Search


Bid Tabulations for the Letting of 4/12/2017 LA DOTD Headquarters

Proposal:H.011584.6
Parish:St. Landry
Routes:LA 103
Description:LA 103: LA 359 TO US 190
Type Construction:GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUBGRADE TREATMENT, CLASS II BASE COURSE, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$3,911,719.82
Rank License BidderConstruction Bid
134356Prairie Contractors Inc.$3,475,899.58
200481COASTAL BRIDGE CO., L.L.C.$3,733,025.29
333663Glenn Lege Construction Inc$4,076,478.01
412487Diamond B Construction Co., L.L.C.$4,325,109.21
512312GILCHRIST CONSTRUCTION CO. LLC$4,337,692.33


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Prairie Contractors Inc.
- 2 -
COASTAL BRIDGE CO., L.L.C.
- 3 -
Glenn Lege Construction Inc
- 4 -
Diamond B Construction Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-02000Removal of Asphalt Drives 907     SQYD5.004,535.0015.0013,605.007.506,802.5016.0014,512.00
0002202-02-06080Removal of Concrete Combination Curb and Gutter 292.4   LNFT11.003,216.4020.005,848.009.202,690.0814.004,093.60
0003202-02-06100Removal of Concrete Walks and Drives 156     SQYD11.001,716.0040.006,240.008.501,326.0010.001,560.00
0004202-02-06140Removal of Curbs (Concrete) 49     LNFT11.00539.0075.003,675.005.25257.2512.00588.00
0005202-02-26300Removal of Median / Island 22     SQYD11.00242.00175.003,850.008.50187.00145.003,190.00
0006202-02-32100Removal of Pipe (Cross Drain) (30" RCP)46     LNFT55.002,530.0020.00920.0020.00920.0012.00552.00
0007202-02-38200Removal of Signs 125     EACH12.001,500.0025.003,125.0056.007,000.0023.002,875.00
0008203-05-00100Excavation and Embankment 1     LUMP10,000.0010,000.007,500.007,500.002,900.002,900.0015,000.0015,000.00
0009203-07-00200Borrow (Vehicular Measurement) (Selected Soils) 500     CUYD15.007,500.0027.0013,500.0025.0012,500.0034.0017,000.00
0010203-07-00300Borrow (Vehicular Measurement) (Plastic Soils) 1,275     CUYD5.006,375.0030.0038,250.0015.5019,762.5023.5029,962.50
0011204-05-00100Temporary Sediment Check Dams (Hay) 20     EACH130.002,600.0050.001,000.00165.003,300.00130.002,600.00
0012204-06-00100Temporary Silt Fencing 265     LNFT2.15569.752.00530.002.30609.502.15569.75
0013302-02-06080Class II Base Course (12" Thick) (Asphaltic Concrete Base on Embankment Layer) 346.8   SQYD110.0038,148.0075.0026,010.0090.0031,212.00116.0040,228.80
0014303-01-00300In-Place Cement Stabilized Base Course (10" Thick) 51,561     SQYD6.35327,412.356.29324,318.696.50335,146.505.75296,475.75
0015303-02-00100Removal of Existing Patches 250     SQYD1.00250.001.00250.008.502,125.0010.002,500.00
0016305-01-04020Subgrade Layer (12" Thick) (Treated) 51,561     SQYD11.30582,639.3011.50592,951.5015.50799,195.5016.50850,756.50
0017401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 2,889     CUYD18.0052,002.0010.0028,890.0033.5096,781.5035.00101,115.00
0018402-01-00100Traffic Maintenance Aggregate (Vehicular Measurement) 200     CUYD71.0014,200.0015.003,000.0033.506,700.0080.0016,000.00
0019502-01-00100Superpave Asphaltic Concrete 19,576     TON73.001,429,048.0074.001,448,624.0080.001,566,080.0083.001,624,808.00
0020502-01-00200Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,328.6   TON45.0059,787.00125.00166,075.0090.00119,574.00150.00199,290.00
0021507-01-00100Asphaltic Material (CRS-2P Emulsion) 50,617     GAL2.35118,949.952.35118,949.952.60131,604.202.50126,542.50
0022507-02-00200Aggregate (S2) 74,437     SQYD1.0074,437.001.0074,437.001.1081,880.701.0074,437.00
0023507-02-00300Aggregate (S3) 74,437     SQYD0.8059,549.600.8059,549.600.9066,993.300.8261,038.34
0024509-01-00100Cold Planing Asphaltic Pavement 70,750     SQYD1.65116,737.502.50176,875.001.75123,812.502.40169,800.00
