Proposal:H.009938.6
Parish:Orleans
Description:MAGNOLIA CONVERTED PED BRIDGE REHABILITATION
Type Construction:CLEARING AND GRUBBING, GRADING, MILLING ASPHALT PAVEMENT, CLASS II BASE COURSE (STONE), ASPHALT CONCRETE PAVEMENT, STEEL SHEET PILE WALL, CLEANING AND PAINTING, STRUCTURAL METALWORK, BRIDGE REPAIRS, AND RELATED WORK.
Estimated Construction Cost:$925,760.96
| Rank | License | Bidder | Construction Bid |
| 1 | 24901 | Hard Rock Construction LLC | $1,305,663.10 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $1,651,738.40 |
| 3 | 26435 | C.E.C., Inc. | $1,754,136.10 |
| 4 | 36827 | Shavers-Whittle Construction LLC | $1,776,760.36 |
| 5 | 44133 | Gibson & Associates Inc. | $2,083,540.50 |
| 6 | 00481 | COASTAL BRIDGE CO., L.L.C. | $2,813,185.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Hard Rock Construction LLC | - 2 - Boh Bros. Construction Co., LLC. | - 3 - C.E.C., Inc. | - 4 - Shavers-Whittle Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.14 | LUMP | 5,000.00 | 5,000.00 | 4,000.00 | 4,000.00 | 2,760.00 | 2,760.00 | 3,500.00 | 3,500.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 2,760.00 | 2,760.00 | 14,750.00 | 14,750.00 | | 0003 | 202-02-00030 | Removal of Curb (Stone) | 20 | LNFT | 10.00 | 200.00 | 60.00 | 1,200.00 | 30.00 | 600.00 | 45.00 | 900.00 | | 0004 | 202-02-04025 | Removal of Bridge Deck | 3,836 | SFIN | 6.00 | 23,016.00 | 4.50 | 17,262.00 | 2.25 | 8,631.00 | 12.50 | 47,950.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 13 | SQYD | 40.00 | 520.00 | 290.00 | 3,770.00 | 180.00 | 2,340.00 | 220.00 | 2,860.00 | | 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 128 | LNFT | 10.00 | 1,280.00 | 75.00 | 9,600.00 | 48.00 | 6,144.00 | 60.00 | 7,680.00 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 142 | SQYD | 25.00 | 3,550.00 | 22.00 | 3,124.00 | 60.50 | 8,591.00 | 32.00 | 4,544.00 | | 0008 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 15.6 | SQYD | 25.00 | 390.00 | 24.00 | 374.40 | 100.00 | 1,560.00 | 20.00 | 312.00 | | 0009 | 203-01-00100 | General Excavation | 38 | CUYD | 60.00 | 2,280.00 | 29.00 | 1,102.00 | 69.50 | 2,641.00 | 85.00 | 3,230.00 | | 0010 | 203-03-00100 | Embankment | 20 | CUYD | 25.00 | 500.00 | 95.00 | 1,900.00 | 165.00 | 3,300.00 | 220.00 | 4,400.00 | | 0011 | 203-04-00100 | Nonplastic Embankment | 62 | CUYD | 20.00 | 1,240.00 | 31.00 | 1,922.00 | 74.50 | 4,619.00 | 75.00 | 4,650.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 500 | LNFT | 1.50 | 750.00 | 3.00 | 1,500.00 | 6.00 | 3,000.00 | 5.00 | 2,500.00 | | 0013 | 302-01-00800 | Class II Base Course (Stone or Recycled Portland Cement Concrete) | 6 | CUYD | 75.00 | 450.00 | 135.00 | 810.00 | 367.00 | 2,202.00 | 300.00 | 1,800.00 | | 0014 | 706-01-00100 | Concrete Walk (4" Thick) | 101.1 | SQYD | 75.00 | 7,582.50 | 110.00 | 11,121.00 | 84.00 | 8,492.40 | 110.00 | 11,121.00 | | 0015 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 21.3 | SQYD | 110.00 | 2,343.00 | 325.00 | 6,922.50 | 240.00 | 5,112.00 | 300.00 | 6,390.00 | | 0016 | 706-04-00100 | Handicapped Curb Ramps | 2 | EACH | 3,500.00 | 7,000.00 | 4,100.00 | 8,200.00 | 3,300.00 | 6,600.00 | 3,500.00 | 7,000.00 | | 0017 | 711-02-00100 | Riprap (2 lb) | 1 | CUYD | 100.00 | 100.00 | 485.00 | 485.00 | 3,420.00 | 3,420.00 | 1,750.00 | 1,750.00 | | 0018 | 711-04-00100 | Geotextile Fabric | 5 | SQYD | 2.00 | 10.00 | 1.50 | 7.50 | 156.00 | 780.00 | 85.00 | 425.