Proposal:H.010560.6
Parish:East Baton Rouge
Routes:LA 3064
Description:ESSEN LANE WIDEN: PERKINS RD to I-10
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT AND CONCRETE PAVEMENT, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, SIGNING, DRILLED SHAFT FOUNDATIONS, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$6,141,307.53
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$5,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 24901 | Hard Rock Construction LLC | $6,607,200.38 | 100.00 | $7,107,200.38 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $7,066,633.55 | 330.00 | $8,716,633.55 |
| 3 | 48896 | Command Construction Industries LLC | $7,293,094.22 | 300.00 | $8,793,094.22 |
| 4 | 39462 | JB JAMES CONSTRUCTION LLC | $9,288,527.05 | 479.00 | $11,683,527.05 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Hard Rock Construction LLC | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - Command Construction Industries LLC | - 4 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 60,000.00 | 60,000.00 | 20,000.00 | 20,000.00 | 250,000.00 | 250,000.00 | 1,000,000.00 | 1,000,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 1,000.00 | 1,000.00 | 35,000.00 | 35,000.00 | | 0003 | 202-02-00010 | Removal of Sign ("Burden Center LSU Rural Life Museum)(8' x 5' Concrete)(Sta. 143+53.50, Lt.) | 1 | EACH | 2,500.00 | 2,500.00 | 3,300.00 | 3,300.00 | 2,000.00 | 2,000.00 | 1,200.00 | 1,200.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 3,882 | SQYD | 16.00 | 62,112.00 | 12.00 | 46,584.00 | 25.00 | 97,050.00 | 30.00 | 116,460.00 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 440 | LNFT | 6.00 | 2,640.00 | 10.00 | 4,400.00 | 5.00 | 2,200.00 | 12.00 | 5,280.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 23 | LNFT | 25.00 | 575.00 | 30.00 | 690.00 | 50.00 | 1,150.00 | 45.00 | 1,035.00 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,625 | SQYD | 12.00 | 19,500.00 | 30.00 | 48,750.00 | 25.00 | 40,625.00 | 75.00 | 121,875.00 | | 0008 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 6,600.00 | 6,600.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0009 | 203-01-00100 | General Excavation | 6,149 | CUYD | 31.00 | 190,619.00 | 16.00 | 98,384.00 | 10.00 | 61,490.00 | 49.00 | 301,301.00 | | 0010 | 203-03-00100 | Embankment | 586 | CUYD | 14.00 | 8,204.00 | 56.00 | 32,816.00 | 10.00 | 5,860.00 | 150.00 | 87,900.00 | | 0011 | 204-02-00100 | Temporary Hay or Straw Bales | 650 | EACH | 14.00 | 9,100.00 | 25.00 | 16,250.00 | 10.00 | 6,500.00 | 15.00 | 9,750.