Bid Tabulations for the Letting of 4/12/2017 LA DOTD Headquarters

Proposal:H.012290.6
Parish:East Baton Rouge
Routes:I-10
Description:PECUE LANE/I-10 INTERCHANGE CLEARING, GRUBBING, & EARTHWORK
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, AND RELATED WORK.
Estimated Construction Cost:$1,041,907.78
Rank License BidderConstruction Bid
155950Brown Industrial Construction, LLC$1,238,402.70
252306Cecil Perry Improvements Llc$1,261,090.28
312198Byron E. Talbot Contractor, Inc.$1,290,548.65
436961Cycle Construction Co. L.L.C.$1,332,736.20
560022D. O'BRIAN CONSTRUCTION, LLC$1,380,102.80
654896Magee Excavation & Development LLC$1,419,061.90
755505MERRICK, LLC$1,462,076.10
834263La Contracting Enterprise LLC$1,488,286.00
905693Industrial Enterprises, Inc.$1,730,774.59
1029595Boone Services LLC$1,860,892.90
1157931KCR CONTRACTORS, LLC$2,180,221.70


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Brown Industrial Construction, LLC
- 2 -
Cecil Perry Improvements Llc
- 3 -
Byron E. Talbot Contractor, Inc.
- 4 -
Cycle Construction Co. L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 24.2   LUMP280,000.00280,000.00330,000.00330,000.00165,000.00165,000.00300,000.00300,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP1,500.001,500.001,125.001,125.005,000.005,000.005,000.005,000.00
0003202-02-12000Removal of Fence 2,693     LNFT3.008,079.002.807,540.404.5012,118.502.506,732.50
0004203-03-00100Embankment 31,708     CUYD20.00634,160.0019.10605,622.8024.20767,333.6020.50650,014.00
0005203-08-00100Geotextile Fabric 16,122     SQYD1.3521,764.701.4523,376.901.5024,183.001.6025,795.20
0006203-11-00100Settlement Plate Installation and Monitoring 3     EACH3,000.009,000.004,171.0012,513.002,500.007,500.001,500.004,500.00
0007204-02-00100Temporary Hay Bales 50     EACH12.00600.0019.99999.5017.50875.0014.00700.00
0008204-03-00100Temporary Slope Drains 160     LNFT15.002,400.0022.003,520.0062.009,920.0023.003,680.00
0009204-05-00200Temporary Sediment Check Dams (Stone) 1     EACH1,000.001,000.00155.00155.002,000.002,000.00750.00750.00
0010204-06-00100Temporary Silt Fencing 1,792     LNFT2.003,584.002.003,584.002.504,480.002.504,480.00
0011204-07-00100Temporary Stone Construction Entrance 3     EACH3,000.009,000.003,900.0011,700.006,200.0018,600.003,300.009,900.00
0012401-01-00100Aggregate Surface Course (Net Section) 117.9   CUYD90.0010,611.00105.0012,379.5095.0011,200.5092.0010,846.80
0013701-01-01040Cross Drain Pipe (36" RCP/PP) 404     LNFT95.0038,380.0076.0030,704.0071.0028,684.0082.5033,330.00
0014701-05-01040Side Drain Pipe (18" RCP/PP/CMP) 50     LNFT65.003,250.0049.972,498.5035.001,750.0076.003,800.00
0015703-03-00100Perforated Pipe Underdrains 525     LNFT15.007,875.0012.256,431.2511.756,168.7522.0011,550.00
0016703-04-00100Nonperforated Pipe Underdrains 175     LNFT15.002,625.0014.252,493.7518.503,237.5034.005,950.00
0017705-01-00100Barbed Wire Fence 939     LNFT9.008,451.006.456,056.558.808,263.2010.509,859.50
0018705-02-00100Combination Mesh & Barbed Wire Fence 1,754     LNFT10.0017,540.007.7013,505.809.9017,364.6011.5020,171.00
0019705-04-00100Single Swinging Driveway Gates 1     EACH800.00800.00570.00570.00550.00550.001,200.001,200.00
0020713-01-00100Temporary Signs and Barricades 1     LUMP10,000.0010,000.0028,000.0028,000.005,500.005,500.004,500.004,500.00
0021716-01-00100Mulch (Vegetative) 6.2   TON650.004,030.00740.004,588.00500.003,100.00750.004,650.00
0022717-01-00100Seeding 93     LB10.00930.0010.31958.8317.001,581.0011.001,023.00
0023718-01-00100Fertilizer 3,100     LB0.702,170.000.501,550.001.755,425.000.702,170.00
0024722-02-00100Project Site Laboratory (Equipped) 1     EACH6,000.006,000.004,815.004,815.0010,000.0010,000.0011,000.0011,000.00
0025726-01-00100Bedding Material 89.8   CUYD65.005,837.00116.5010,461.7090.008,082.0079.007,094.20
0026727-01-00100Mobilization 1     LUMP120,000.00120,000.00120,000.00120,000.00110,000.00110,000.00111,000.00111,000.00
0027740-01-00100Construction Layout 1     LUMP10,000.0010,000.0015,000.0015,000.0015,000.0015,000.0036,000.0036,000.00
0028NS-203-00014Wick Drains 94,080     LNFT0.2018,816.000.01940.800.4037,632.000.5047,040.00
             
