Proposal:H.010243.6
Parish:Jefferson Davis
Routes:LA 26
Description:LA 26: 0.08 MI N HOSPITAL DR - W RACCA RD
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, LOOP DETECTOR, AND RELATED WORK.
Estimated Construction Cost:$1,337,786.16
| Rank | License | Bidder | Construction Bid |
| 1 | 00481 | COASTAL BRIDGE CO., L.L.C. | $1,169,867.28 |
| 2 | 33663 | Glenn Lege Construction Inc | $1,199,508.09 |
| 3 | 00183 | R. E. Heidt Construction Co., LLC | $1,256,771.94 |
| 4 | 34356 | Prairie Contractors Inc. | $1,381,443.63 |
| 5 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $1,654,046.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - COASTAL BRIDGE CO., L.L.C. | - 2 - Glenn Lege Construction Inc | - 3 - R. E. Heidt Construction Co., LLC | - 4 - Prairie Contractors Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 4,065.00 | 4,065.00 | 5,050.00 | 5,050.00 | 5,000.00 | 5,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 12.7 | SQYD | 200.00 | 2,540.00 | 80.00 | 1,016.00 | 101.00 | 1,282.70 | 100.00 | 1,270.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 90 | SQYD | 50.00 | 4,500.00 | 27.00 | 2,430.00 | 75.75 | 6,817.50 | 9.00 | 810.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 499 | LNFT | 15.00 | 7,485.00 | 11.50 | 5,738.50 | 15.15 | 7,559.85 | 6.00 | 2,994.00 | | 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 70 | SQYD | 20.00 | 1,400.00 | 22.00 | 1,540.00 | 121.20 | 8,484.00 | 9.00 | 630.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 5,000.00 | 5,000.00 | 1,250.00 | 1,250.00 | 40,400.00 | 40,400.00 | 5,000.00 | 5,000.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 44 | CUYD | 30.00 | 1,320.00 | 25.00 | 1,100.00 | 151.50 | 6,666.00 | 40.00 | 1,760.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 10 | CUYD | 150.00 | 1,500.00 | 110.00 | 1,100.00 | 165.00 | 1,650.00 | 350.00 | 3,500.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 7,526.9 | TON | 85.00 | 639,786.50 | 87.50 | 658,603.75 | 97.50 | 733,872.75 | 90.00 | 677,421.00 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 585.7 | TON | 118.00 | 69,112.60 | 113.00 | 66,184.10 | 104.00 | 60,912.80 | 55.00 | 32,213.50 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 47,359 | SQYD | 1.85 | 87,614.15 | 1.61 | 76,247.99 | 1.40 | 66,302.60 | 4.00 | 189,436.00 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,902 | CUYD | 0.01 | -19.02 | 0.10 | -190.20 | 0.50 | -951.00 | 0.01 | -19.02 | | 0013 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 119 | SQYD | 150.00 | 17,850.00 | 115.00 | 13,685.00 | 126.00 | 14,994.00 | 299.00 | 35,581.00 | | 0014 | 510-02-00100 | Pavement Widening | 31 | SQYD | 100.00 | 3,100.00 | 102.00 | 3,162.00 | 109.10 | 3,382.10 | 250.00 | 7,750.00 | | 0015 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 70.7 | SQYD | 75.00 | 5,302.50 | 92.50 | 6,539.75 | 118.17 | 8,354.62 | 115.00 | 8,130.50 | | 0016 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 250.00 | 2,000.00 | 135.00 | 1,080.00 | 252.50 | 2,020.00 | 98.00 | 784.00 | | 0017 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,000.00 | 2,000.00 | 425.00 | 425.00 | 1,262.50 | 1,262.50 | 575.00 | 575.00 | | 0018 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) | 1 | EACH | 500.00 | 500.00 | 2,300.00 | 2,300.00 | 3,030.00 | 3,030.00 | 1,500.00 | 1,500.00 | | 0019 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 23 | EACH | 175.00 | 4,025.00 | 200.00 | 4,600.00 | 850.00 | 19,550.00 | 450.00 | 10,350.00 | | 0020 | 706-01-00100 | Concrete Walk (4" Thick) | 16.9 | SQYD | 85.00 | 1,436.50 | 60.00 | 1,014.00 | 53.53 | 904.66 | 51.00 | 861.90 | | 0021 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 119.3 | SQYD | 60.00 | 7,158.00 | 68.00 | 8,112.40 | 63.63 | 7,591.06 | 50.00 | 5,965.00 | | 0022 | 706-04-00100 | Handicapped Curb Ramps | 42 | EACH | 1,600.00 | 67,200.00 | 1,660.00 | 69,720.00 | 1,212.00 | 50,904.00 | 1,690.00 | 70,980.00 | | 0023 | 707-01-00200 | Concrete Curb (Barrier) | 38 | LNFT | 70.00 | 2,660.00 | 30.00 | 1,140.00 | 27.27 | 1,036.26 | 15.00 | 570.00 | | 0024 | 707-03-00100 | Combination Concrete Curb and Gutter Barrier Type | 82.6 | LNFT | 35.00 | 2,891.00 | 38.00 | 3,138.80 | 33.33 | 2,753.06 | 24.50 | 2,023.70 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 45,300.00 | 45,300.00 | 4,750.00 | 4,750.00 | 96,000.00 | 96,000.00 | | 0026 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,082 | LNFT | 0.50 | 1,041.00 | 0.40 | 832.80 | 0.25 | 520.50 | 0.01 | 20.82 | | 0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,648 | LNFT | 1.00 | 1,648.00 | 1.10 | 1,812.80 | 0.35 | 576.80 | 0.01 | 16.48 | | 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.696 | MILE | 250.00 | 1,424.00 | 575.00 | 3,275.20 | 580.00 | 3,303.68 | 2,985.00 | 17,002.56 | | 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.188 | MILE | 500.00 | 3,094.00 | 535.00 | 3,310.58 | 252.50 | 1,562.47 | 0.01 | 0.06 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 16.905 | MILE | 650.00 | 10,988.25 | 665.00 | 11,241.83 | 555.50 | 9,390.73 | 0.01 | 0.17 | | 0031 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 13 | EACH | 50.00 | 650.00 | 53.00 | 689.00 | 20.20 | 262.60 | 0.01 | 0.13 | | 0032 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 8 | EACH | 80.00 | 640.00 | 85.00 | 680.00 | 60.60 | 484.80 | 0.01 | 0.08 | | 0033 | 726-01-00100 | Bedding Material | 0.3 | CUYD | 130.00 | 39.00 | 1,000.00 | 300.00 | 27.00 | 8.10 | 100.00 | 30.00 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 78,000.00 | 78,000.00 | 85,850.00 | 85,850.00 | 85,500.00 | 85,500.00 | 104,000.00 | 104,000.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,499 | EACH | 8.00 | 11,992.00 | 6.50 | 9,743.50 | 5.05 | 7,569.95 | 6.00 | 8,994.00 | | 0036 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 318 | LNFT | 2.00 | 636.00 | 1.60 | 508.80 | 1.50 | 477.00 | 1.50 | 477.00 | | 0037 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 40 | LNFT | 10.00 | 400.00 | 8.00 | 320.00 | 8.08 | 323.20 | 7.50 | 300.00 | | 0038 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 723 | LNFT | 2.00 | 1,446.00 | 2.00 | 1,446.00 | 1.67 | 1,207.41 | 1.85 | 1,337.55 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,539 | LNFT | 10.00 | 15,390.00 | 9.00 | 13,851.00 | 7.50 | 11,542.50 | 8.50 | 13,081.50 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.766 | MILE | 3,400.00 | 36,604.40 | 3,610.00 | 38,865.26 | 2,801.00 | 30,155.57 | 3,400.00 | 36,604.40 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.352 | MILE | 950.00 | 3,184.40 | 955.00 | 3,201.16 | 909.00 | 3,046.97 | 900.00 | 3,016.80 | | 0042 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.494 | MILE | 2,000.00 | 988.00 | 2,121.00 | 1,047.77 | 808.00 | 399.15 | 2,000.00 | 988.00 | | 0043 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 300.00 | 300.00 | 292.00 | 292.00 | 303.00 | 303.00 | 275.00 | 275.00 | | 0044 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 300.00 | 1,800.00 | 292.00 | 1,752.00 | 277.75 | 1,666.50 | 275.00 | 1,650.00 | | 0045 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 300.00 | 300.00 | 292.00 | 292.00 | 277.75 | 277.75 | 275.00 | 275.00 | | 0046 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 600.00 | 2,400.00 | 640.00 | 2,560.00 | 808.00 | 3,232.00 | 600.00 | 2,400.00 | | 0047 | 735-01-00100 | Mailboxes | 29 | EACH | 5.00 | 145.00 | 1.20 | 34.80 | 10.10 | 292.90 | 10.00 | 290.00 | | 0048 | 735-02-00100 | Mailbox Supports (Single) | 22 | EACH | 171.00 | 3,762.00 | 170.00 | 3,740.00 | 126.25 | 2,777.50 | 130.00 | 2,860.00 | | 0049 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 350.00 | 700.00 | 210.00 | 420.00 | 156.55 | 313.10 | 160.00 | 320.00 | | 0050 | 735-04-00100 | Mailbox Supports (Multiple) | 1 | EACH | 600.00 | 600.00 | 410.00 | 410.00 | 358.55 | 358.55 | 400.00 | 400.00 | | 0051 | 736-09-00100 | Loop Detector | 533 | LNFT | 31.00 | 16,523.00 | 27.50 | 14,657.50 | 30.75 | 16,389.75 | 31.00 | 16,523.00 | | 0052 | 739-01-00100 | Hydro-Seeding | 0.1 | ACRE | 12,500.00 | 1,250.00 | 14,520.00 | 1,452.00 | 9,600.00 | 960.00 | 12,500.00 | 1,250.00 | | 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,500.00 | 4,500.00 | 10,807.00 | 10,807.00 | 10,250.00 | 10,250.00 | 500.00 | 500.00 | | 0054 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 54 | INLF | 15.00 | 810.00 | 9.50 | 513.00 | 26.00 | 1,404.00 | 1.75 | 94.50 | | 0055 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 9 | EACH | 250.00 | 2,250.00 | 700.00 | 6,300.00 | 404.00 | 3,636.00 | 850.00 | 7,650.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,169,867.28 | | 1,199,508.09 | | 1,256,771.94 | | 1,381,443.63 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 23,000.00 | 23,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 12.7 | SQYD | 65.00 | 825.50 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 90 | SQYD | 80.00 | 7,200.