Proposal:H.012482.6
Parish:Orleans
Routes:LA 46
Description: LA 46: ST. CLAUDE @ ELYSIAN FIELDS INT IMP
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, CLASS II BASE COURSE (STONE), ASPHALT CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$315,221.35
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $429,761.17 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $470,551.64 |
| 3 | 38610 | The Three C's Properties Inc | $497,548.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - The Three C's Properties Inc | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 2,200.00 | 4,400.00 | 1,500.00 | 3,000.00 | 600.00 | 1,200.00 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 624 | LNFT | 14.00 | 8,736.00 | 14.00 | 8,736.00 | 13.00 | 8,112.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 118 | SQYD | 20.00 | 2,360.00 | 15.00 | 1,770.00 | 18.00 | 2,124.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 60 | LNFT | 18.00 | 1,080.00 | 15.11 | 906.60 | 13.00 | 780.00 | | 0005 | 202-02-26300 | Removal of Median / Island | 28 | SQYD | 56.00 | 1,568.00 | 35.00 | 980.00 | 30.00 | 840.00 | | 0006 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 86 | SQYD | 20.00 | 1,720.00 | 45.00 | 3,870.00 | 13.00 | 1,118.00 | | 0007 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 472.5 | SQYD | 15.00 | 7,087.50 | 18.00 | 8,505.00 | 22.55 | 10,654.88 | | 0008 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 4,700.00 | 4,700.00 | 4,400.00 | 4,400.00 | 4,750.00 | 4,750.00 | | 0009 | 202-03-38000 | Relocation of Sign (ADJUST) | 2 | EACH | 380.00 | 760.00 | 530.00 | 1,060.00 | 500.00 | 1,000.00 | | 0010 | 203-01-00100 | General Excavation | 311 | CUYD | 21.00 | 6,531.00 | 19.00 | 5,909.00 | 23.00 | 7,153.00 | | 0011 | 203-07-00100 | Borrow (Vehicular Measurement) | 200 | CUYD | 40.00 | 8,000.00 | 30.00 | 6,000.00 | 20.00 | 4,000.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 393 | LNFT | 0.10 | 39.30 | 6.50 | 2,554.50 | 3.00 | 1,179.00 | | 0013 | 302-02-03100 | Class II Base Course (8" Thick) (Stone) | 85.53 | SQYD | 42.00 | 3,592.26 | 35.00 | 2,993.55 | 12.00 | 1,026.36 | | 0014 | 702-02-00001 | Manhole (Remove and Replace Frame and Cover) | 4 | EACH | 380.00 | 1,520.00 | 1,800.00 | 7,200.00 | 1,000.00 | 4,000.00 | | 0015 | 702-03-00500 | Catch Basins (CB-06) | 3 | EACH | 5,600.00 | 16,800.00 | 5,500.00 | 16,500.00 | 4,000.00 | 12,000.00 | | 0016 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 1,000.00 | 2,000.00 | 900.00 | 1,800.00 | 350.00 | 700.00 | | 0017 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 2 | EACH | 140.00 | 280.00 | 700.00 | 1,400.00 | 675.00 | 1,350.00 | | 0018 | 706-01-00100 | Concrete Walk (4" Thick) | 147 | SQYD | 76.00 | 11,172.00 | 92.00 | 13,524.00 | 65.00 | 9,555.00 | | 0019 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 30 | SQYD | 86.00 | 2,580.00 | 133.00 | 3,990.00 | 65.00 | 1,950.00 | | 0020 | 706-04-00100 | Handicapped Curb Ramps (TYPE 1) | 5 | EACH | 2,200.00 | 11,000.00 | 2,300.00 | 11,500.00 | 2,000.00 | 10,000.00 | | 0021 | 706-04-00100 | Handicapped Curb Ramps (TYPE 11) | 1 | EACH | 3,200.00 | 3,200.00 | 4,800.00 | 4,800.00 | 3,000.00 | 3,000.00 | | 0022 | 706-04-00100 | Handicapped Curb Ramps (TYPE 4) | 2 | EACH | 3,200.00 | 6,400.00 | 2,050.00 | 4,100.00 | 2,000.00 | 4,000.00 | | 0023 | 706-04-00100 | Handicapped Curb Ramps (TYPE 5) | 2 | EACH | 3,200.00 | 6,400.00 | 2,200.00 | 4,400.00 | 2,000.00 | 4,000.00 | | 0024 | 707-01-00100 | Concrete Curb | 60 | LNFT | 32.00 | 1,920.00 | 35.00 | 2,100.00 | 15.00 | 900.00 | | 0025 | 707-03-00100 | Combination Concrete Curb and Gutter | 735 | LNFT | 34.00 | 24,990.00 | 42.00 | 30,870.00 | 38.00 | 27,930.