Proposal:H.010060.6
Parish:Caddo
Description:BLANCHARD FURRH ROAD BRIDGE OVER CHOCTAW BAYOU
Type Construction:CLEARING AND GRUBBING, GRADING, REMOVAL OF BRIDGE, CLASS II BASE COURSE, SUPERPAVE ASLPHALTIC CONCRETE PAVEMENT,PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$884,365.00
| Rank | License | Bidder | Construction Bid |
| 1 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $634,127.15 |
| 2 | 49864 | Terral Construction L.L.C. | $677,443.00 |
| 3 | 18546 | C W & W Contractors, Inc. | $829,934.50 |
| 4 | 23112 | BEN ALLEN, INC. | $842,302.50 |
| 5 | 55505 | MERRICK, LLC | $918,500.66 |
| 6 | 49239 | WL Bass Construction Inc. | $1,039,627.30 |
| 7 | 00044 | GUINN CONSTRUCTION, LLC | $1,086,709.60 |
| 8 | 34567 | James Construction Group LLC | $1,095,938.00 |
| 9 | 12487 | Diamond B Construction Co., L.L.C. | $1,140,376.05 |
| 10 | 39462 | JB JAMES CONSTRUCTION LLC | $1,144,297.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 2 - Terral Construction L.L.C. | - 3 - C W & W Contractors, Inc. | - 4 - BEN ALLEN, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 7,500.00 | 7,500.00 | 65,000.00 | 65,000.00 | 10,000.00 | 10,000.00 | 16,000.00 | 16,000.00 | | 0002 | 202-02-04000 | Removal of Bridge (STA 105+68; 28' X 135' TIMBER PILE W/ CONC. BENT & SLAB) | 1 | EACH | 10,780.00 | 10,780.00 | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 36,000.00 | 36,000.00 | | 0003 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 959.1 | SQYD | 6.50 | 6,234.15 | 10.00 | 9,591.00 | 5.00 | 4,795.50 | 7.00 | 6,713.70 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 35,000.00 | 35,000.00 | 38,000.00 | 38,000.00 | | 0005 | 204-03-00100 | Temporary Slope Drains | 124 | LNFT | 45.00 | 5,580.00 | 18.00 | 2,232.00 | 35.00 | 4,340.00 | 10.00 | 1,240.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 1 | EACH | 200.00 | 200.00 | 1,000.00 | 1,000.00 | 250.00 | 250.00 | 100.00 | 100.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 1,052 | LNFT | 2.00 | 2,104.00 | 2.00 | 2,104.00 | 3.50 | 3,682.00 | 3.50 | 3,682.00 | | 0008 | 302-01-00700 | Class II Base Course (Stone) (CRUSHED) | 218 | CUYD | 108.00 | 23,544.00 | 100.00 | 21,800.00 | 80.00 | 17,440.00 | 110.00 | 23,980.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 24 | CUYD | 142.00 | 3,408.00 | 200.00 | 4,800.00 | 100.00 | 2,400.00 | 110.00 | 2,640.00 | | 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 173.8 | TON | 155.00 | 26,939.00 | 200.00 | 34,760.00 | 230.00 | 39,974.00 | 186.00 | 32,326.80 | | 0011 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 20.00 | 1,000.00 | 20.00 | 1,000.00 | 24.50 | 1,225.00 | 22.00 | 1,100.00 | | 0012 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 60.00 | 6,000.00 | 60.00 | 6,000.00 | 71.00 | 7,100.00 | 66.00 | 6,600.00 | | 0013 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,150.00 | 8,600.00 | 2,150.00 | 8,600.00 | 2,550.00 | 10,200.00 | 2,365.00 | 9,460.00 | | 0014 | 705-01-00100 | Barbed Wire Fence | 652 | LNFT | 3.00 | 1,956.00 | 10.00 | 6,520.00 | 5.00 | 3,260.00 | 15.00 | 9,780.00 | | 0015 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 952 | SQYD | 45.00 | 42,840.00 | 6.00 | 5,712.00 | 80.00 | 76,160.00 | 70.00 | 66,640.00 | | 0016 | 711-04-00100 | Geotextile Fabric | 952 | SQYD | 1.50 | 1,428.00 | 1.00 | 952.00 | 3.00 | 2,856.00 | 4.00 | 3,808.