Proposal:H.008278.6
Parish:Rapides
Routes:US 71
Description:US 71: UP RR OVERPASS NEAR TIOGA
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE, DRILLED SHAFTS, PRECAST - PRESTRESSED GIRDER BRIDGE REPLACEMENT, AND RELATED WORK.
Estimated Construction Cost:$14,720,589.83
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $11,067,709.30 |
| 2 | 12395 | Jensen Construction Co. | $11,914,646.03 |
| 3 | 49239 | WL Bass Construction Inc. | $12,440,944.50 |
| 4 | 34567 | James Construction Group LLC | $12,756,816.80 |
| 5 | 39462 | JB JAMES CONSTRUCTION LLC | $14,026,957.46 |
| 6 | 36827 | Shavers-Whittle Construction LLC | $14,998,272.15 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GILCHRIST CONSTRUCTION CO. LLC | - 2 - Jensen Construction Co. | - 3 - WL Bass Construction Inc. | - 4 - James Construction Group LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3.16 | LUMP | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 500,000.00 | 500,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 1,500.00 | 1,500.00 | 35,000.00 | 35,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 2,885 | SQYD | 4.00 | 11,540.00 | 5.00 | 14,425.00 | 10.00 | 28,850.00 | 10.00 | 28,850.00 | | 0004 | 202-02-04000 | Removal of Bridge Sta. 120+03.58: 26 x 212 Concrete deck and Bents with steel I beams. | 1 | EACH | 100,000.00 | 100,000.00 | 200,000.00 | 200,000.00 | 150,000.00 | 150,000.00 | 500,000.00 | 500,000.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 37 | SQYD | 13.00 | 481.00 | 10.00 | 370.00 | 15.00 | 555.00 | 15.00 | 555.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 1,254.4 | LNFT | 4.00 | 5,017.60 | 12.00 | 15,052.80 | 4.00 | 5,017.60 | 10.00 | 12,544.00 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 4,129.9 | SQYD | 8.50 | 35,104.15 | 5.00 | 20,649.50 | 10.00 | 41,299.00 | 12.00 | 49,558.80 | | 0008 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 2,315.8 | SQYD | 12.50 | 28,947.50 | 8.00 | 18,526.40 | 9.00 | 20,842.20 | 9.00 | 20,842.20 | | 0009 | 203-01-00100 | General Excavation | 22,572 | CUYD | 8.00 | 180,576.00 | 4.85 | 109,474.20 | 5.00 | 112,860.00 | 10.00 | 225,720.00 | | 0010 | 203-03-00100 | Embankment | 6,465 | CUYD | 24.00 | 155,160.00 | 10.00 | 64,650.00 | 17.00 | 109,905.00 | 11.00 | 71,115.00 | | 0011 | 204-02-00100 | Temporary Hay or Straw Bales | 36 | EACH | 32.00 | 1,152.00 | 10.00 | 360.00 | 12.50 | 450.00 | 20.00 | 720.00 | | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 380.00 | 1,140.00 | 125.00 | 375.00 | 125.00 | 375.00 | 150.00 | 450.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 3,505 | LNFT | 4.25 | 14,896.25 | 1.85 | 6,484.25 | 1.65 | 5,783.25 | 3.00 | 10,515.00 | | 0014 | 302-02-03121 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 1,916 | SQYD | 30.00 | 57,480.00 | 13.65 | 26,153.40 | 28.00 | 53,648.00 | 24.00 | 45,984.00 | | 0015 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 2,507.5 | SQYD | 40.00 | 100,300.00 | 20.35 | 51,027.63 | 33.00 | 82,747.50 | 34.00 | 85,255.00 | | 0016 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 83 | CUYD | 30.00 | 2,490.00 | 80.00 | 6,640.00 | 58.00 | 4,814.00 | 35.00 | 2,905.00 | | 0017 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,000 | CUYD | 10.00 | 10,000.00 | 80.00 | 80,000.00 | 21.00 | 21,000.00 | 127.23 | 127,230.00 | | 0018 