Proposal:H.012137.6
Parish:Rapides
Routes:LA 121
Description:LA 121: LA 28 TO LA 496
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, TREATED SUBGRADE LAYER,IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$2,610,866.57
| Rank | License | Bidder | Construction Bid |
| 1 | 08815 | W. E. MCDONALD & SON, LLC. | $2,083,756.14 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,215,444.27 |
| 3 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $2,491,248.73 |
| 4 | 05789 | D & J CONSTRUCTION CO., LLC | $2,850,752.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - W. E. MCDONALD & SON, LLC. | - 2 - Diamond B Construction Co., L.L.C. | - 3 - GILCHRIST CONSTRUCTION CO. LLC | - 4 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,000.00 | 8,000.00 | 8,500.00 | 8,500.00 | 20,000.00 | 20,000.00 | 3,000.00 | 3,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 27 | SQYD | 50.00 | 1,350.00 | 22.00 | 594.00 | 136.00 | 3,672.00 | 16.00 | 432.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,700 | CUYD | 12.00 | 20,400.00 | 18.00 | 30,600.00 | 21.23 | 36,091.00 | 25.00 | 42,500.00 | | 0004 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,200 | CUYD | 12.00 | 14,400.00 | 18.00 | 21,600.00 | 13.00 | 15,600.00 | 12.50 | 15,000.00 | | 0005 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 38,791 | SQYD | 7.75 | 300,630.25 | 10.00 | 387,910.00 | 9.00 | 349,119.00 | 8.00 | 310,328.00 | | 0006 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 57,458 | SQYD | 6.60 | 379,222.80 | 6.25 | 359,112.50 | 8.75 | 502,757.50 | 7.00 | 402,206.00 | | 0007 | 308-02-00100 | Removal of Existing Patches | 300 | SQYD | 10.00 | 3,000.00 | 7.50 | 2,250.00 | 10.00 | 3,000.00 | 12.00 | 3,600.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,007 | CUYD | 50.00 | 100,350.00 | 37.00 | 74,259.00 | 61.00 | 122,427.00 | 65.00 | 130,455.00 | | 0009 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 16 | LNFT | 188.00 | 3,008.00 | 110.00 | 1,760.00 | 225.00 | 3,600.00 | 125.00 | 2,000.00 | | 0010 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,000.00 | 2,000.00 | 777.00 | 1,554.00 | 1,600.00 | 3,200.00 | 750.00 | 1,500.00 | | 0011 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 35 | SQYD | 108.00 | 3,780.00 | 80.00 | 2,800.00 | 150.00 | 5,250.00 | 100.00 | 3,500.00 | | 0012 | 711-04-00100 | Geotextile Fabric | 35 | SQYD | 11.00 | 385.00 | 2.55 | 89.25 | 10.00 | 350.00 | 5.00 | 175.00 | | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 17,750.00 | 17,750.00 | 25,000.00 | 25,000.00 | 22,500.00 | 22,500.00 | 125,000.00 | 125,000.00 | | 0014 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.215 | MILE | 400.00 | 4,886.00 | 154.00 | 1,881.11 | 200.00 | 2,443.00 | 200.00 | 2,443.00 | | 0015 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.855 | MILE | 1.00 | 5.86 | 1.00 | 5.86 | 1.00 | 5.86 | 400.00 | 2,342.00 | | 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 40.771 | MILE | 1.00 | 40.77 | 1.00 | 40.77 | 1.00 | 40.77 | 100.00 | 4,077.10 | | 0017 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 3,000.00 | 3,000.00 | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | | 0018 | 726-01-00100 | Bedding Material | 20 | CUYD | 100.00 | 2,000.00 | 100.00 | 2,000.00 | 150.00 | 3,000.00 | 100.00 | 2,000.