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 2,500.00 | 2,500.00 | 6,200.00 | 6,200.00 | 7,250.00 | 7,250.00 | 15,000.00 | 15,000.00 | | 0018 | 716-01-00100 | Mulch (Vegetative) | 1 | TON | 3,500.00 | 3,500.00 | 2,600.00 | 2,600.00 | 4,100.00 | 4,100.00 | 1,200.00 | 1,200.00 | | 0019 | 717-01-00100 | Seeding | 15 | LB | 30.00 | 450.00 | 70.00 | 1,050.00 | 35.00 | 525.00 | 50.00 | 750.00 | | 0020 | 718-01-00100 | Fertilizer | 500 | LB | 1.00 | 500.00 | 2.00 | 1,000.00 | 1.50 | 750.00 | 2.00 | 1,000.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 35,000.00 | 35,000.00 | 60,000.00 | 60,000.00 | 40,000.00 | 40,000.00 | 65,000.00 | 65,000.00 | | 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 75.00 | 300.00 | 100.00 | 400.00 | 100.00 | 400.00 | 80.00 | 320.00 | | 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 4,000.00 | 4,000.00 | 10,000.00 | 10,000.00 | 14,000.00 | 14,000.00 | | 0024 | 804-01-00200 | Precast Concrete Piles (14") | 2,052 | LNFT | 52.00 | 106,704.00 | 58.00 | 119,016.00 | 65.00 | 133,380.00 | 58.00 | 119,016.00 | | 0025 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 0.00 | 0.00 | 1.00 | 1.00 | 0.00 | 0.00 | | 0026 | 805-10-02300 | Bridge Superstructure and Substructure (28' Clear Roadway; 90 Degree Crossing) | 8 | SPAN | 27,000.00 | 216,000.00 | 27,000.00 | 216,000.00 | 36,800.00 | 294,400.00 | 36,000.00 | 288,000.00 | | 0027 | 810-01-00100 | Concrete Railing (Standard Barrier) | 240 | LNFT | 160.00 | 38,400.00 | 100.00 | 24,000.00 | 164.00 | 39,360.00 | 82.00 | 19,680.00 | | 0028 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 80 | LNFT | 160.00 | 12,800.00 | 0.00 | 0.00 | 243.50 | 19,480.00 | 82.00 | 6,560.00 | | 0029 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 353 | INLF | 3.00 | 1,059.00 | 2.00 | 706.00 | 2.00 | 706.00 | 2.00 | 706.00 | | 0030 | NS-800-00040 | Concrete Approach Slabs (28' CLR RDWY 90 DEG CROSSING) (W/O ASPHALT) | 2 | EACH | 11,200.00 | 22,400.00 | 8,000.00 | 16,000.00 | 15,000.00 | 30,000.00 | 13,500.00 | 27,000.00 | | 0031 | NS-804-00001 | Vibration Monitoring | 36 | EACH | 150.00 | 5,400.00 | 400.00 | 14,400.00 | 250.00 | 9,000.00 | 500.00 | 18,000.00 | | 0032 | NS-804-00002 | Construction Site Survey | 1 | LUMP | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 | 6,900.00 | 6,900.00 | 8,000.00 | 8,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 634,127.15 | | 677,443.00 | | 829,934.50 | | 842,302.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - MERRICK, LLC | - 6 - WL Bass Construction Inc. | - 7 - GUINN CONSTRUCTION, LLC | - 8 - James Construction Group LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 5,000.00 | 5,000.00 | 51,000.00 | 51,000.00 | 40,000.00 | 40,000.00 | 70,000.00 | 70,000.00 | | 0002 | 202-02-04000 | Removal of Bridge (STA 105+68; 28' X 135' TIMBER PILE W/ CONC. BENT & SLAB) | 1 | EACH | 20,000.00 | 20,000.00 | 31,800.00 | 31,800.00 | 25,000.00 | 25,000.00 | 65,000.00 | 65,000.00 | | 0003 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 959.1 | SQYD | 5.00 | 4,795.50 | 3.00 | 2,877.30 | 6.00 | 5,754.60 | 10.00 | 9,591.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | 45,000.00 | 45,000.00 | 36,000.00 | 36,000.00 | | 0005 | 204-03-00100 | Temporary Slope Drains | 124 | LNFT | 15.00 | 1,860.00 | 1.00 | 124.00 | 10.00 | 1,240.00 | 20.00 | 2,480.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 1 | EACH | 500.00 | 500.00 | 200.00 | 200.00 | 100.00 | 100.00 | 200.00 | 200.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 1,052 | LNFT | 1.50 | 1,578.00 | 3.00 | 3,156.00 | 4.00 | 4,208.00 | 4.00 | 4,208.00 | | 0008 | 302-01-00700 | Class II Base Course (Stone) (CRUSHED) | 218 | CUYD | 140.00 | 30,520.00 | 130.00 | 28,340.00 | 135.00 | 29,430.00 | 125.00 | 27,250.