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 | 16,080.00 | 16,080.00 | 15,000.00 | 15,000.00 | | 0020 | 714-01-00700 | Slab Sodding (Centipede) | 184 | SQYD | 10.00 | 1,840.00 | 14.00 | 2,576.00 | 21.00 | 3,864.00 | 15.00 | 2,760.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 35,000.00 | 35,000.00 | 100,000.00 | 100,000.00 | 150,000.00 | 150,000.00 | 84,000.00 | 84,000.00 | | 0022 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 306 | LNFT | 2.50 | 765.00 | 2.80 | 856.80 | 1.50 | 459.00 | 2.15 | 657.90 | | 0023 | 732-01-02020 | Plastic Pavement Striping (6" Width) (Thermoplastic 125 mil) | 58 | LNFT | 5.00 | 290.00 | 5.00 | 290.00 | 3.50 | 203.00 | 3.75 | 217.50 | | 0024 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 28 | LNFT | 16.00 | 448.00 | 17.00 | 476.00 | 24.00 | 672.00 | 14.00 | 392.00 | | 0025 | 732-05-00100 | Removal of Existing Markings | 0.03 | MILE | 20,000.00 | 600.00 | 16,500.00 | 495.00 | 18,000.00 | 540.00 | 16,500.00 | 495.00 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 8,500.00 | 8,500.00 | 25,500.00 | 25,500.00 | | 0027 | 803-03-00100 | Steel Sheet Pile Wall | 528 | SQFT | 65.00 | 34,320.00 | 31.55 | 16,658.40 | 185.00 | 97,680.00 | 70.00 | 36,960.00 | | 0028 | 805-01-00100 | Class A Concrete | 4.95 | CUYD | 1,500.00 | 7,425.00 | 9,000.00 | 44,550.00 | 6,376.00 | 31,561.20 | 4,500.00 | 22,275.00 | | 0029 | 806-01-00100 | Deformed Reinforcing Steel | 431 | LB | 1.00 | 431.00 | 2.00 | 862.00 | 6.00 | 2,586.00 | 5.00 | 2,155.00 | | 0030 | 807-08-00100 | Structural Metalwork | 3,826 | LUMP | 100,000.00 | 100,000.00 | 166,000.00 | 166,000.00 | 121,800.00 | 121,800.00 | 63,000.00 | 63,000.00 | | 0031 | NS-502-01000 | Asphalt Concrete | 16.4 | TON | 100.00 | 1,640.00 | 800.00 | 13,120.00 | 960.00 | 15,744.00 | 525.00 | 8,610.00 | | 0032 | NS-509-01000 | Milling Asphalt Pavement | 103 | SQYD | 10.00 | 1,030.00 | 80.00 | 8,240.00 | 36.00 | 3,708.00 | 40.00 | 4,120.00 | | 0033 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -4 | CUYD | 0.10 | -0.40 | 0.00 | 0.00 | 5.00 | -20.00 | 0.01 | -0.04 | | 0034 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,436 | INLF | 1.00 | 1,436.00 | 0.80 | 1,148.80 | 2.00 | 2,872.00 | 1.00 | 1,436.00 | | 0035 | NS-602-00006 | Epoxy Injection | 10 | LNFT | 50.00 | 500.00 | 340.00 | 3,400.00 | 258.00 | 2,580.00 | 200.00 | 2,000.00 | | 0036 | NS-800-00020 | Cleaning, Painting and Disposal (Near White Finish) | 1 | LUMP | 630,000.00 | 630,000.00 | 640,000.00 | 640,000.00 | 680,000.00 | 680,000.00 | 745,000.00 | 745,000.00 | | 0037 | NS-804-00006 | Vibration Monitoring | 10 | DAY | 560.00 | 5,600.00 | 655.00 | 6,550.00 | 336.00 | 3,360.00 | 730.00 | 7,300.00 | | 0038 | NS-805-00006 | Class 2A, Special Surface Finish for Existing Concrete | 200 | SQFT | 16.00 | 3,200.00 | 18.00 | 3,600.00 | 19.20 | 3,840.00 | 18.50 | 3,700.00 | | 0039 | NS-805-00016 | Bridge Superstructure