Proposal:H.012733.6
Parish:Iberville
Routes:LA 3066
Description:LA 3066: SLIDE FAILURE 2 MI N OF LA 75
Type Construction:RIPRAP, EMBANKMENT, ASPHALT OVERLAY, AND RELATED WORK
Estimated Construction Cost:$898,781.56
| Rank | License | Bidder | Construction Bid |
| 1 | 12198 | Byron E. Talbot Contractor, Inc. | $914,496.50 |
| 2 | 31943 | Hamp's Construction L.L.C. | $996,111.00 |
| 3 | 57931 | KCR CONTRACTORS, LLC | $996,144.75 |
| 4 | 00481 | COASTAL BRIDGE CO., L.L.C. | $1,110,749.33 |
| 5 | 55950 | Brown Industrial Construction, LLC | $1,467,506.41 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Byron E. Talbot Contractor, Inc. | - 2 - Hamp's Construction L.L.C. | - 3 - KCR CONTRACTORS, LLC | - 4 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.4 | LUMP | 25,000.00 | 25,000.00 | 64,600.00 | 64,600.00 | 15,585.00 | 15,585.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 94.4 | SQYD | 14.00 | 1,321.60 | 10.00 | 944.00 | 11.50 | 1,085.60 | 25.00 | 2,360.00 | | 0003 | 203-04-00300 | Nonplastic Embankment (Stone) | 801.2 | CUYD | 106.00 | 84,927.20 | 60.00 | 48,072.00 | 28.32 | 22,689.98 | 85.00 | 68,102.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 9,500.00 | 9,500.00 | 6,450.00 | 6,450.00 | 63,950.00 | 63,950.00 | 70,000.00 | 70,000.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 5,118.6 | CUYD | 25.00 | 127,965.00 | 32.00 | 163,795.20 | 30.69 | 157,089.83 | 12.00 | 61,423.20 | | 0006 | 203-08-00100 | Geotextile Fabric | 8,471.6 | SQYD | 2.00 | 16,943.20 | 0.85 | 7,200.86 | 1.15 | 9,742.34 | 2.00 | 16,943.20 | | 0007 | 204-02-00100 | Temporary Hay Bales | 20 | EACH | 20.00 | 400.00 | 10.00 | 200.00 | 17.25 | 345.00 | 15.00 | 300.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 700 | LNFT | 2.50 | 1,750.00 | 1.00 | 700.00 | 2.24 | 1,568.00 | 2.00 | 1,400.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 35 | CUYD | 106.00 | 3,710.00 | 100.00 | 3,500.00 | 115.00 | 4,025.00 | 100.00 | 3,500.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 249.5 | TON | 145.00 | 36,177.50 | 132.00 | 32,934.00 | 141.51 | 35,306.75 | 125.00 | 31,187.50 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 4.6 | TON | 700.00 | 3,220.00 | 132.00 | 607.20 | 141.51 | 650.95 | 225.00 | 1,035.00 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 1,488 | SQYD | 7.50 | 11,160.00 | 6.12 | 9,106.56 | 6.58 | 9,791.04 | 10.00 | 14,880.00 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -83 | CUYD | 1.00 | -83.00 | 1.00 | -83.00 | 0.10 | -8.30 | 0.01 | -0.83 | | 0014 | 711-03-00700 | Riprap (440 lb) | 6,965 | TON | 77.00 | 536,305.00 | 59.00 | 410,935.00 | 73.73 | 513,529.45 | 110.00 | 766,150.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 102,331.00 | 102,331.00 | 28,750.00 | 28,750.00 | 15,000.00 | 15,000.00 | | 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.27 | MILE | 2,500.00 | 675.00 | 800.00 | 216.00 | 840.00 | 226.80 | 2,000.00 | 540.00 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 17,000.00 | 17,000.00 | 93,887.00 | 93,887.00 | 99,600.00 | 99,600.00 | 20,000.00 | 20,000.00 | | 0018 | 731-02-00100 | Reflectorized Raised Pavement Markers | 36 | EACH | 18.00 | 648.00 | 8.00 | 288.00 | 8.40 | 302.40 | 15.00 | 540.00 | | 0019 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.539 | MILE | 7,000.00 | 3,773.00 | 3,400.00 | 1,832.60 | 3,574.68 | 1,926.75 | 6,500.00 | 3,503.50 | | 0020 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 32,000.00 | 32,000.00 | 20,500.00 | 20,500.00 | 15,000.00 | 15,000.00 | | 0021 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 12,883.2 | INLF | 1.25 | 16,104.00 | 0.90 | 11,594.88 | 0.55 | 7,085.76 | 0.55 | 7,085.76 | | 0022 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 1 | EACH | 5,000.00 | 5,000.00 | 4,999.70 | 4,999.70 | 2,402.40 | 2,402.40 | 1,800.00 | 1,800.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 914,496.50 | | 996,111.00 | | 996,144.75 | | 1,110,749.33 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Brown Industrial Construction, LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.4 | LUMP | 180,000.00 | 180,000.00 | | 0002 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 94.4 | SQYD | 16.00 | 1,510.40 | | 0003 | 203-04-00300 | Nonplastic Embankment (Stone) | 801.2 | CUYD | 100.00 | 80,120.00 | | 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 50,000.00 | 50,000.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 5,118.6 | CUYD | 48.00 | 245,692.80 | | 0006 | 203-08-00100 | Geotextile Fabric | 8,471.6 | SQYD | 3.00 | 25,414.80 | | 0007 | 204-02-00100 | Temporary Hay Bales | 20 | EACH | 15.00 | 300.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 700 | LNFT | 2.30 | 1,610.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 35 | CUYD | 100.00 | 3,500.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 249.5 | TON | 140.00 | 34,930.00 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 4.6 | TON | 140.00 | 644.00 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 1,488 | SQYD | 9.00 | 13,392.00 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -83 | CUYD | 0.01 | -0.83 | | 0014 | 711-03-00700 | Riprap (440 lb) | 6,965 | TON | 85.00 | 592,025.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | | 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.27 | MILE | 2,000.00 | 540.00 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 140,000.00 | 140,000.00 | | 0018 | 731-02-00100 | Reflectorized Raised Pavement Markers | 36 | EACH | 16.00 | 576.00 | | 0019 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.539 | MILE | 6,000.00 | 3,234.00 | | 0020 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | | 0021 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 12,883.2 | INLF | 0.70 | 9,018.24 | | 0022 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 1 | EACH | 5,000.00 | 5,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,467,506.41 |
|