  CONTRACTOR TOTAL   1,238,402.70 1,261,090.28 1,290,548.65 1,332,736.20



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
D. O'BRIAN CONSTRUCTION, LLC
- 6 -
Magee Excavation & Development LLC
- 7 -
MERRICK, LLC
- 8 -
La Contracting Enterprise LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 24.2   LUMP29,899.0029,899.00225,000.00225,000.00240,000.00240,000.00260,000.00260,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP34,520.0034,520.0020,000.0020,000.005,000.005,000.0015,000.0015,000.00
0003202-02-12000Removal of Fence 2,693     LNFT12.0032,316.001.504,039.501.504,039.505.0013,465.00
0004203-03-00100Embankment 31,708     CUYD24.00760,992.0024.25768,919.0024.00760,992.0025.50808,554.00
0005203-08-00100Geotextile Fabric 16,122     SQYD4.0064,488.001.5024,183.001.4523,376.901.1518,540.30
0006203-11-00100Settlement Plate Installation and Monitoring 3     EACH11,220.0033,660.002,800.008,400.001,200.003,600.002,100.006,300.00
0007204-02-00100Temporary Hay Bales 50     EACH12.00600.0013.50675.0015.00750.0013.00650.00
0008204-03-00100Temporary Slope Drains 160     LNFT40.006,400.0025.004,000.0018.002,880.0031.004,960.00
0009204-05-00200Temporary Sediment Check Dams (Stone) 1     EACH540.00540.001,875.001,875.001,200.001,200.002,000.002,000.00
0010204-06-00100Temporary Silt Fencing 1,792     LNFT4.007,168.003.005,376.001.602,867.201.703,046.40
0011204-07-00100Temporary Stone Construction Entrance 3     EACH3,450.0010,350.007,075.0021,225.003,800.0011,400.007,500.0022,500.00
0012401-01-00100Aggregate Surface Course (Net Section) 117.9   CUYD98.0011,554.2050.005,895.0088.0010,375.20107.0012,615.30
0013701-01-01040Cross Drain Pipe (36" RCP/PP) 404     LNFT94.0037,976.0085.0034,340.00140.0056,560.0095.0038,380.00
0014701-05-01040Side Drain Pipe (18" RCP/PP/CMP) 50     LNFT68.003,400.0070.003,500.0075.003,750.0054.002,700.00
0015703-03-00100Perforated Pipe Underdrains 525     LNFT54.0028,350.0035.0018,375.008.004,200.0019.009,975.00
0016703-04-00100Nonperforated Pipe Underdrains 175     LNFT54.009,450.0035.006,125.008.001,400.0018.003,150.00
0017705-01-00100Barbed Wire Fence 939     LNFT22.0020,658.0010.009,390.007.507,042.5011.0010,329.00
0018705-02-00100Combination Mesh & Barbed Wire Fence 1,754     LNFT14.0024,556.0011.5020,171.008.2014,382.8012.0021,048.00
0019705-04-00100Single Swinging Driveway Gates 1     EACH780.00780.001,150.001,150.00600.00600.001,200.001,200.00
0020713-01-00100Temporary Signs and Barricades 1     LUMP34,500.0034,500.0010,000.0010,000.0040,000.0040,000.0025,000.0025,000.00
0021716-01-00100Mulch (Vegetative) 6.2   TON1,000.006,200.00725.004,495.00700.004,340.00700.004,340.00
0022717-01-00100Seeding 93     LB26.002,418.0012.001,116.0012.001,116.0011.001,023.00
0023718-01-00100Fertilizer 3,100     LB3.009,300.000.802,480.000.551,705.000.802,480.00
0024722-02-00100Project Site Laboratory (Equipped) 1     EACH18,000.0018,000.0015,000.0015,000.0015,000.0015,000.0010,000.0010,000.00
0025726-01-00100Bedding Material 89.8   CUYD110.009,878.0050.004,490.0055.004,939.00110.009,878.00
0026727-01-00100Mobilization 1     LUMP81,900.0081,900.00150,000.00150,000.00150,000.00150,000.00100,000.00100,000.00
0027740-01-00100Construction Layout 1     LUMP18,400.0018,400.0022,500.0022,500.0020,000.0020,000.0020,000.0020,000.00
0028NS-203-00014Wick Drains 94,080     LNFT0.8781,849.600.2826,342.400.7570,560.000.6561,152.00
             
