Proposal:H.000883.6
Parish:Beauregard
Routes:N. WASHINGTON ST.
Description:DERIDDER SIDEWALKS AND LIGHTING
Type Construction:PAVEMENT PATCHING, PORTLAND CEMENT CONCRETE PAVEMENT, LIGHTING, DRILLED SHAFT FOUNDATIONS, AND RELATED WORK.
Estimated Construction Cost:$360,523.75
| Rank | License | Bidder | Construction Bid |
| 1 | 39104 | RMK Construction Company LLC | $344,002.80 |
| 2 | 27239 | Apeck Construction, LLC | $387,874.03 |
| 3 | 39001 | JD's Rebar & Construction Inc. | $458,347.30 |
| 4 | 30774 | Progressive Construction Co., LLC | $523,704.70 |
| 5 | 18546 | C W & W Contractors, Inc. | $527,276.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - RMK Construction Company LLC | - 2 - Apeck Construction, LLC | - 3 - JD's Rebar & Construction Inc. | - 4 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,500.00 | 1,500.00 | 5,430.76 | 5,430.76 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-00020 | Removal of Pavement (Asphalt Overlaid PCCP) | 65 | SQYD | 9.00 | 585.00 | 51.98 | 3,378.70 | 68.00 | 4,420.00 | 50.00 | 3,250.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,142 | SQYD | 5.00 | 5,710.00 | 12.30 | 14,046.60 | 11.00 | 12,562.00 | 25.00 | 28,550.00 | | 0004 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 436.8 | CUYD | 30.00 | 13,104.00 | 79.91 | 34,904.69 | 59.00 | 25,771.20 | 110.00 | 48,048.00 | | 0005 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 115 | SQYD | 124.00 | 14,260.00 | 218.90 | 25,173.50 | 143.00 | 16,445.00 | 123.00 | 14,145.00 | | 0006 | 706-01-00100 | Concrete Walk (4" Thick) | 987.3 | SQYD | 48.00 | 47,390.40 | 45.95 | 45,366.44 | 69.00 | 68,123.70 | 64.00 | 63,187.20 | | 0007 | 706-02-00200 | Concrete Drive (6" Thick) | 15.4 | SQYD | 72.00 | 1,108.80 | 177.21 | 2,729.03 | 350.00 | 5,390.00 | 70.00 | 1,078.00 | | 0008 | 706-04-00100 | Handicapped Curb Ramps | 14 | EACH | 1,000.00 | 14,000.00 | 1,298.70 | 18,181.80 | 1,500.00 | 21,000.00 | 2,000.00 | 28,000.00 | | 0009 | 707-03-00100 | Combination Concrete Curb and Gutter | 843.3 | LNFT | 22.00 | 18,552.60 | 25.79 | 21,748.71 | 28.00 | 23,612.40 | 35.00 | 29,515.50 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 18,000.00 | 18,000.00 | 10,554.94 | 10,554.94 | 4,000.00 | 4,000.00 | 25,000.00 | 25,000.00 | | 0011 | 727-01-00100 | Mobilization | 1 | LUMP | 29,000.00 | 29,000.00 | 6,321.00 | 6,321.00 | 73,000.00 | 73,000.00 | 50,000.00 | 50,000.00 | | 0012 | 730-01-00100 | Trenching and Backfilling | 800 | LNFT | 4.00 | 3,200.00 | 4.83 | 3,864.00 | 15.00 | 12,000.00 | 12.00 | 9,600.00 | | 0013 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") (SCH. 40 PVC, 2 #6 XHHW-2 STR. CU., 1 #8 EGC. XHHW-2 STR. CU. GREEN INSUL.) | 910 | LNFT | 10.00 | 9,100.00 | 7.60 | 6,916.00 | 5.00 | 4,550.00 | 6.00 | 5,460.00 | | 0014 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") (SCH. 80 PVC, 2 #6 XHHW-2 STR. CU., 1 #8 EGC. XHHW-2 STR. CU. GREEN INSUL.) | 10 | LNFT | 13.00 | 130.00 | 21.11 | 211.10 | 12.00 | 120.00 | 15.00 | 150.00 | | 0015 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (SCH 