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 24 | CUYD | 130.00 | 3,120.00 | 55.00 | 1,320.00 | 250.00 | 6,000.00 | 125.00 | 3,000.00 | | 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 173.8 | TON | 235.00 | 40,843.00 | 220.00 | 38,236.00 | 250.00 | 43,450.00 | 200.00 | 34,760.00 | | 0011 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 45.00 | 2,250.00 | 25.00 | 1,250.00 | 25.00 | 1,250.00 | 20.00 | 1,000.00 | | 0012 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 80.00 | 8,000.00 | 70.00 | 7,000.00 | 70.00 | 7,000.00 | 60.00 | 6,000.00 | | 0013 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 3,200.00 | 12,800.00 | 2,200.00 | 8,800.00 | 2,500.00 | 10,000.00 | 2,150.00 | 8,600.00 | | 0014 | 705-01-00100 | Barbed Wire Fence | 652 | LNFT | 13.00 | 8,476.00 | 3.00 | 1,956.00 | 12.50 | 8,150.00 | 3.00 | 1,956.00 | | 0015 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 952 | SQYD | 70.00 | 66,640.00 | 65.00 | 61,880.00 | 75.00 | 71,400.00 | 60.00 | 57,120.00 | | 0016 | 711-04-00100 | Geotextile Fabric | 952 | SQYD | 1.58 | 1,504.16 | 1.75 | 1,666.00 | 5.00 | 4,760.00 | 2.00 | 1,904.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0018 | 716-01-00100 | Mulch (Vegetative) | 1 | TON | 3,900.00 | 3,900.00 | 3,500.00 | 3,500.00 | 3,500.00 | 3,500.00 | 3,500.00 | 3,500.00 | | 0019 | 717-01-00100 | Seeding | 15 | LB | 20.00 | 300.00 | 30.00 | 450.00 | 25.00 | 375.00 | 30.00 | 450.00 | | 0020 | 718-01-00100 | Fertilizer | 500 | LB | 0.75 | 375.00 | 1.00 | 500.00 | 1.00 | 500.00 | 1.00 | 500.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 90,000.00 | 90,000.00 | 103,000.00 | 103,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | | 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 75.00 | 300.00 | 75.00 | 300.00 | 100.00 | 400.00 | 75.00 | 300.00 | | 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 8,500.00 | 8,500.00 | | 0024 | 804-01-00200 | Precast Concrete Piles (14") | 2,052 | LNFT | 85.00 | 174,420.00 | 55.00 | 112,860.00 | 60.00 | 123,120.00 | 80.00 | 164,160.00 | | 0025 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 5,000.00 | 5,000.00 | 1,200.00 | 1,200.00 | 1.00 | 1.00 | 16,000.00 | 16,000.00 | | 0026 | 805-10-02300 | Bridge Superstructure and Substructure (28' Clear Roadway; 90 Degree Crossing) | 8 | SPAN | 33,000.00 | 264,000.00 | 51,000.00 | 408,000.00 | 52,000.00 | 416,000.00 | 50,000.00 | 400,000.00 | | 0027 | 810-01-00100 | Concrete Railing (Standard Barrier) | 240 | LNFT | 160.00 | 38,400.00 | 98.00 | 23,520.00 | 165.00 | 39,600.00 | 80.00 | 19,200.00 | | 0028 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 80 | LNFT | 240.00 | 19,200.00 | 121.00 | 9,680.00 | 165.00 | 13,200.00 | 80.00 | 6,400.00 | | 0029 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 353 | INLF | 3.00 | 1,059.00 | 4.00 | 1,412.00 | 7.00 | 2,471.00 | 3.00 | 1,059.00 | | 0030 | NS-800-00040 | Concrete Approach Slabs (28' CLR RDWY 90 DEG CROSSING) (W/O ASPHALT) | 2 | EACH | 9,000.00 | 18,000.00 | 13,000.00 | 26,000.00 | 17,000.00 | 34,000.00 | 10,000.00 | 20,000.00 | | 0031 | NS-804-00001 | Vibration Monitoring | 36 | EACH | 310.00 | 11,160.00 | 100.00 | 3,600.00 | 300.00 | 10,800.00 | 300.00 | 10,800.00 | | 0032 | NS-804-00002 | Construction Site Survey | 1 | LUMP | 1,500.00 | 1,500.00 | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 918,500.66 | | 1,039,627.30 | | 1,086,709.60 | | 1,095,938.