Proposal:H.012127.6
Parish:Lafourche
Routes:LA 654
Description:LA 654: 1.8 MI E LA 308 - CANAL BRIDGE
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,038,781.59
| Rank | License | Bidder | Construction Bid |
| 1 | 62139 | HUEY P. STOCKSTILL, LLC | $969,939.80 |
| 2 | 06276 | Barriere Construction Co., LLC | $1,087,981.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - HUEY P. STOCKSTILL, LLC | - 2 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) (2) 18" CMP | 56 | LNFT | 26.00 | 1,456.00 | 25.00 | 1,400.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 725 | CUYD | 4.00 | 2,900.00 | 10.00 | 7,250.00 | | 0003 | 204-06-00100 | Temporary Silt Fencing | 19,500 | LNFT | 0.01 | 195.00 | 0.10 | 1,950.00 | | 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 483 | CUYD | 50.00 | 24,150.00 | 5.00 | 2,415.00 | | 0005 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 56 | LNFT | 219.00 | 12,264.00 | 200.00 | 11,200.00 | | 0006 | 701-14-00100 | Cleaning Existing Pipes | 311 | LNFT | 15.00 | 4,665.00 | 7.00 | 2,177.00 | | 0007 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,600.00 | 7,600.00 | 70,700.00 | 70,700.00 | | 0008 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.606 | MILE | 150.00 | 540.90 | 200.00 | 721.20 | | 0009 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.802 | MILE | 0.10 | 0.58 | 25.00 | 145.05 | | 0010 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 20.668 | MILE | 0.20 | 4.13 | 25.00 | 516.70 | | 0011 | 717-01-00100 | Seeding | 162 | LB | 0.01 | 1.62 | 1.00 | 162.00 | | 0012 | 718-01-00100 | Fertilizer | 5,392 | LB | 0.01 | 53.92 | 0.05 | 269.60 | | 0013 | 726-01-00100 | Bedding Material 12" thick | 20 | CUYD | 134.00 | 2,680.00 | 150.00 | 3,000.00 | | 0014 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 100,000.00 | 100,000.00 | | 0015 | 729-16-00200 | Object Marker Assembly (Type 2) | 24 | EACH | 45.00 | 1,080.00 | 55.00 | 1,320.00 | | 0016 | 731-02-00100 | Reflectorized Raised Pavement Markers | 489 | EACH | 7.00 | 3,423.00 | 10.00 | 4,890.00 | | 0017 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.334 | MILE | 3,500.00 | 36,169.00 | 3,700.00 | 38,235.80 | | 0018 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.802 | MILE | 1,600.00 | 9,283.20 | 1,600.00 | 9,283.20 | | 0019 | 735-01-00100 | Mailboxes | 136 | EACH | 5.00 | 680.00 | 1.00 | 136.00 | | 0020 | 735-02-00100 | Mailbox Supports (Single) | 111 | EACH | 115.00 | 12,765.00 | 140.00 | 15,540.00 | | 0021 | 735-03-00100 | Mailbox Supports (Double) | 6 | EACH | 165.00 | 990.00 | 200.00 | 1,200.00 | | 0022 | 735-04-00100 | Mailbox Supports (Multiple) | 4 | EACH | 325.00 | 1,300.00 | 400.00 | 1,600.00 | | 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 30,000.00 | 30,000.00 | | 0024 | NS-200-00020 | Cleaning Existing Ditches | 19,500 | LNFT | 3.00 | 58,500.00 | 5.00 | 97,500.00 | | 0025 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 640 | INLF | 0.01 | 6.40 | 0.60 | 384.00 | | 0026 | NS-502-01000 | Asphalt Concrete | 5,041.4 | TON | 77.00 | 388,187.80 | 70.00 | 352,898.00 | | 0027 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 196.2 | TON | 77.00 | 15,107.40 | 70.00 | 13,734.00 | | 0028 | NS-509-01000 | Milling Asphalt Pavement | 44,976 | SQYD | 1.00 | 44,976.00 | 1.50 | 67,464.00 | | 0029 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -1,812 | CUYD | 18.00 | -32,616.00 | 5.00 | -9,060.00 | | 0030 | NS-510-01700 | Pavement Patching (18" Minimum Thickness) | 2,887 | SQYD | 99.55 | 287,400.85 | 90.00 | 259,830.00 | | 0031 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 56 | LNFT | 21.00 | 1,176.00 | 20.00 | 1,120.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 969,939.80 | | 1,087,981.55 |
|