Proposal:H.002822.6
Parish:East Baton Rouge
Routes:LA 30
Description:NICHOLSON DRIVE @ BRIGHTSIDE LANE/ WEST LEE DRIVE
Type Construction:GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, MILLING ASPHALT CONCRETE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, DRILLED SHAFT FOUNDATIONS, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$7,562,906.27
| Rank | License | Bidder | Construction Bid |
| 1 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $7,791,953.82 |
| 2 | 57931 | KCR CONTRACTORS, LLC | $7,953,517.67 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $8,820,036.40 |
| 4 | 24901 | Hard Rock Construction LLC | $9,003,055.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - KORT's CONSTRUCTION SERVICES, INC. | - 2 - KCR CONTRACTORS, LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - Hard Rock Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,500.00 | 12,500.00 | 6,050.00 | 6,050.00 | 40,000.00 | 40,000.00 | 8,868.49 | 8,868.49 | | 0002 | 202-02-00030 | Removal of Existing 8" PVC Gravity Sewer | 176 | LNFT | 14.00 | 2,464.00 | 12.10 | 2,129.60 | 15.00 | 2,640.00 | 14.99 | 2,637.89 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 1,025 | SQYD | 8.00 | 8,200.00 | 3.47 | 3,556.75 | 10.00 | 10,250.00 | 10.62 | 10,881.40 | | 0004 | 202-02-02040 | Removal of Asphalt Surfacing from Bridge Deck | 399 | SQYD | 6.50 | 2,593.50 | 6.69 | 2,669.31 | 15.00 | 5,985.00 | 2.73 | 1,087.28 | | 0005 | 202-02-04000 | Removal of Bridge (Sta. 43+77, 48'x57' Slab-Span Bridge) | 1 | EACH | 80,000.00 | 80,000.00 | 18,980.76 | 18,980.76 | 75,000.00 | 75,000.00 | 83,260.64 | 83,260.64 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,913 | SQYD | 8.25 | 15,782.25 | 4.53 | 8,665.89 | 15.00 | 28,695.00 | 12.16 | 23,254.43 | | 0007 | 202-02-14500 | Removal of Guard Rail | 389.4 | LNFT | 6.50 | 2,531.10 | 9.68 | 3,769.39 | 15.00 | 5,841.00 | 7.09 | 2,758.90 | | 0008 | 202-02-26000 | Removal of Manholes | 1 | EACH | 1,250.00 | 1,250.00 | 1,452.00 | 1,452.00 | 2,000.00 | 2,000.00 | 1,318.94 | 1,318.94 | | 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 2,656 | SQYD | 13.00 | 34,528.00 | 6.99 | 18,565.44 | 15.00 | 39,840.00 | 12.97 | 34,458.94 | | 0010 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,047.7 | SQYD | 13.00 | 13,620.10 | 5.90 | 6,181.43 | 10.00 | 10,477.00 | 13.19 | 13,821.26 | | 0011 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 8,900.00 | 8,900.00 | 12,182.50 | 12,182.50 | 50,000.00 | 50,000.00 | 188,570.00 | 188,570.00 | | 0012 | 202-03-00010 | Relocation Relocation of Bus Stop (Sta 51+53RT & Sta 61+86RT | 2 | EACH | 15,000.00 | 30,000.00 | 6,050.00 | 12,100.00 | 15,000.00 | 30,000.00 | 8,307.91 | 16,615.82 | | 0013 | 203-01-00100 | General Excavation | 6,739 | CUYD | 19.00 | 128,041.00 | 11.60 | 78,172.40 | 20.00 | 134,780.00 | 25.08 | 169,014.12 | | 0014 | 203-02-00100 | Drainage Excavation | 1,474 | CUYD | 22.00 | 32,428.00 | 12.29 | 18,115.46 | 30.00 | 44,220.00 | 38.36 | 56,548.54 | | 0015 | 203-03-00100 | Embankment | 8,478 | CUYD | 32.00 | 271,296.00 | 32.76 | 277,739.28 | 25.00 | 211,950.00 | 25.19 | 213,535.39 | | 0016 | 