Proposal:H.010277.6
Parish:Morehouse
Routes:LA 593
Description:LA 593: INTER. IMPRV. NAFF @ COLLINSTON
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$579,519.41
| Rank | License | Bidder | Construction Bid |
| 1 | 15099 | Amethyst Construction, Inc. | $767,790.68 |
| 2 | 49239 | WL Bass Construction Inc. | $783,666.90 |
| 3 | 36936 | Dirtworks Inc Of Vicksburg | $1,064,245.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Amethyst Construction, Inc. | - 2 - WL Bass Construction Inc. | - 3 - Dirtworks Inc Of Vicksburg | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 45,000.00 | 45,000.00 | 45,200.00 | 45,200.00 | 115,000.00 | 115,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 9,000.00 | 9,000.00 | 3,000.00 | 3,000.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 674 | SQYD | 12.00 | 8,088.00 | 7.00 | 4,718.00 | 20.00 | 13,480.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 15" RCP | 45 | LNFT | 28.00 | 1,260.00 | 38.00 | 1,710.00 | 60.00 | 2,700.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 30" RCP | 40 | LNFT | 34.00 | 1,360.00 | 44.00 | 1,760.00 | 60.00 | 2,400.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" CMP | 36 | LNFT | 36.00 | 1,296.00 | 24.00 | 864.00 | 60.00 | 2,160.00 | | 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" CMPA | 40 | LNFT | 36.00 | 1,440.00 | 21.00 | 840.00 | 60.00 | 2,400.00 | | 0008 | 202-02-32120 | Removal of Pipe (Side Drain) 15" RCP | 60 | LNFT | 32.00 | 1,920.00 | 29.00 | 1,740.00 | 60.00 | 3,600.00 | | 0009 | 202-02-32120 | Removal of Pipe (Side Drain) 18" RCP | 144 | LNFT | 32.00 | 4,608.00 | 25.00 | 3,600.00 | 50.00 | 7,200.00 | | 0010 | 202-02-32120 | Removal of Pipe (Side Drain) 24" RCP | 56 | LNFT | 32.00 | 1,792.00 | 26.00 | 1,456.00 | 50.00 | 2,800.00 | | 0011 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 2,954.5 | SQYD | 7.00 | 20,681.50 | 5.50 | 16,249.75 | 19.00 | 56,135.50 | | 0012 | 203-01-00100 | General Excavation | 1,591.5 | CUYD | 14.00 | 22,281.00 | 12.00 | 19,098.00 | 12.00 | 19,098.00 | | 0013 | 203-03-00100 | Embankment | 1,110.5 | CUYD | 22.00 | 24,431.00 | 27.00 | 29,983.50 | 12.00 | 13,326.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 160.00 | 960.00 | 135.00 | 810.00 | 260.00 | 1,560.00 | | 0015 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 2 | EACH | 750.00 | 1,500.00 | 450.00 | 900.00 | 700.00 | 1,400.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 1,920 | LNFT | 4.50 | 8,640.00 | 1.81 | 3,475.20 | 3.00 | 5,760.00 | | 0017 | 302-02-08000 | Class II Base Course (8" Thick) | 5,143.4 | SQYD | 28.00 | 144,015.20 | 20.00 | 102,868.00 | 43.00 | 221,166.20 | | 0018 | 402-01-00100 | Mainline Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 400 | CUYD | 80.00 | 32,000.00 | 50.00 | 20,000.00 | 150.00 | 60,000.00 | | 0019 | 502-01-00100 | Asphalt Concrete | 1,208.7 | TON | 150.00 | 181,305.00 | 155.00 | 187,348.50 | 165.00 | 199,435.50 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 44.8 | TON | 170.00 | 7,616.00 | 195.00 | 8,736.00 | 195.00 | 8,736.00 | | 0021 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 88 | LNFT | 96.00 | 8,448.00 | 147.00 | 12,936.00 | 150.00 | 13,200.00 | | 0022 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 80 | LNFT | 92.00 | 7,360.00 | 143.00 | 11,440.00 | 120.00 | 9,600.00 | | 0023 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 176 | LNFT | 125.00 | 22,000.00 | 190.00 | 33,440.00 | 