40 PVC WITH NO CONDUCTORS) | 30 | LNFT | 9.50 | 285.00 | 9.05 | 271.50 | 9.00 | 270.00 | 11.00 | 330.00 | | 0016 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (SCH 80 PVC WITH NO CONDUCTORS) | 40 | LNFT | 11.00 | 440.00 | 8.30 | 332.00 | 10.00 | 400.00 | 12.00 | 480.00 | | 0017 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (SCH. 40 PVC, 2 #6 XHHW-2 STR. CU., 1 #8 EGC. XHHW-2 STR. CU. GREEN INSUL.) | 10 | LNFT | 14.00 | 140.00 | 27.14 | 271.40 | 13.00 | 130.00 | 16.00 | 160.00 | | 0018 | 730-04-00100 | Jacked or Bored Casing (4" Diameter) (PVC/HDPE) | 160 | LNFT | 50.00 | 8,000.00 | 42.22 | 6,755.20 | 40.00 | 6,400.00 | 50.00 | 8,000.00 | | 0019 | 730-05-10000 | Light Pole (16') (ALUMINUM, ORNAMENTAL) (TWIN ARMS) (GROUND MOUNT) | 9 | EACH | 5,500.00 | 49,500.00 | 4,037.68 | 36,339.12 | 5,250.00 | 47,250.00 | 6,000.00 | 54,000.00 | | 0020 | 730-07-10000 | Luminaire (150 WATT) (HIGH PRESSURE SODIUM) (TYPE V, ACORN GLOBE W/LAMP, DOUBLE FUSE) | 18 | EACH | 1,000.00 | 18,000.00 | 611.52 | 11,007.36 | 1,050.00 | 18,900.00 | 1,250.00 | 22,500.00 | | 0021 | 730-08-00200 | Electrical Service Point (Structure) | 2 | EACH | 2,200.00 | 4,400.00 | 753.93 | 1,507.86 | 2,000.00 | 4,000.00 | 2,350.00 | 4,700.00 | | 0022 | 730-09-00100 | Electrical System | 1 | LUMP | 3,300.00 | 3,300.00 | 6,272.65 | 6,272.65 | 3,000.00 | 3,000.00 | 3,500.00 | 3,500.00 | | 0023 | 730-12-00100 | Removal and Storage of Light Poles (Ground Mounted) (30' MH, SINGLE ARM, STREET) | 8 | EACH | 100.00 | 800.00 | 75.39 | 603.12 | 400.00 | 3,200.00 | 470.00 | 3,760.00 | | 0024 | 730-13-00100 | Removal and Disposal of Light Pole Foundation | 8 | EACH | 50.00 | 400.00 | 339.42 | 2,715.36 | 600.00 | 4,800.00 | 530.00 | 4,240.00 | | 0025 | 730-14-00100 | Removal and Disposal of Luminaires | 8 | EACH | 100.00 | 800.00 | 49.01 | 392.08 | 100.00 | 800.00 | 120.00 | 960.00 | | 0026 | 730-16-00200 | Underground Junction Box (11" x 18") | 5 | EACH | 715.00 | 3,575.00 | 361.88 | 1,809.40 | 700.00 | 3,500.00 | 825.00 | 4,125.00 | | 0027 | 730-20-00020 | Disconnect (Service) (60A, 2P, 240V, CIRCUIT BREAKER, NEMA 3R PAINTED STEEL ENCLOSURE) | 2 | EACH | 1,450.00 | 2,900.00 | 3,015.70 | 6,031.40 | 1,400.00 | 2,800.00 | 1,650.00 | 3,300.00 | | 0028 | 730-21-00020 | Duct Marker (Concrete) | 4 | EACH | 325.00 | 1,300.00 | 83.69 | 334.76 | 350.00 | 1,400.00 | 412.00 | 1,648.00 | | 0029 | 730-22-00420 | Underground Marker Tape (6")(Detectable) | 800 | LNFT | 0.65 | 520.00 | 0.60 | 480.00 | 0.55 | 440.00 | 1.00 | 800.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 55 | EACH | 22.00 | 1,210.00 | 9.65 | 530.75 | 9.00 | 495.00 | 17.00 | 935.00 | | 0031 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 437 | LNFT | 8.00 | 3,496.00 | 6.03 | 2,635.11 | 6.00 | 2,622.00 | 10.00 | 4,370.00 | | 0032 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 176 | LNFT | 22.00 | 3,872.00 | 15.08 | 2,654.08 | 13.00 | 2,288.00 | 21.00 | 3,696.00 | | 0033 | 732-05-00100 | Removal of Existing Markings | 0.1 | MILE | 10,000.00 | 1,000.00 | 5,428.30 | 542.83 | 4,500.00 | 450.00 | 65,000.00 | 6,500.