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 8,332 | LNFT | 2.00 | 16,664.00 | 2.00 | 16,664.00 | 5.00 | 41,660.00 | 2.00 | 16,664.00 | | 0013 | 302-02-03121 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 8,170.7 | SQYD | 31.00 | 253,291.70 | 27.00 | 220,608.90 | 35.00 | 285,974.50 | 34.00 | 277,803.80 | | 0014 | 304-05-00100 | Lime Treatment (Type E) | 115.82 | TON | 400.00 | 46,328.00 | 480.00 | 55,593.60 | 1.00 | 115.82 | 680.00 | 78,757.60 | | 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,500 | CUYD | 77.00 | 115,500.00 | 68.00 | 102,000.00 | 1.00 | 1,500.00 | 140.00 | 210,000.00 | | 0016 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 6,880.2 | SQYD | 87.00 | 598,577.40 | 100.00 | 688,020.00 | 120.00 | 825,624.00 | 99.00 | 681,139.80 | | 0017 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 7 | EACH | 380.00 | 2,660.00 | 115.00 | 805.00 | 150.00 | 1,050.00 | 125.00 | 875.00 | | 0018 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 22,505 | LNFT | 1.80 | 40,509.00 | 2.00 | 45,010.00 | 1.00 | 22,505.00 | 3.00 | 67,515.00 | | 0019 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 17,271 | LNFT | 1.80 | 31,087.80 | 2.50 | 43,177.50 | 1.00 | 17,271.00 | 3.50 | 60,448.50 | | 0020 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | 2,020 | SQYD | 238.00 | 480,760.00 | 250.00 | 505,000.00 | 300.00 | 606,000.00 | 450.00 | 909,000.00 | | 0021 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 61 | SQYD | 205.00 | 12,505.00 | 250.00 | 15,250.00 | 200.00 | 12,200.00 | 660.00 | 40,260.00 | | 0022 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 80 | LNFT | 500.00 | 40,000.00 | 215.00 | 17,200.00 | 250.00 | 20,000.00 | 450.00 | 36,000.00 | | 0023 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 72 | LNFT | 500.00 | 36,000.00 | 320.00 | 23,040.00 | 250.00 | 18,000.00 | 500.00 | 36,000.00 | | 0024 | 701-07-00300 | Yard Drain Pipe (8") | 28 | LNFT | 46.00 | 1,288.00 | 86.00 | 2,408.00 | 50.00 | 1,400.00 | 140.00 | 3,920.00 | | 0025 | 702-03-00400 | Catch Basins (CB-05) | 1 | EACH | 2,100.00 | 2,100.00 | 1,200.00 | 1,200.00 | 2,500.00 | 2,500.00 | 3,500.00 | 3,500.00 | | 0026 | 702-03-00500 | Catch Basins (CB-06) | 7 | EACH | 8,000.00 | 56,000.00 | 6,000.00 | 42,000.00 | 5,000.00 | 35,000.00 | 8,000.00 | 56,000.00 | | 0027 | 702-03-00600 | Catch Basins (CB-07) | 12 | EACH | 10,000.00 | 120,000.00 | 9,500.00 | 114,000.00 | 6,000.00 | 72,000.00 | 10,000.00 | 120,000.00 | | 0028 | 702-03-00700 | Catch Basins (CB-08) | 11 | EACH | 18,000.00 | 198,000.00 | 10,000.00 | 110,000.00 | 8,000.00 | 88,000.00 | 13,000.00 | 143,000.00 | | 0029 | 702-03-00800 | Catch Basins (CB-09) | 10 | EACH | 12,000.00 | 120,000.00 | 9,000.00 | 90,000.00 | 6,000.00 | 60,000.00 | 14,000.00 | 140,000.00 | | 0030 | 702-04-00100 | Adjusting Manholes | 32 | EACH | 400.00 | 12,800.00 | 1,200.00 | 38,400.00 | 1,000.00 | 32,000.00 | 1,500.00 | 48,000.00 | | 0031 | 702-04-00200 | Adjusting Catch Basins | 9 | EACH | 5,000.00 | 45,000.00 | 3,500.00 | 31,500.00 | 1,500.00 | 13,500.00 | 3,500.00 | 31,500.00 | | 0032 | 703-01-00100 | Shoulder Underdrain Systems | 9,145.16 | LNFT | 24.00 | 219,483.84 | 10.00 | 91,451.60 | 15.00 | 137,177.40 | 25.00 | 228,629.00 | | 0033 | 706-01-00100 | Concrete Walk (4" Thick) | 3,096.8 | SQYD | 60.00 | 185,808.00 | 50.00 | 154,840.00 | 60.00 | 185,808.00 | 60.00 | 185,808.00 | | 0034 | 706-02-00200 | Concrete Drive (6" Thick) | 2,233.9 | SQYD | 88.00 | 196,583.20 | 55.00 | 122,864.50 | 80.00 | 178,712.00 | 70.00 | 156,373.00 | | 0035 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 172.3 | SQYD | 55.00 | 9,476.50 | 70.00 | 12,061.00 | 60.00 | 10,338.00 | 70.00 | 12,061.00 | | 0036 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 409.7 | SQYD | 80.00 | 32,776.00 | 75.00 | 30,727.50 | 65.00 | 26,630.50 | 80.00 | 32,776.00 | | 0037 | 706-04-00100 | Handicapped Curb Ramps | 104 | EACH | 1,395.00 | 145,080.00 | 2,400.00 | 249,600.00 | 750.00 | 78,000.00 | 1,100.00 | 114,400.00 | | 0038 | 707-01-00200 | Concrete Curb (Barrier) | 5,979.2 | LNFT | 15.00 | 89,688.00 | 10.00 | 59,792.00 | 10.00 | 59,792.00 | 22.00 | 131,542.40 | | 0039 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,030.9 | LNFT | 30.00 | 30,927.00 | 35.00 | 36,081.50 | 40.00 | 41,236.00 | 44.00 | 45,359.60 | | 0040 | 708-01-00100 | Right-of-Way Monument | 58 | EACH | 200.00 | 11,600.00 | 250.00 | 14,500.00 | 250.00 | 14,500.00 | 250.00 | 14,500.00 | | 0041 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 300,000.00 | 300,000.00 | 500,000.00 | 500,000.00 | 250,000.00 | 250,000.00 | | 0042 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,700 | LNFT | 0.50 | 850.00 | 0.40 | 680.00 | 0.50 | 850.00 | 0.20 | 340.00 | | 0043 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,830 | LNFT | 2.00 | 3,660.00 | 1.00 | 1,830.00 | 3.00 | 5,490.00 | 0.75 | 1,372.50 | | 0044 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.091 | MILE | 400.00 | 436.40 | 500.00 | 545.50 | 500.00 | 545.50 | 350.00 | 381.85 | | 0045 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.617 | MILE | 220.00 | 1,455.74 | 550.00 | 3,639.35 | 500.00 | 3,308.50 | 250.00 | 1,654.25 | | 0046 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 15.35 | MILE | 1,500.00 | 23,025.00 | 700.00 | 10,745.00 | 650.00 | 9,977.50 | 500.00 | 7,675.00 | | 0047 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 26 | EACH | 50.00 | 1,300.00 | 60.00 | 1,560.00 | 100.00 | 2,600.00 | 25.00 | 650.00 | | 0048 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,317 | EACH | 6.50 | 8,560.50 | 6.50 | 8,560.50 | 5.00 | 6,585.00 | 3.00 | 3,951.00 | | 0049 | 717-01-00100 | Seeding | 30 | LB | 16.00 | 480.00 | 20.00 | 600.00 | 10.00 | 300.00 | 15.00 | 450.00 | | 0050 | 718-01-00100 | Fertilizer | 1,000 | LB | 1.00 | 1,000.00 | 2.00 | 2,000.00 | 1.00 | 1,000.00 | 0.70 | 700.00 | | 0051 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 12,000.00 | 12,000.00 | 18,000.00 | 18,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | | 0052 | 725-01-00100 | Temporary Detour Roads | 64.1 | SQYD | 300.00 | 19,230.00 | 150.00 | 9,615.00 | 300.00 | 19,230.00 | 250.00 | 