Proposal:H.002747.6
Parish:Vermilion
Routes:LA 335
Description:LA 335 BRIDGES
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGES, GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC PAVEMENT, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PRECAST CONCRETE PILES, STEEL SHEET PILE WALL, CONCRETE SLAB SPAN BRIDGE, CONCRETE APPROACH SLABS, AND RELATED WORK.
Estimated Construction Cost:$1,860,844.85
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $1,745,882.08 |
| 2 | 55505 | MERRICK, LLC | $1,767,903.85 |
| 3 | 56994 | MATT L GUINN CONSTRUCTION | $1,776,963.73 |
| 4 | 40312 | GRAY CONSTRUCTION CORP. | $1,806,542.47 |
| 5 | 12487 | Diamond B Construction Co., L.L.C. | $1,827,708.89 |
| 6 | 00044 | GUINN CONSTRUCTION, LLC | $1,874,537.75 |
| 7 | 55950 | Brown Industrial Construction, LLC | $2,088,783.83 |
| 8 | 00481 | COASTAL BRIDGE CO., L.L.C. | $2,097,611.87 |
| 9 | 34567 | James Construction Group LLC | $2,244,978.53 |
| 10 | 39462 | JB JAMES CONSTRUCTION LLC | $2,275,039.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GILCHRIST CONSTRUCTION CO. LLC | - 2 - MERRICK, LLC | - 3 - MATT L GUINN CONSTRUCTION | - 4 - GRAY CONSTRUCTION CORP. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 12,000.00 | 12,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 8,000.00 | 8,000.00 | 6,000.00 | 6,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 187.4 | SQYD | 24.00 | 4,497.60 | 13.00 | 2,436.20 | 8.00 | 1,499.20 | 12.50 | 2,342.50 | | 0004 | 202-02-04000 | Removal of Bridge [39' X 25' TTTRES BRIDGE] | 2 | EACH | 8,000.00 | 16,000.00 | 18,000.00 | 36,000.00 | 15,000.00 | 30,000.00 | 25,000.00 | 50,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 388.8 | LNFT | 8.00 | 3,110.40 | 7.00 | 2,721.60 | 10.00 | 3,888.00 | 8.00 | 3,110.40 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 688.3 | SQYD | 13.00 | 8,947.90 | 14.00 | 9,636.20 | 9.00 | 6,194.70 | 15.00 | 10,324.50 | | 0007 | 203-02-00100 | Drainage Excavation | 150 | CUYD | 29.00 | 4,350.00 | 30.00 | 4,500.00 | 15.00 | 2,250.00 | 23.10 | 3,465.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 50,000.00 | 50,000.00 | 45,000.00 | 45,000.00 | 55,000.00 | 55,000.00 | 35,000.00 | 35,000.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 7 | EACH | 130.00 | 910.00 | 165.00 | 1,155.00 | 150.00 | 1,050.00 | 125.00 | 875.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 938 | LNFT | 2.25 | 2,110.50 | 2.36 | 2,213.68 | 2.50 | 2,345.00 | 2.10 | 1,969.80 | | 0011 | 302-02-04000 | Class II Base Course (8 1/2" Thick) | 200.6 | SQYD | 70.00 | 14,042.00 | 58.00 | 11,634.80 | 25.00 | 5,015.00 | 60.00 | 12,036.00 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 2.66 | TON | 1,200.00 | 3,192.00 | 1,500.00 | 3,990.00 | 1,000.00 | 2,660.00 | 2,800.00 | 7,448.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4.43 | CUYD | 130.00 | 575.90 | 300.00 | 1,329.00 | 200.00 | 886.00 | 155.00 | 686.65 | | 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 196.8 | TON | 175.00 | 34,440.00 | 200.00 | 39,360.00 | 210.00 | 41,328.00 | 165.00 | 32,472.00 | | 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 38 | TON | 300.00 | 11,400.00 | 300.00 | 11,400.00 | 250.00 | 9,500.00 | 250.00 | 9,500.00 | | 0016 | 509-01-00100 | Cold Planing Asphaltic Pavement | 941.8 | SQYD | 9.00 | 8,476.20 | 9.75 | 9,182.55 | 8.00 | 7,534.40 | 12.00 | 11,301.60 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -52.3 | CUYD | 1.00 | -52.30 | 0.10 | -5.23 | 0.01 | -0.52 | 0.15 | -7.85 | | 0018 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 54 | LNFT | 110.00 | 5,940.00 | 42.00 | 2,268.00 | 82.00 | 4,428.00 | 89.00 | 4,806.00 | | 0019 | 701-05-02080 | Side Drain Pipe (Erosion) (30" PP/CMP) | 190 | LNFT | 112.00 | 21,280.00 | 72.00 | 13,680.00 | 90.00 | 17,100.00 | 80.00 | 15,200.00 | | 0020 | 701-05-02100 | Side Drain Pipe (Erosion) (36" PP/CMP) | 118 | LNFT | 130.00 | 15,340.00 | 102.00 | 12,036.00 | 120.00 | 14,160.00 | 81.50 | 9,617.00 | | 0021 | 701-06-02040 | Side Drain Pipe Arch (Erosion) (24" CMPA) | 210 | LNFT | 105.00 | 22,050.00 | 65.00 | 13,650.00 | 85.00 | 17,850.00 | 67.50 | 14,175.00 | | 0022 | 701-06-02060 | Side Drain Pipe Arch (Erosion) (30" CMPA) | 134 | LNFT | 120.00 | 16,080.00 | 95.00 | 12,730.00 | 115.00 | 15,410.00 | 81.00 | 10,854.00 | | 0023 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 4,000.00 | 4,000.00 | 3,300.00 | 3,300.00 | 5,000.00 | 5,000.00 | 3,550.00 | 3,550.00 | | 0024 | 702-08-00200 | Side Drain Safety End (Type 2) | 4 | EACH | 5,000.00 | 20,000.00 | 5,000.00 | 20,000.00 | 4,100.00 | 16,400.00 | 3,825.00 | 15,300.00 | | 0025 | 704-03-00100 | Blocked Out Guard Rail | 118.75 | LNFT | 21.00 | 2,493.75 | 25.00 | 2,968.75 | 26.00 | 3,087.50 | 22.36 | 2,655.25 | | 0026 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 68.00 | 3,400.00 | 70.00 | 3,500.00 | 72.00 | 3,600.00 | 68.10 | 3,405.00 | | 0027 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 2 | EACH | 3,100.00 | 6,200.00 | 3,200.00 | 6,400.00 | 2,450.00 | 4,900.00 | 2,300.00 | 4,600.00 | | 0028 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 779.7 | SQYD | 120.00 | 93,564.00 | 65.00 | 50,680.50 | 68.50 | 53,409.45 | 123.00 | 95,903.10 | | 0029 | 711-04-00100 | Geotextile Fabric | 779.7 | SQYD | 1.25 | 974.63 | 2.00 | 1,559.40 | 5.00 | 3,898.50 | 5.00 | 3,898.50 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 38,000.00 | 38,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0031 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 1,938 | LNFT | 0.55 | 1,065.90 | 1.00 | 1,938.00 | 1.20 | 2,325.60 | 0.75 | 1,453.50 | | 0032 | 716-01-00100 | Mulch (Vegetative) | 0.08 | TON | 6,600.00 | 528.00 | 20,000.00 | 1,600.00 | 15,000.00 | 1,200.00 | 6,400.00 | 512.00 | | 0033 | 717-01-00100 | Seeding | 13.66 | LB | 40.00 | 546.40 | 15.00 | 204.90 | 25.00 | 341.50 | 37.00 | 505.42 | | 0034 | 718-01-00100 | Fertilizer | 455 | LB | 1.25 | 568.75 | 2.00 | 910.00 | 1.65 | 750.75 | 1.20 | 546.00 | | 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 2,100.00 | 2,100.00 | 20,000.00 | 20,000.00 | 12,500.00 | 12,500.00 | 17,000.00 | 17,000.00 | | 0036 | 726-01-00100 | Bedding Material | 86.62 | CUYD | 150.00 | 12,993.00 | 115.00 | 9,961.30 | 120.00 | 10,394.40 | 218.00 | 18,883.16 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 150,000.00 | 150,000.00 | 175,000.00 | 175,000.00 | 80,000.00 | 80,000.00 | 138,400.00 | 138,400.00 | | 0038 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 58.00 | 232.00 | 60.00 | 240.00 | 125.00 | 500.00 | 70.00 | 280.00 | | 0039 | 729-16-00300 | Object Marker Assembly (Type 3) | 32 | EACH | 78.00 | 2,496.00 | 85.00 | 2,720.00 | 100.00 | 3,200.00 | 85.00 | 2,720.00 | | 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 17 | EACH | 20.00 | 340.00 | 25.00 | 425.00 | 32.00 | 544.00 | 20.00 | 340.00 | | 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.25 | MILE | 9,000.00 | 2,250.00 | 18,000.00 | 4,500.00 | 17,850.00 | 4,462.50 | 8,500.00 | 2,125.00 | | 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.12 | MILE | 3,000.00 | 360.00 | 15,000.00 | 1,800.00 | 15,000.00 | 1,800.00 | 5,000.00 | 600.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 18,000.00 | 18,000.00 | 6,000.00 | 6,000.00 | | 0044 | 803-03-00100 | Steel Sheet Pile Wall | 14,980 | SQFT | 28.00 | 419,440.00 | 31.00 | 464,380.00 | 39.25 | 587,965.00 | 36.00 | 539,280.00 | | 0045 | 804-01-00300 | Precast Concrete Piles (16") | 1,388 | LNFT | 75.00 | 104,100.00 | 90.00 | 124,920.00 | 68.00 | 94,384.00 | 75.00 | 104,100.00 | | 0046 | 805-02-00100 | Class A(M) Concrete | 42.47 | CUYD | 1,500.00 | 63,705.00 | 1,000.00 | 42,470.00 | 1,525.00 | 64,766.75 | 1,655.00 | 70,287.85 | | 0047 | 805-04-00100 | Class AA(M) Concrete | 136.07 | CUYD | 1,000.00 | 136,070.00 | 850.00 | 115,659.50 | 1,225.00 | 166,685.75 | 1,210.00 | 164,644.70 | | 0048 | 806-01-00100 | Deformed Reinforcing Steel | 34,714 | LB | 1.50 | 52,071.00 | 1.50 | 52,071.00 | 0.95 | 32,978.30 | 1.30 | 45,128.20 | | 0049 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 200 | LNFT | 140.00 | 28,000.00 | 100.00 | 20,000.00 | 105.00 | 21,000.00 | 125.00 | 25,000.00 | | 0050 | 813-01-00100 | Concrete Approach Slabs | 551.12 | SQYD | 325.00 | 179,114.00 | 315.00 | 173,602.80 | 272.00 | 149,904.64 | 222.00 | 122,348.64 | | 0051 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 116 | LNFT | 25.00 | 2,900.00 | 20.00 | 2,320.00 | 10.00 | 1,160.00 | 12.50 | 1,450.00 | | 0052 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 3,996.6 | INLF | 0.75 | 2,997.45 | 1.50 | 5,994.90 | 2.85 | 11,390.31 | 1.25 | 4,995.75 | | 0053 | NS-700-00220 | Impact Attenuator (Kinetic; Test Level 3) | 6 | EACH | 25,000.00 | 150,000.00 | 24,000.00 | 144,000.00 | 22,350.00 | 134,100.00 | 21,400.00 | 128,400.00 | | 0054 | NS-724-00005 | Rumble Strips (Shoulder) | 0.062 | MILE | 11,000.00 | 682.00 | 30,000.00 | 1,860.00 | 3,500.00 | 217.00 | 65,400.00 | 4,054.80 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,745,882.08 | | 1,767,903.85 | | 1,776,963.73 | | 1,806,542.47 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Diamond B Construction Co., L.L.C. | - 6 - GUINN CONSTRUCTION, LLC | - 7 - Brown Industrial Construction, LLC | - 8 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 10,000.00 | 10,000.00 | 16,000.00 | 16,000.00 | 50,000.00 | 50,000.00 | 31,000.00 | 31,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,500.00 | 6,500.00 | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 187.4 | SQYD | 20.00 | 3,748.00 | 6.00 | 1,124.40 | 25.00 | 4,685.00 | 26.00 | 4,872.40 | | 0004 | 202-02-04000 | Removal of Bridge [39' X 25' TTTRES BRIDGE] | 2 | EACH | 10,000.00 | 20,000.00 | 8,000.00 | 16,000.00 | 50,000.00 | 100,000.00 | 50,000.00 | 100,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 388.8 | LNFT | 15.00 | 5,832.00 | 5.00 | 1,944.00 | 20.00 | 7,776.00 | 7.00 | 2,721.60 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 688.3 | SQYD | 5.00 | 3,441.50 | 8.00 | 5,506.40 | 10.00 | 6,883.00 | 10.00 | 6,883.00 | | 0007 | 203-02-00100 | Drainage Excavation | 150 | CUYD | 35.00 | 5,250.00 | 12.00 | 1,800.00 | 35.00 | 5,250.00 | 30.00 | 4,500.