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 211 | LNFT | 75.00 | 15,825.00 | 80.00 | 16,880.00 | 81.00 | 17,091.00 | 75.00 | 15,825.00 | | 0019 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 60 | LNFT | 96.00 | 5,760.00 | 75.00 | 4,500.00 | 125.00 | 7,500.00 | 110.00 | 6,600.00 | | 0020 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 16 | LNFT | 118.00 | 1,888.00 | 100.00 | 1,600.00 | 132.00 | 2,112.00 | 400.00 | 6,400.00 | | 0021 | 702-03-00100 | Catch Basins (CB-01) | 6 | EACH | 3,700.00 | 22,200.00 | 4,000.00 | 24,000.00 | 3,500.00 | 21,000.00 | 2,200.00 | 13,200.00 | | 0022 | 704-03-00100 | Blocked Out Guard Rail | 75 | LNFT | 21.00 | 1,575.00 | 20.00 | 1,500.00 | 20.00 | 1,500.00 | 20.00 | 1,500.00 | | 0023 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 62.00 | 6,200.00 | 60.00 | 6,000.00 | 60.00 | 6,000.00 | 60.00 | 6,000.00 | | 0024 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,500.00 | 10,000.00 | 2,150.00 | 8,600.00 | 2,400.00 | 9,600.00 | 2,400.00 | 9,600.00 | | 0025 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 88 | LNFT | 13.00 | 1,144.00 | 10.00 | 880.00 | 18.50 | 1,628.00 | 11.00 | 968.00 | | 0026 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 1,300.00 | 1,300.00 | 500.00 | 500.00 | 1,200.00 | 1,200.00 | 600.00 | 600.00 | | 0027 | 705-06-00400 | Chain Link Fence (7 Foot Height) | 970 | LNFT | 70.00 | 67,900.00 | 100.00 | 97,000.00 | 105.00 | 101,850.00 | 100.00 | 97,000.00 | | 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 32.2 | SQYD | 130.00 | 4,186.00 | 90.00 | 2,898.00 | 101.00 | 3,252.20 | 60.00 | 1,932.00 | | 0029 | 708-01-00100 | Right-of-Way Monument | 7 | EACH | 160.00 | 1,120.00 | 200.00 | 1,400.00 | 500.00 | 3,500.00 | 250.00 | 1,750.00 | | 0030 | 708-02-00100 | Right-of-Way Monument Witness Post | 7 | EACH | 160.00 | 1,120.00 | 200.00 | 1,400.00 | 12.00 | 84.00 | 250.00 | 1,750.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 44,000.00 | 44,000.00 | 11,850.00 | 11,850.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | | 0032 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 12 | LNFT | 5.00 | 60.00 | 4.35 | 52.20 | 4.35 | 52.20 | 5.00 | 60.00 | | 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.723 | MILE | 200.00 | 144.60 | 600.00 | 433.80 | 600.00 | 433.80 | 600.00 | 433.80 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.888 | MILE | 1,100.00 | 3,176.80 | 1,000.00 | 2,888.00 | 1,000.00 | 2,888.00 | 1,000.00 | 2,888.00 | | 0035 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,311 | SQYD | 1.60 | 2,097.60 | 1.10 | 1,442.10 | 1.35 | 1,769.85 | 1.50 | 1,966.50 | | 0036 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 163 | SQYD | 5.50 | 896.50 | 1.80 | 293.40 | 2.00 | 326.00 | 5.00 | 815.00 | | 0037 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | | 0038 | 726-01-00100 | Bedding Material | 129.9 | CUYD | 75.00 | 9,742.50 | 80.00 | 10,392.00 | 70.00 | 9,093.00 | 135.00 | 17,536.50 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 900,000.00 | 900,000.00 | 1,150,000.00 | 1,150,000.00 | 1,300,000.00 | 1,300,000.00 | 1,000,000.00 | 1,000,000.00 | | 0040 | 729-16-00200 | Object Marker Assembly (Type 2) | 1 | EACH | 50.00 | 50.00 | 65.00 | 65.00 | 45.00 | 45.00 | 45.00 | 45.00 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | 75.00 | 300.00 | 45.00 | 180.00 | 75.00 | 300.