0025509-02-00100Contractor Retained Reclaimed Asphaltic Pavement -3,053     CUYD0.01-30.530.01-30.530.10-305.301.00-3,053.00
0026510-01-00200Pavement Patching (12" Minimum Thickness) 813     SQYD78.0063,414.0075.0060,975.0090.0073,170.00110.0089,430.00
0027510-01-00300Pavement Patching (18" Minimum Thickness) 89     SQYD130.0011,570.00150.0013,350.00135.0012,015.00205.0018,245.00
0028602-02-00100Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints 335     LNFT8.002,680.0010.003,350.008.352,797.258.002,680.00
0029602-03-00100Cleaning and Sealing Random cracks 72     LNFT8.00576.0010.00720.008.35601.208.00576.00
0030602-08-00100Grinding Concrete Pavement 26.7   SQYD10.00267.00115.003,070.50240.006,408.00160.004,272.00
0031701-01-01021Cross Drain Pipe (30" RCP) 48     LNFT210.0010,080.00160.007,680.00220.0010,560.00115.005,520.00
0032701-03-01000Storm Drain Pipe (15" RCP/PP) 12     LNFT120.001,440.0085.001,020.0058.00696.0095.001,140.00
0033702-03-00600Catch Basins (CB-07) 1     EACH4,750.004,750.005,000.005,000.003,350.003,350.006,200.006,200.00
0034702-04-00100Adjusting Manholes 2     EACH2,250.004,500.00750.001,500.002,050.004,100.002,700.005,400.00
0035702-04-00150Adjusting Manholes w/Manhole Adjustment Rings 4     EACH500.002,000.00250.001,000.00200.00800.00415.001,660.00
0036702-04-00200Adjusting Catch Basins 1     EACH2,250.002,250.002,500.002,500.002,150.002,150.002,700.002,700.00
0037706-02-00200Concrete Drive (6" Thick) 156     SQYD90.0014,040.0055.008,580.0061.509,594.0083.0012,948.00
0038707-01-00100Concrete Curb 49     LNFT55.002,695.0050.002,450.0017.00833.0020.00980.00
0039707-03-00100Combination Concrete Curb and Gutter 285.4   LNFT45.0012,843.0030.008,562.0025.007,135.0032.009,132.80
0040711-04-00100Geotextile Fabric 309     SQYD1.20370.802.00618.002.50772.502.00618.00
0041712-02-00100Sacked Concrete Revetment 309     SQYD110.0033,990.0085.0026,265.00130.0040,170.00350.00108,150.00
0042713-01-00100Temporary Signs and Barricades 1     LUMP30,000.0030,000.0050,000.0050,000.0087,820.0087,820.0045,000.0045,000.00
0043713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 17.66  MILE450.007,947.00250.004,415.00650.0011,479.00154.002,719.64
0044713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 1.722 MILE0.010.02400.00688.80445.00766.291.001.72
0045713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 18.656 MILE0.010.19580.0010,820.48725.0013,525.601.0018.66
0046713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 2,820     EACH1.504,230.001.504,230.001.704,794.001.504,230.00
0047722-02-00100Project Site Laboratory (Equipped) 1     EACH6,500.006,500.0011,500.0011,500.008,200.008,200.002,500.002,500.00
0048726-01-00100Bedding Material 15.3   CUYD110.001,683.00150.002,295.0078.001,193.40100.001,530.00
0049727-01-00100Mobilization 1     LUMP185,000.00185,000.00202,500.00202,500.00186,840.00186,840.00175,000.00175,000.00
0050729-01-00102Sign (Type A)(Furnish and Install) 590     SQFT16.009,440.0020.0011,800.0018.9011,151.0013.007,670.00
0051729-02-00102Sign (Type B)(Furnish and Install) 446.2   SQFT16.007,139.2020.008,924.0021.209,459.4413.005,800.60
0052729-16-00200Object Marker Assembly (Type 2) 40     EACH55.002,200.0045.001,800.0066.752,670.0080.003,200.00
0053729-16-00300Object Marker Assembly (Type 3) 21     EACH80.001,680.0070.001,470.0083.501,753.5096.002,016.00
0054729-22-00100Square Tubing Post with 2-1/4" Anchor 144     EACH75.0010,800.0060.008,640.0094.5013,608.0098.0014,112.00
0055731-02-00100Reflectorized Raised Pavement Markers 1,551     EACH6.259,693.755.508,530.506.7010,391.706.259,693.75
0056732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 120     LNFT3.00360.006.00720.002.80336.002.50300.00
