Proposal:H.010257.6
Parish:St. John the Baptist
Routes:I-10, LA 3188
Description:GRADE RAISING I-10 RAMPS @ LA 3188 INT.
Type Construction:GRADING, MILLING ASPHALT PAVEMENT, MILLING CONCRETE PAVEMENT, ASPHALT CONCRETE PAVEMENT, DRILLED SHAFT FOUNDATIONS, AND RELATED WORK.
Estimated Construction Cost:$3,658,131.00
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,992,647.21 |
| 2 | 06276 | Barriere Construction Co., LLC | $3,240,438.80 |
| 3 | 62139 | HUEY P. STOCKSTILL, LLC | $3,756,505.16 |
| 4 | 00481 | COASTAL BRIDGE CO., L.L.C. | $3,885,369.06 |
| 5 | 02179 | Boh Bros. Construction Co., LLC. | $4,650,641.47 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - Barriere Construction Co., LLC | - 3 - HUEY P. STOCKSTILL, LLC | - 4 - COASTAL BRIDGE CO., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,500.00 | 4,500.00 | 1.00 | 1.00 | 1,000.00 | 1,000.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 3,341 | LNFT | 6.75 | 22,551.75 | 4.00 | 13,364.00 | 6.00 | 20,046.00 | 10.00 | 33,410.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 300 | LNFT | 9.00 | 2,700.00 | 6.00 | 1,800.00 | 9.00 | 2,700.00 | 8.50 | 2,550.00 | | 0004 | 202-03-38000 | Relocation of Sign Relocation of signs (including concrete base) shall be relocated according to the required elevation. | 54 | EACH | 1,000.00 | 54,000.00 | 750.00 | 40,500.00 | 1,000.00 | 54,000.00 | 125.00 | 6,750.00 | | 0005 | 203-03-00100 | Embankment | 6,841.6 | CUYD | 31.00 | 212,089.60 | 18.00 | 123,148.80 | 29.00 | 198,406.40 | 50.30 | 344,132.48 | | 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 48 | EACH | 10.00 | 480.00 | 6.00 | 288.00 | 13.00 | 624.00 | 10.00 | 480.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 20,880 | LNFT | 1.50 | 31,320.00 | 0.50 | 10,440.00 | 1.50 | 31,320.00 | 0.25 | 5,220.00 | | 0008 | 702-04-00200 | Adjusting Catch Basins | 6 | EACH | 2,200.00 | 13,200.00 | 2,000.00 | 12,000.00 | 1,800.00 | 10,800.00 | 5,000.00 | 30,000.00 | | 0009 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 150 | LNFT | 54.25 | 8,137.50 | 50.00 | 7,500.00 | 53.00 | 7,950.00 | 52.00 | 7,800.00 | | 0010 | 704-03-00100 | Blocked Out Guard Rail | 237.5 | LNFT | 38.50 | 9,143.75 | 15.00 | 3,562.50 | 20.00 | 4,750.00 | 20.00 | 4,750.00 | | 0011 | 704-06-00100 | Guard Rail Anchor Sections (Trailing End) | 12.5 | LNFT | 94.00 | 1,175.00 | 90.00 | 1,125.00 | 100.00 | 1,250.00 | 90.00 | 1,125.00 | | 0012 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 12.5 | LNFT | 99.00 | 1,237.50 | 90.00 | 1,125.00 | 100.00 | 1,250.00 | 95.00 | 1,187.50 | | 0013 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,500.00 | 10,000.00 | 2,200.00 | 8,800.00 | 2,500.00 | 10,000.00 | 2,400.00 | 9,600.00 | | 0014 | 707-03-00100 | Combination Concrete Curb and Gutter | 3,341 | LNFT | 20.50 | 68,490.50 | 39.00 | 130,299.00 | 35.00 | 116,935.00 | 52.00 | 173,732.00 | | 0015 | 707-04-00100 | Asphaltic Curb | 54 | LNFT | 28.00 | 1,512.00 | 20.00 | 1,080.00 | 100.00 | 5,400.00 | 100.00 | 5,400.