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Diamond B Construction Co., L.L.C. | - 10 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 35,000.00 | 35,000.00 | 75,000.00 | 75,000.00 | | 0002 | 202-02-04000 | Removal of Bridge (STA 105+68; 28' X 135' TIMBER PILE W/ CONC. BENT & SLAB) | 1 | EACH | 50,000.00 | 50,000.00 | 70,000.00 | 70,000.00 | | 0003 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 959.1 | SQYD | 7.50 | 7,193.25 | 13.00 | 12,468.30 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 52,000.00 | 52,000.00 | 80,000.00 | 80,000.00 | | 0005 | 204-03-00100 | Temporary Slope Drains | 124 | LNFT | 25.00 | 3,100.00 | 20.00 | 2,480.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 1 | EACH | 220.00 | 220.00 | 200.00 | 200.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 1,052 | LNFT | 3.00 | 3,156.00 | 4.00 | 4,208.00 | | 0008 | 302-01-00700 | Class II Base Course (Stone) (CRUSHED) | 218 | CUYD | 100.00 | 21,800.00 | 150.00 | 32,700.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 24 | CUYD | 140.00 | 3,360.00 | 140.00 | 3,360.00 | | 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 173.8 | TON | 160.00 | 27,808.00 | 200.00 | 34,760.00 | | 0011 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 22.00 | 1,100.00 | 25.00 | 1,250.00 | | 0012 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 65.00 | 6,500.00 | 70.00 | 7,000.00 | | 0013 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,400.00 | 9,600.00 | 2,500.00 | 10,000.00 | | 0014 | 705-01-00100 | Barbed Wire Fence | 652 | LNFT | 5.00 | 3,260.00 | 6.00 | 3,912.00 | | 0015 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 952 | SQYD | 88.00 | 83,776.00 | 80.00 | 76,160.00 | | 0016 | 711-04-00100 | Geotextile Fabric | 952 | SQYD | 4.40 | 4,188.80 | 3.00 | 2,856.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,700.00 | 7,700.00 | 17,000.00 | 17,000.00 | | 0018 | 716-01-00100 | Mulch (Vegetative) | 1 | TON | 3,700.00 | 3,700.00 | 3,500.00 | 3,500.00 | | 0019 | 717-01-00100 | Seeding | 15 | LB | 33.00 | 495.00 | 30.00 | 450.00 | | 0020 | 718-01-00100 | Fertilizer | 500 | LB | 1.10 | 550.00 | 1.00 | 500.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 153,000.00 | 153,000.00 | 100,000.00 | 100,000.00 | | 0022 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | 85.00 | 340.00 | | 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | | 0024 | 804-01-00200 | Precast Concrete Piles (14") | 2,052 | LNFT | 98.00 | 201,096.00 | 100.00 | 205,200.00 | | 0025 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 | | 0026 | 805-10-02300 | Bridge Superstructure and Substructure (28' Clear Roadway; 90 Degree Crossing) | 8 | SPAN | 46,000.00 | 368,000.00 | 36,500.00 | 292,000.00 | | 0027 | 810-01-00100 | Concrete Railing (Standard Barrier) | 240 | LNFT | 45.00 | 10,800.00 | 100.00 | 24,000.00 | | 0028 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 80 | LNFT | 70.00 | 5,600.00 | 120.00 | 9,600.00 | | 0029 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 353 | INLF | 1.00 | 353.00 | 1.00 | 353.00 | | 0030 | NS-800-00040 | Concrete Approach Slabs (28' CLR RDWY 90 DEG CROSSING) (W/O ASPHALT) | 2 | EACH | 12,000.00 | 24,000.00 | 10,000.00 | 20,000.00 | | 0031 | NS-804-00001 | Vibration Monitoring | 36 | EACH | 700.00 | 25,200.00 | 500.00 | 18,000.00 | | 0032 | NS-804-00002 | Construction Site Survey | 1 | LUMP | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,140,376.05 | | 1,144,297.30 |
|