Repair (Bottom Channel) | 4 | EACH | 100.00 | 400.00 | 1,100.00 | 4,400.00 | 1,650.00 | 6,600.00 | 5,400.00 | 21,600.00 | | 0040 | NS-805-00016 | Bridge Superstructure Repair (Bottom Chord Bracing Plate) | 35 | EACH | 45.00 | 1,575.00 | 455.00 | 15,925.00 | 330.50 | 11,567.50 | 70.00 | 2,450.00 | | 0041 | NS-805-00016 | Bridge Superstructure Repair (Bottom Chord Cover Plate) | 8 | EACH | 510.00 | 4,080.00 | 4,300.00 | 34,400.00 | 1,941.00 | 15,528.00 | 450.00 | 3,600.00 | | 0042 | NS-805-00016 | Bridge Superstructure Repair (Bottom Chord Lacing Bars) | 76 | EACH | 25.00 | 1,900.00 | 165.00 | 12,540.00 | 262.00 | 19,912.00 | 300.00 | 22,800.00 | | 0043 | NS-805-00016 | Bridge Superstructure Repair (Floor Beam) | 2 | EACH | 4,500.00 | 9,000.00 | 4,700.00 | 9,400.00 | 12,900.00 | 25,800.00 | 22,500.00 | 45,000.00 | | 0044 | NS-805-00016 | Bridge Superstructure Repair (Floor Stringer) | 20 | EACH | 2,100.00 | 42,000.00 | 885.00 | 17,700.00 | 2,245.00 | 44,900.00 | 4,250.00 | 85,000.00 | | 0045 | NS-805-00016 | Bridge Superstructure Repair (Portal Beam Bottom Cover Plate) | 8 | EACH | 183.00 | 1,464.00 | 1,800.00 | 14,400.00 | 1,276.00 | 10,208.00 | 1,100.00 | 8,800.00 | | 0046 | NS-805-00016 | Bridge Superstructure Repair (Portal Beam Top Stiffener) | 4 | EACH | 394.00 | 1,576.00 | 1,900.00 | 7,600.00 | 2,553.00 | 10,212.00 | 5,000.00 | 20,000.00 | | 0047 | NS-805-00016 | Bridge Superstructure Repair (Removal, Storage and Replacement of Exist. Metal Grid Deck, C4 Beams and C10) | 1 | EACH | 53,000.00 | 53,000.00 | 135,000.00 | 135,000.00 | 63,000.00 | 63,000.00 | 92,500.00 | 92,500.00 | | 0048 | NS-805-00016 | Bridge Superstructure Repair (Shoring Beam) | 4 | EACH | 32,000.00 | 128,000.00 | 30,000.00 | 120,000.00 | 16,680.00 | 66,720.00 | 46,500.00 | 186,000.00 | | 0049 | NS-805-00016 | Bridge Superstructure Repair (Top Chord Bracing Plate) | 1 | EACH | 440.00 | 440.00 | 760.00 | 760.00 | 1,572.00 | 1,572.00 | 800.00 | 800.00 | | 0050 | NS-805-00016 | Bridge Superstructure Repair (Vertical Web Addition) | 8 | EACH | 815.00 | 6,520.00 | 4,300.00 | 34,400.00 | 5,745.00 | 45,960.00 | 2,750.00 | 22,000.00 | | 0051 | NS-805-00016 | Bridge Superstructure Repair (Vertical Web Lacing Bars) | 2 | EACH | 45.00 | 90.00 | 435.00 | 870.00 | 1,323.00 | 2,646.00 | 350.00 | 700.00 | | 0052 | NS-805-00016 | Bridge Superstructure Repair (Web Reinforcement) | 17 | EACH | 106.00 | 1,802.00 | 900.00 | 15,300.00 | 329.00 | 5,593.00 | 750.00 | 12,750.00 | | 0053 | NS-ENH-02080 | Bollards (Steel Pipe) | 8 | EACH | 1,600.00 | 12,800.00 | 500.00 | 4,000.00 | 2,016.00 | 16,128.00 | 750.00 | 6,000.00 | | 0054 | NS-ENH-16060 | Pedestrian Bridge (Rehabilitation) (Composite Deck) | 1 | LUMP | 123,000.00 | 123,000.00 | 80,000.00 | 80,000.00 | 180,000.00 | 180,000.00 | 82,500.00 | 82,500.00 | | 0055 | NS-P36-00075 | Concrete Curb Barrier (Drilled and Doweled) | 152 | LNFT | 15.00 | 2,280.00 | 85.00 | 12,920.00 | 54.00 | 8,208.00 | 85.00 | 12,920.