Proposal:H.011584.6
Parish:St. Landry
Routes:LA 103
Description:LA 103: LA 359 TO US 190
Type Construction:GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUBGRADE TREATMENT, CLASS II BASE COURSE, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALTIC SURFACE TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$3,911,719.82
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors Inc. | $3,475,899.58 |
| 2 | 00481 | COASTAL BRIDGE CO., L.L.C. | $3,733,025.29 |
| 3 | 33663 | Glenn Lege Construction Inc | $4,076,478.01 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $4,325,109.21 |
| 5 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $4,337,692.33 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors Inc. | - 2 - COASTAL BRIDGE CO., L.L.C. | - 3 - Glenn Lege Construction Inc | - 4 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 907 | SQYD | 5.00 | 4,535.00 | 15.00 | 13,605.00 | 7.50 | 6,802.50 | 16.00 | 14,512.00 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 292.4 | LNFT | 11.00 | 3,216.40 | 20.00 | 5,848.00 | 9.20 | 2,690.08 | 14.00 | 4,093.60 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 156 | SQYD | 11.00 | 1,716.00 | 40.00 | 6,240.00 | 8.50 | 1,326.00 | 10.00 | 1,560.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 49 | LNFT | 11.00 | 539.00 | 75.00 | 3,675.00 | 5.25 | 257.25 | 12.00 | 588.00 | | 0005 | 202-02-26300 | Removal of Median / Island | 22 | SQYD | 11.00 | 242.00 | 175.00 | 3,850.00 | 8.50 | 187.00 | 145.00 | 3,190.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) (30" RCP) | 46 | LNFT | 55.00 | 2,530.00 | 20.00 | 920.00 | 20.00 | 920.00 | 12.00 | 552.00 | | 0007 | 202-02-38200 | Removal of Signs | 125 | EACH | 12.00 | 1,500.00 | 25.00 | 3,125.00 | 56.00 | 7,000.00 | 23.00 | 2,875.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,000.00 | 10,000.00 | 7,500.00 | 7,500.00 | 2,900.00 | 2,900.00 | 15,000.00 | 15,000.00 | | 0009 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 500 | CUYD | 15.00 | 7,500.00 | 27.00 | 13,500.00 | 25.00 | 12,500.00 | 34.00 | 17,000.00 | | 0010 | 203-07-00300 | Borrow (Vehicular Measurement) (Plastic Soils) | 1,275 | CUYD | 5.00 | 6,375.00 | 30.00 | 38,250.00 | 15.50 | 19,762.50 | 23.50 | 29,962.50 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 20 | EACH | 130.00 | 2,600.00 | 50.00 | 1,000.00 | 165.00 | 3,300.00 | 130.00 | 2,600.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 265 | LNFT | 2.15 | 569.75 | 2.00 | 530.00 | 2.30 | 609.50 | 2.15 | 569.75 | | 0013 | 302-02-06080 | Class II Base Course (12" Thick) (Asphaltic Concrete Base on Embankment Layer) | 346.8 | SQYD | 110.00 | 38,148.00 | 75.00 | 26,010.00 | 90.00 | 31,212.00 | 116.00 | 40,228.80 | | 0014 | 303-01-00300 | In-Place Cement Stabilized Base Course (10" Thick) | 51,561 | SQYD | 6.35 | 327,412.35 | 6.29 | 324,318.69 | 6.50 | 335,146.50 | 5.75 | 296,475.75 | | 0015 | 303-02-00100 | Removal of Existing Patches | 250 | SQYD | 1.00 | 250.00 | 1.00 | 250.00 | 8.50 | 2,125.00 | 10.00 | 2,500.00 | | 0016 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 51,561 | SQYD | 11.30 | 582,639.30 | 11.50 | 592,951.50 | 15.50 | 799,195.50 | 16.50 | 850,756.50 | | 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,889 | CUYD | 18.00 | 52,002.00 | 10.00 | 28,890.00 | 33.50 | 96,781.50 | 35.00 | 101,115.00 | | 0018 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 200 | CUYD | 71.00 | 14,200.00 | 15.00 | 3,000.00 | 33.50 | 6,700.00 | 80.00 | 16,000.00 | | 