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 325,000.00 | 325,000.00 | 60,000.00 | 60,000.00 | 101,000.00 | 101,000.00 | | 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.3 | MILE | 575.00 | 747.50 | 600.00 | 780.00 | 700.00 | 910.00 | 550.00 | 715.00 | | 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 21.4 | MILE | 575.00 | 12,305.00 | 600.00 | 12,840.00 | 1,100.00 | 23,540.00 | 550.00 | 11,770.00 | | 0019 | 717-01-00100 | Seeding | 146.7 | LB | 10.50 | 1,540.35 | 10.00 | 1,467.00 | 10.00 | 1,467.00 | 5.00 | 733.50 | | 0020 | 718-01-00100 | Fertilizer | 4,890 | LB | 0.85 | 4,156.50 | 0.80 | 3,912.00 | 1.00 | 4,890.00 | 0.75 | 3,667.50 | | 0021 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 23,667.3 | SQYD | 1.15 | 27,217.40 | 1.20 | 28,400.76 | 1.20 | 28,400.76 | 3.00 | 71,001.90 | | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 149,000.00 | 149,000.00 | 320,000.00 | 320,000.00 | 225,000.00 | 225,000.00 | 350,000.00 | 350,000.00 | | 0023 | 730-01-00100 | Trenching and Backfilling | 8,140 | LNFT | 5.00 | 40,700.00 | 3.00 | 24,420.00 | 5.00 | 40,700.00 | 8.00 | 65,120.00 | | 0024 | 730-02-01060 | Conduit with Conductors (PVC/HDPE) (1 1/4") S40 2#6, 1#6 Bare Stranded (Conduit G) | 4,663 | LNFT | 5.15 | 24,014.45 | 4.00 | 18,652.00 | 5.00 | 23,315.00 | 5.00 | 23,315.00 | | 0025 | 730-02-01080 | Conduit with Conductors (PVC/HDPE) (1 1/2") S40 2#2, 1#2 Bare Stranded(Conduit E) | 4,163 | LNFT | 9.00 | 37,467.00 | 8.00 | 33,304.00 | 9.00 | 37,467.00 | 9.00 | 37,467.00 | | 0026 | 730-02-01080 | Conduit with Conductors (PVC/HDPE) (1 1/2") S40 4#6, 1#6 Bare Stranded (Conduit M) | 134 | LNFT | 9.00 | 1,206.00 | 8.00 | 1,072.00 | 9.00 | 1,206.00 | 8.00 | 1,072.00 | | 0027 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") S40 Conduit L (4#2, 1#2 Bare Stranded) | 35 | LNFT | 19.75 | 691.25 | 18.00 | 630.00 | 20.00 | 700.00 | 14.00 | 490.00 | | 0028 | 730-03-01060 | Conductors in Existing Conduit (PVC/HDPE) (1 1/4") (2#6, 1#6 Bare Stranded) | 347 | LNFT | 5.25 | 1,821.75 | 4.00 | 1,388.00 | 6.00 | 2,082.00 | 5.00 | 1,735.00 | | 0029 | 730-03-01080 | Conductors in Existing Conduit (PVC/HDPE) (1 1/2") (2#2, 1#2 Bare Stranded) | 199 | LNFT | 8.30 | 1,651.70 | 8.00 | 1,592.00 | 9.00 | 1,791.00 | 7.00 | 1,393.00 | | 0030 | 730-03-01080 | Conductors in Existing Conduit (PVC/HDPE) (1 1/2") (4#6, 1#6 Bare Stranded) | 11 | LNFT | 28.25 | 310.75 | 20.00 | 220.00 | 28.00 | 308.00 | 8.00 | 88.00 | | 0031 | 730-03-01100 | Conductors in Existing Conduit (PVC/HDPE) (2") (4#2, 1#2 Bare Stranded ) | 11 | LNFT | 33.50 | 368.50 | 25.00 | 275.00 | 33.00 | 363.00 | 11.00 | 121.00 | | 0032 | 730-03-03060 | Conductors in Existing Conduit (Ridgid Galvanized Steel) (1 1/4") (2#6, 1#6 Bare Stranded) | 16 | LNFT | 27.00 | 432.00 | 25.00 | 400.00 | 26.00 | 416.00 | 5.00 | 80.00 | | 0033 | 730-03-03080 | Conductors in Existing Conduit (Ridgid Galvanized Steel) (1 1/2") (4#6, 1#6 Bare Stranded) | 5 | LNFT | 28.00 | 140.00 | 25.00 | 125.00 | 28.00 | 140.00 | 28.00 | 140.00 | | 0034 | 730-03-03100 | Conductors in Existing Conduit (Ridgid Galvanized Steel) (2") (4#2, 1#2 Bare Stranded ) | 5 | LNFT | 34.00 | 170.00 | 30.00 | 150.00 | 33.00 | 165.00 | 31.00 | 155.00 | | 0035 | 730-04-00200 | Jacked or Bored Casing (6" Diameter) (PVC/HDPE) | 220 | LNFT | 46.00 | 10,120.00 | 30.00 | 6,600.00 | 48.00 | 10,560.00 | 55.00 | 12,100.00 | | 0036 | 730-07-05000 | Luminaire (250 Watt) (High PressureSodium) | 28 | EACH | 400.00 | 11,200.00 | 400.00 | 11,200.00 | 400.00 | 11,200.00 | 700.00 | 19,600.00 | | 0037 | 730-07-06000 | Luminaire (400 Watt) (High PressureSodium) | 8 | EACH | 435.00 | 3,480.00 | 400.00 | 3,200.00 | 450.00 | 3,600.00 | 800.00 | 6,400.00 | | 0038 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 6,000.00 | 6,000.00 | 1,000.00 | 1,000.00 | 6,000.00 | 6,000.00 | 50,000.00 | 50,000.00 | | 0039 | 730-14-00100 | Removal and Disposal of Luminaires | 36 | EACH | 215.00 | 7,740.00 | 100.00 | 3,600.00 | 210.00 | 7,560.00 | 250.00 | 9,000.00 | | 0040 | 730-15-12100 | Relocate Light Poles (40') (Aluminum) (Single Arm) | 28 | EACH | 2,860.00 | 80,080.00 | 2,000.00 | 56,000.00 | 3,000.00 | 84,000.00 | 3,500.00 | 98,000.00 | | 0041 | 730-15-22200 | Relocate Light Poles (50') (Aluminum) (Twin Arm) | 4 | EACH | 3,120.00 | 12,480.00 | 3,000.00 | 12,000.00 | 3,100.00 | 12,400.00 | 3,500.00 | 14,000.00 | | 0042 | 730-16-00100 | Underground Junction Box (12" x 12") | 32 | EACH | 485.00 | 15,520.00 | 300.00 | 9,600.00 | 500.00 | 16,000.00 | 1,130.00 | 36,160.00 | | 0043 | 730-16-00200 | Underground Junction Box (11" x 18") | 4 | EACH | 660.00 | 2,640.00 | 400.00 | 1,600.00 | 650.00 | 2,600.00 | 1,255.00 | 5,020.00 | | 0044 | 730-16-00300 | Underground Junction Box (13" x 24") | 5 | EACH | 730.00 | 3,650.00 | 500.00 | 2,500.00 | 700.00 | 3,500.00 | 2,500.00 | 12,500.00 | | 0045 | 730-19-00010 | Modular Breakaway Cable System | 32 | EACH | 2,115.00 | 67,680.00 | 1,500.00 | 48,000.00 | 2,100.00 | 67,200.00 | 2,500.00 | 80,000.00 | | 0046 | 730-21-00020 | Duct Marker (Concrete) | 8 | EACH | 285.00 | 2,280.00 | 200.00 | 1,600.00 | 300.00 | 2,400.00 | 600.00 | 4,800.00 | | 0047 | 730-22-00420 | Underground Marker Tape (6")(Detectable) | 8,360 | LNFT | 0.60 | 5,016.00 | 0.25 | 2,090.00 | 0.60 | 5,016.00 | 1.00 | 8,360.00 | | 0048 | 731-02-00100 | Reflectorized Raised Pavement Markers | 854 | EACH | 10.00 | 8,540.00 | 7.00 | 