0057732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 106     LNFT12.001,272.0010.001,060.0011.151,181.9010.001,060.00
0058732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 18.656 MILE3,300.0061,564.803,500.0065,296.003,445.0064,269.923,225.0060,165.60
0059732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.722 MILE1,250.002,152.501,800.003,099.601,335.002,298.871,200.002,066.40
0060732-04-01040Plastic Pavement Legends and Symbols (Arrow - Double) 1     EACH600.00600.00506.20506.20615.00615.00555.00555.00
0061732-04-01100Plastic Pavement Legends and Symbols (Arrow - Right Turn) 1     EACH400.00400.00500.00500.00390.00390.00355.00355.00
0062732-05-00100Removal of Existing Markings 0.051 MILE10,000.00510.0010,000.00510.005,555.00283.315,100.00260.10
0063735-01-00100Mailboxes 68     EACH5.00340.001.0068.0012.00816.001.0068.00
0064735-02-00100Mailbox Supports (Single) 68     EACH120.008,160.00120.008,160.00115.007,820.00120.008,160.00
0065740-01-00100Construction Layout 1     LUMP100.00100.0035,000.0035,000.0020,000.0020,000.0025,000.0025,000.00
0066NS-201-00001Tree and Stump Removal (Under 36" - 36" Diameter) 9     EACH2,000.0018,000.001,000.009,000.00715.006,435.001,500.0013,500.00
0067NS-600-00220Saw Cutting Portland Cement Concrete Pavement 4,104     INLF2.008,208.002.008,208.002.108,618.402.058,413.20
0068NS-701-00002Trench Excavation Safety Protection (Depth > 5 feet) 60     LNFT110.006,600.0060.003,600.0015.50930.002.00120.00
0069NS-724-00005Rumble Strips (Shoulder) 7     MILE950.006,650.00300.002,100.00325.002,275.00900.006,300.00
0070NS-MSC-00120Drainage Structure CONVERT CATCH BASIN TO MANHOLE1     EACH2,750.002,750.003,000.003,000.002,350.002,350.003,200.003,200.00
             
  CONTRACTOR TOTAL   3,475,899.58 3,733,025.29 4,076,478.01 4,325,109.21



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
GILCHRIST CONSTRUCTION CO. LLC
Unit PriceTotal
Amount
0001202-02-02000Removal of Asphalt Drives 907     SQYD17.0015,419.00
0002202-02-06080Removal of Concrete Combination Curb and Gutter 292.4   LNFT8.502,485.40
0003202-02-06100Removal of Concrete Walks and Drives 156     SQYD27.004,212.00
0004202-02-06140Removal of Curbs (Concrete) 49     LNFT12.50612.50
0005202-02-26300Removal of Median / Island 22     SQYD56.001,232.00
0006202-02-32100Removal of Pipe (Cross Drain) (30" RCP)46     LNFT18.00828.00
0007202-02-38200Removal of Signs 125     EACH28.003,500.00
0008203-05-00100Excavation and Embankment 1     LUMP15,000.0015,000.00
0009203-07-00200Borrow (Vehicular Measurement) (Selected Soils) 500     CUYD15.007,500.00
0010203-07-00300Borrow (Vehicular Measurement) (Plastic Soils) 1,275     CUYD20.0025,500.00
0011204-05-00100Temporary Sediment Check Dams (Hay) 20     EACH170.003,400.00
0012204-06-00100Temporary Silt Fencing 265     LNFT4.001,060.00
0013302-02-06080Class II Base Course (12" Thick) (Asphaltic Concrete Base on Embankment Layer) 346.8   SQYD55.0019,074.00
0014303-01-00300In-Place Cement Stabilized Base Course (10" Thick) 51,561     SQYD7.00360,927.00
0015303-02-00100Removal of Existing Patches 250     SQYD10.002,500.00
0016305-01-04020Subgrade Layer (12" Thick) (Treated) 51,561     SQYD13.00670,293.00
0017401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 2,889     CUYD42.00121,338.00
0018402-01-00100Traffic Maintenance Aggregate (Vehicular Measurement) 200     CUYD62.0012,400.00
0019502-01-00100Superpave Asphaltic Concrete 19,576     TON88.001,722,688.00
0020502-01-00200Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,328.6   TON150.00199,290.00
0021507-01-00100Asphaltic Material (CRS-2P Emulsion) 50,617     GAL2.50126,542.50
0022507-02-00200Aggregate (S2) 74,437     SQYD1.0074,437.00