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,500.00 | 3,500.00 | 21,607.24 | 21,607.24 | 5,000.00 | 5,000.00 | 3,400.00 | 3,400.00 | | 0035 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,746 | INLF | 1.50 | 7,119.00 | 2.30 | 10,915.80 | 3.00 | 14,238.00 | 2.00 | 9,492.00 | | 0036 | NS-ENH-03060 | Concrete Steps (INSTALLED) | 11 | SQYD | 200.00 | 2,200.00 | 638.05 | 7,018.55 | 1,200.00 | 13,200.00 | 450.00 | 4,950.00 | | 0037 | NS-ENH-08000 | Handrails (Type A) | 49 | LNFT | 200.00 | 9,800.00 | 99.97 | 4,898.53 | 70.00 | 3,430.00 | 125.00 | 6,125.00 | | 0038 | NS-ENH-08000 | Handrails (Type B) | 11 | LNFT | 175.00 | 1,925.00 | 100.20 | 1,102.20 | 210.00 | 2,310.00 | 125.00 | 1,375.00 | | 0039 | NS-ENH-08000 | Handrails (Type C) | 82 | LNFT | 250.00 | 20,500.00 | 133.29 | 10,929.78 | 120.00 | 9,840.00 | 200.00 | 16,400.00 | | 0040 | NS-ENH-20000 | Temporary Business Entrances (Furnished and Installed) | 1 | LUMP | 5,000.00 | 5,000.00 | 9,854.56 | 9,854.56 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | | 0041 | NS-ENH-20100 | Trench Drains (Gutter) | 36 | LNFT | 150.00 | 5,400.00 | 272.43 | 9,807.48 | 150.00 | 5,400.00 | 150.00 | 5,400.00 | | 0042 | NS-ENH-23000 | Walks (Concrete) (Non-Railed Building Entrance/Exit Ramps) | 52 | SQYD | 90.00 | 4,680.00 | 207.27 | 10,778.04 | 100.00 | 5,200.00 | 185.00 | 9,620.00 | | 0043 | NS-ENH-23000 | Walks (Concrete) (Railed Building Entrance/Exit Ramps) | 43 | SQYD | 100.00 | 4,300.00 | 480.20 | 20,648.60 | 130.00 | 5,590.00 | 185.00 | 7,955.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 344,002.80 | | 387,874.03 | | 458,347.30 | | 523,704.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - C W & W Contractors, Inc. | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | | 0002 | 202-02-00020 | Removal of Pavement (Asphalt Overlaid PCCP) | 65 | SQYD | 10.00 | 650.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,142 | SQYD | 10.00 | 11,420.00 | | 0004 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 436.8 | CUYD | 100.00 | 43,680.00 | | 0005 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 115 | SQYD | 125.00 | 14,375.00 | | 0006 | 706-01-00100 | Concrete Walk (4" Thick) | 987.3 | SQYD | 65.00 | 64,174.50 | | 0007 | 706-02-00200 | Concrete Drive (6" Thick) | 15.4 | SQYD | 85.00 | 1,309.00 | | 0008 | 706-04-00100 | Handicapped Curb Ramps | 14 | EACH | 1,500.00 | 21,000.00 | | 0009 | 707-03-00100 | Combination Concrete Curb and Gutter | 843.3 | LNFT | 30.00 | 25,299.00 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,100.00 | 5,100.00 | | 0011 | 727-01-00100 | Mobilization | 1 | LUMP | 97,000.00 | 97,000.00 | | 0012 | 730-01-00100 | Trenching and Backfilling | 800 | LNFT | 12.00 | 9,600.00 | | 0013 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") (SCH. 40 PVC, 2 #6 XHHW-2 STR. CU., 1 #8 EGC. XHHW-2 STR. CU. GREEN INSUL.) | 910 | LNFT | 6.00 | 5,460.00 | | 0014 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") (SCH. 80 PVC, 2 #6 XHHW-2 STR. CU., 1 #8 EGC. XHHW-2 STR. CU. GREEN