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 43,000.00 | 43,000.00 | 35,250.00 | 35,250.00 | 38,000.00 | 38,000.00 | 35,000.00 | 35,000.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 7 | EACH | 325.00 | 2,275.00 | 100.00 | 700.00 | 125.00 | 875.00 | 125.00 | 875.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 938 | LNFT | 5.00 | 4,690.00 | 3.00 | 2,814.00 | 2.10 | 1,969.80 | 2.10 | 1,969.80 | | 0011 | 302-02-04000 | Class II Base Course (8 1/2" Thick) | 200.6 | SQYD | 60.00 | 12,036.00 | 40.00 | 8,024.00 | 50.00 | 10,030.00 | 32.00 | 6,419.20 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 2.66 | TON | 1,000.00 | 2,660.00 | 2,000.00 | 5,320.00 | 1,300.00 | 3,458.00 | 2,150.00 | 5,719.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4.43 | CUYD | 125.00 | 553.75 | 250.00 | 1,107.50 | 150.00 | 664.50 | 150.00 | 664.50 | | 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 196.8 | TON | 150.00 | 29,520.00 | 200.00 | 39,360.00 | 165.00 | 32,472.00 | 150.00 | 29,520.00 | | 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 38 | TON | 156.00 | 5,928.00 | 300.00 | 11,400.00 | 250.00 | 9,500.00 | 250.00 | 9,500.00 | | 0016 | 509-01-00100 | Cold Planing Asphaltic Pavement | 941.8 | SQYD | 2.50 | 2,354.50 | 18.00 | 16,952.40 | 12.00 | 11,301.60 | 15.00 | 14,127.00 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -52.3 | CUYD | 1.00 | -52.30 | 0.00 | 0.00 | 0.10 | -5.23 | 0.01 | -0.52 | | 0018 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 54 | LNFT | 170.00 | 9,180.00 | 95.00 | 5,130.00 | 100.00 | 5,400.00 | 70.00 | 3,780.00 | | 0019 | 701-05-02080 | Side Drain Pipe (Erosion) (30" PP/CMP) | 190 | LNFT | 175.00 | 33,250.00 | 123.00 | 23,370.00 | 100.00 | 19,000.00 | 85.00 | 16,150.00 | | 0020 | 701-05-02100 | Side Drain Pipe (Erosion) (36" PP/CMP) | 118 | LNFT | 225.00 | 26,550.00 | 60.00 | 7,080.00 | 110.00 | 12,980.00 | 125.00 | 14,750.00 | | 0021 | 701-06-02040 | Side Drain Pipe Arch (Erosion) (24" CMPA) | 210 | LNFT | 170.00 | 35,700.00 | 95.00 | 19,950.00 | 110.00 | 23,100.00 | 85.00 | 17,850.00 | | 0022 | 701-06-02060 | Side Drain Pipe Arch (Erosion) (30" CMPA) | 134 | LNFT | 195.00 | 26,130.00 | 160.00 | 21,440.00 | 150.00 | 20,100.00 | 115.00 | 15,410.00 | | 0023 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 4,000.00 | 4,000.00 | 3,750.00 | 3,750.00 | 10,000.00 | 10,000.00 | 4,800.00 | 4,800.00 | | 0024 | 702-08-00200 | Side Drain Safety End (Type 2) | 4 | EACH | 3,500.00 | 14,000.00 | 4,850.00 | 19,400.00 | 7,500.00 | 30,000.00 | 6,500.00 | 26,000.00 | | 0025 | 704-03-00100 | Blocked Out Guard Rail | 118.75 | LNFT | 40.00 | 4,750.00 | 25.00 | 2,968.75 | 23.00 | 2,731.25 | 20.00 | 2,375.00 | | 0026 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 58.00 | 2,900.00 | 65.00 | 3,250.00 | 68.00 | 3,400.00 | 65.00 | 3,250.00 | | 0027 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 2 | EACH | 2,600.00 | 5,200.00 | 2,750.00 | 5,500.00 | 2,300.00 | 4,600.00 | 3,000.00 | 6,000.00 | | 0028 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 779.7 | SQYD | 95.00 | 74,071.50 | 110.00 | 85,767.00 | 101.00 | 78,749.70 | 77.00 | 60,036.90 | | 0029 | 711-04-00100 | Geotextile Fabric | 779.7 | SQYD | 2.00 | 1,559.40 | 3.00 | 2,339.10 | 1.20 | 935.64 | 3.50 | 2,728.95 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 24,000.00 | 24,000.00 | 24,300.00 | 24,300.00 | 30,000.00 | 30,000.00 | | 0031 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 1,938 | LNFT | 0.80 | 1,550.40 | 0.50 | 969.00 | 0.10 | 193.80 | 3.50 | 6,783.00 | | 0032 | 716-01-00100 | Mulch (Vegetative) | 0.08 | TON | 22,500.00 | 1,800.00 | 50,000.00 | 4,000.00 | 6,400.00 | 512.00 | 6,400.00 | 512.00 | | 0033 | 717-01-00100 | Seeding | 13.66 | LB | 80.00 | 1,092.80 | 25.00 | 341.50 | 37.00 | 505.42 | 37.00 | 505.42 | | 0034 | 718-01-00100 | Fertilizer | 455 | LB | 2.20 | 1,001.00 | 1.00 | 455.00 | 1.20 | 546.00 | 1.20 | 546.00 | | 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | | 0036 | 726-01-00100 | Bedding Material | 86.62 | CUYD | 115.00 | 9,961.30 | 100.00 | 8,662.00 | 160.00 | 13,859.20 | 125.00 | 10,827.50 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 130,000.00 | 130,000.00 | 208,000.00 | 208,000.00 | 200,000.00 | 200,000.00 | | 0038 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 85.00 | 340.00 | 100.00 | 400.00 | 70.00 | 280.00 | 55.00 | 220.00 | | 0039 | 729-16-00300 | Object Marker Assembly (Type 3) | 32 | EACH | 85.00 | 2,720.00 | 100.00 | 3,200.00 | 85.00 | 2,720.00 | 75.00 | 2,400.00 | | 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 17 | EACH | 27.00 | 459.00 | 25.00 | 425.00 | 50.00 | 850.00 | 25.00 | 425.00 | | 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.25 | MILE | 18,000.00 | 4,500.00 | 10,000.00 | 2,500.00 | 30,750.00 | 7,687.50 | 4,488.00 | 1,122.00 | | 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.12 | MILE | 15,000.00 | 1,800.00 | 3,500.00 | 420.00 | 10,000.00 | 1,200.00 | 3,696.00 | 443.52 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,000.00 | 22,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 45,000.00 | 45,000.00 | | 0044 | 803-03-00100 | Steel Sheet Pile Wall | 14,980 | SQFT | 36.00 | 539,280.00 | 43.50 | 651,630.00 | 32.00 | 479,360.00 | 34.50 | 516,810.00 | | 0045 | 804-01-00300 | Precast Concrete Piles (16") | 1,388 | LNFT | 90.00 | 124,920.00 | 60.00 | 83,280.00 | 135.00 | 187,380.00 | 91.00 | 126,308.00 | | 0046 | 805-02-00100 | Class A(M) Concrete | 42.47 | CUYD | 2,600.00 | 110,422.00 | 1,250.00 | 53,087.50 | 250.00 | 10,617.50 | 2,300.00 | 97,681.00 | | 0047 | 805-04-00100 | Class AA(M) Concrete | 136.07 | CUYD | 995.00 | 135,389.65 | 1,150.00 | 156,480.50 | 1,000.00 | 136,070.00 | 1,600.00 | 217,712.00 | | 0048 | 806-01-00100 | Deformed Reinforcing Steel | 34,714 | LB | 1.50 | 52,071.00 | 1.00 | 34,714.00 | 2.00 | 69,428.00 | 1.10 | 38,185.40 | | 0049 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 200 | LNFT | 105.00 | 21,000.00 | 165.00 | 33,000.00 | 275.00 | 55,000.00 | 145.00 | 29,000.00 | | 0050 | 813-01-00100 | Concrete Approach Slabs | 551.12 | SQYD | 270.00 | 148,802.40 | 255.00 | 140,535.60 | 310.00 | 170,847.20 | 250.00 | 137,780.00 | | 0051 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 116 | LNFT | 