0019 | 502-01-00100 | Superpave Asphaltic Concrete | 19,576 | TON | 73.00 | 1,429,048.00 | 74.00 | 1,448,624.00 | 80.00 | 1,566,080.00 | 83.00 | 1,624,808.00 | | 0020 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,328.6 | TON | 45.00 | 59,787.00 | 125.00 | 166,075.00 | 90.00 | 119,574.00 | 150.00 | 199,290.00 | | 0021 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 50,617 | GAL | 2.35 | 118,949.95 | 2.35 | 118,949.95 | 2.60 | 131,604.20 | 2.50 | 126,542.50 | | 0022 | 507-02-00200 | Aggregate (S2) | 74,437 | SQYD | 1.00 | 74,437.00 | 1.00 | 74,437.00 | 1.10 | 81,880.70 | 1.00 | 74,437.00 | | 0023 | 507-02-00300 | Aggregate (S3) | 74,437 | SQYD | 0.80 | 59,549.60 | 0.80 | 59,549.60 | 0.90 | 66,993.30 | 0.82 | 61,038.34 | | 0024 | 509-01-00100 | Cold Planing Asphaltic Pavement | 70,750 | SQYD | 1.65 | 116,737.50 | 2.50 | 176,875.00 | 1.75 | 123,812.50 | 2.40 | 169,800.00 | | 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,053 | CUYD | 0.01 | -30.53 | 0.01 | -30.53 | 0.10 | -305.30 | 1.00 | -3,053.00 | | 0026 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 813 | SQYD | 78.00 | 63,414.00 | 75.00 | 60,975.00 | 90.00 | 73,170.00 | 110.00 | 89,430.00 | | 0027 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 89 | SQYD | 130.00 | 11,570.00 | 150.00 | 13,350.00 | 135.00 | 12,015.00 | 205.00 | 18,245.00 | | 0028 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 335 | LNFT | 8.00 | 2,680.00 | 10.00 | 3,350.00 | 8.35 | 2,797.25 | 8.00 | 2,680.00 | | 0029 | 602-03-00100 | Cleaning and Sealing Random cracks | 72 | LNFT | 8.00 | 576.00 | 10.00 | 720.00 | 8.35 | 601.20 | 8.00 | 576.00 | | 0030 | 602-08-00100 | Grinding Concrete Pavement | 26.7 | SQYD | 10.00 | 267.00 | 115.00 | 3,070.50 | 240.00 | 6,408.00 | 160.00 | 4,272.00 | | 0031 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 48 | LNFT | 210.00 | 10,080.00 | 160.00 | 7,680.00 | 220.00 | 10,560.00 | 115.00 | 5,520.00 | | 0032 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 12 | LNFT | 120.00 | 1,440.00 | 85.00 | 1,020.00 | 58.00 | 696.00 | 95.00 | 1,140.00 | | 0033 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 4,750.00 | 4,750.00 | 5,000.00 | 5,000.00 | 3,350.00 | 3,350.00 | 6,200.00 | 6,200.00 | | 0034 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 2,250.00 | 4,500.00 | 750.00 | 1,500.00 | 2,050.00 | 4,100.00 | 2,700.00 | 5,400.00 | | 0035 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 4 | EACH | 500.00 | 2,000.00 | 250.00 | 1,000.00 | 200.00 | 800.00 | 415.00 | 1,660.00 | | 0036 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,250.00 | 2,250.00 | 2,500.00 | 2,500.00 | 2,150.00 | 2,150.00 | 2,700.00 | 2,700.00 | | 0037 | 706-02-00200 | Concrete Drive (6" Thick) | 156 | SQYD | 90.00 | 14,040.00 | 55.00 | 8,580.00 | 61.50 | 9,594.00 | 83.00 | 12,948.00 | | 0038 | 707-01-00100 | Concrete Curb | 49 | LNFT | 55.00 | 2,695.00 | 50.00 | 2,450.00 | 17.00 | 833.00 | 20.00 | 980.00 | | 0039 | 707-03-00100 | Combination Concrete Curb and Gutter | 285.4 | LNFT | 45.00 | 12,843.00 | 30.00 | 8,562.00 | 25.00 | 7,135.00 | 32.00 | 9,132.80 | | 0040 | 711-04-00100 | Geotextile Fabric | 309 | SQYD | 1.20 | 370.80 | 2.00 | 618.00 | 2.50 | 772.50 | 2.00 | 618.00 | | 0041 | 712-02-00100 | Sacked Concrete Revetment | 309 | SQYD | 110.00 | 33,990.00 | 85.00 | 26,265.00 | 130.00 | 40,170.00 | 350.00 | 108,150.00 | | 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 87,820.00 | 87,820.00 | 45,000.00 | 45,000.00 | | 0043 