204-02-00100 | Temporary Hay or Straw Bales | 666 | EACH | 13.00 | 8,658.00 | 13.02 | 8,671.32 | 18.00 | 11,988.00 | 13.08 | 8,711.28 | | 0017 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 17 | EACH | 111.00 | 1,887.00 | 113.93 | 1,936.81 | 250.00 | 4,250.00 | 27.25 | 463.25 | | 0018 | 204-06-00100 | Temporary Silt Fencing | 6,405 | LNFT | 2.00 | 12,810.00 | 1.62 | 10,376.10 | 1.80 | 11,529.00 | 1.58 | 10,126.31 | | 0019 | 204-07-00100 | Temporary Stone Construction Entrance | 3 | EACH | 5,000.00 | 15,000.00 | 4,427.26 | 13,281.78 | 10,000.00 | 30,000.00 | 3,594.00 | 10,781.99 | | 0020 | 302-01-00800 | Class II Base Course (Stone or Recycled Portland Cement Concrete) | 1,784.3 | CUYD | 90.00 | 160,587.00 | 110.80 | 197,700.44 | 108.00 | 192,704.40 | 86.85 | 154,968.24 | | 0022 | 304-05-00100 | Lime Treatment (Type E) | 363.76 | TON | 325.00 | 118,222.00 | 385.68 | 140,294.96 | 360.00 | 130,953.60 | 389.02 | 141,508.10 | | 0023 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 482.5 | CUYD | 105.00 | 50,662.50 | 78.04 | 37,654.30 | 70.00 | 33,775.00 | 77.78 | 37,527.40 | | 0024 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 56.2 | SQYD | 200.00 | 11,240.00 | 139.95 | 7,865.19 | 150.00 | 8,430.00 | 85.28 | 4,792.46 | | 0025 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 1 | EACH | 650.00 | 650.00 | 181.50 | 181.50 | 450.00 | 450.00 | 381.50 | 381.50 | | 0026 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 1,998 | LNFT | 60.00 | 119,880.00 | 85.98 | 171,788.04 | 70.00 | 139,860.00 | 85.71 | 171,254.57 | | 0027 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 575 | LNFT | 56.00 | 32,200.00 | 91.84 | 52,808.00 | 80.00 | 46,000.00 | 100.40 | 57,731.73 | | 0028 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,401 | LNFT | 69.00 | 96,669.00 | 104.49 | 146,390.49 | 100.00 | 140,100.00 | 124.40 | 174,281.60 | | 0029 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 1,781 | LNFT | 82.00 | 146,042.00 | 127.48 | 227,041.88 | 130.00 | 231,530.00 | 146.35 | 260,644.01 | | 0030 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 706 | LNFT | 98.00 | 69,188.00 | 145.45 | 102,687.70 | 145.00 | 102,370.00 | 168.65 | 119,065.49 | | 0031 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 212 | LNFT | 165.00 | 34,980.00 | 171.04 | 36,260.48 | 180.00 | 38,160.00 | 236.61 | 50,161.53 | | 0032 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 313 | LNFT | 150.00 | 46,950.00 | 221.03 | 69,182.39 | 235.00 | 73,555.00 | 251.33 | 78,667.54 | | 0033 | 701-03-01120 | Storm Drain Pipe (54" RCP) | 192 | LNFT | 160.00 | 30,720.00 | 204.36 | 39,237.12 | 250.00 | 48,000.00 | 281.48 | 54,043.78 | | 0034 | 701-15-00100 | Concrete Collar | 6 | EACH | 1,400.00 | 8,400.00 | 907.50 | 5,445.00 | 2,000.00 | 12,000.00 | 1,093.25 | 6,559.52 | | 0035 | 702-02-00001 | Manhole (Remove and Replace Frame and Cover) | 1 | EACH | 1,600.00 | 1,600.00 | 2,238.50 | 2,238.50 | 3,000.00 | 3,000.00 | 1,603.41 | 1,603.41 | | 0036 | 702-02-00200 | Manholes (R-CB-11) | 9 | EACH | 2,700.00 | 24,300.00 | 4,484.26 | 40,358.34 | 5,000.00 | 45,000.00 | 7,802.26 | 70,220.37 | | 0037 | 702-02-00600 | Manholes (R-CB-36) (Sanitary Sewer Manhole) | 3 | EACH | 3,000.00 | 9,000.00 | 4,584.67 | 13,754.01 | 5,500.00 | 16,500.00 | 4,787.95 | 14,363.86 | | 0038 | 702-03-00100 | Catch Basins (CB-01) | 38 | EACH | 2,200.00 | 83,600.00 | 2,784.05 | 105,793.90 | 2,800.00 | 106,400.00 | 3,268.80 | 124,214.21 | | 0039 | 702-03-00200 | Catch Basins (CB-02) | 4 | EACH | 2,600.00 | 10,400.00 | 4,288.38 | 17,153.52 | 5,000.00 | 20,000.00 | 4,995.37 | 19,981.48 | | 0040 | 702-03-00500 | Catch Basins (CB-06) | 29 | EACH | 5,200.00 | 150,800.00 | 5,249.29 | 152,229.41 | 4,200.00 | 121,800.00 | 7,381.66 | 214,068.00 | | 0041 | 702-03-00700 | Catch Basins (CB-08) | 10 | EACH | 11,000.00 | 110,000.00 | 9,388.95 | 93,889.50 | 9,000.00 | 90,000.00 | 14,768.00 | 147,680.04 | | 0042 | 702-03-00800 | Catch Basins (CB-09) | 5 | EACH | 6,800.00 | 34,000.00 | 4,625.23 | 23,126.15 | 5,000.00 | 25,000.00 | 9,401.65 | 47,008.25 | | 0043 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 1,300.00 | 6,500.00 | 1,260.00 | 6,300.00 | 2,000.00 | 10,000.00 | 390.56 | 1,952.81 | | 0044 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 1,600.00 | 1,600.00 | 2,420.00 | 2,420.00 | 2,500.00 | 2,500.00 | 4,115.62 | 4,115.62 | | 0045 | 702-08-00100 | Side Drain Safety End (Type I) | 1 | EACH | 1,650.00 | 1,650.00 | 1,815.00 | 1,815.00 | 4,000.00 | 4,000.00 | 4,054.83 | 4,054.83 | | 0046 | 703-01-00100 | Shoulder Underdrain Systems | 5,675 | LNFT | 13.00 | 73,775.00 | 17.89 | 101,525.75 | 20.00 | 113,500.00 | 25.91 | 147,039.25 | | 0047 | 703-02-00100 | Shoulder Outlet Underdrains | 4 | EACH | 575.00 | 2,300.00 | 605.00 | 2,420.00 | 1,000.00 | 4,000.00 | 1,308.00 | 5,232.00 | | 0048 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 100 | LNFT | 42.00 | 4,200.00 | 40.85 | 4,085.00 | 40.00 | 4,000.00 | 49.05 | 4,905.00 | | 0049 | 704-03-00100 | Blocked Out Guard Rail | 12.5 | LNFT | 19.00 | 237.50 | 21.50 | 268.75 | 25.00 | 312.50 | 21.80 | 272.50 | | 0050 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 6.3 | LNFT | 84.00 | 529.20 | 107.50 | 677.25 | 110.00 | 693.00 | 87.20 | 549.36 | | 0051 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 1 | EACH | 2,400.00 | 2,400.00 | 3,225.00 | 3,225.00 | 3,500.00 | 3,500.00 | 2,616.00 | 2,616.00 | | 0052 | 706-01-00100 | Concrete Walk (4" Thick) | 2,792.2 | SQYD | 53.00 | 147,986.60 | 56.52 | 157,815.14 | 50.00 | 139,610.00 | 56.68 | 158,261.90 | | 0054 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 678.4 | SQYD | 57.00 | 38,668.80 | 59.79 | 40,561.54 | 60.00 | 40,704.00 | 65.40 | 44,367.36 | | 0055 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 760.2 | SQYD | 130.00 | 98,826.00 | 65.25 | 49,603.05 | 70.00 | 53,214.00 | 539.53 | 410,153.75 | | 0056 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 26.5 | SQYD | 118.00 | 3,127.00 | 78.65 | 2,084.23 | 100.00 | 2,650.00 | 65.40 | 1,733.10 | | 0057 | 706-04-00100 | Handicapped Curb Ramps | 14 | EACH | 2,700.00 | 37,800.00 | 1,512.50 | 21,175.00 | 2,500.00 | 35,000.00 | 1,308.00 | 18,312.00 | | 0058 | 707-01-00100 | Concrete Curb | 181.5 | LNFT | 65.00 | 11,797.50 | 14.52 | 2,635.38 | 32.00 | 