8.00 | 928.00 | 22.00 | 2,552.00 | 12.00 | 1,392.00 | 15.00 | 1,740.00 | | 0052 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 3,996.6 | INLF | 1.65 | 6,594.39 | 3.50 | 13,988.10 | 1.50 | 5,994.90 | 2.00 | 7,993.20 | | 0053 | NS-700-00220 | Impact Attenuator (Kinetic; Test Level 3) | 6 | EACH | 21,000.00 | 126,000.00 | 22,000.00 | 132,000.00 | 21,356.00 | 128,136.00 | 23,250.00 | 139,500.00 | | 0054 | NS-724-00005 | Rumble Strips (Shoulder) | 0.062 | MILE | 800.00 | 49.60 | 75,000.00 | 4,650.00 | 775.00 | 48.05 | 68,000.00 | 4,216.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,827,708.89 | | 1,874,537.75 | | 2,088,783.83 | | 2,097,611.87 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - James Construction Group LLC | - 10 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 3,500.00 | 3,500.00 | 110,000.00 | 110,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,000.00 | 6,000.00 | 30,000.00 | 30,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 187.4 | SQYD | 13.00 | 2,436.20 | 15.00 | 2,811.00 | | 0004 | 202-02-04000 | Removal of Bridge [39' X 25' TTTRES BRIDGE] | 2 | EACH | 15,000.00 | 30,000.00 | 90,000.00 | 180,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 388.8 | LNFT | 25.00 | 9,720.00 | 20.00 | 7,776.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 688.3 | SQYD | 18.00 | 12,389.40 | 12.50 | 8,603.75 | | 0007 | 203-02-00100 | Drainage Excavation | 150 | CUYD | 95.00 | 14,250.00 | 40.00 | 6,000.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 65,000.00 | 65,000.00 | 80,000.00 | 80,000.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 7 | EACH | 30.00 | 210.00 | 125.00 | 875.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 938 | LNFT | 2.50 | 2,345.00 | 5.00 | 4,690.00 | | 0011 | 302-02-04000 | Class II Base Course (8 1/2" Thick) | 200.6 | SQYD | 60.00 | 12,036.00 | 42.00 | 8,425.20 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 2.66 | TON | 2,400.00 | 6,384.00 | 2,800.00 | 7,448.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4.43 | CUYD | 900.00 | 3,987.00 | 190.00 | 841.70 | | 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 196.8 | TON | 200.00 | 39,360.00 | 165.00 | 32,472.00 | | 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 38 | TON | 300.00 | 11,400.00 | 250.00 | 9,500.00 | | 0016 | 509-01-00100 | Cold Planing Asphaltic Pavement | 941.8 | SQYD | 12.00 | 11,301.60 | 12.00 | 11,301.60 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -52.3 | CUYD | 0.01 | -0.52 | 1.00 | -52.30 | | 0018 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 54 | LNFT | 120.00 | 6,480.00 | 130.00 | 7,020.00 | | 0019 | 701-05-02080 | Side Drain Pipe (Erosion) (30" PP/CMP) | 190 | LNFT | 125.00 | 23,750.00 | 135.00 | 25,650.00 | | 0020 | 701-05-02100 | Side Drain Pipe (Erosion) (36" PP/CMP) | 118 | LNFT | 130.00 | 15,340.00 | 145.00 | 17,110.00 | | 0021 | 701-06-02040 | Side Drain Pipe Arch (Erosion) (24" CMPA) | 210 | LNFT | 120.00 | 25,200.00 | 140.00 | 29,400.00 | | 0022 | 701-06-02060 | Side Drain Pipe Arch (Erosion) (30" CMPA) | 134 | LNFT | 120.00 | 16,080.00 | 145.00 | 19,430.00 | | 0023 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,500.00 | 3,500.00 | 5,000.00 | 5,000.00 | | 0024 | 702-08-00200 | Side Drain Safety End (Type 2) | 4 | EACH | 