5,978.00 | 7.00 | 5,978.00 | 10.00 | 8,540.00 | | 0049 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 260 | LNFT | 16.75 | 4,355.00 | 10.00 | 2,600.00 | 11.00 | 2,860.00 | 16.00 | 4,160.00 | | 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.91 | MILE | 4,700.00 | 18,377.00 | 4,500.00 | 17,595.00 | 4,000.00 | 15,640.00 | 4,500.00 | 17,595.00 | | 0051 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.16 | MILE | 1,565.00 | 250.40 | 1,000.00 | 160.00 | 1,900.00 | 304.00 | 1,500.00 | 240.00 | | 0052 | 732-05-00100 | Removal of Existing Markings | 0.05 | MILE | 15,660.00 | 783.00 | 1,000.00 | 50.00 | 10,000.00 | 500.00 | 15,000.00 | 750.00 | | 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 16,820.00 | 16,820.00 | 50,000.00 | 50,000.00 | 70,000.00 | 70,000.00 | 25,000.00 | 25,000.00 | | 0054 | 741-06-00100 | Relocating Fire Hydrant | 1 | EACH | 2,600.00 | 2,600.00 | 2,000.00 | 2,000.00 | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | | 0055 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 26,776 | INLF | 0.01 | 267.76 | 0.01 | 267.76 | 0.60 | 16,065.60 | 0.50 | 13,388.00 | | 0056 | NS-502-01000 | Asphalt Concrete | 23,990.6 | TON | 72.00 | 1,727,323.20 | 75.00 | 1,799,295.00 | 98.00 | 2,351,078.80 | 84.00 | 2,015,210.40 | | 0057 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 376.3 | TON | 105.00 | 39,511.50 | 75.00 | 28,222.50 | 150.00 | 56,445.00 | 175.00 | 65,852.50 | | 0058 | NS-509-01000 | Milling Asphalt Pavement | 2,074 | SQYD | 7.00 | 14,518.00 | 10.00 | 20,740.00 | 8.00 | 16,592.00 | 12.00 | 24,888.00 | | 0059 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -51.6 | CUYD | 0.00 | 0.00 | 0.01 | -0.52 | 0.00 | 0.00 | 0.01 | -0.52 | | 0060 | NS-602-00001 | Milling Concrete Pavement | 432 | SQYD | 7.00 | 3,024.00 | 22.00 | 9,504.00 | 25.00 | 10,800.00 | 30.00 | 12,960.00 | | 0061 | NS-700-00020 | Adjusting Guard Rail | 537.6 | LNFT | 11.00 | 5,913.60 | 10.00 | 5,376.00 | 11.00 | 5,913.60 | 10.50 | 5,644.80 | | 0062 | NS-713-00008 | Portable Changeable Message Sign | 5 | EACH | 5,600.00 | 28,000.00 | 2,000.00 | 10,000.00 | 9,000.00 | 45,000.00 | 3,800.00 | 19,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,992,647.21 | | 3,240,438.80 | | 3,756,505.16 | | 3,885,369.06 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 3,341 | LNFT | 5.00 | 16,705.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 300 | LNFT | 10.00 | 3,000.00 | | 0004 | 202-03-38000 | Relocation of Sign Relocation of signs (including concrete base) shall be relocated according to the required elevation. | 54 | EACH | 1,200.00 | 64,800.00 | | 0005 | 203-03-00100 | Embankment | 6,841.6 | CUYD | 40.00 | 273,664.00 | | 0006 | 204-02-00100 | Temporary Hay or Straw Bales | 48 | EACH | 25.00 | 1,200.