 | 35,582.10 | 280.00 | 46,480.00 | | 0039 | NS-700-00240 | Special Guard Rail Anchor Section | 2 | EACH | 2,000.00 | 4,000.00 | 2,101.65 | 4,203.30 | 3,000.00 | 6,000.00 | | 0040 | NS-800-00040 | Concrete Approach Slabs (24' CLR RDWY 90 DEG CROSSING) (W/O ASPHALT) | 2 | EACH | 15,000.00 | 30,000.00 | 12,500.00 | 25,000.00 | 10,500.00 | 21,000.00 | | 0041 | NS-804-00001 | Vibration Monitoring | 16 | EACH | 500.00 | 8,000.00 | 850.00 | 13,600.00 | 500.00 | 8,000.00 | | 0042 | NS-804-00002 | Construction Site Survey | 1 | LUMP | 25,000.00 | 25,000.00 | 17,250.00 | 17,250.00 | 5,000.00 | 5,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 998,736.00 | | 1,014,325.91 | | 1,192,401.95 |
|