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 23,500.00 | 23,500.00 | 29,000.00 | 29,000.00 | 30,000.00 | 30,000.00 | | 0027 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,078 | LNFT | 0.20 | 215.60 | 0.50 | 539.00 | 0.55 | 592.90 | | 0028 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 327 | LNFT | 0.50 | 163.50 | 2.00 | 654.00 | 2.25 | 735.75 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.54 | MILE | 300.00 | 162.00 | 4,900.00 | 2,646.00 | 6,000.00 | 3,240.00 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.54 | MILE | 50.00 | 27.00 | 500.00 | 270.00 | 550.00 | 297.00 | | 0031 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 50.00 | 200.00 | 50.00 | 200.00 | 55.00 | 220.00 | | 0032 | 717-01-00100 | Seeding | 5 | LB | 25.00 | 125.00 | 50.00 | 250.00 | 30.00 | 150.00 | | 0033 | 718-01-00100 | Fertilizer | 244 | LB | 1.00 | 244.00 | 3.25 | 793.00 | 2.00 | 488.00 | | 0034 | 726-01-00100 | Bedding Material | 6.13 | CUYD | 45.00 | 275.85 | 68.00 | 416.84 | 100.00 | 613.00 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 42,000.00 | 42,000.00 | 45,000.00 | 45,000.00 | 60,000.00 | 60,000.00 | | 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 117 | EACH | 13.00 | 1,521.00 | 7.50 | 877.50 | 8.50 | 994.50 | | 0037 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 297 | LNFT | 4.00 | 1,188.00 | 3.00 | 891.00 | 4.45 | 1,321.65 | | 0038 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 92 | LNFT | 19.00 | 1,748.00 | 12.00 | 1,104.00 | 14.00 | 1,288.00 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 71 | LNFT | 21.00 | 1,491.00 | 14.00 | 994.00 | 16.00 | 1,136.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.268 | MILE | 16,000.00 | 4,288.00 | 4,900.00 | 1,313.20 | 5,500.00 | 1,474.00 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.25 | MILE | 5,300.00 | 1,325.00 | 2,500.00 | 625.00 | 3,500.00 | 875.00 | | 0042 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 420.00 | 840.00 | 300.00 | 600.00 | 350.00 | 700.00 | | 0043 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 3 | EACH | 680.00 | 2,040.00 | 300.00 | 900.00 | 350.00 | 1,050.00 | | 0044 | 732-05-00100 | Removal of Existing Markings | 0.005 | MILE | 21,000.00 | 105.00 | 50,000.00 | 250.00 | 27,500.00 | 137.50 | | 0045 | 736-01-00100 | Trenching and Backfilling | 50 | LNFT | 9.50 | 475.00 | 9.00 | 450.00 | 10.00 | 500.00 | | 0046 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 90 | LNFT | 36.00 | 3,240.00 | 33.00 | 2,970.00 | 36.00 | 3,240.00 | | 0047 | 736-04-02000 | Signal Support (Pedestal Pole) | 2 | EACH | 5,600.00 | 11,200.00 | 5,200.00 | 10,400.00 | 5,500.00 | 11,000.00 | | 0048 | 736-10-00300 | Underground Junction Box (Type F) | 1 | EACH | 1,000.00 | 1,000.00 | 980.00 | 980.00 | 1,100.00 | 1,100.00 | | 0049 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 70 | LNFT | 5.00 | 350.00 | 4.50 | 315.00 | 5.00 | 350.00 | | 0050 | 736-12-04000 | Conductor (6c, #14 awg) | 250 | LNFT | 4.50 | 1,125.00 | 4.00 | 1,000.00 | 5.00 | 1,250.00 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 22,000.00 | 22,000.00 | | 0052 | 805-02-00100 | Class A(M) Concrete | 23.759 | CUYD | 440.00 | 10,453.96 | 550.00 | 13,067.45 | 565.00 | 13,423.84 | | 0053 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 5 | EACH | 400.00 | 2,000.00 | 1,250.00 | 6,250.00 | 300.00 | 1,500.00 | | 0054 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 2,034 | LNFT | 4.00 | 8,136.00 | 4.00 | 8,136.00 | 6.60 | 13,424.40 | | 0055 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 1,017 | LNFT | 4.00 | 4,068.00 | 4.00 | 4,068.00 | 6.60 | 6,712.20 | | 0056 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 2,960 | INLF | 0.70 | 2,072.00 | 0.70 | 2,072.00 | 1.10 | 3,256.00 | | 0057 | NS-502-01000 | Asphalt Concrete | 511.5 | TON | 120.00 | 61,380.00 | 150.00 | 76,725.00 | 172.00 | 87,978.00 | | 0058 | NS-509-01000 | Milling Asphalt Pavement | 2,768 | SQYD | 5.50 | 15,224.00 | 3.25 | 8,996.00 | 4.00 | 11,072.00 | | 0059 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -153.78 | CUYD | 10.00 | -1,537.80 | 0.00 | 0.00 | 1.00 | -153.78 | | 0060 | NS-510-01400 | Pavement Patching (12" Minimum Thickness) | 700 | SQYD | 100.00 | 70,000.00 | 115.00 | 80,500.00 | 117.00 | 81,900.00 | | 0061 | NS-736-00010 | LED Pedestrian Countdown Signal Head | 3 | EACH | 1,300.00 | 3,900.00 | 1,150.00 | 3,450.00 | 1,320.00 | 3,960.00 | | 0062 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 3 | EACH | 260.00 | 780.00 | 180.00 | 540.00 | 1,600.00 | 4,800.00 | | 0063 | NS-P36-00087 | Street Name Tiles STREET NAME TILES | 2 | EACH | 300.00 | 600.00 | 220.00 | 440.00 | 800.00 | 1,600.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 429,761.17 | | 470,551.64 | | 497,548.20 |
|