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 20,880 | LNFT | 1.75 | 36,540.00 | | 0008 | 702-04-00200 | Adjusting Catch Basins | 6 | EACH | 3,500.00 | 21,000.00 | | 0009 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 150 | LNFT | 60.00 | 9,000.00 | | 0010 | 704-03-00100 | Blocked Out Guard Rail | 237.5 | LNFT | 24.00 | 5,700.00 | | 0011 | 704-06-00100 | Guard Rail Anchor Sections (Trailing End) | 12.5 | LNFT | 105.00 | 1,312.50 | | 0012 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 12.5 | LNFT | 110.00 | 1,375.00 | | 0013 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,800.00 | 11,200.00 | | 0014 | 707-03-00100 | Combination Concrete Curb and Gutter | 3,341 | LNFT | 46.00 | 153,686.00 | | 0015 | 707-04-00100 | Asphaltic Curb | 54 | LNFT | 75.00 | 4,050.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 400,000.00 | 400,000.00 | | 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.3 | MILE | 750.00 | 975.00 | | 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 21.4 | MILE | 1,000.00 | 21,400.00 | | 0019 | 717-01-00100 | Seeding | 146.7 | LB | 12.00 | 1,760.40 | | 0020 | 718-01-00100 | Fertilizer | 4,890 | LB | 1.00 | 4,890.00 | | 0021 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 23,667.3 | SQYD | 1.25 | 29,584.13 | | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 450,000.00 | 450,000.00 | | 0023 | 730-01-00100 | Trenching and Backfilling | 8,140 | LNFT | 10.00 | 81,400.00 | | 0024 | 730-02-01060 | Conduit with Conductors (PVC/HDPE) (1 1/4") S40 2#6, 1#6 Bare Stranded (Conduit G) | 4,663 | LNFT | 6.00 | 27,978.00 | | 0025 | 730-02-01080 | Conduit with Conductors (PVC/HDPE) (1 1/2") S40 2#2, 1#2 Bare Stranded(Conduit E) | 4,163 | LNFT | 10.00 | 41,630.00 | | 0026 | 730-02-01080 | Conduit with Conductors (PVC/HDPE) (1 1/2") S40 4#6, 1#6 Bare Stranded (Conduit M) | 134 | LNFT | 10.00 | 1,340.00 | | 0027 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") S40 Conduit L (4#2, 1#2 Bare Stranded) | 35 | LNFT | 16.00 | 560.00 | | 0028 | 730-03-01060 | Conductors in Existing Conduit (PVC/HDPE) (1 1/4") (2#6, 1#6 Bare Stranded) | 347 | LNFT | 5.00 | 1,735.00 | | 0029 | 730-03-01080 | Conductors in Existing Conduit (PVC/HDPE) (1 1/2") (2#2, 1#2 Bare Stranded) | 199 | LNFT | 7.00 | 1,393.00 | | 0030 | 730-03-01080 | Conductors in Existing Conduit (PVC/HDPE) (1 1/2") (4#6, 1#6 Bare Stranded) | 11 | LNFT | 10.00 | 110.00 | | 0031 | 730-03-01100 | Conductors in Existing Conduit (PVC/HDPE) (2") (4#2, 1#2 Bare Stranded ) | 11 | LNFT | 10.00 | 110.00 | | 0032 | 730-03-03060 | Conductors in Existing Conduit (Ridgid Galvanized Steel) (1 1/4") (2#6, 1#6 Bare Stranded) | 16 | LNFT | 10.00 | 160.00 | | 0033 | 730-03-03080 | Conductors in Existing Conduit (Ridgid Galvanized Steel) (1 1/2") (4#6, 1#6 Bare Stranded) | 5 | LNFT | 30.00 | 150.00 | | 0034 | 730-03-03100 | Conductors in Existing Conduit (Ridgid Galvanized Steel) (2") (4#2, 1#2 Bare Stranded ) | 5 | LNFT | 30.00 | 150.00 | | 0035 | 730-04-00200 | Jacked or Bored Casing (6" Diameter) (PVC/HDPE) | 220 | LNFT | 60.00 | 13,200.00 | | 0036 | 730-07-05000 | Luminaire (250 Watt) (High PressureSodium) | 28 | EACH | 800.00 | 22,400.00 | | 0037 | 730-07-06000 | Luminaire (400 Watt) (High PressureSodium) | 8 | EACH | 800.00 | 6,400.00 | | 0038 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 20,000.00 | 20,000.00 | | 0039 | 730-14-00100 | Removal and Disposal of Luminaires | 36 | EACH | 300.00 | 10,800.00 | | 0040 | 730-15-12100 | Relocate Light Poles (40') (Aluminum) (Single Arm) | 28 | EACH | 4,000.00 | 112,000.00 | | 0041 | 730-15-22200 | Relocate Light Poles (50') (Aluminum) (Twin Arm) | 4 | EACH | 4,500.00 | 18,000.00 | | 0042 | 730-16-00100 | Underground Junction Box (12" x 12") | 32 | EACH | 1,300.00 | 41,600.00 | | 0043 | 730-16-00200 | Underground Junction Box (11" x 18") | 4 | EACH | 1,500.00 | 6,000.00 | | 0044 | 730-16-00300 | Underground Junction Box (13" x 24") | 5 | EACH | 1,700.00 | 8,500.00 | | 0045 | 730-19-00010 | Modular Breakaway Cable System | 32 | EACH | 3,000.00 | 96,000.00 | | 0046 | 730-21-00020 | Duct Marker (Concrete) | 8 | EACH | 700.00 | 5,600.00 | | 0047 | 730-22-00420 | Underground Marker Tape (6")(Detectable) | 8,360 | LNFT | 1.00 | 8,360.00 | | 0048 | 731-02-00100 | Reflectorized Raised Pavement Markers | 854 | EACH | 12.00 | 10,248.00 | | 0049 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 260 | LNFT | 20.00 | 5,200.00 | | 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.91 | MILE | 5,000.00 | 19,550.00 | | 0051 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.16 | MILE | 2,500.00 | 400.00 | | 0052 | 732-05-00100 | Removal of Existing Markings | 0.05 | MILE | 20,000.00 | 1,000.00 | | 0053 | 740-01-00100 | Construction Layout | 1 | LUMP | 255,000.00 | 255,000.00 | | 0054 | 741-06-00100 | Relocating Fire Hydrant | 1 | EACH | 7,500.00 | 7,500.00 | | 0055 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 26,776 | INLF | 0.40 | 10,710.40 | | 0056 | NS-502-01000 | Asphalt Concrete | 23,990.6 | TON | 90.00 | 2,159,154.00 | | 0057 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 376.3 | TON | 150.00 | 56,445.00 | | 0058 | NS-509-01000 | Milling Asphalt Pavement | 2,074 | SQYD | 15.00 | 31,110.00 | | 0059 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -51.6 | CUYD | 0.10 | -5.16 | | 0060 | NS-602-00001 | Milling Concrete Pavement | 432 | SQYD | 30.00 | 12,960.00 | | 0061 | NS-700-00020 | Adjusting Guard Rail | 537.6 | LNFT | 12.00 | 6,451.20 | | 0062 | NS-713-00008 | Portable Changeable Message Sign | 5 | EACH | 5,500.00 | 27,500.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,650,641.47 |
|