5,808.00 | 27.25 | 4,945.88 | | 0059 | 707-01-00200 | Concrete Curb (Barrier) | 4,164.6 | LNFT | 21.00 | 87,456.60 | 20.57 | 85,665.82 | 28.00 | 116,608.80 | 27.25 | 113,485.35 | | 0060 | 707-01-00300 | Concrete Curb (Mountable) | 6,245.6 | LNFT | 22.00 | 137,403.20 | 10.42 | 65,079.15 | 28.00 | 174,876.80 | 27.25 | 170,192.60 | | 0061 | 707-03-00100 | Combination Concrete Curb and Gutter | 915.4 | LNFT | 23.00 | 21,054.20 | 57.84 | 52,946.74 | 40.00 | 36,616.00 | 27.25 | 24,944.65 | | 0062 | 708-01-00100 | Right-of-Way Monument | 72 | EACH | 275.00 | 19,800.00 | 256.18 | 18,444.96 | 400.00 | 28,800.00 | 218.00 | 15,696.00 | | 0063 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 73 | SQYD | 150.00 | 10,950.00 | 84.70 | 6,183.10 | 140.00 | 10,220.00 | 89.36 | 6,523.28 | | 0064 | 711-04-00100 | Geotextile Fabric | 14,426 | SQYD | 1.50 | 21,639.00 | 2.04 | 29,429.04 | 2.00 | 28,852.00 | 0.03 | 389.50 | | 0065 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 400,000.00 | 400,000.00 | 390,158.45 | 390,158.45 | 350,000.00 | 350,000.00 | 110,487.09 | 110,487.09 | | 0066 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 65 | LNFT | 0.54 | 35.10 | 1.09 | 70.85 | 1.25 | 81.25 | 1.09 | 70.85 | | 0067 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 144 | LNFT | 0.80 | 115.20 | 2.17 | 312.48 | 2.50 | 360.00 | 2.18 | 313.92 | | 0068 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 89 | LNFT | 1.00 | 89.00 | 4.34 | 386.26 | 5.00 | 445.00 | 4.36 | 388.04 | | 0069 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.518 | MILE | 315.00 | 163.17 | 4,189.19 | 2,170.00 | 800.00 | 414.40 | 1,094.21 | 566.80 | | 0070 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 11.087 | MILE | 735.00 | 8,148.95 | 434.00 | 4,811.76 | 450.00 | 4,989.15 | 436.00 | 4,833.93 | | 0071 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 8 | EACH | 26.25 | 210.00 | 54.25 | 434.00 | 60.00 | 480.00 | 54.50 | 436.00 | | 0072 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 60 | EACH | 1,300.00 | 78,000.00 | 128.08 | 7,684.80 | 750.00 | 45,000.00 | 1,290.69 | 77,441.64 | | 0073 | 713-09-00100 | Temporary Portable Barrier (Water Filled) | 8 | EACH | 925.00 | 7,400.00 | 825.96 | 6,607.68 | 500.00 | 4,000.00 | 773.90 | 6,191.20 | | 0074 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 28 | EACH | 230.00 | 6,440.00 | 58.62 | 1,641.36 | 250.00 | 7,000.00 | 1,293.84 | 36,227.46 | | 0075 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 15,750.00 | 15,750.00 | 19,965.00 | 19,965.00 | 30,000.00 | 30,000.00 | 78,403.70 | 78,403.70 | | 0076 | 725-01-00100 | Temporary Detour Roads | 1,489.4 | SQYD | 75.00 | 111,705.00 | 134.56 | 200,413.66 | 65.00 | 96,811.00 | 107.66 | 160,348.80 | | 0077 | 726-01-00100 | Bedding Material | 955.9 | CUYD | 52.00 | 49,706.80 | 90.73 | 86,728.81 | 75.00 | 71,692.50 | 77.46 | 74,047.84 | | 0078 | 727-01-00100 | Mobilization | 1 | LUMP | 470,000.00 | 470,000.00 | 783,574.87 | 783,574.87 | 750,000.00 | 750,000.00 | 349,199.66 | 349,199.66 | | 0079 | 729-01-00100 | Sign (Type A) | 97.5 | SQFT | 53.00 | 5,167.50 | 69.44 | 6,770.40 | 45.00 | 4,387.50 | 50.38 | 