  CONTRACTOR TOTAL   1,380,102.80 1,419,061.90 1,462,076.10 1,488,286.00



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 9 -
Industrial Enterprises, Inc.
- 10 -
Boone Services LLC
- 11 -
KCR CONTRACTORS, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 24.2   LUMP264,000.00264,000.00268,000.00268,000.00464,428.00464,428.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP24,000.0024,000.003,700.003,700.0028,750.0028,750.00
0003202-02-12000Removal of Fence 2,693     LNFT5.7515,484.756.2016,696.601.153,096.95
0004203-03-00100Embankment 31,708     CUYD28.73910,970.8434.271,086,633.1640.631,288,296.04
0005203-08-00100Geotextile Fabric 16,122     SQYD1.8029,019.601.4222,893.241.1518,540.30
0006203-11-00100Settlement Plate Installation and Monitoring 3     EACH3,000.009,000.002,000.006,000.006,708.3320,124.99
0007204-02-00100Temporary Hay Bales 50     EACH13.80690.0022.501,125.0013.80690.00
0008204-03-00100Temporary Slope Drains 160     LNFT30.004,800.0010.781,724.8034.505,520.00
0009204-05-00200Temporary Sediment Check Dams (Stone) 1     EACH1,800.001,800.00665.00665.001,437.501,437.50
0010204-06-00100Temporary Silt Fencing 1,792     LNFT1.793,207.684.077,293.441.713,064.32
0011204-07-00100Temporary Stone Construction Entrance 3     EACH11,550.0034,650.006,500.0019,500.009,583.3328,749.99
0012401-01-00100Aggregate Surface Course (Net Section) 117.9   CUYD264.0031,125.60111.2513,116.38115.0013,558.50
0013701-01-01040Cross Drain Pipe (36" RCP/PP) 404     LNFT86.4534,925.8063.4025,613.6087.2635,253.04
0014701-05-01040Side Drain Pipe (18" RCP/PP/CMP) 50     LNFT57.682,884.0047.672,383.5040.992,049.50
0015703-03-00100Perforated Pipe Underdrains 525     LNFT14.407,560.008.234,320.7510.355,433.75
0016703-04-00100Nonperforated Pipe Underdrains 175     LNFT14.402,520.0011.171,954.7510.351,811.25
0017705-01-00100Barbed Wire Fence 939     LNFT10.8010,141.209.899,286.7110.359,718.65
0018705-02-00100Combination Mesh & Barbed Wire Fence 1,754     LNFT11.8820,837.5211.5120,188.5411.3819,960.52
0019705-04-00100Single Swinging Driveway Gates 1     EACH1,230.001,230.001,400.001,400.001,178.751,178.75
0020713-01-00100Temporary Signs and Barricades 1     LUMP6,000.006,000.006,700.006,700.007,475.007,475.00
0021716-01-00100Mulch (Vegetative) 6.2   TON780.004,836.00518.003,211.60747.504,634.50
0022717-01-00100Seeding 93     LB12.001,116.0017.251,604.2511.501,069.50
0023718-01-00100Fertilizer 3,100     LB0.842,604.001.735,363.000.812,511.00
0024722-02-00100Project Site Laboratory (Equipped) 1     EACH72,000.0072,000.003,300.003,300.008,625.008,625.00
0025726-01-00100Bedding Material 89.8   CUYD90.008,082.0041.083,688.98186.2516,725.25
0026727-01-00100Mobilization 1     LUMP180,000.00180,000.00192,502.00192,502.00125,881.00125,881.00
0027740-01-00100Construction Layout 1     LUMP36,000.0036,000.0017,250.0017,250.0040,000.0040,000.00
0028NS-203-00014Wick Drains 94,080     LNFT0.1211,289.601.22114,777.600.2321,638.40
           
  CONTRACTOR TOTAL   1,730,774.59 1,860,892.90 2,180,221.70