Proposal:H.012034.6
Parish:Vermilion
Routes:LA 697
Description:LA 697: LA 696 - LA 343
Type Construction:DRAINAGE STRUCTURES, LIME TREATMENT, COLD PLANING ASPHALTIC CONCRETE, SUBGRADE TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$2,082,810.65
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction Inc | $1,517,969.65 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $1,919,710.69 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction Inc | - 2 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" | 60 | LNFT | 11.25 | 675.00 | 23.00 | 1,380.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 40" | 48 | LNFT | 11.25 | 540.00 | 30.00 | 1,440.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 105 | CUYD | 11.15 | 1,170.75 | 15.00 | 1,575.00 | | 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 69 | EACH | 120.00 | 8,280.00 | 175.00 | 12,075.00 | | 0005 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 40,305 | SQYD | 8.55 | 344,607.75 | 8.80 | 354,684.00 | | 0006 | 304-05-00100 | Lime Treatment (Type E) | 252.71 | TON | 1.00 | 252.71 | 375.00 | 94,766.25 | | 0007 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 4,048 | SQYD | 8.00 | 32,384.00 | 12.00 | 48,576.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,151 | CUYD | 48.75 | 56,111.25 | 110.00 | 126,610.00 | | 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 26.50 | 1,325.00 | 45.00 | 2,250.00 | | 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 9,417.1 | TON | 74.00 | 696,865.40 | 87.00 | 819,287.70 | | 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 437.7 | TON | 92.20 | 40,355.94 | 160.00 | 70,032.00 | | 0012 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 25,824 | GAL | 2.56 | 66,109.44 | 2.55 | 65,851.20 | | 0013 | 507-02-00200 | Aggregate (S2) | 37,977 | SQYD | 1.13 | 42,914.01 | 1.20 | 45,572.40 | | 0014 | 507-02-00300 | Aggregate (S3) | 37,977 | SQYD | 0.92 | 34,938.84 | 0.90 | 34,179.30 | | 0015 | 509-01-00100 | Cold Planing Asphaltic Pavement | 35,126 | SQYD | 1.40 | 49,176.40 | 2.00 | 70,252.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,210.00 | 20,210.00 | 10,500.00 | 10,500.00 | | 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.848 | MILE | 600.00 | 3,508.80 | 150.00 | 877.20 | | 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.006 | MILE | 333.30 | 1,668.50 | 340.00 | 1,702.04 | | 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 15.15 | MILE | 666.60 | 10,098.99 | 650.00 | 9,847.50 | | 0021 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 774 | EACH | 1.67 | 1,292.58 | 1.75 | 1,354.50 | | 0022 | 717-01-00100 | Seeding | 75 | LB | 8.50 | 637.50 | 22.00 | 1,650.00 | | 0023 | 718-01-00100 | Fertilizer | 3,000 | LB | 0.65 | 1,950.00 | 0.90 | 2,700.00 | | 0024 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 3,500.00 | 3,500.00 | 5,500.00 | 5,500.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 29,100.00 | 29,100.00 | 70,000.00 | 70,000.00 | | 0026 | 729-16-00200 | Object Marker Assembly (Type 2) | 14 | EACH | 56.00 | 784.00 | 60.00 | 840.00 | | 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 455 | EACH | 5.60 | 2,548.00 | 6.00 | 2,730.00 | | 0028 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 10 | LNFT | 11.20 | 112.00 | 11.00 | 110.00 | | 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.575 | MILE | 3,111.00 | 23,565.83 | 3,000.00 | 22,725.00 | | 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.503 | MILE | 1,222.00 | 3,058.67 | 1,200.00 | 3,003.60 | | 0031 | 735-01-00100 | Mailboxes | 37 | EACH | 10.00 | 370.00 | 5.00 | 185.00 | | 0032 | 735-02-00100 | Mailbox Supports (Single) | 31 | EACH | 140.00 | 4,340.00 | 135.00 | 4,185.00 | | 0033 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 154.43 | 463.29 | 150.00 | 450.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,795.00 | 5,795.00 | 11,000.00 | 11,000.00 | | 0035 | NS-713-00008 | Portable Changeable Message Sign | 2 | EACH | 2,750.00 | 5,500.00 | 2,000.00 | 4,000.00 | | 0036 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 108 | LNFT | 220.00 | 23,760.00 | 165.00 | 17,820.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,517,969.65 | | 1,919,710.69 |
|