4,912.05 | | 0080 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 13 | EACH | 105.00 | 1,365.00 | 57.51 | 747.63 | 100.00 | 1,300.00 | 272.50 | 3,542.50 | | 0081 | 731-02-00100 | Reflectorized Raised Pavement Markers | 484 | EACH | 5.25 | 2,541.00 | 5.97 | 2,889.48 | 6.00 | 2,904.00 | 6.00 | 2,901.58 | | 0082 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 2,515 | LNFT | 8.50 | 21,377.50 | 8.68 | 21,830.20 | 9.00 | 22,635.00 | 8.72 | 21,930.80 | | 0083 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.545 | MILE | 3,500.00 | 19,407.50 | 3,038.00 | 16,845.71 | 3,000.00 | 16,635.00 | 3,052.00 | 16,923.34 | | 0084 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.476 | MILE | 5,500.00 | 2,618.00 | 6,076.00 | 2,892.18 | 6,000.00 | 2,856.00 | 6,104.00 | 2,905.50 | | 0085 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.253 | MILE | 1,300.00 | 1,628.90 | 1,302.00 | 1,631.41 | 1,300.00 | 1,628.90 | 1,308.00 | 1,638.92 | | 0086 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.768 | MILE | 1,500.00 | 1,152.00 | 1,519.00 | 1,166.59 | 1,400.00 | 1,075.20 | 1,526.00 | 1,171.97 | | 0087 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.222 | MILE | 2,100.00 | 466.20 | 2,170.00 | 481.74 | 2,200.00 | 488.40 | 2,180.00 | 483.96 | | 0088 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 14 | EACH | 210.00 | 2,940.00 | 244.13 | 3,417.82 | 250.00 | 3,500.00 | 245.25 | 3,433.50 | | 0089 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 6 | EACH | 236.00 | 1,416.00 | 352.63 | 2,115.78 | 350.00 | 2,100.00 | 354.25 | 2,125.50 | | 0090 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 16 | EACH | 210.00 | 3,360.00 | 271.25 | 4,340.00 | 300.00 | 4,800.00 | 272.50 | 4,360.00 | | 0091 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 5 | EACH | 370.00 | 1,850.00 | 379.75 | 1,898.75 | 400.00 | 2,000.00 | 381.50 | 1,907.50 | | 0092 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 26 | EACH | 262.00 | 6,812.00 | 271.25 | 7,052.50 | 300.00 | 7,800.00 | 272.50 | 7,085.00 | | 0093 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 5 | EACH | 420.00 | 2,100.00 | 651.00 | 3,255.00 | 650.00 | 3,250.00 | 654.00 | 3,270.00 | | 0094 | 735-01-00100 | Mailboxes | 2 | EACH | 5.25 | 10.50 | 16.28 | 32.56 | 5.00 | 10.00 | 5.45 | 10.90 | | 0095 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 263.00 | 526.00 | 124.78 | 249.56 | 200.00 | 400.00 | 272.50 | 545.00 | | 0096 | 736-01-00100 | Trenching and Backfilling | 435 | LNFT | 7.30 | 3,175.50 | 8.21 | 3,571.35 | 8.50 | 3,697.50 | 17.34 | 7,543.77 | | 0097 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 1,040 | LNFT | 25.00 | 26,000.00 | 23.72 | 24,668.80 | 17.00 | 17,680.00 | 30.66 | 31,888.48 | | 0098 | 736-04-02000 | Signal Support (Pedestal Pole) | 1 | EACH | 2,800.00 | 2,800.00 | 3,277.79 | 3,277.79 | 3,500.00 | 3,500.00 | 4,927.89 | 4,927.89 | | 0099 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 8 | EACH | 1,100.00 | 8,800.00 | 1,280.30 | 10,242.40 | 1,200.00 | 9,600.00 | 2,233.41 | 17,867.28 | | 0100 | 736-05-02070 | Signal Hds (3 Sec, 12" Led Lens, LT. R, LT. Y, LT. G) | 1 | EACH | 1,100.00 | 