Proposal:H.012290.6
Parish:East Baton Rouge
Routes:I-10
Description:PECUE LANE/I-10 INTERCHANGE CLEARING, GRUBBING, & EARTHWORK
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, AND RELATED WORK.
Estimated Construction Cost:$1,041,907.78
| Rank | License | Bidder | Construction Bid |
| 1 | 55950 | Brown Industrial Construction, LLC | $1,238,402.70 |
| 2 | 52306 | Cecil Perry Improvements Llc | $1,261,090.28 |
| 3 | 12198 | Byron E. Talbot Contractor, Inc. | $1,290,548.65 |
| 4 | 36961 | Cycle Construction Co. L.L.C. | $1,332,736.20 |
| 5 | 60022 | D. O'BRIAN CONSTRUCTION, LLC | $1,380,102.80 |
| 6 | 54896 | Magee Excavation & Development LLC | $1,419,061.90 |
| 7 | 55505 | MERRICK, LLC | $1,462,076.10 |
| 8 | 34263 | La Contracting Enterprise LLC | $1,488,286.00 |
| 9 | 05693 | Industrial Enterprises, Inc. | $1,730,774.59 |
| 10 | 29595 | Boone Services LLC | $1,860,892.90 |
| 11 | 57931 | KCR CONTRACTORS, LLC | $2,180,221.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Brown Industrial Construction, LLC | - 2 - Cecil Perry Improvements Llc | - 3 - Byron E. Talbot Contractor, Inc. | - 4 - Cycle Construction Co. L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 24.2 | LUMP | 280,000.00 | 280,000.00 | 330,000.00 | 330,000.00 | 165,000.00 | 165,000.00 | 300,000.00 | 300,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,500.00 | 1,500.00 | 1,125.00 | 1,125.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-12000 | Removal of Fence | 2,693 | LNFT | 3.00 | 8,079.00 | 2.80 | 7,540.40 | 4.50 | 12,118.50 | 2.50 | 6,732.50 | | 0004 | 203-03-00100 | Embankment | 31,708 | CUYD | 20.00 | 634,160.00 | 19.10 | 605,622.80 | 24.20 | 767,333.60 | 20.50 | 650,014.00 | | 0005 | 203-08-00100 | Geotextile Fabric | 16,122 | SQYD | 1.35 | 21,764.70 | 1.45 | 23,376.90 | 1.50 | 24,183.00 | 1.60 | 25,795.20 | | 0006 | 203-11-00100 | Settlement Plate Installation and Monitoring | 3 | EACH | 3,000.00 | 9,000.00 | 4,171.00 | 12,513.00 | 2,500.00 | 7,500.00 | 1,500.00 | 4,500.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 50 | EACH | 12.00 | 600.00 | 19.99 | 999.50 | 17.50 | 875.00 | 14.00 | 700.00 | | 0008 | 204-03-00100 | Temporary Slope Drains | 160 | LNFT | 15.00 | 2,400.00 | 22.00 | 3,520.00 | 62.00 | 9,920.00 | 23.00 | 3,680.00 | | 0009 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 1 | EACH | 1,000.00 | 1,000.00 | 155.00 | 155.00 | 2,000.00 | 2,000.00 | 750.00 | 750.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,792 | LNFT | 2.00 | 3,584.00 | 2.00 | 3,584.00 | 2.50 | 4,480.00 | 2.50 | 4,480.00 | | 0011 | 204-07-00100 | Temporary Stone Construction Entrance | 3 | EACH | 3,000.00 | 9,000.00 | 3,900.00 | 11,700.00 | 6,200.00 | 18,600.00 | 3,300.00 | 9,900.00 | | 0012 | 401-01-00100 | Aggregate Surface Course (Net Section) | 117.9 | CUYD | 90.00 | 10,611.00 | 105.00 | 12,379.50 | 95.00 | 11,200.50 | 92.00 | 10,846.80 | | 0013 | 701-01-01040 | Cross Drain Pipe (36" RCP/PP) | 404 | LNFT | 95.00 | 38,380.00 | 76.00 | 30,704.00 | 71.00 | 28,684.00 | 82.50 | 33,330.00 | | 0014 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 50 | LNFT | 65.00 | 3,250.00 | 49.97 | 2,498.50 | 35.00 | 1,750.00 | 76.00 | 3,800.00 | | 0015 | 703-03-00100 | Perforated Pipe Underdrains | 525 | LNFT | 15.00 | 7,875.00 | 12.25 | 6,431.25 | 11.75 | 6,168.75 | 22.00 | 11,550.00 | | 0016 | 703-04-00100 | Nonperforated Pipe Underdrains | 175 | LNFT | 15.00 | 2,625.00 | 14.25 | 2,493.75 | 18.50 | 3,237.50 | 34.00 | 5,950.00 | | 0017 | 705-01-00100 | Barbed Wire Fence | 939 | LNFT | 9.00 | 8,451.00 | 6.45 | 6,056.55 | 8.80 | 8,263.20 | 10.50 | 9,859.50 | | 0018 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 1,754 | LNFT | 10.00 | 17,540.00 | 7.70 | 13,505.80 | 9.90 | 17,364.60 | 11.50 | 20,171.00 | | 0019 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 800.00 | 800.00 | 570.00 | 570.00 | 550.00 | 550.00 | 1,200.00 | 1,200.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 28,000.00 | 28,000.00 | 5,500.00 | 5,500.00 | 4,500.00 | 4,500.00 | | 0021 | 716-01-00100 | Mulch (Vegetative) | 6.2 | TON | 650.00 | 4,030.00 | 740.00 | 4,588.00 | 500.00 | 3,100.00 | 750.00 | 4,650.00 | | 0022 | 717-01-00100 | Seeding | 93 | LB | 10.00 | 930.00 | 10.31 | 958.83 | 17.00 | 1,581.00 | 11.00 | 1,023.00 | | 0023 | 718-01-00100 | Fertilizer | 3,100 | LB | 0.70 | 2,170.00 | 0.50 | 1,550.00 | 1.75 | 5,425.00 | 0.70 | 2,170.00 | | 0024 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 6,000.00 | 6,000.00 | 4,815.00 | 4,815.00 | 10,000.00 | 10,000.00 | 11,000.00 | 11,000.00 | | 0025 | 726-01-00100 | Bedding Material | 89.8 | CUYD | 65.00 | 5,837.00 | 116.50 | 10,461.70 | 90.00 | 8,082.00 | 79.00 | 7,094.20 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 120,000.00 | 120,000.00 | 120,000.00 | 120,000.00 | 110,000.00 | 110,000.00 | 111,000.00 | 111,000.00 | | 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 36,000.00 | 36,000.00 | | 0028 | NS-203-00014 | Wick Drains | 94,080 | LNFT | 0.20 | 18,816.00 | 0.01 | 940.80 | 0.40 | 37,632.00 | 0.50 | 47,040.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,238,402.70 | | 1,261,090.28 | | 1,290,548.65 | | 1,332,736.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - D. O'BRIAN CONSTRUCTION, LLC | - 6 - Magee Excavation & Development LLC | - 7 - MERRICK, LLC | - 8 - La Contracting Enterprise LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 24.2 | LUMP | 29,899.00 | 29,899.00 | 225,000.00 | 225,000.00 | 240,000.00 | 240,000.00 | 260,000.00 | 260,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 34,520.00 | 34,520.00 | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | | 0003 | 202-02-12000 | Removal of Fence | 2,693 | LNFT | 12.00 | 32,316.00 | 1.50 | 4,039.50 | 1.50 | 4,039.50 | 5.00 | 13,465.00 | | 0004 | 203-03-00100 | Embankment | 31,708 | CUYD | 24.00 | 760,992.00 | 24.25 | 768,919.00 | 24.00 | 760,992.00 | 25.50 | 808,554.00 | | 0005 | 203-08-00100 | Geotextile Fabric | 16,122 | SQYD | 4.00 | 64,488.00 | 1.50 | 24,183.00 | 1.45 | 23,376.90 | 1.15 | 18,540.30 | | 0006 | 203-11-00100 | Settlement Plate Installation and Monitoring | 3 | EACH | 11,220.00 | 33,660.00 | 2,800.00 | 8,400.00 | 1,200.00 | 3,600.00 | 2,100.00 | 6,300.