0023507-02-00300Aggregate (S3) 74,437     SQYD0.8563,271.45
0024509-01-00100Cold Planing Asphaltic Pavement 70,750     SQYD2.00141,500.00
0025509-02-00100Contractor Retained Reclaimed Asphaltic Pavement -3,053     CUYD1.00-3,053.00
0026510-01-00200Pavement Patching (12" Minimum Thickness) 813     SQYD100.0081,300.00
0027510-01-00300Pavement Patching (18" Minimum Thickness) 89     SQYD180.0016,020.00
0028602-02-00100Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints 335     LNFT12.004,020.00
0029602-03-00100Cleaning and Sealing Random cracks 72     LNFT25.001,800.00
0030602-08-00100Grinding Concrete Pavement 26.7   SQYD200.005,340.00
0031701-01-01021Cross Drain Pipe (30" RCP) 48     LNFT270.0012,960.00
0032701-03-01000Storm Drain Pipe (15" RCP/PP) 12     LNFT155.001,860.00
0033702-03-00600Catch Basins (CB-07) 1     EACH11,500.0011,500.00
0034702-04-00100Adjusting Manholes 2     EACH3,000.006,000.00
0035702-04-00150Adjusting Manholes w/Manhole Adjustment Rings 4     EACH1,400.005,600.00
0036702-04-00200Adjusting Catch Basins 1     EACH5,600.005,600.00
0037706-02-00200Concrete Drive (6" Thick) 156     SQYD80.0012,480.00
0038707-01-00100Concrete Curb 49     LNFT45.002,205.00
0039707-03-00100Combination Concrete Curb and Gutter 285.4   LNFT45.0012,843.00
0040711-04-00100Geotextile Fabric 309     SQYD20.006,180.00
0041712-02-00100Sacked Concrete Revetment 309     SQYD270.0083,430.00
0042713-01-00100Temporary Signs and Barricades 1     LUMP25,000.0025,000.00
0043713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 17.66  MILE220.003,885.20
0044713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 1.722 MILE1.001.72
0045713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 18.656 MILE1.0018.66
0046713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 2,820     EACH1.754,935.00
0047722-02-00100Project Site Laboratory (Equipped) 1     EACH1,200.001,200.00
0048726-01-00100Bedding Material 15.3   CUYD175.002,677.50
0049727-01-00100Mobilization 1     LUMP257,000.00257,000.00
0050729-01-00102Sign (Type A)(Furnish and Install) 590     SQFT21.0012,390.00
0051729-02-00102Sign (Type B)(Furnish and Install) 446.2   SQFT21.009,370.20
0052729-16-00200Object Marker Assembly (Type 2) 40     EACH50.002,000.00
0053729-16-00300Object Marker Assembly (Type 3) 21     EACH75.001,575.00
0054729-22-00100Square Tubing Post with 2-1/4" Anchor 144     EACH65.009,360.00
0055731-02-00100Reflectorized Raised Pavement Markers 1,551     EACH7.0010,857.00
0056732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 120     LNFT2.65318.00
0057732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 106     LNFT11.001,166.00
0058732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 18.656 MILE3,200.0059,699.20
0059732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.722 MILE1,250.002,152.50
0060732-04-01040Plastic Pavement Legends and Symbols (Arrow - Double) 1     EACH600.00600.00
0061732-04-01100Plastic Pavement Legends and Symbols (Arrow - Right Turn) 1     EACH375.00375.00
0062732-05-00100Removal of Existing Markings 0.051 MILE5,500.00280.50
0063735-01-00100Mailboxes 68     EACH2.00136.00
0064735-02-00100Mailbox Supports (Single) 68     EACH150.0010,200.00
0065740-01-00100Construction Layout 1     LUMP7,000.007,000.00
0066NS-201-00001Tree and Stump Removal (Under 36" - 36" Diameter) 9     EACH4,000.0036,000.00
0067NS-600-00220Saw Cutting Portland Cement Concrete Pavement 4,104     INLF1.255,130.00
0068NS-701-00002Trench Excavation Safety Protection (Depth > 5 feet) 60     LNFT50.003,000.00
0069NS-724-00005Rumble Strips (Shoulder) 7     MILE610.004,270.00
0070NS-MSC-00120Drainage Structure CONVERT CATCH BASIN TO MANHOLE1     EACH6,000.006,000.00
       
  CONTRACTOR TOTAL   4,337,692.33