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 77,000.00 | 77,000.00 | 175,000.00 | 175,000.00 | 200,000.00 | 200,000.00 | 240,000.00 | 240,000.00 | | 0020 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 91.27 | 547.62 | 85.00 | 510.00 | 90.00 | 540.00 | 100.00 | 600.00 | | 0021 | 731-02-00100 | Reflectorized Raised Pavement Markers | 817 | EACH | 6.44 | 5,261.48 | 6.50 | 5,310.50 | 6.00 | 4,902.00 | 9.00 | 7,353.00 | | 0022 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 12.89 | 154.68 | 13.00 | 156.00 | 13.00 | 156.00 | 60.00 | 720.00 | | 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.59 | MILE | 3,489.58 | 47,423.39 | 3,750.00 | 50,962.50 | 3,300.00 | 44,847.00 | 5,000.00 | 67,950.00 | | 0024 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.952 | MILE | 1,394.40 | 2,721.87 | 1,300.00 | 2,537.60 | 1,300.00 | 2,537.60 | 3,000.00 | 5,856.00 | | 0025 | 732-05-00100 | Removal of Existing Markings | 0.18 | MILE | 6,442.33 | 1,159.62 | 6,300.00 | 1,134.00 | 6,100.00 | 1,098.00 | 20,000.00 | 3,600.00 | | 0026 | 735-01-00100 | Mailboxes | 22 | EACH | 1.07 | 23.54 | 1.00 | 22.00 | 1.00 | 22.00 | 5.00 | 110.00 | | 0027 | 735-02-00100 | Mailbox Supports (Single) | 8 | EACH | 214.74 | 1,717.92 | 210.00 | 1,680.00 | 210.00 | 1,680.00 | 300.00 | 2,400.00 | | 0028 | 735-03-00100 | Mailbox Supports (Double) | 4 | EACH | 214.74 | 858.96 | 310.00 | 1,240.00 | 210.00 | 840.00 | 300.00 | 1,200.00 | | 0029 | 735-04-00100 | Mailbox Supports (Multiple) | 2 | EACH | 348.96 | 697.92 | 325.00 | 650.00 | 350.00 | 700.00 | 400.00 | 800.00 | | 0030 | 739-01-00100 | Hydro-Seeding | 2.97 | ACRE | 1,771.63 | 5,261.74 | 1,750.00 | 5,197.50 | 1,750.00 | 5,197.50 | 3,000.00 | 8,910.00 | | 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,000.00 | 14,000.00 | 18,000.00 | 18,000.00 | 9,000.00 | 9,000.00 | 32,000.00 | 32,000.00 | | 0032 | 805-12-34000 | Reinforced Concrete Box Culverts (5' x 5') (Extension) | 20 | LNFT | 965.00 | 19,300.00 | 775.00 | 15,500.00 | 1,500.00 | 30,000.00 | 800.00 | 16,000.00 | | 0033 | 805-12-35000 | Reinforced Concrete Box Culverts (6' x 6') (Extension) | 24 | LNFT | 1,075.00 | 25,800.00 | 875.00 | 21,000.00 | 1,800.00 | 43,200.00 | 900.00 | 21,600.00 | | 0034 | NS-502-01000 | Asphalt Concrete | 11,843.5 | TON | 73.00 | 864,575.50 | 73.00 | 864,575.50 | 75.00 | 888,262.50 | 100.00 | 1,184,350.00 | | 0035 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 789.3 | TON | 127.00 | 100,241.10 | 115.00 | 90,769.50 | 130.00 | 102,609.00 | 155.00 | 122,341.50 | | 0036 | NS-509-01000 | Milling Asphalt Pavement | 22,404 | SQYD | 2.25 | 50,409.00 | 1.67 | 37,414.68 | 2.25 | 50,409.00 | 3.00 | 67,212.00 | | 0037 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -688 | CUYD | 0.01 | -6.88 | 1.00 | -688.00 | 1.00 | -688.00 | 1.00 | -688.00 | | 0038 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 960 | INLF | 2.50 | 2,400.00 | 2.10 | 2,016.00 | 3.00 | 2,880.00 | 3.00 | 2,880.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,083,756.14 | | 2,215,444.27 | | 2,491,248.73 | | 2,850,752.60 |
|