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 50 | EACH | 12.00 | 600.00 | 13.50 | 675.00 | 15.00 | 750.00 | 13.00 | 650.00 | | 0008 | 204-03-00100 | Temporary Slope Drains | 160 | LNFT | 40.00 | 6,400.00 | 25.00 | 4,000.00 | 18.00 | 2,880.00 | 31.00 | 4,960.00 | | 0009 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 1 | EACH | 540.00 | 540.00 | 1,875.00 | 1,875.00 | 1,200.00 | 1,200.00 | 2,000.00 | 2,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,792 | LNFT | 4.00 | 7,168.00 | 3.00 | 5,376.00 | 1.60 | 2,867.20 | 1.70 | 3,046.40 | | 0011 | 204-07-00100 | Temporary Stone Construction Entrance | 3 | EACH | 3,450.00 | 10,350.00 | 7,075.00 | 21,225.00 | 3,800.00 | 11,400.00 | 7,500.00 | 22,500.00 | | 0012 | 401-01-00100 | Aggregate Surface Course (Net Section) | 117.9 | CUYD | 98.00 | 11,554.20 | 50.00 | 5,895.00 | 88.00 | 10,375.20 | 107.00 | 12,615.30 | | 0013 | 701-01-01040 | Cross Drain Pipe (36" RCP/PP) | 404 | LNFT | 94.00 | 37,976.00 | 85.00 | 34,340.00 | 140.00 | 56,560.00 | 95.00 | 38,380.00 | | 0014 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 50 | LNFT | 68.00 | 3,400.00 | 70.00 | 3,500.00 | 75.00 | 3,750.00 | 54.00 | 2,700.00 | | 0015 | 703-03-00100 | Perforated Pipe Underdrains | 525 | LNFT | 54.00 | 28,350.00 | 35.00 | 18,375.00 | 8.00 | 4,200.00 | 19.00 | 9,975.00 | | 0016 | 703-04-00100 | Nonperforated Pipe Underdrains | 175 | LNFT | 54.00 | 9,450.00 | 35.00 | 6,125.00 | 8.00 | 1,400.00 | 18.00 | 3,150.00 | | 0017 | 705-01-00100 | Barbed Wire Fence | 939 | LNFT | 22.00 | 20,658.00 | 10.00 | 9,390.00 | 7.50 | 7,042.50 | 11.00 | 10,329.00 | | 0018 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 1,754 | LNFT | 14.00 | 24,556.00 | 11.50 | 20,171.00 | 8.20 | 14,382.80 | 12.00 | 21,048.00 | | 0019 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 780.00 | 780.00 | 1,150.00 | 1,150.00 | 600.00 | 600.00 | 1,200.00 | 1,200.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 34,500.00 | 34,500.00 | 10,000.00 | 10,000.00 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | | 0021 | 716-01-00100 | Mulch (Vegetative) | 6.2 | TON | 1,000.00 | 6,200.00 | 725.00 | 4,495.00 | 700.00 | 4,340.00 | 700.00 | 4,340.00 | | 0022 | 717-01-00100 | Seeding | 93 | LB | 26.00 | 2,418.00 | 12.00 | 1,116.00 | 12.00 | 1,116.00 | 11.00 | 1,023.00 | | 0023 | 718-01-00100 | Fertilizer | 3,100 | LB | 3.00 | 9,300.00 | 0.80 | 2,480.00 | 0.55 | 1,705.00 | 0.80 | 2,480.00 | | 0024 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 18,000.00 | 18,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0025 | 726-01-00100 | Bedding Material | 89.8 | CUYD | 110.00 | 9,878.00 | 50.00 | 4,490.00 | 55.00 | 4,939.00 | 110.00 | 9,878.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 81,900.00 | 81,900.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 100,000.00 | 100,000.00 | | 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,400.00 | 18,400.00 | 22,500.00 | 22,500.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | | 0028 | NS-203-00014 | Wick Drains | 94,080 | LNFT | 0.87 | 81,849.60 | 0.28 | 26,342.40 | 0.75 | 70,560.00 | 0.65 | 61,152.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,380,102.80 | | 1,419,061.90 | | 1,462,076.10 | | 1,488,286.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Industrial Enterprises, Inc. | - 10 - Boone Services LLC | - 11 - KCR CONTRACTORS, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 24.2 | LUMP | 264,000.00 | 264,000.00 | 268,000.00 | 268,000.00 | 464,428.00 | 464,428.