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 17.66 | MILE | 450.00 | 7,947.00 | 250.00 | 4,415.00 | 650.00 | 11,479.00 | 154.00 | 2,719.64 | | 0044 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.722 | MILE | 0.01 | 0.02 | 400.00 | 688.80 | 445.00 | 766.29 | 1.00 | 1.72 | | 0045 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.656 | MILE | 0.01 | 0.19 | 580.00 | 10,820.48 | 725.00 | 13,525.60 | 1.00 | 18.66 | | 0046 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,820 | EACH | 1.50 | 4,230.00 | 1.50 | 4,230.00 | 1.70 | 4,794.00 | 1.50 | 4,230.00 | | 0047 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 6,500.00 | 6,500.00 | 11,500.00 | 11,500.00 | 8,200.00 | 8,200.00 | 2,500.00 | 2,500.00 | | 0048 | 726-01-00100 | Bedding Material | 15.3 | CUYD | 110.00 | 1,683.00 | 150.00 | 2,295.00 | 78.00 | 1,193.40 | 100.00 | 1,530.00 | | 0049 | 727-01-00100 | Mobilization | 1 | LUMP | 185,000.00 | 185,000.00 | 202,500.00 | 202,500.00 | 186,840.00 | 186,840.00 | 175,000.00 | 175,000.00 | | 0050 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 590 | SQFT | 16.00 | 9,440.00 | 20.00 | 11,800.00 | 18.90 | 11,151.00 | 13.00 | 7,670.00 | | 0051 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 446.2 | SQFT | 16.00 | 7,139.20 | 20.00 | 8,924.00 | 21.20 | 9,459.44 | 13.00 | 5,800.60 | | 0052 | 729-16-00200 | Object Marker Assembly (Type 2) | 40 | EACH | 55.00 | 2,200.00 | 45.00 | 1,800.00 | 66.75 | 2,670.00 | 80.00 | 3,200.00 | | 0053 | 729-16-00300 | Object Marker Assembly (Type 3) | 21 | EACH | 80.00 | 1,680.00 | 70.00 | 1,470.00 | 83.50 | 1,753.50 | 96.00 | 2,016.00 | | 0054 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 144 | EACH | 75.00 | 10,800.00 | 60.00 | 8,640.00 | 94.50 | 13,608.00 | 98.00 | 14,112.00 | | 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,551 | EACH | 6.25 | 9,693.75 | 5.50 | 8,530.50 | 6.70 | 10,391.70 | 6.25 | 9,693.75 | | 0056 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 120 | LNFT | 3.00 | 360.00 | 6.00 | 720.00 | 2.80 | 336.00 | 2.50 | 300.00 | | 0057 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 106 | LNFT | 12.00 | 1,272.00 | 10.00 | 1,060.00 | 11.15 | 1,181.90 | 10.00 | 1,060.00 | | 0058 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 18.656 | MILE | 3,300.00 | 61,564.80 | 3,500.00 | 65,296.00 | 3,445.00 | 64,269.92 | 3,225.00 | 60,165.60 | | 0059 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.722 | MILE | 1,250.00 | 2,152.50 | 1,800.00 | 3,099.60 | 1,335.00 | 2,298.87 | 1,200.00 | 2,066.40 | | 0060 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 600.00 | 600.00 | 506.20 | 506.20 | 615.00 | 615.00 | 555.00 | 555.00 | | 0061 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 400.00 | 400.00 | 500.00 | 500.00 | 390.00 | 390.00 | 355.00 | 355.00 | | 0062 | 732-05-00100 | Removal of Existing Markings | 0.051 | MILE | 10,000.00 | 510.00 | 10,000.00 | 510.00 | 5,555.00 | 283.31 | 5,100.00 | 260.10 | | 0063 | 735-01-00100 | Mailboxes | 68 | EACH | 5.00 | 340.00 | 1.00 | 68.00 | 12.00 | 816.00 | 1.00 | 68.00 | | 0064 | 735-02-00100 | Mailbox Supports (Single) | 68 | EACH | 120.00 | 8,160.00 | 120.00 | 8,160.00 | 115.00 | 7,820.00 | 120.00 | 8,160.00 | | 0065 | 740-01-00100 | Construction Layout | 1 | LUMP | 100.00 | 100.00 | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | 0066 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 9 | EACH | 2,000.00 | 18,000.00 | 1,000.00 | 9,000.00 | 715.00 | 6,435.00 | 1,500.00 | 13,500.00 | | 0067 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,104 | INLF | 2.00 | 8,208.00 | 2.00 | 8,208.00 | 2.10 | 8,618.40 | 2.05 | 8,413.20 | | 0068 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 60 | LNFT | 110.00 | 6,600.00 | 60.00 | 3,600.00 | 15.50 | 930.00 | 2.00 | 120.00 | | 0069 | NS-724-00005 | Rumble Strips (Shoulder) | 7 | MILE | 950.00 | 6,650.00 | 300.00 | 2,100.00 | 325.00 | 2,275.00 | 900.00 | 6,300.00 | | 0070 | NS-MSC-00120 | Drainage Structure CONVERT CATCH BASIN TO MANHOLE | 1 | EACH | 2,750.00 | 2,750.00 | 3,000.00 | 3,000.00 | 2,350.00 | 2,350.00 | 3,200.00 | 3,200.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,475,899.58 | | 3,733,025.29 | | 4,076,478.01 | | 4,325,109.21 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 907 | SQYD | 17.00 | 15,419.00 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 292.4 | LNFT | 8.50 | 2,485.40 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 156 | SQYD | 27.00 | 4,212.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 49 | LNFT | 12.50 | 612.50 | | 0005 | 202-02-26300 | Removal of Median / Island | 22 | SQYD | 56.00 | 1,232.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) (30" RCP) | 46 | LNFT | 18.00 | 828.00 | | 0007 | 202-02-38200 | Removal of Signs | 125 | EACH | 28.00 | 3,500.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 15,000.00 | 15,000.00 | | 0009 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 500 | CUYD | 15.00 | 7,500.00 | | 0010 | 203-07-00300 | Borrow (Vehicular Measurement) (Plastic Soils) | 1,275 | CUYD | 20.00 | 25,500.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 20 | EACH | 170.00 | 3,400.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 265 | LNFT | 4.00 | 1,060.00 | | 0013 | 302-02-06080 | Class II Base Course (12" Thick) (Asphaltic Concrete Base on Embankment Layer) | 346.8 | SQYD | 55.00 | 19,074.00 | | 0014 | 303-01-00300 | In-Place Cement Stabilized Base Course (10" Thick) | 51,561 | SQYD | 7.00 | 360,927.00 | | 0015 | 303-02-00100 | Removal of Existing Patches | 250 | SQYD | 10.00 | 2,500.00 | | 0016 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 51,561 | SQYD | 13.00 | 670,293.00 | | 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,889 | CUYD | 42.00 | 121,338.00 | | 0018 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 200 | CUYD | 62.00 | 12,400.00 | | 0019 | 502-01-00100 | Superpave Asphaltic Concrete | 19,576 | TON | 88.00 | 1,722,688.00 | | 0020 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,328.6 | TON | 150.00 | 199,290.00 | | 0021 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 50,617 | GAL | 2.50 | 126,542.50 | | 0022 | 507-02-00200 | Aggregate (S2) | 74,437 | SQYD | 1.00 | 74,437.00 | | 0023 | 507-02-00300 | Aggregate (S3) | 74,437 | SQYD | 0.85 | 63,271.45 | | 0024 | 509-01-00100 | Cold Planing Asphaltic Pavement | 70,750 | SQYD | 2.00 | 141,500.00 | | 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,053 | CUYD | 1.00 | -3,053.00 | | 0026 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 813 | SQYD | 100.00 | 81,300.00 | | 0027 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 89 | SQYD | 180.00 | 16,020.00 | | 0028 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 335 | LNFT | 12.00 | 4,020.00 | | 0029 | 602-03-00100 | Cleaning and Sealing Random cracks | 72 | LNFT | 25.00 | 1,800.00 | | 0030 | 602-08-00100 | Grinding Concrete Pavement | 26.7 | SQYD | 200.00 | 5,340.00 | | 0031 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 