16,025.00 | | 0053 | 726-01-00100 | Bedding Material | 78.4 | CUYD | 77.00 | 6,036.80 | 55.00 | 4,312.00 | 50.00 | 3,920.00 | 80.00 | 6,272.00 | | 0054 | 727-01-00100 | Mobilization | 1 | LUMP | 105,000.00 | 105,000.00 | 800,000.00 | 800,000.00 | 750,000.00 | 750,000.00 | 900,000.00 | 900,000.00 | | 0055 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 904.5 | SQFT | 62.00 | 56,079.00 | 35.00 | 31,657.50 | 50.00 | 45,225.00 | 40.00 | 36,180.00 | | 0056 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 68.4 | SQFT | 30.00 | 2,052.00 | 30.00 | 2,052.00 | 25.00 | 1,710.00 | 18.75 | 1,282.50 | | 0057 | 729-04-00103 | Sign (Type D)(Relocate) | 50 | SQFT | 30.00 | 1,500.00 | 55.00 | 2,750.00 | 50.00 | 2,500.00 | 10.00 | 500.00 | | 0058 | 729-08-00100 | Mounting (2 1/2" Size Post) | 30 | EACH | 400.00 | 12,000.00 | 950.00 | 28,500.00 | 900.00 | 27,000.00 | 925.00 | 27,750.00 | | 0059 | 729-08-00200 | Mounting (3 1/2" Size Post) | 4 | EACH | 400.00 | 1,600.00 | 1,200.00 | 4,800.00 | 1,100.00 | 4,400.00 | 1,150.00 | 4,600.00 | | 0060 | 729-08-00300 | Mounting (5" Size Post) | 1 | EACH | 500.00 | 500.00 | 1,300.00 | 1,300.00 | 1,200.00 | 1,200.00 | 16.00 | 16.00 | | 0061 | 729-21-00100 | U-Channel Post | 16 | EACH | 1.00 | 16.00 | 65.00 | 1,040.00 | 60.00 | 960.00 | 85.00 | 1,360.00 | | 0062 | 731-02-00100 | Reflectorized Raised Pavement Markers | 998 | EACH | 16.00 | 15,968.00 | 8.00 | 7,984.00 | 10.00 | 9,980.00 | 8.00 | 7,984.00 | | 0063 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 4,197 | LNFT | 5.00 | 20,985.00 | 3.00 | 12,591.00 | 1.00 | 4,197.00 | 2.00 | 8,394.00 | | 0064 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 103 | LNFT | 20.00 | 2,060.00 | 14.50 | 1,493.50 | 10.00 | 1,030.00 | 10.00 | 1,030.00 | | 0065 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 906 | LNFT | 25.00 | 22,650.00 | 16.50 | 14,949.00 | 10.00 | 9,060.00 | 14.00 | 12,684.00 | | 0066 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.716 | MILE | 9,000.00 | 33,444.00 | 4,000.00 | 14,864.00 | 2,000.00 | 7,432.00 | 3,800.00 | 14,120.80 | | 0067 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.88 | MILE | 4,100.00 | 15,908.00 | 1,600.00 | 6,208.00 | 2,000.00 | 7,760.00 | 2,000.00 | 7,760.00 | | 0068 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.182 | MILE | 4,500.00 | 819.00 | 5,000.00 | 910.00 | 5,000.00 | 910.00 | 2,000.00 | 364.00 | | 0069 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.023 | MILE | 9,000.00 | 207.00 | 5,000.00 | 115.00 | 5,000.00 | 115.00 | 3,200.00 | 73.60 | | 0070 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 850.00 | 1,700.00 | 500.00 | 1,000.00 | 1,000.00 | 2,000.00 | 505.05 | 1,010.10 | | 0071 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 28 | EACH | 570.00 | 15,960.00 | 400.00 | 11,200.00 | 500.00 | 14,000.00 | 300.00 | 8,400.00 | | 0072 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 