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 499 | LNFT | 20.00 | 9,980.00 | | 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 70 | SQYD | 160.00 | 11,200.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 2,500.00 | 2,500.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 44 | CUYD | 40.00 | 1,760.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 10 | CUYD | 160.00 | 1,600.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 7,526.9 | TON | 100.00 | 752,690.00 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 585.7 | TON | 200.00 | 117,140.00 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 47,359 | SQYD | 3.50 | 165,756.50 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,902 | CUYD | 1.00 | -1,902.00 | | 0013 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 119 | SQYD | 200.00 | 23,800.00 | | 0014 | 510-02-00100 | Pavement Widening | 31 | SQYD | 200.00 | 6,200.00 | | 0015 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 70.7 | SQYD | 135.00 | 9,544.50 | | 0016 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 240.00 | 1,920.00 | | 0017 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,000.00 | 2,000.00 | | 0018 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) | 1 | EACH | 4,000.00 | 4,000.00 | | 0019 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 23 | EACH | 1,500.00 | 34,500.00 | | 0020 | 706-01-00100 | Concrete Walk (4" Thick) | 16.9 | SQYD | 65.00 | 1,098.50 | | 0021 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 119.3 | SQYD | 75.00 | 8,947.50 | | 0022 | 706-04-00100 | Handicapped Curb Ramps | 42 | EACH | 1,500.00 | 63,000.00 | | 0023 | 707-01-00200 | Concrete Curb (Barrier) | 38 | LNFT | 32.00 | 1,216.00 | | 0024 | 707-03-00100 | Combination Concrete Curb and Gutter Barrier Type | 82.6 | LNFT | 40.00 | 3,304.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | | 0026 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,082 | LNFT | 0.40 | 832.80 | | 0027 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,648 | LNFT | 1.10 | 1,812.80 | | 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.696 | MILE | 225.00 | 1,281.60 | | 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.188 | MILE | 525.00 | 3,248.70 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 16.905 | MILE | 650.00 | 10,988.25 | | 0031 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 13 | EACH | 60.00 | 780.00 | | 0032 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 8 | EACH | 90.00 | 720.00 | | 0033 | 726-01-00100 | Bedding Material | 0.3 | CUYD | 1,500.00 | 450.00 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 160,000.00 | 160,000.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,499 | EACH | 7.00 | 10,493.00 | | 0036 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 318 | LNFT | 1.75 | 556.50 | | 0037 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 40 | LNFT | 8.00 | 320.00 | | 0038 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 723 | LNFT | 2.00 | 1,446.00 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,539 | LNFT | 9.00 | 13,851.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.766 | MILE | 3,600.00 | 38,757.60 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.352 | MILE | 925.00 | 3,100.60 | | 0042 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.494 | MILE | 2,100.00 | 1,037.40 | | 0043 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 300.00 | 300.00 | | 0044 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 300.00 | 1,800.00 | | 0045 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 300.00 | 300.00 | | 0046 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 700.00 | 2,800.00 | | 0047 | 735-01-00100 | Mailboxes | 29 | EACH | 5.00 | 145.00 | | 0048 | 735-02-00100 | Mailbox Supports (Single) | 22 | EACH | 175.00 | 3,850.00 | | 0049 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 225.00 | 450.00 | | 0050 | 735-04-00100 | Mailbox Supports (Multiple) | 1 | EACH | 425.00 | 425.00 | | 0051 | 736-09-00100 | Loop Detector | 533 | LNFT | 40.00 | 21,320.00 | | 0052 | 739-01-00100 | Hydro-Seeding | 0.1 | ACRE | 13,000.00 | 1,300.00 | | 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | | 0054 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 54 | INLF | 25.00 | 1,350.00 | | 0055 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 9 | EACH | 450.00 | 4,050.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,654,046.75 |
|