48 | LNFT | 270.00 | 12,960.00 | | 0032 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 12 | LNFT | 155.00 | 1,860.00 | | 0033 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 11,500.00 | 11,500.00 | | 0034 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 3,000.00 | 6,000.00 | | 0035 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 4 | EACH | 1,400.00 | 5,600.00 | | 0036 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 5,600.00 | 5,600.00 | | 0037 | 706-02-00200 | Concrete Drive (6" Thick) | 156 | SQYD | 80.00 | 12,480.00 | | 0038 | 707-01-00100 | Concrete Curb | 49 | LNFT | 45.00 | 2,205.00 | | 0039 | 707-03-00100 | Combination Concrete Curb and Gutter | 285.4 | LNFT | 45.00 | 12,843.00 | | 0040 | 711-04-00100 | Geotextile Fabric | 309 | SQYD | 20.00 | 6,180.00 | | 0041 | 712-02-00100 | Sacked Concrete Revetment | 309 | SQYD | 270.00 | 83,430.00 | | 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | | 0043 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 17.66 | MILE | 220.00 | 3,885.20 | | 0044 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.722 | MILE | 1.00 | 1.72 | | 0045 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.656 | MILE | 1.00 | 18.66 | | 0046 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,820 | EACH | 1.75 | 4,935.00 | | 0047 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 1,200.00 | 1,200.00 | | 0048 | 726-01-00100 | Bedding Material | 15.3 | CUYD | 175.00 | 2,677.50 | | 0049 | 727-01-00100 | Mobilization | 1 | LUMP | 257,000.00 | 257,000.00 | | 0050 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 590 | SQFT | 21.00 | 12,390.00 | | 0051 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 446.2 | SQFT | 21.00 | 9,370.20 | | 0052 | 729-16-00200 | Object Marker Assembly (Type 2) | 40 | EACH | 50.00 | 2,000.00 | | 0053 | 729-16-00300 | Object Marker Assembly (Type 3) | 21 | EACH | 75.00 | 1,575.00 | | 0054 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 144 | EACH | 65.00 | 9,360.00 | | 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,551 | EACH | 7.00 | 10,857.00 | | 0056 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 120 | LNFT | 2.65 | 318.00 | | 0057 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 106 | LNFT | 11.00 | 1,166.00 | | 0058 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 18.656 | MILE | 3,200.00 | 59,699.20 | | 0059 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.722 | MILE | 1,250.00 | 2,152.50 | | 0060 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 600.00 | 600.00 | | 0061 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 375.00 | 375.00 | | 0062 | 732-05-00100 | Removal of Existing Markings | 0.051 | MILE | 5,500.00 | 280.50 | | 0063 | 735-01-00100 | Mailboxes | 68 | EACH | 2.00 | 136.00 | | 0064 | 735-02-00100 | Mailbox Supports (Single) | 68 | EACH | 150.00 | 10,200.00 | | 0065 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | | 0066 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 9 | EACH | 4,000.00 | 36,000.00 | | 0067 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,104 | INLF | 1.25 | 5,130.00 | | 0068 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 60 | LNFT | 50.00 | 3,000.00 | | 0069 | NS-724-00005 | Rumble Strips (Shoulder) | 7 | MILE | 610.00 | 4,270.00 | | 0070 | NS-MSC-00120 | Drainage Structure CONVERT CATCH BASIN TO MANHOLE | 1 | EACH | 6,000.00 | 6,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,337,692.33 |
|