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 96 | EACH | 8.00 | 768.00 | 8.00 | 768.00 | 8.00 | 768.00 | 8.00 | 768.00 | | 0043 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 16.00 | 192.00 | 15.00 | 180.00 | 15.00 | 180.00 | 15.00 | 180.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.444 | MILE | 4,200.00 | 6,064.80 | 4,000.00 | 5,776.00 | 4,000.00 | 5,776.00 | 4,000.00 | 5,776.00 | | 0045 | 735-01-00100 | Mailboxes | 8 | EACH | 1.10 | 8.80 | 50.00 | 400.00 | 1.00 | 8.00 | 1.00 | 8.00 | | 0046 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 155.00 | 1,240.00 | 200.00 | 1,600.00 | 150.00 | 1,200.00 | 150.00 | 1,200.00 | | 0047 | 739-01-00100 | Hydro-Seeding | 3.24 | ACRE | 2,000.00 | 6,480.00 | 1,250.00 | 4,050.00 | 1,250.00 | 4,050.00 | 1,850.00 | 5,994.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 70,000.00 | 70,000.00 | 125,000.00 | 125,000.00 | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | | 0049 | 805-01-00700 | Class A Concrete (Bents) | 1,043.61 | CUYD | 430.00 | 448,752.30 | 500.00 | 521,805.00 | 650.00 | 678,346.50 | 625.00 | 652,256.25 | | 0050 | 805-04-00100 | Class AA(M) Concrete | 1,117 | CUYD | 500.00 | 558,500.00 | 470.00 | 524,990.00 | 675.00 | 753,975.00 | 500.00 | 558,500.00 | | 0051 | 805-08-00300 | Precast-Prestressed Concrete Girder (Type III) | 1,777 | LNFT | 120.00 | 213,240.00 | 150.00 | 266,550.00 | 155.00 | 275,435.00 | 150.00 | 266,550.00 | | 0052 | 805-11-00100 | Strip Seal Joints | 85.15 | LNFT | 200.00 | 17,030.00 | 175.00 | 14,901.25 | 200.00 | 17,030.00 | 165.00 | 14,049.75 | | 0053 | 806-01-00100 | Deformed Reinforcing Steel | 664,151 | LB | 0.90 | 597,735.90 | 0.90 | 597,735.90 | 0.80 | 531,320.80 | 0.80 | 531,320.80 | | 0054 | 807-08-00100 | Structural Metalwork | 4,338,420 | LUMP | 4,453,000.00 | 4,453,000.00 | 4,500,000.00 | 4,500,000.00 | 4,695,000.00 | 4,695,000.00 | 5,015,000.00 | 5,015,000.00 | | 0055 | 810-01-00100 | Concrete Railing (Standard Barrier) | 1,900 | LNFT | 70.00 | 133,000.00 | 100.00 | 190,000.00 | 60.00 | 114,000.00 | 65.00 | 123,500.00 | | 0056 | 813-01-00100 | Concrete Approach Slabs | 400 | SQYD | 530.00 | 212,000.00 | 275.00 | 110,000.00 | 405.00 | 162,000.00 | 350.00 | 140,000.00 | | 0057 | 814-01-00200 | Drilled Shaft (24" Diameter) | 7,302 | LNFT | 137.00 | 1,000,374.00 | 160.00 | 1,168,320.00 | 180.00 | 1,314,360.00 | 135.00 | 985,770.00 | | 0058 | 814-01-00650 | Drilled Shaft (54" Diameter) | 597 | LNFT | 580.00 | 346,260.00 | 1,500.00 | 895,500.00 | 700.00 | 417,900.00 | 535.00 | 319,395.00 | | 0059 | 814-02-00650 | Trial Shaft (54" Diameter) | 70 | LNFT | 745.00 | 52,150.00 | 500.00 | 35,000.00 | 700.00 | 49,000.00 | 700.00 | 49,000.00 | | 0060 | 814-04-00200 | Crosshole Sonic Logging (24" Diameter) | 100 | EACH | 2,500.00 | 250,000.00 | 1,000.00 | 100,000.00 | 1,700.00 | 170,000.00 | 1,350.00 | 135,000.00 | | 0061 | 814-04-00650 | Crosshole Sonic Logging (54" Diameter) | 9 | EACH | 3,900.00 | 35,100.00 | 1,500.00 | 13,500.00 | 5,000.00 | 45,000.00 | 1,830.00 | 16,470.00 | | 0062 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 85 | LNFT | 23.00 | 1,955.00 | 4.00 | 340.00 | 4.00 | 340.00 | 4.00 | 340.00 | | 0063 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 152 | INLF | 9.00 | 1,368.00 | 3.00 | 456.00 | 3.00 | 456.00 | 3.00 | 456.00 | | 0064 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 432 | INLF | 3.00 | 1,296.00 | 5.50 | 2,376.00 | 6.00 | 2,592.00 | 5.50 | 2,376.00 | | 0065 | NS-502-01000 | Asphalt Concrete | 1,315.9 | TON | 100.00 | 131,590.00 | 123.00 | 161,855.70 | 124.00 | 163,171.60 | 123.00 | 161,855.70 | | 0066 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 337.9 | TON | 140.00 | 47,306.00 | 155.00 | 52,374.50 | 155.00 | 52,374.50 | 155.00 | 52,374.50 | | 0067 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 228 | INLF | 6.00 | 1,368.00 | 10.00 | 2,280.00 | 5.00 | 1,140.00 | 1.00 | 228.00 | | 0068 | NS-800-00004 | Disc Bearing | 24 | EACH | 5,500.00 | 132,000.00 | 5,000.00 | 120,000.00 | 7,500.00 | 180,000.00 | 10,000.00 | 240,000.00 | | 0069 | NS-800-00060 | Deck Drainage System | 1 | LUMP | 78,000.00 | 78,000.00 | 70,000.00 | 70,000.00 | 77,000.00 | 77,000.00 | 80,000.00 | 80,000.00 | | 0070 | NS-800-00100 | Load Testing a Drilled Shaft | 1 | EACH | 100,000.00 | 100,000.00 | 70,000.00 | 70,000.00 | 58,000.00 | 58,000.00 | 105,000.00 | 105,000.00 | | 0071 | NS-800-00140 | Test Drilled Shaft Test drilled shaft 54" dia. | 1 | EACH | 70,000.00 | 70,000.00 | 160,000.00 | 160,000.00 | 40,000.00 | 40,000.00 | 68,000.00 | 68,000.00 | | 0072 | NS-800-00160 | Steel Finger Joints | 85 | LNFT | 1,800.00 | 153,000.00 | 1,600.00 | 136,000.00 | 2,500.00 | 212,500.00 | 2,100.00 | 178,500.00 | | 0073 | NS-800-00241 | Bearing Pads (Elastomeric) | 42 | EACH | 220.00 | 9,240.00 | 100.00 | 4,200.00 | 210.00 | 8,820.00 | 430.00 | 18,060.00 | | 0074 | 802-03-00100 | Structural Excavation for Piers (Dry) | 985 | CUYD | 20.00 | 19,700.00 | 25.00 | 24,625.00 | 16.70 | 16,449.50 | 35.00 | 34,475.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 11,067,709.30 | | 11,914,646.03 | | 12,440,944.50 | | 12,756,816.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JB JAMES CONSTRUCTION LLC | - 6 - Shavers-Whittle Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3.16 | LUMP | 682,000.00 | 682,000.00 | 150,000.00 | 150,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,500.00 | 5,500.00 | 3,000.00 | 3,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 2,885 | SQYD | 6.00 | 17,310.00 | 5.25 | 15,146.25 | | 0004 | 202-02-04000 | Removal of Bridge Sta. 120+03.58: 26 x 212 Concrete deck and Bents with steel I beams. | 1 | EACH | 150,000.00 | 150,000.00 | 300,000.00 | 300,000.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 37 | SQYD | 10.50 | 388.50 | 15.00 | 555.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 1,254.4 | LNFT | 5.00 | 6,272.00 | 8.50 | 10,662.40 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 4,129.9 | SQYD | 4.50 | 18,584.55 | 9.00 | 37,169.10 | | 0008 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 2,315.8 | SQYD | 7.00 | 16,210.60 | 12.00 | 27,789.60 | | 0009 | 203-01-00100 | General Excavation | 22,572 | CUYD | 6.00 | 135,432.00 | 10.00 | 225,720.00 | | 0010 | 203-03-00100 | Embankment | 6,465 | CUYD | 9.50 | 61,417.50 | 19.00 | 122,835.00 | | 0011 | 204-02-00100 | Temporary Hay or Straw Bales | 36 | EACH | 12.50 | 450.00 | 14.00 | 504.00 | | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 125.00 | 375.00 | 135.00 | 405.