1,100.00 | 1,328.04 | 1,328.04 | 1,200.00 | 1,200.00 | 1,197.91 | 1,197.91 | | 0101 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 3 | EACH | 1,700.00 | 5,100.00 | 1,750.11 | 5,250.33 | 1,600.00 | 4,800.00 | 1,652.44 | 4,957.32 | | 0102 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 1,700.00 | 1,700.00 | 1,724.07 | 1,724.07 | 1,600.00 | 1,600.00 | 3,143.56 | 3,143.56 | | 0103 | 736-05-05000 | Signal Heads (3 Section, 12" Optically Programmed Lens, R, Y, G) | 2 | EACH | 6,300.00 | 12,600.00 | 9,602.25 | 19,204.50 | 5,000.00 | 10,000.00 | 4,951.87 | 9,903.74 | | 0104 | 736-05-07000 | Signal Heads (5 Section, 12" Optically Programmed Lens, R, LT. Y, Y, LT. G, G) | 1 | EACH | 7,300.00 | 7,300.00 | 9,602.25 | 9,602.25 | 7,500.00 | 7,500.00 | 8,006.05 | 8,006.05 | | 0105 | 736-06-00100 | Signal Service | 1 | EACH | 3,800.00 | 3,800.00 | 2,906.72 | 2,906.72 | 2,500.00 | 2,500.00 | 3,829.17 | 3,829.17 | | 0106 | 736-06-00200 | Signal Service (Pedestal Required) | 1 | EACH | 3,300.00 | 3,300.00 | 3,372.18 | 3,372.18 | 3,000.00 | 3,000.00 | 2,786.04 | 2,786.04 | | 0107 | 736-09-00100 | Loop Detector | 353 | LNFT | 23.00 | 8,119.00 | 34.82 | 12,291.46 | 24.00 | 8,472.00 | 49.75 | 17,561.04 | | 0108 | 736-10-00200 | Underground Junction Box (Type E) | 6 | EACH | 700.00 | 4,200.00 | 994.95 | 5,969.70 | 620.00 | 3,720.00 | 670.35 | 4,022.10 | | 0109 | 736-10-00300 | Underground Junction Box (Type F) | 5 | EACH | 785.00 | 3,925.00 | 1,193.50 | 5,967.50 | 725.00 | 3,625.00 | 1,750.54 | 8,752.70 | | 0110 | 736-10-00400 | Underground Junction Box (Type G) | 1 | EACH | 1,300.00 | 1,300.00 | 1,867.29 | 1,867.29 | 1,000.00 | 1,000.00 | 2,403.45 | 2,403.45 | | 0111 | 736-11-00100 | Conduit (1/2" HDPE, Schedule 80) | 5 | LNFT | 2.00 | 10.00 | 3.26 | 16.30 | 2.20 | 11.00 | 4.19 | 20.93 | | 0112 | 736-11-00200 | Conduit (1" HDPE, Schedule 80) | 677 | LNFT | 2.00 | 1,354.00 | 3.81 | 2,579.37 | 14.00 | 9,478.00 | 15.16 | 10,264.67 | | 0113 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 37 | LNFT | 4.00 | 148.00 | 4.34 | 160.58 | 5.00 | 185.00 | 8.94 | 330.71 | | 0114 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 316 | LNFT | 4.00 | 1,264.00 | 6.63 | 2,095.08 | 8.50 | 2,686.00 | 17.59 | 5,559.39 | | 0115 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 1,836 | LNFT | 2.00 | 3,672.00 | 2.70 | 4,957.20 | 1.00 | 1,836.00 | 1.53 | 2,801.74 | | 0116 | 736-12-01020 | Conductor (2c, #6 awg) | 500 | LNFT | 4.25 | 2,125.00 | 3.27 | 1,635.00 | 2.60 | 1,300.00 | 5.30 | 2,648.50 | | 0117 | 736-12-01040 | Conductor (2c, #14 awg) | 855 | LNFT | 2.00 | 1,710.00 | 1.56 | 1,333.80 | 0.80 | 684.00 | 1.37 | 1,173.92 | | 0118 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 630 | LNFT | 4.30 | 2,709.00 | 4.81 | 3,030.30 | 4.00 | 2,520.00 | 8.09 | 5,095.44 | | 0119 | 736-12-02020 | Conductor (3c, #14 awg) | 778 | LNFT | 1.40 | 1,089.20 | 1.91 | 1,485.98 | 1.00 | 778.00 | 2.21 | 1,721.71 | | 0120 | 736-12-04000 | Conductor (6c, #14 awg) | 1,061 | LNFT | 2.25 | 2,387.25 | 2.34 | 2,482.74 | 3.00 | 3,183.00 | 5.57 | 5,909.77 | | 0121 | 736-12-06000 | Conductor (10c, #14 awg) | 1,824 | LNFT | 