1,800.00 | 7,200.00 | 5,500.00 | 22,000.00 | | 0025 | 704-03-00100 | Blocked Out Guard Rail | 118.75 | LNFT | 25.00 | 2,968.75 | 30.00 | 3,562.50 | | 0026 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 65.00 | 3,250.00 | 70.00 | 3,500.00 | | 0027 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 2 | EACH | 2,750.00 | 5,500.00 | 2,500.00 | 5,000.00 | | 0028 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 779.7 | SQYD | 100.00 | 77,970.00 | 130.00 | 101,361.00 | | 0029 | 711-04-00100 | Geotextile Fabric | 779.7 | SQYD | 10.00 | 7,797.00 | 4.00 | 3,118.80 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 13,200.00 | 13,200.00 | 55,000.00 | 55,000.00 | | 0031 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 1,938 | LNFT | 1.00 | 1,938.00 | 0.50 | 969.00 | | 0032 | 716-01-00100 | Mulch (Vegetative) | 0.08 | TON | 6,500.00 | 520.00 | 6,400.00 | 512.00 | | 0033 | 717-01-00100 | Seeding | 13.66 | LB | 40.00 | 546.40 | 37.00 | 505.42 | | 0034 | 718-01-00100 | Fertilizer | 455 | LB | 1.50 | 682.50 | 1.20 | 546.00 | | 0035 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 19,000.00 | 19,000.00 | 40,000.00 | 40,000.00 | | 0036 | 726-01-00100 | Bedding Material | 86.62 | CUYD | 200.00 | 17,324.00 | 100.00 | 8,662.00 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 140,000.00 | 140,000.00 | 200,000.00 | 200,000.00 | | 0038 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 70.00 | 280.00 | 65.00 | 260.00 | | 0039 | 729-16-00300 | Object Marker Assembly (Type 3) | 32 | EACH | 80.00 | 2,560.00 | 75.00 | 2,400.00 | | 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 17 | EACH | 20.00 | 340.00 | 18.00 | 306.00 | | 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.25 | MILE | 9,000.00 | 2,250.00 | 8,889.00 | 2,222.25 | | 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.12 | MILE | 3,000.00 | 360.00 | 2,889.00 | 346.68 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 95,000.00 | 95,000.00 | 30,000.00 | 30,000.00 | | 0044 | 803-03-00100 | Steel Sheet Pile Wall | 14,980 | SQFT | 40.00 | 599,200.00 | 35.00 | 524,300.00 | | 0045 | 804-01-00300 | Precast Concrete Piles (16") | 1,388 | LNFT | 180.00 | 249,840.00 | 130.00 | 180,440.00 | | 0046 | 805-02-00100 | Class A(M) Concrete | 42.47 | CUYD | 2,350.00 | 99,804.50 | 1,800.00 | 76,446.00 | | 0047 | 805-04-00100 | Class AA(M) Concrete | 136.07 | CUYD | 1,450.00 | 197,301.50 | 800.00 | 108,856.00 | | 0048 | 806-01-00100 | Deformed Reinforcing Steel | 34,714 | LB | 1.50 | 52,071.00 | 1.00 | 34,714.00 | | 0049 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 200 | LNFT | 250.00 | 50,000.00 | 160.00 | 32,000.00 | | 0050 | 813-01-00100 | Concrete Approach Slabs | 551.12 | SQYD | 250.00 | 137,780.00 | 200.00 | 110,224.00 | | 0051 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 116 | LNFT | 5.00 | 580.00 | 2.00 | 232.00 | | 0052 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 3,996.6 | INLF | 1.00 | 3,996.60 | 0.80 | 3,197.28 | | 0053 | NS-700-00220 | Impact Attenuator (Kinetic; Test Level 3) | 6 | EACH | 22,500.00 | 135,000.00 | 20,000.00 | 120,000.00 | | 0054 | NS-724-00005 | Rumble Strips (Shoulder) | 0.062 | MILE | 800.00 | 49.60 | 910.00 | 56.42 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,244,978.53 | | 2,275,039.30 |
|