570.00 | 2,850.00 | 400.00 | 2,000.00 | 500.00 | 2,500.00 | 300.00 | 1,500.00 | | 0073 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 6 | EACH | 1,800.00 | 10,800.00 | 700.00 | 4,200.00 | 2,000.00 | 12,000.00 | 1,000.00 | 6,000.00 | | 0074 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 1 | EACH | 500.00 | 500.00 | 250.00 | 250.00 | 1,000.00 | 1,000.00 | 250.00 | 250.00 | | 0075 | 732-05-00100 | Removal of Existing Markings | 0.884 | MILE | 17,000.00 | 15,028.00 | 5,000.00 | 4,420.00 | 10,000.00 | 8,840.00 | 9,500.00 | 8,398.00 | | 0076 | 736-01-00100 | Trenching and Backfilling | 650 | LNFT | 5.00 | 3,250.00 | 8.00 | 5,200.00 | 15.00 | 9,750.00 | 4.50 | 2,925.00 | | 0077 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 8,495 | LNFT | 13.00 | 110,435.00 | 9.00 | 76,455.00 | 15.00 | 127,425.00 | 10.00 | 84,950.00 | | 0078 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 1,510 | LNFT | 22.00 | 33,220.00 | 13.00 | 19,630.00 | 20.00 | 30,200.00 | 15.00 | 22,650.00 | | 0079 | 736-04-02000 | Signal Support (Pedestal Pole) | 9 | EACH | 2,000.00 | 18,000.00 | 2,200.00 | 19,800.00 | 2,000.00 | 18,000.00 | 1,985.00 | 17,865.00 | | 0080 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 35 | EACH | 2,000.00 | 70,000.00 | 1,000.00 | 35,000.00 | 1,500.00 | 52,500.00 | 950.00 | 33,250.00 | | 0081 | 736-05-02020 | Signal Heads (3 Section, 12 inch Led Lens, R, LT. Y, LT. G) | 10 | EACH | 1,008.00 | 10,080.00 | 1,000.00 | 10,000.00 | 1,500.00 | 15,000.00 | 950.00 | 9,500.00 | | 0082 | 736-05-03000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 2 | EACH | 1,280.00 | 2,560.00 | 1,200.00 | 2,400.00 | 1,500.00 | 3,000.00 | 1,200.00 | 2,400.00 | | 0083 | 736-05-04020 | Signal Heads (5 Section, 12" Led Lens, R, Y, RT. Y, G, RT. G) | 4 | EACH | 1,500.00 | 6,000.00 | 1,500.00 | 6,000.00 | 1,500.00 | 6,000.00 | 1,300.00 | 5,200.00 | | 0084 | 736-06-00100 | Signal Service | 4 | EACH | 2,000.00 | 8,000.00 | 1,800.00 | 7,200.00 | 1,000.00 | 4,000.00 | 1,800.00 | 7,200.00 | | 0085 | 736-06-00300 | Signal Service (Pedestal Required, Separate Disconnect for Street Lights) | 4 | EACH | 2,000.00 | 8,000.00 | 2,500.00 | 10,000.00 | 2,000.00 | 8,000.00 | 2,400.00 | 9,600.00 | | 0086 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 4 | EACH | 6,500.00 | 26,000.00 | 6,000.00 | 24,000.00 | 5,000.00 | 20,000.00 | 6,000.00 | 24,000.00 | | 0087 | 736-09-00100 | Loop Detector | 2,460 | LNFT | 25.00 | 61,500.00 | 22.00 | 54,120.00 | 20.00 | 49,200.00 | 25.00 | 61,500.00 | | 0088 | 736-10-00100 | Underground Junction Box (Type D) | 16 | EACH | 607.00 | 9,712.00 | 800.00 | 12,800.00 | 1,200.00 | 19,200.00 | 787.00 | 12,592.00 | | 0089 | 736-10-00300 | Underground Junction Box (Type F) | 25 | EACH | 680.00 | 17,000.00 | 900.00 | 22,500.00 | 1,200.00 | 30,000.00 | 900.00 | 22,500.00 | | 0090 | 736-10-00400 | Underground Junction Box (Type G) | 4 | EACH | 1,092.00 | 4,368.00 | 1,300.00 | 5,200.00 | 1,200.00 | 4,800.00 | 1,200.00 | 4,800.00 | | 0091 | 736-10-00600 | Underground Junction Box (Type I) | 3 | EACH | 1,200.00 | 3,600.00 | 1,200.00 | 3,600.00 | 1,200.00 | 3,600.00 | 1,100.00 | 3,300.00 | | 0092 | 736-10-00700 | Underground Junction Box (Type J) | 4 | EACH | 1,200.00 | 4,800.00 | 1,300.00 | 5,200.00 | 1,200.00 | 4,800.00 | 1,300.00 | 5,200.00 | | 0093 | 736-11-00100 | Conduit (1/2" HDPE, Schedule 80) | 140 | LNFT | 5.00 | 700.00 | 2.00 | 280.00 | 50.00 | 7,000.00 | 2.00 | 280.00 | | 0094 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 355 | LNFT | 5.00 | 1,775.00 | 4.00 | 1,420.00 | 50.00 | 17,750.00 | 4.00 | 1,420.00 | | 0095 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 805 | LNFT | 9.00 | 7,245.00 | 8.00 | 6,440.00 | 50.00 | 40,250.00 | 8.00 | 6,440.00 | | 0096 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 10,080 | LNFT | 1.00 | 10,080.00 | 1.00 | 10,080.00 | 1.00 | 10,080.00 | 0.75 | 7,560.00 | | 0097 | 736-12-01020 | Conductor (2c, #6 awg) | 1,910 | LNFT | 3.00 | 5,730.00 | 2.50 | 4,775.00 | 3.00 | 5,730.00 | 2.40 | 4,584.00 | | 0098 | 736-12-01040 | Conductor (2c, #14 awg) | 2,965 | LNFT | 2.00 | 5,930.00 | 0.70 | 2,075.50 | 1.00 | 2,965.00 | 1.00 | 2,965.00 | | 0099 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 300 | LNFT | 4.00 | 1,200.00 | 3.70 | 1,110.00 | 5.00 | 1,500.00 | 3.50 | 1,050.00 | | 0100 | 736-12-02020 | Conductor (3c, #14 awg) | 3,205 | LNFT | 2.00 | 6,410.00 | 1.20 | 3,846.00 | 2.00 | 6,410.00 | 1.25 | 4,006.25 | | 0101 | 736-12-04000 | Conductor (6c, #14 awg) | 3,430 | LNFT | 2.00 | 6,860.00 | 2.40 | 8,232.00 | 3.00 | 10,290.00 | 2.50 | 8,575.00 | | 0102 | 736-12-06000 | Conductor (10c, #14 awg) | 8,480 | LNFT | 3.00 | 25,440.00 | 3.00 | 25,440.00 | 3.00 | 25,440.00 | 3.00 | 25,440.00 | | 0103 | 737-04-00001 | Painted Curbs and Islands | 128 | SQYD | 6.00 | 768.00 | 12.00 | 1,536.00 | 50.00 | 6,400.00 | 20.00 | 2,560.00 | | 0104 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 125,000.00 | 125,000.00 | 100,000.00 | 100,000.00 | 80,000.00 | 80,000.00 | | 0105 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 30,823 | LNFT | 2.00 | 61,646.00 | 3.00 | 92,469.00 | 2.00 | 61,646.00 | 3.00 | 92,469.00 | | 0106 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 19,767 | LNFT | 2.00 | 39,534.00 | 3.00 | 59,301.00 | 2.00 | 39,534.00 | 3.50 | 69,184.50 | | 0107 | NS-502-01000 | Asphalt Concrete | 6,853.8 | TON | 95.00 | 651,111.00 | 87.00 | 596,280.60 | 90.00 | 616,842.00 | 85.00 | 582,573.00 | | 0108 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 346.9 | TON | 190.00 | 65,911.00 | 145.00 | 50,300.50 | 200.00 | 69,380.00 | 175.00 | 60,707.50 | | 0109 | NS-509-01000 | Milling Asphalt Pavement | 1,354 | SQYD | 10.00 | 13,540.00 | 10.00 | 13,540.00 | 10.00 | 13,540.00 | 10.00 | 13,540.00 | | 0110 