Proposal:H.011607.6
Parish:East Carroll
Routes:LA 580
Description:LA 580: LA 877 TO JONES BAYOU
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,101,080.30
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $2,729,388.00 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $3,195,168.73 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) Approx. 6.195 Acres | 6.195 | LUMP | 23,000.00 | 23,000.00 | 35,000.00 | 35,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 357.6 | SQYD | 10.00 | 3,576.00 | 25.00 | 8,940.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 370 | LNFT | 25.00 | 9,250.00 | 20.00 | 7,400.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" RCP) | 16 | LNFT | 16.00 | 256.00 | 15.00 | 240.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (30" CMP) | 8 | LNFT | 16.00 | 128.00 | 15.00 | 120.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) (30" RCP) | 64 | LNFT | 16.00 | 1,024.00 | 15.00 | 960.00 | | 0007 | 202-02-32100 | Removal of Pipe (Cross Drain) (36" RCP) | 8 | LNFT | 16.00 | 128.00 | 15.00 | 120.00 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 201 | CUYD | 35.00 | 7,035.00 | 18.00 | 3,618.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 525 | LNFT | 5.00 | 2,625.00 | 4.00 | 2,100.00 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,314 | CUYD | 20.00 | 26,280.00 | 110.00 | 144,540.00 | | 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 15.00 | 7,500.00 | 110.00 | 55,000.00 | | 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 13,981 | TON | 95.00 | 1,328,195.00 | 104.00 | 1,454,024.00 | | 0013 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 459.3 | TON | 95.00 | 43,633.50 | 325.00 | 149,272.50 | | 0014 | 509-01-00100 | Cold Planing Asphaltic Pavement | 51,535 | SQYD | 3.00 | 154,605.00 | 4.00 | 206,140.00 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,154 | CUYD | 1.00 | -3,154.00 | 1.00 | -3,154.00 | | 0016 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 5,100 | SQYD | 150.00 | 765,000.00 | 145.00 | 739,500.00 | | 0017 | 510-03-00100 | Pavement Joint Repair | 517 | TON | 125.00 | 64,625.00 | 290.00 | 149,930.00 | | 0018 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 64 | LNFT | 150.00 | 9,600.00 | 200.00 | 12,800.00 | | 0019 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 16 | LNFT | 120.00 | 1,920.00 | 350.00 | 5,600.00 | | 0020 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 16 | LNFT | 120.00 | 1,920.00 | 385.00 | 6,160.00 | | 0021 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 24 | LNFT | 150.00 | 3,600.00 | 450.00 | 10,800.00 | | 0022 | 701-14-00100 | Cleaning Existing Pipes | 104 | LNFT | 25.00 | 2,600.00 | 13.00 | 1,352.00 | | 0023 | 701-15-00100 | Concrete Collar | 9 | EACH | 750.00 | 6,750.00 | 1,000.00 | 9,000.00 | | 0024 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 50 | LNFT | 46.00 | 2,300.00 | 55.00 | 2,750.00 | | 0025 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 114 | LNFT | 55.00 | 6,270.00 | 60.00 | 6,840.00 | | 0026 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 4 | EACH | 2,400.00 | 9,600.00 | 2,800.00 | 11,200.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | | 0028 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 18.313 | MILE | 200.00 | 3,662.60 | 175.00 | 3,204.78 | | 0029 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.327 | MILE | 100.00 | 1,132.70 | 250.00 | 2,831.75 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 22.858 | MILE | 100.00 | 2,285.80 | 500.00 | 11,429.00 | | 0031 | 716-01-00100 | Mulch (Vegetative) | 6.7 | TON | 600.00 | 4,020.00 | 750.00 | 5,025.00 | | 0032 | 717-01-00100 | Seeding | 197 | LB | 12.00 | 2,364.00 | 15.00 | 2,955.00 | | 0033 | 718-01-00100 | Fertilizer | 3,274 | LB | 0.60 | 1,964.40 | 0.55 | 1,800.70 | | 0034 | 726-01-00100 | Bedding Material | 59.2 | CUYD | 100.00 | 5,920.00 | 105.00 | 6,216.00 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 145,000.00 | 145,000.00 | 53,000.00 | 53,000.00 | | 0036 | 729-16-00200 | Object Marker Assembly (Type 2) | 14 | EACH | 100.00 | 1,400.00 | 95.00 | 1,330.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 100.00 | 400.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 580 | EACH | 7.00 | 4,060.00 | 7.00 | 4,060.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.902 | MILE | 4,500.00 | 40,059.00 | 4,500.00 | 40,059.00 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.4 | MILE | 1,500.00 | 6,600.00 | 1,000.00 | 4,400.00 | | 0041 | 732-05-00100 | Removal of Existing Markings | 0.034 | MILE | 20,000.00 | 680.00 | 10,000.00 | 340.00 | | 0042 | 735-01-00100 | Mailboxes | 9 | EACH | 5.00 | 45.00 | 5.00 | 45.00 | | 0043 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 200.00 | 400.00 | 500.00 | 1,000.00 | | 0044 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 300.00 | 600.00 | 500.00 | 1,000.00 | | 0045 | 735-04-00100 | Mailbox Supports (Multiple) | 1 | EACH | 400.00 | 400.00 | 500.00 | 500.00 | | 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | | 0047 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 64 | LNFT | 2.00 | 128.00 | 5.00 | 320.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,729,388.00 | | 3,195,168.73 |
|