170.00 | 29,920.00 | | 0024 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 72 | LNFT | 60.00 | 4,320.00 | 68.70 | 4,946.40 | 70.00 | 5,040.00 | | 0025 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 48 | LNFT | 70.00 | 3,360.00 | 81.80 | 3,926.40 | 80.00 | 3,840.00 | | 0026 | 701-15-00100 | Concrete Collar | 12 | EACH | 1,200.00 | 14,400.00 | 1,250.00 | 15,000.00 | 1,000.00 | 12,000.00 | | 0027 | 706-02-00200 | Concrete Drive (6" Thick) | 259.9 | SQYD | 84.00 | 21,831.60 | 92.00 | 23,910.80 | 100.00 | 25,990.00 | | 0028 | 708-01-00100 | Right-of-Way Monument | 16 | EACH | 240.00 | 3,840.00 | 320.00 | 5,120.00 | 150.00 | 2,400.00 | | 0029 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 94 | SQYD | 65.00 | 6,110.00 | 100.00 | 9,400.00 | 55.00 | 5,170.00 | | 0030 | 711-04-00100 | Geotextile Fabric | 94 | SQYD | 2.50 | 235.00 | 4.50 | 423.00 | 6.00 | 564.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.464 | MILE | 620.00 | 287.68 | 500.00 | 232.00 | 2,500.00 | 1,160.00 | | 0033 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.25 | MILE | 500.00 | 125.00 | 500.00 | 125.00 | 2,500.00 | 625.00 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.122 | MILE | 1,500.00 | 1,683.00 | 1,500.00 | 1,683.00 | 2,000.00 | 2,244.00 | | 0035 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 1,600.00 | 3,200.00 | 1,000.00 | 2,000.00 | 1,200.00 | 2,400.00 | | 0036 | 717-01-00100 | Seeding | 59 | LB | 12.00 | 708.00 | 17.00 | 1,003.00 | 30.00 | 1,770.00 | | 0037 | 718-01-00100 | Fertilizer | 989 | LB | 1.00 | 989.00 | 0.80 | 791.20 | 3.00 | 2,967.00 | | 0038 | 726-01-00100 | Bedding Material | 153.8 | CUYD | 94.00 | 14,457.20 | 130.00 | 19,994.00 | 150.00 | 23,070.00 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 78,377.00 | 78,377.00 | 100,000.00 | 100,000.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 275.00 | 2,200.00 | 250.00 | 2,000.00 | 200.00 | 1,600.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 235 | EACH | 5.00 | 1,175.00 | 5.00 | 1,175.00 | 7.00 | 1,645.00 | | 0042 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,110 | LNFT | 2.00 | 2,220.00 | 2.00 | 2,220.00 | 3.00 | 3,330.00 | | 0043 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 700 | LNFT | 5.00 | 3,500.00 | 5.00 | 3,500.00 | 6.00 | 4,200.00 | | 0044 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 28 | LNFT | 11.00 | 308.00 | 10.50 | 294.00 | 12.00 | 336.00 | | 0045 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.561 | MILE | 4,000.00 | 2,244.00 | 3,650.00 | 2,047.65 | 4,500.00 | 2,524.50 | | 0046 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.125 | MILE | 1,500.00 | 187.50 | 1,500.00 | 187.50 | 2,500.00 | 312.50 | | 0047 | 735-01-00100 | Mailboxes | 2 | EACH | 20.00 | 40.00 | 1.00 | 2.00 | 350.00 | 700.00 | | 0048 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 400.00 | 800.00 | 700.00 | 1,400.00 | 200.00 | 400.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 | | 0050 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,440 | INLF | 1.00 | 1,440.00 | 2.00 | 2,880.00 | 2.00 | 2,880.00 | | 0051 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 840 | INLF | 1.00 | 840.00 | 3.00 | 2,520.00 | 2.00 | 1,680.00 | | 0052 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 288 | LNFT | 1.00 | 288.00 | 22.00 | 6,336.00 | 15.00 | 4,320.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 767,790.68 | | 783,666.90 | | 1,064,245.20 |
|