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 3,505 | LNFT | 4.00 | 14,020.00 | 2.25 | 7,886.25 | | 0014 | 302-02-03121 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 1,916 | SQYD | 20.00 | 38,320.00 | 30.00 | 57,480.00 | | 0015 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 2,507.5 | SQYD | 31.50 | 78,986.25 | 36.00 | 90,270.00 | | 0016 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 83 | CUYD | 166.00 | 13,778.00 | 90.00 | 7,470.00 | | 0017 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,000 | CUYD | 111.00 | 111,000.00 | 75.00 | 75,000.00 | | 0018 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 211 | LNFT | 56.00 | 11,816.00 | 95.00 | 20,045.00 | | 0019 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 60 | LNFT | 107.00 | 6,420.00 | 125.00 | 7,500.00 | | 0020 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 16 | LNFT | 122.50 | 1,960.00 | 120.00 | 1,920.00 | | 0021 | 702-03-00100 | Catch Basins (CB-01) | 6 | EACH | 2,300.00 | 13,800.00 | 3,300.00 | 19,800.00 | | 0022 | 704-03-00100 | Blocked Out Guard Rail | 75 | LNFT | 22.00 | 1,650.00 | 24.00 | 1,800.00 | | 0023 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 66.00 | 6,600.00 | 75.00 | 7,500.00 | | 0024 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,630.00 | 10,520.00 | 2,800.00 | 11,200.00 | | 0025 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 88 | LNFT | 10.00 | 880.00 | 20.00 | 1,760.00 | | 0026 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 500.00 | 500.00 | 1,350.00 | 1,350.00 | | 0027 | 705-06-00400 | Chain Link Fence (7 Foot Height) | 970 | LNFT | 95.00 | 92,150.00 | 120.00 | 116,400.00 | | 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 32.2 | SQYD | 123.00 | 3,960.60 | 95.00 | 3,059.00 | | 0029 | 708-01-00100 | Right-of-Way Monument | 7 | EACH | 250.00 | 1,750.00 | 275.00 | 1,925.00 | | 0030 | 708-02-00100 | Right-of-Way Monument Witness Post | 7 | EACH | 250.00 | 1,750.00 | 275.00 | 1,925.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 52,200.00 | 52,200.00 | 60,000.00 | 60,000.00 | | 0032 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 12 | LNFT | 5.00 | 60.00 | 1.10 | 13.20 | | 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.723 | MILE | 647.00 | 467.78 | 1,300.00 | 939.90 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.888 | MILE | 1,080.00 | 3,119.04 | 650.00 | 1,877.20 | | 0035 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,311 | SQYD | 1.10 | 1,442.10 | 1.20 | 1,573.20 | | 0036 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 163 | SQYD | 1.80 | 293.40 | 1.90 | 309.70 | | 0037 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 22,214.00 | 22,214.00 | 15,000.00 | 15,000.00 | | 0038 | 726-01-00100 | Bedding Material | 129.9 | CUYD | 72.00 | 9,352.80 | 65.00 | 8,443.50 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 600,000.00 | 600,000.00 | 1,500,000.00 | 1,500,000.00 | | 0040 | 729-16-00200 | Object Marker Assembly (Type 2) | 1 | EACH | 49.50 | 49.50 | 60.00 | 60.00 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 82.50 | 330.00 | 90.00 | 360.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 96 | EACH | 9.00 | 864.00 | 5.50 | 528.00 | | 0043 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 16.50 | 198.00 | 11.00 | 132.