INSUL.) | 10 | LNFT | 14.00 | 140.00 | | 0015 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (SCH 40 PVC WITH NO CONDUCTORS) | 30 | LNFT | 11.00 | 330.00 | | 0016 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (SCH 80 PVC WITH NO CONDUCTORS) | 40 | LNFT | 12.00 | 480.00 | | 0017 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (SCH. 40 PVC, 2 #6 XHHW-2 STR. CU., 1 #8 EGC. XHHW-2 STR. CU. GREEN INSUL.) | 10 | LNFT | 15.00 | 150.00 | | 0018 | 730-04-00100 | Jacked or Bored Casing (4" Diameter) (PVC/HDPE) | 160 | LNFT | 46.00 | 7,360.00 | | 0019 | 730-05-10000 | Light Pole (16') (ALUMINUM, ORNAMENTAL) (TWIN ARMS) (GROUND MOUNT) | 9 | EACH | 6,100.00 | 54,900.00 | | 0020 | 730-07-10000 | Luminaire (150 WATT) (HIGH PRESSURE SODIUM) (TYPE V, ACORN GLOBE W/LAMP, DOUBLE FUSE) | 18 | EACH | 1,300.00 | 23,400.00 | | 0021 | 730-08-00200 | Electrical Service Point (Structure) | 2 | EACH | 2,300.00 | 4,600.00 | | 0022 | 730-09-00100 | Electrical System | 1 | LUMP | 3,450.00 | 3,450.00 | | 0023 | 730-12-00100 | Removal and Storage of Light Poles (Ground Mounted) (30' MH, SINGLE ARM, STREET) | 8 | EACH | 500.00 | 4,000.00 | | 0024 | 730-13-00100 | Removal and Disposal of Light Pole Foundation | 8 | EACH | 500.00 | 4,000.00 | | 0025 | 730-14-00100 | Removal and Disposal of Luminaires | 8 | EACH | 150.00 | 1,200.00 | | 0026 | 730-16-00200 | Underground Junction Box (11" x 18") | 5 | EACH | 900.00 | 4,500.00 | | 0027 | 730-20-00020 | Disconnect (Service) (60A, 2P, 240V, CIRCUIT BREAKER, NEMA 3R PAINTED STEEL ENCLOSURE) | 2 | EACH | 1,600.00 | 3,200.00 | | 0028 | 730-21-00020 | Duct Marker (Concrete) | 4 | EACH | 400.00 | 1,600.00 | | 0029 | 730-22-00420 | Underground Marker Tape (6")(Detectable) | 800 | LNFT | 1.00 | 800.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 55 | EACH | 10.00 | 550.00 | | 0031 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 437 | LNFT | 6.00 | 2,622.00 | | 0032 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 176 | LNFT | 15.00 | 2,640.00 | | 0033 | 732-05-00100 | Removal of Existing Markings | 0.1 | MILE | 5,200.00 | 520.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | | 0035 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,746 | INLF | 2.00 | 9,492.00 | | 0036 | NS-ENH-03060 | Concrete Steps (INSTALLED) | 11 | SQYD | 650.00 | 7,150.00 | | 0037 | NS-ENH-08000 | Handrails (Type A) | 49 | LNFT | 200.00 | 9,800.00 | | 0038 | NS-ENH-08000 | Handrails (Type B) | 11 | LNFT | 225.00 | 2,475.00 | | 0039 | NS-ENH-08000 | Handrails (Type C) | 82 | LNFT | 250.00 | 20,500.00 | | 0040 | NS-ENH-20000 | Temporary Business Entrances (Furnished and Installed) | 1 | LUMP | 10,000.00 | 10,000.00 | | 0041 | NS-ENH-20100 | Trench Drains (Gutter) | 36 | LNFT | 200.00 | 7,200.00 | | 0042 | NS-ENH-23000 | Walks (Concrete) (Non-Railed Building Entrance/Exit Ramps) | 52 | SQYD | 200.00 | 10,400.00 | | 0043 | NS-ENH-23000 | Walks (Concrete) (Railed Building Entrance/Exit Ramps) | 43 | SQYD | 250.00 | 10,750.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 527,276.50 |
|