2.00 | 3,648.00 | 3.89 | 7,095.36 | 3.20 | 5,836.80 | 6.43 | 11,730.14 | | 0122 | 739-01-00100 | Hydro-Seeding | 2.14 | ACRE | 1,500.00 | 3,210.00 | 1,356.25 | 2,902.38 | 1,600.00 | 3,424.00 | 3,052.00 | 6,531.28 | | 0123 | 740-01-00100 | Construction Layout | 1 | LUMP | 250,000.00 | 250,000.00 | 45,322.62 | 45,322.62 | 150,000.00 | 150,000.00 | 21,698.38 | 21,698.38 | | 0124 | 742-01-00400 | Sanitary Sewer Pipe (8") | 181 | LNFT | 100.00 | 18,100.00 | 36.30 | 6,570.30 | 60.00 | 10,860.00 | 162.31 | 29,378.83 | | 0125 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 300,000.00 | 300,000.00 | 60,819.00 | 60,819.00 | 100,000.00 | 100,000.00 | 206,348.85 | 206,348.85 | | 0126 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 336.93 | CUYD | 505.00 | 170,149.65 | 65.30 | 22,001.53 | 1,200.00 | 404,316.00 | 320.76 | 108,074.34 | | 0127 | 805-12-24040 | Reinforced Concrete Box Culverts (10' x 8') (Precast) | 276 | LNFT | 1,300.00 | 358,800.00 | 1,094.00 | 301,944.00 | 1,200.00 | 331,200.00 | 988.55 | 272,838.42 | | 0128 | 806-01-00100 | Deformed Reinforcing Steel | 43,779 | LB | 1.00 | 43,779.00 | 0.05 | 2,188.95 | 1.30 | 56,912.70 | 0.79 | 34,454.07 | | 0129 | 807-08-00100 | Structural Metalwork (Side Path Drain Cover | 3,559.5 | LUMP | 20,000.00 | 20,000.00 | 9,256.50 | 9,256.50 | 25,000.00 | 25,000.00 | 751.01 | 751.01 | | 0130 | 810-03-00100 | Pipe Railing | 69.9 | LNFT | 100.00 | 6,990.00 | 176.83 | 12,360.42 | 125.00 | 8,737.50 | 159.69 | 11,162.47 | | 0131 | NS-300-00060 | Geogrid | 7,164.88 | SQYD | 2.00 | 14,329.76 | 2.86 | 20,491.56 | 4.00 | 28,659.52 | 1.17 | 8,411.57 | | 0132 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 888 | INLF | 1.50 | 1,332.00 | 1.21 | 1,074.48 | 0.80 | 710.40 | 1.23 | 1,092.24 | | 0133 | NS-502-01000 | Asphalt Concrete | 17,929.42 | TON | 74.00 | 1,326,777.08 | 96.57 | 1,731,444.09 | 94.00 | 1,685,365.48 | 97.01 | 1,739,333.03 | | 0134 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 376 | TON | 137.00 | 51,512.00 | 146.48 | 55,076.48 | 150.00 | 56,400.00 | 141.70 | 53,279.20 | | 0135 | NS-509-01000 | Milling Asphalt Pavement | 5,465.3 | SQYD | 2.75 | 15,029.58 | 2.71 | 14,810.96 | 5.00 | 27,326.50 | 2.73 | 14,892.94 | | 0136 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -228 | CUYD | 0.01 | -2.28 | 23.87 | -5,442.36 | 0.00 | 0.00 | 23.98 | -5,467.44 | | 0137 | NS-510-01200 | Pavement Patching (8" Minimum Thickness) | 168 | SQYD | 65.00 | 10,920.00 | 143.75 | 24,150.00 | 120.00 | 20,160.00 | 103.72 | 17,425.30 | | 0138 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 12,288 | INLF | 1.50 | 18,432.00 | 1.21 | 14,868.48 | 1.00 | 12,288.00 | 0.94 | 11,513.86 | | 0139 | NS-700-00220 | Impact Attenuator (Kinetic; Test Level 3) | 1 | EACH | 25,000.00 | 25,000.00 | 23,595.00 | 23,595.00 | 25,000.00 | 25,000.00 | 25,615.00 | 25,615.00 | | 0140 | NS-700-00600 | Lane Separator System (Furnish and Install) | 80.11 | LNFT | 110.00 | 8,812.10 | 84.70 | 6,785.32 | 85.00 | 6,809.35 | 111.18 | 8,906.63 | | 0141 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 4,306 | LNFT | 5.00 | 21,530.00 | 1.15 | 4,951.90 | 5.00 | 21,530.00 | 