Bid Tabulations for the Letting of 6/14/2017 LA DOTD Headquarters

Proposal:H.011893.6
Parish:Vermilion
Routes:FORMER LA 1260
Description:FORMER LA 1260: VERMILION RIVER TO LA 330
Type Construction:COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUBGRADE TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$535,023.69
Rank License BidderConstruction Bid
133663Glenn Lege Construction Inc$475,075.92
251821Elliott Construction, LLC$668,891.14
312487Diamond B Construction Co., L.L.C.$787,126.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Glenn Lege Construction Inc
- 2 -
Elliott Construction, LLC
- 3 -
Diamond B Construction Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001203-07-00200Borrow (Vehicular Measurement) (Selected Soils) 200     CUYD12.752,550.0020.004,000.0065.0013,000.00
0002204-05-00100Temporary Sediment Check Dams (Hay) 18     EACH165.002,970.00143.002,574.00150.002,700.00
0003303-01-00400In-Place Cement Stabilized Base Course (12" Thick) 21,528     SQYD9.20198,057.609.45203,439.6011.00236,808.00
0004303-02-00100Removal of Existing Patches 65     SQYD7.00455.0035.002,275.0025.001,625.00
0005305-01-04020Subgrade Layer (12" Thick) (Treated) 1,806     SQYD19.5035,217.0011.0019,866.0020.0036,120.00
0006401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 1,350     CUYD21.2028,620.0094.00126,900.0085.00114,750.00
0007402-01-00100Traffic Maintenance Aggregate (Vehicular Measurement) 75     CUYD19.241,443.0090.006,750.0065.004,875.00
0008502-01-00100Superpave Asphaltic Concrete 2,223.3   TON67.46149,983.82100.00222,330.0095.00211,213.50
0009502-01-00200Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 64.3   TON105.636,792.01160.0010,288.00240.0015,432.00
0010509-01-00100Cold Planing Asphaltic Pavement 187     SQYD16.303,048.1025.004,675.0045.008,415.00
0011509-02-00100Contractor Retained Reclaimed Asphaltic Pavement -21     CUYD0.10-2.100.01-0.211.00-21.00
0012510-01-00200Pavement Patching (12" Minimum Thickness) 44     SQYD96.004,224.00180.007,920.00290.0012,760.00
0013602-02-00100Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints 472     LNFT5.252,478.005.502,596.0010.004,720.00
0014713-01-00100Temporary Signs and Barricades 1     LUMP11,288.8611,288.867,500.007,500.0015,000.0015,000.00
0015722-02-00100Project Site Laboratory (Equipped) 1     EACH3,500.003,500.007,500.007,500.007,500.007,500.00
0016727-01-00100Mobilization 1     LUMP8,855.008,855.0030,000.0030,000.0081,500.0081,500.00
0017731-02-00100Reflectorized Raised Pavement Markers 306     EACH10.023,066.127.002,142.007.002,142.00
0018735-01-00100Mailboxes 1     EACH12.0012.001.101.105.005.00
0019735-02-00100Mailbox Supports (Single) 1     EACH1,391.501,391.501,375.001,375.001,300.001,300.00
0020737-01-00100Painted Traffic Striping (Solid Line) (4" Width) 1.333 MILE3,526.624,700.982,750.003,665.752,500.003,332.50
0021737-02-00100Painted Traffic Striping (Broken Line) (4" Width) 0.966 MILE2,644.962,555.031,650.001,593.901,500.001,449.00
0022740-01-00100Construction Layout 1     LUMP3,870.003,870.001,500.001,500.0012,500.0012,500.00
           
  CONTRACTOR TOTAL   475,075.92 668,891.14 787,126.00