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,305,663.10 | | 1,651,738.40 | | 1,754,136.10 | | 1,776,760.36 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Gibson & Associates Inc. | - 6 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.14 | LUMP | 1,000.00 | 1,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,500.00 | 7,500.00 | 110,000.00 | 110,000.00 | | 0003 | 202-02-00030 | Removal of Curb (Stone) | 20 | LNFT | 49.50 | 990.00 | 45.00 | 900.00 | | 0004 | 202-02-04025 | Removal of Bridge Deck | 3,836 | SFIN | 7.50 | 28,770.00 | 14.00 | 53,704.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 13 | SQYD | 247.50 | 3,217.50 | 225.00 | 2,925.00 | | 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 128 | LNFT | 66.00 | 8,448.00 | 60.00 | 7,680.00 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 142 | SQYD | 100.00 | 14,200.00 | 170.00 | 24,140.00 | | 0008 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 15.6 | SQYD | 210.00 | 3,276.00 | 241.00 | 3,759.60 | | 0009 | 203-01-00100 | General Excavation | 38 | CUYD | 115.00 | 4,370.00 | 125.00 | 4,750.00 | | 0010 | 203-03-00100 | Embankment | 20 | CUYD | 115.00 | 2,300.00 | 300.00 | 6,000.00 | | 0011 | 203-04-00100 | Nonplastic Embankment | 62 | CUYD | 120.00 | 7,440.00 | 125.00 | 7,750.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 500 | LNFT | 3.25 | 1,625.00 | 3.00 | 1,500.00 | | 0013 | 302-01-00800 | Class II Base Course (Stone or Recycled Portland Cement Concrete) | 6 | CUYD | 100.00 | 600.00 | 200.00 | 1,200.00 | | 0014 | 706-01-00100 | Concrete Walk (4" Thick) | 101.1 | SQYD | 93.50 | 9,452.85 | 85.00 | 8,593.50 | | 0015 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 21.3 | SQYD | 275.00 | 5,857.50 | 250.00 | 5,325.00 | | 0016 | 706-04-00100 | Handicapped Curb Ramps | 2 | EACH | 3,520.00 | 7,040.00 | 3,200.00 | 6,400.00 | | 0017 | 711-02-00100 | Riprap (2 lb) | 1 | CUYD | 500.00 | 500.00 | 1,450.00 | 1,450.00 | | 0018 | 711-04-00100 | Geotextile Fabric | 5 | SQYD | 100.00 | 500.00 | 20.00 | 100.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 90,000.00 | 90,000.00 | 40,000.00 | 40,000.00 | | 0020 | 714-01-00700 | Slab Sodding (Centipede) | 184 | SQYD | 18.43 | 3,391.12 | 11.75 | 2,162.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 220,000.00 | 220,000.00 | | 0022 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 306 | LNFT | 1.98 | 605.88 | 1.80 | 550.80 | | 0023 | 732-01-02020 | Plastic Pavement Striping (6" Width) (Thermoplastic 125 mil) | 58 | LNFT | 3.30 | 191.40 | 3.00 | 174.00 | | 0024 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 28 | LNFT | 13.20 | 369.60 | 12.00 | 336.00 | | 0025 | 732-05-00100 | Removal of Existing Markings | 0.03 | MILE | 16,500.00 | 495.00 | 15,000.00 | 450.00 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | | 0027 | 803-03-00100 | Steel Sheet Pile Wall | 528 | SQFT | 165.00 | 87,120.00 | 200.00 | 105,600.00 | | 0028 | 805-01-00100 | Class A Concrete | 4.95 | CUYD | 4,350.00 | 21,532.50 | 18,000.00 | 89,100.00 | | 0029 | 806-01-00100 | Deformed Reinforcing Steel | 431 | LB | 1.25 | 538.75 | 5.00 | 2,155.00 | | 0030 | 807-08-00100 | Structural Metalwork | 3,826 | LUMP | 113,000.00 | 113,000.00 | 165,000.00 | 165,000.00 | | 0031 | NS-502-01000 | Asphalt Concrete | 16.4 | TON | 500.00 | 8,200.00 | 500.00 | 8,200.00 | | 0032 | NS-509-01000 | Milling Asphalt Pavement | 103 | SQYD | 63.80 | 6,571.40 | 75.00 | 7,725.00 | | 0033 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -4 | CUYD | 1.00 | -4.00 | 1.00 | -4.00 | | 0034 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,436 | INLF | 1.50 | 2,154.00 | 5.00 | 7,180.00 | | 0035 | NS-602-00006 | Epoxy Injection | 10 | LNFT | 75.00 | 750.00 | 500.00 | 5,000.00 | | 0036 | NS-800-00020 | Cleaning, Painting and Disposal (Near White Finish) | 1 | LUMP | 680,000.00 | 680,000.00 | 800,000.00 | 800,000.00 | | 0037 | NS-804-00006 | Vibration Monitoring | 10 | DAY | 1,200.00 | 12,000.00 | 2,000.00 | 20,000.00 | | 0038 | NS-805-00006 | Class 2A, Special Surface Finish for Existing Concrete | 200 | SQFT | 20.00 | 4,000.00 | 30.00 | 6,000.00 | | 0039 | NS-805-00016 | Bridge Superstructure Repair (Bottom Channel) | 4 | EACH | 1,350.00 | 5,400.00 | 3,000.00 | 12,000.00 | | 0040 | NS-805-00016 | Bridge Superstructure Repair (Bottom Chord Bracing Plate) | 35 | EACH | 515.00 | 18,025.00 | 2,000.00 | 70,000.00 | | 0041 | NS-805-00016 | Bridge Superstructure Repair (Bottom Chord Cover Plate) | 8 | EACH | 2,500.00 | 20,000.00 | 3,100.00 | 24,800.00 | | 0042 | NS-805-00016 | Bridge Superstructure Repair (Bottom Chord Lacing Bars) | 76 | EACH | 235.00 | 17,860.00 | 600.00 | 45,600.00 | | 0043 | NS-805-00016 | Bridge Superstructure Repair (Floor Beam) | 2 | EACH | 11,500.00 | 23,000.00 | 25,000.00 | 50,000.00 | | 0044 | NS-805-00016 | Bridge Superstructure Repair (Floor Stringer) | 20 | EACH | 1,700.00 | 34,000.00 | 4,000.00 | 80,000.00 | | 0045 | NS-805-00016 | Bridge Superstructure Repair (Portal Beam Bottom Cover Plate) | 8 | EACH | 2,100.00 | 16,800.00 | 1,500.00 | 12,000.00 | | 0046 | NS-805-00016 | Bridge Superstructure Repair (Portal Beam Top Stiffener) | 4 | EACH | 2,300.00 | 9,200.00 | 6,000.00 | 24,000.00 | | 0047 | NS-805-00016 | Bridge Superstructure Repair (Removal, Storage and Replacement of Exist. Metal Grid Deck, C4 Beams and C10) | 1 | EACH | 195,000.00 | 195,000.00 | 200,000.00 | 200,000.00 | | 0048 | NS-805-00016 | Bridge Superstructure Repair (Shoring Beam) | 4 | EACH | 49,750.00 | 199,000.00 | 50,000.00 | 200,000.00 | | 0049 | NS-805-00016 | Bridge Superstructure Repair (Top Chord Bracing Plate) | 1 | EACH | 515.00 | 515.00 | 3,000.00 | 3,000.00 | | 0050 | NS-805-00016 | Bridge Superstructure Repair (Vertical Web Addition) | 8 | EACH | 4,500.00 | 36,000.00 | 7,100.00 | 56,800.00 | | 0051 | NS-805-00016 | Bridge Superstructure Repair (Vertical Web Lacing Bars) | 2 | EACH | 235.00 | 470.00 | 1,100.00 | 2,200.00 | | 0052 | NS-805-00016 | Bridge Superstructure Repair (Web Reinforcement) | 17 | EACH | 1,200.00 | 20,400.00 | 3,300.00 | 56,100.00 | | 0053 | NS-ENH-02080 | Bollards (Steel Pipe) | 8 | EACH | 1,500.00 | 12,000.00 | 2,000.00 | 16,000.00 | | 0054 | NS-ENH-16060 | Pedestrian Bridge (Rehabilitation) (Composite Deck) | 1 | LUMP | 112,000.00 | 112,000.00 | 175,000.00 | 175,000.00 | | 0055 | NS-P36-00075 | Concrete Curb Barrier (Drilled and Doweled) | 152 | LNFT | 71.50 | 10,868.00 | 65.00 | 9,880.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,083,540.50 | | 2,813,185.90 |
|