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 24,000.00 | 24,000.00 | 3,700.00 | 3,700.00 | 28,750.00 | 28,750.00 | | 0003 | 202-02-12000 | Removal of Fence | 2,693 | LNFT | 5.75 | 15,484.75 | 6.20 | 16,696.60 | 1.15 | 3,096.95 | | 0004 | 203-03-00100 | Embankment | 31,708 | CUYD | 28.73 | 910,970.84 | 34.27 | 1,086,633.16 | 40.63 | 1,288,296.04 | | 0005 | 203-08-00100 | Geotextile Fabric | 16,122 | SQYD | 1.80 | 29,019.60 | 1.42 | 22,893.24 | 1.15 | 18,540.30 | | 0006 | 203-11-00100 | Settlement Plate Installation and Monitoring | 3 | EACH | 3,000.00 | 9,000.00 | 2,000.00 | 6,000.00 | 6,708.33 | 20,124.99 | | 0007 | 204-02-00100 | Temporary Hay Bales | 50 | EACH | 13.80 | 690.00 | 22.50 | 1,125.00 | 13.80 | 690.00 | | 0008 | 204-03-00100 | Temporary Slope Drains | 160 | LNFT | 30.00 | 4,800.00 | 10.78 | 1,724.80 | 34.50 | 5,520.00 | | 0009 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 1 | EACH | 1,800.00 | 1,800.00 | 665.00 | 665.00 | 1,437.50 | 1,437.50 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,792 | LNFT | 1.79 | 3,207.68 | 4.07 | 7,293.44 | 1.71 | 3,064.32 | | 0011 | 204-07-00100 | Temporary Stone Construction Entrance | 3 | EACH | 11,550.00 | 34,650.00 | 6,500.00 | 19,500.00 | 9,583.33 | 28,749.99 | | 0012 | 401-01-00100 | Aggregate Surface Course (Net Section) | 117.9 | CUYD | 264.00 | 31,125.60 | 111.25 | 13,116.38 | 115.00 | 13,558.50 | | 0013 | 701-01-01040 | Cross Drain Pipe (36" RCP/PP) | 404 | LNFT | 86.45 | 34,925.80 | 63.40 | 25,613.60 | 87.26 | 35,253.04 | | 0014 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 50 | LNFT | 57.68 | 2,884.00 | 47.67 | 2,383.50 | 40.99 | 2,049.50 | | 0015 | 703-03-00100 | Perforated Pipe Underdrains | 525 | LNFT | 14.40 | 7,560.00 | 8.23 | 4,320.75 | 10.35 | 5,433.75 | | 0016 | 703-04-00100 | Nonperforated Pipe Underdrains | 175 | LNFT | 14.40 | 2,520.00 | 11.17 | 1,954.75 | 10.35 | 1,811.25 | | 0017 | 705-01-00100 | Barbed Wire Fence | 939 | LNFT | 10.80 | 10,141.20 | 9.89 | 9,286.71 | 10.35 | 9,718.65 | | 0018 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 1,754 | LNFT | 11.88 | 20,837.52 | 11.51 | 20,188.54 | 11.38 | 19,960.52 | | 0019 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 1,230.00 | 1,230.00 | 1,400.00 | 1,400.00 | 1,178.75 | 1,178.75 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,000.00 | 6,000.00 | 6,700.00 | 6,700.00 | 7,475.00 | 7,475.00 | | 0021 | 716-01-00100 | Mulch (Vegetative) | 6.2 | TON | 780.00 | 4,836.00 | 518.00 | 3,211.60 | 747.50 | 4,634.50 | | 0022 | 717-01-00100 | Seeding | 93 | LB | 12.00 | 1,116.00 | 17.25 | 1,604.25 | 11.50 | 1,069.50 | | 0023 | 718-01-00100 | Fertilizer | 3,100 | LB | 0.84 | 2,604.00 | 1.73 | 5,363.00 | 0.81 | 2,511.00 | | 0024 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 72,000.00 | 72,000.00 | 3,300.00 | 3,300.00 | 8,625.00 | 8,625.00 | | 0025 | 726-01-00100 | Bedding Material | 89.8 | CUYD | 90.00 | 8,082.00 | 41.08 | 3,688.98 | 186.25 | 16,725.25 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 180,000.00 | 180,000.00 | 192,502.00 | 192,502.00 | 125,881.00 | 125,881.00 | | 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 36,000.00 | 36,000.00 | 17,250.00 | 17,250.00 | 40,000.00 | 40,000.00 | | 0028 | NS-203-00014 | Wick Drains | 94,080 | LNFT | 0.12 | 11,289.60 | 1.22 | 114,777.60 | 0.23 | 21,638.40 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,730,774.59 | | 1,860,892.90 | | 2,180,221.70 |
|