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.444 | MILE | 4,317.00 | 6,233.75 | 8,400.00 | 12,129.60 | | 0045 | 735-01-00100 | Mailboxes | 8 | EACH | 9.00 | 72.00 | 1.25 | 10.00 | | 0046 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 125.00 | 1,000.00 | 200.00 | 1,600.00 | | 0047 | 739-01-00100 | Hydro-Seeding | 3.24 | ACRE | 1,250.00 | 4,050.00 | 1,300.00 | 4,212.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 122,068.00 | 122,068.00 | 200,000.00 | 200,000.00 | | 0049 | 805-01-00700 | Class A Concrete (Bents) | 1,043.61 | CUYD | 744.00 | 776,445.84 | 600.00 | 626,166.00 | | 0050 | 805-04-00100 | Class AA(M) Concrete | 1,117 | CUYD | 988.00 | 1,103,596.00 | 700.00 | 781,900.00 | | 0051 | 805-08-00300 | Precast-Prestressed Concrete Girder (Type III) | 1,777 | LNFT | 166.00 | 294,982.00 | 120.00 | 213,240.00 | | 0052 | 805-11-00100 | Strip Seal Joints | 85.15 | LNFT | 413.00 | 35,166.95 | 160.00 | 13,624.00 | | 0053 | 806-01-00100 | Deformed Reinforcing Steel | 664,151 | LB | 1.10 | 730,566.10 | 0.75 | 498,113.25 | | 0054 | 807-08-00100 | Structural Metalwork | 4,338,420 | LUMP | 5,350,500.00 | 5,350,500.00 | 5,817,000.00 | 5,817,000.00 | | 0055 | 810-01-00100 | Concrete Railing (Standard Barrier) | 1,900 | LNFT | 82.00 | 155,800.00 | 90.00 | 171,000.00 | | 0056 | 813-01-00100 | Concrete Approach Slabs | 400 | SQYD | 559.00 | 223,600.00 | 400.00 | 160,000.00 | | 0057 | 814-01-00200 | Drilled Shaft (24" Diameter) | 7,302 | LNFT | 163.00 | 1,190,226.00 | 260.00 | 1,898,520.00 | | 0058 | 814-01-00650 | Drilled Shaft (54" Diameter) | 597 | LNFT | 647.00 | 386,259.00 | 1,100.00 | 656,700.00 | | 0059 | 814-02-00650 | Trial Shaft (54" Diameter) | 70 | LNFT | 815.00 | 57,050.00 | 1,250.00 | 87,500.00 | | 0060 | 814-04-00200 | Crosshole Sonic Logging (24" Diameter) | 100 | EACH | 1,902.00 | 190,200.00 | 500.00 | 50,000.00 | | 0061 | 814-04-00650 | Crosshole Sonic Logging (54" Diameter) | 9 | EACH | 2,735.50 | 24,619.50 | 600.00 | 5,400.00 | | 0062 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 85 | LNFT | 4.00 | 340.00 | 4.50 | 382.50 | | 0063 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 152 | INLF | 3.00 | 456.00 | 3.25 | 494.00 | | 0064 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 432 | INLF | 5.50 | 2,376.00 | 6.00 | 2,592.00 | | 0065 | NS-502-01000 | Asphalt Concrete | 1,315.9 | TON | 123.00 | 161,855.70 | 130.00 | 171,067.00 | | 0066 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 337.9 | TON | 155.00 | 52,374.50 | 175.00 | 59,132.50 | | 0067 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 228 | INLF | 6.00 | 1,368.00 | 4.50 | 1,026.00 | | 0068 | NS-800-00004 | Disc Bearing | 24 | EACH | 10,514.00 | 252,336.00 | 5,000.00 | 120,000.00 | | 0069 | NS-800-00060 | Deck Drainage System | 1 | LUMP | 205,764.00 | 205,764.00 | 120,000.00 | 120,000.00 | | 0070 | NS-800-00100 | Load Testing a Drilled Shaft | 1 | EACH | 98,889.00 | 98,889.00 | 80,000.00 | 80,000.00 | | 0071 | NS-800-00140 | Test Drilled Shaft Test drilled shaft 54" dia. | 1 | EACH | 25,996.00 | 25,996.00 | 100,000.00 | 100,000.00 | | 0072 | NS-800-00160 | Steel Finger Joints | 85 | LNFT | 3,619.00 | 307,615.00 | 2,200.00 | 187,000.00 | | 0073 | NS-800-00241 | Bearing Pads (Elastomeric) | 42 | EACH | 219.00 | 9,198.00 | 300.00 | 12,600.00 | | 0074 | 802-03-00100 | Structural Excavation for Piers (Dry) | 985 | CUYD | 62.50 | 61,562.50 | 30.00 | 29,550.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 14,026,957.46 | | 14,998,272.15 |
|