Search


Bid Tabulations for the Letting of 6/14/2017 LA DOTD Headquarters

Proposal:H.011607.6
Parish:East Carroll
Routes:LA 580
Description:LA 580: LA 877 TO JONES BAYOU
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,101,080.30
Rank License BidderConstruction Bid
105789D & J CONSTRUCTION CO., LLC$2,729,388.00
212487Diamond B Construction Co., L.L.C.$3,195,168.73


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
D & J CONSTRUCTION CO., LLC
- 2 -
Diamond B Construction Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00200Clearing and Grubbing (Selective) Approx. 6.195 Acres6.195 LUMP23,000.0023,000.0035,000.0035,000.00
0002202-02-02020Removal of Asphalt Pavement 357.6   SQYD10.003,576.0025.008,940.00
0003202-02-14500Removal of Guard Rail 370     LNFT25.009,250.0020.007,400.00
0004202-02-32100Removal of Pipe (Cross Drain) (24" RCP)16     LNFT16.00256.0015.00240.00
0005202-02-32100Removal of Pipe (Cross Drain) (30" CMP)8     LNFT16.00128.0015.00120.00
0006202-02-32100Removal of Pipe (Cross Drain) (30" RCP)64     LNFT16.001,024.0015.00960.00
0007202-02-32100Removal of Pipe (Cross Drain) (36" RCP)8     LNFT16.00128.0015.00120.00
0008203-07-00100Borrow (Vehicular Measurement) 201     CUYD35.007,035.0018.003,618.00
0009204-06-00100Temporary Silt Fencing 525     LNFT5.002,625.004.002,100.00
0010401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 1,314     CUYD20.0026,280.00110.00144,540.00
0011402-01-00100Traffic Maintenance Aggregate (Vehicular Measurement) 500     CUYD15.007,500.00110.0055,000.00
0012502-01-00100Superpave Asphaltic Concrete 13,981     TON95.001,328,195.00104.001,454,024.00
0013502-01-00200Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 459.3   TON95.0043,633.50325.00149,272.50
0014509-01-00100Cold Planing Asphaltic Pavement 51,535     SQYD3.00154,605.004.00206,140.00
0015509-02-00100Contractor Retained Reclaimed Asphaltic Pavement -3,154     CUYD1.00-3,154.001.00-3,154.00
0016510-01-00300Pavement Patching (18" Minimum Thickness) 5,100     SQYD150.00765,000.00145.00739,500.00
0017510-03-00100Pavement Joint Repair 517     TON125.0064,625.00290.00149,930.00
0018701-01-01021Cross Drain Pipe (30" RCP) 64     LNFT150.009,600.00200.0012,800.00
0019701-10-01060Reinforced Concrete Pipe (Extension) (24") 16     LNFT120.001,920.00350.005,600.00
0020701-10-01080Reinforced Concrete Pipe (Extension) (30") 16     LNFT120.001,920.00385.006,160.00
0021701-10-01100Reinforced Concrete Pipe (Extension) (36") 24     LNFT150.003,600.00450.0010,800.00
0022701-14-00100Cleaning Existing Pipes 104     LNFT25.002,600.0013.001,352.00
0023701-15-00100Concrete Collar 9     EACH750.006,750.001,000.009,000.00
0024704-01-01000Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 50     LNFT46.002,300.0055.002,750.00
0025704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 114     LNFT55.006,270.0060.006,840.00
0026704-11-00200Guard Rail End Treatment (Tangent) 4     EACH2,400.009,600.002,800.0011,200.00
0027713-01-00100Temporary Signs and Barricades 1     LUMP25,000.0025,000.0020,000.0020,000.00
0028713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 18.313 MILE200.003,662.60175.003,204.78
0029713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 11.327 MILE100.001,132.70250.002,831.75
0030713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 22.858 MILE100.002,285.80500.0011,429.00
0031716-01-00100Mulch (Vegetative) 6.7   TON600.004,020.00750.005,025.00
0032717-01-00100Seeding 197     LB12.002,364.0015.002,955.00
0033718-01-00100Fertilizer 3,274     LB0.601,964.400.551,800.70
0034726-01-00100Bedding Material 59.2   CUYD100.005,920.00105.006,216.00
0035727-01-00100Mobilization 1     LUMP145,000.00145,000.0053,000.0053,000.00
0036729-16-00200Object Marker Assembly (Type 2) 14     EACH100.001,400.0095.001,330.00
0037729-16-00300Object Marker Assembly (Type 3) 4     EACH100.00400.00100.00400.00
0038731-02-00100Reflectorized Raised Pavement Markers 580     EACH7.004,060.007.004,060.00
0039732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 8.902 MILE4,500.0040,059.004,500.0040,059.00
0040732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 4.4   MILE1,500.006,600.001,000.004,400.00
0041732-05-00100Removal of Existing Markings 0.034 MILE20,000.00680.0010,000.00340.00
0042735-01-00100Mailboxes 9     EACH5.0045.005.0045.00
0043735-02-00100Mailbox Supports (Single) 2     EACH200.00400.00500.001,000.00
0044735-03-00100Mailbox Supports (Double) 2     EACH300.00600.00500.001,000.00
0045735-04-00100Mailbox Supports (Multiple) 1     EACH400.00400.00500.00500.00
0046740-01-00100Construction Layout 1     LUMP5,000.005,000.0015,000.0015,000.00
0047NS-701-00002Trench Excavation Safety Protection (Depth > 5 feet) 64     LNFT2.00128.005.00320.00
         
  CONTRACTOR TOTAL   2,729,388.00 3,195,168.73