4.66 | 20,057.35 | | 0142 | NS-705-00002 | Temporary Fence | 500 | LF | 35.00 | 17,500.00 | 4.84 | 2,420.00 | 20.00 | 10,000.00 | 14.17 | 7,085.00 | | 0143 | NS-736-00004 | LED Blank-Out Sign | 1 | EACH | 6,000.00 | 6,000.00 | 9,323.41 | 9,323.41 | 6,000.00 | 6,000.00 | 4,992.20 | 4,992.20 | | 0144 | NS-736-00005 | Video Detection Cabinet Components | 1 | EACH | 11,000.00 | 11,000.00 | 14,338.28 | 14,338.28 | 10,000.00 | 10,000.00 | 19,011.78 | 19,011.78 | | 0145 | NS-736-00006 | Video Detection Camera | 5 | EACH | 2,500.00 | 12,500.00 | 2,659.34 | 13,296.70 | 3,000.00 | 15,000.00 | 5,755.20 | 28,776.00 | | 0146 | NS-MSC-00120 | Drainage Structure PG-02 Paved Gutter Drain | 4 | EACH | 5,000.00 | 20,000.00 | 2,420.00 | 9,680.00 | 4,500.00 | 18,000.00 | 5,607.65 | 22,430.59 | | 0147 | NS-P17-00009 | Pedestrian Pushbuttons | 6 | EACH | 275.00 | 1,650.00 | 208.32 | 1,249.92 | 350.00 | 2,100.00 | 348.80 | 2,092.80 | | 0148 | NS-P17-00010 | Emergency Vehicle Preemption Phase Selector | 1 | EACH | 5,000.00 | 5,000.00 | 875.60 | 875.60 | 3,800.00 | 3,800.00 | 8,116.14 | 8,116.14 | | 0149 | NS-P17-00012 | Signal Cont and Cab 54" height (TS-2, Typ 1, Eth)Install on new base | 1 | EACH | 35,000.00 | 35,000.00 | 31,189.41 | 31,189.41 | 33,000.00 | 33,000.00 | 33,245.00 | 33,245.00 | | 0150 | NS-P17-00018 | Emergency Vehicle Preemption Detector | 5 | EACH | 1,000.00 | 5,000.00 | 4,417.04 | 22,085.20 | 900.00 | 4,500.00 | 1,690.59 | 8,452.95 | | 0151 | NS-P17-00020 | LED Street Name Sign (18"xVaries) | 2 | EACH | 2,800.00 | 5,600.00 | 3,899.49 | 7,798.98 | 3,000.00 | 6,000.00 | 3,090.15 | 6,180.30 | | 0152 | NS-P17-00021 | LED Street Name Sign (26.5"xVaries) | 2 | EACH | 3,200.00 | 6,400.00 | 3,899.49 | 7,798.98 | 4,200.00 | 8,400.00 | 4,406.87 | 8,813.74 | | 0153 | NS-P17-00039 | Signal Support (Mast Arm Standard w/45 ft Arm and 1 luminaire) | 1 | EACH | 22,000.00 | 22,000.00 | 32,662.84 | 32,662.84 | 33,000.00 | 33,000.00 | 52,314.55 | 52,314.55 | | 0154 | NS-P17-00045 | Signal Support (Mast Arm Standard w/55 ft Arm and 1 luminaire) | 3 | EACH | 27,000.00 | 81,000.00 | 40,530.18 | 121,590.54 | 50,000.00 | 150,000.00 | 79,046.80 | 237,140.40 | | 0155 | NS-P17-00059 | Signal Head (LED Pedistrian Signal) | 6 | EACH | 925.00 | 5,550.00 | 953.72 | 5,722.32 | 1,500.00 | 9,000.00 | 1,425.72 | 8,554.32 | | 0156 | NS-P17-00114 | Additional Mast Arm (50 foot Arm) | 1 | EACH | 23,000.00 | 23,000.00 | 2,185.19 | 2,185.19 | 11,500.00 | 11,500.00 | 12,507.75 | 12,507.75 | | 0157 | 302-02-04500 | Class II Base Course (9" Thick) (Stone or Recycled Portland Cement Concrete) | 9,983.75 | SQYD | 27.00 | 269,561.25 | 26.13 | 260,875.39 | 30.00 | 299,512.50 | 36.79 | 367,272.21 | | 0158 | 706-02-00200 | Concrete Drive (6" Thick) | 1,606.4 | SQYD | 78.00 | 125,299.20 | 73.13 | 117,476.03 | 80.00 | 128,512.00 | 67.58 | 108,560.51 | | 0159 | NS-502-04000 | Asphalt Concrete (SMA) Wearing Course | 2,856.63 | TON | 132.00 | 377,075.16 | 131.29 | 375,046.95 | 125.00 | 357,078.75 | 132.98 | 379,874.66 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,791,953.82 | | 7,953,517.67 | | 8,820,036.40 | | 9,003,055.30 |
|