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -75 | CUYD | 10.00 | -750.00 | 0.00 | 0.00 | 10.00 | -750.00 | 15.00 | -1,125.00 | | 0111 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 75,740 | INLF | 1.00 | 75,740.00 | 0.80 | 60,592.00 | 1.00 | 75,740.00 | 1.00 | 75,740.00 | | 0112 | NS-602-00001 | Milling Concrete Pavement | 8,630.5 | SQYD | 15.00 | 129,457.50 | 12.00 | 103,566.00 | 15.00 | 129,457.50 | 13.00 | 112,196.50 | | 0113 | NS-736-00001 | GPS | 4 | EACH | 1,000.00 | 4,000.00 | 1,000.00 | 4,000.00 | 1,000.00 | 4,000.00 | 1,000.00 | 4,000.00 | | 0114 | NS-736-00005 | Video Detection Cabinet Components | 4 | EACH | 9,000.00 | 36,000.00 | 9,000.00 | 36,000.00 | 8,000.00 | 32,000.00 | 8,000.00 | 32,000.00 | | 0115 | NS-736-00006 | Video Detection Camera | 16 | EACH | 2,100.00 | 33,600.00 | 2,500.00 | 40,000.00 | 2,500.00 | 40,000.00 | 2,000.00 | 32,000.00 | | 0116 | NS-736-00010 | LED Pedestrian Countdown Signal Head | 22 | EACH | 900.00 | 19,800.00 | 1,300.00 | 28,600.00 | 1,500.00 | 33,000.00 | 900.00 | 19,800.00 | | 0117 | NS-736-00011 | Pedestrian Push Buttons | 22 | EACH | 200.00 | 4,400.00 | 400.00 | 8,800.00 | 500.00 | 11,000.00 | 160.00 | 3,520.00 | | 0118 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 4 | EACH | 20,000.00 | 80,000.00 | 20,000.00 | 80,000.00 | 15,000.00 | 60,000.00 | 16,000.00 | 64,000.00 | | 0119 | NS-ITS-04020 | Fiber Optic Cable, SM, Furnish & Install, 13-48 Fibers | 5,505 | LNFT | 5.00 | 27,525.00 | 2.50 | 13,762.50 | 3.00 | 16,515.00 | 3.00 | 16,515.00 | | 0120 | NS-ITS-04035 | Fiber Optic Fan Out Kits, SM, 12 Strand, Furnish & Install | 4 | EACH | 240.00 | 960.00 | 110.00 | 440.00 | 120.00 | 480.00 | 222.00 | 888.00 | | 0121 | NS-ITS-04180 | Fiber Optic Connection, Install, Splice | 60 | EACH | 40.00 | 2,400.00 | 12.00 | 720.00 | 15.00 | 900.00 | 30.00 | 1,800.00 | | 0122 | NS-ITS-04200 | Fiber Optic Connection, Termination, Furnish & Install | 48 | EACH | 90.00 | 4,320.00 | 32.00 | 1,536.00 | 50.00 | 2,400.00 | 33.00 | 1,584.00 | | 0123 | NS-ITS-04250 | Fiber Optic Drop Cable, SM, 12 Strand, Furnish & Install | 445 | LNFT | 5.00 | 2,225.00 | 2.00 | 890.00 | 5.00 | 2,225.00 | 2.00 | 890.00 | | 0124 | NS-ITS-04290 | Fiber Optic Patch Cord, SM, 2 Strand, Furnish & Install | 8 | EACH | 90.00 | 720.00 | 42.00 | 336.00 | 50.00 | 400.00 | 40.00 | 320.00 | | 0125 | NS-ITS-04360 | Fiber Optic Connection Splice Tray, Furnish & Install | 18 | EACH | 93.00 | 1,674.00 | 100.00 | 1,800.00 | 100.00 | 1,800.00 | 91.00 | 1,638.00 | | 0126 | NS-ITS-04425 | Fiber Optic Connection Patch Panel, Outdoor, Furnish & Install | 4 | EACH | 132.00 | 528.00 | 280.00 | 1,120.00 | 300.00 | 1,200.00 | 123.00 | 492.00 | | 0127 | NS-ITS-05025 | Splice Closure, Outdoor, Furnish & Install | 4 | EACH | 1,173.00 | 4,692.00 | 900.00 | 3,600.00 | 1,000.00 | 4,000.00 | 830.00 | 3,320.00 | | 0128 | NS-ITS-12000 | Communications System Integration | 1 | LUMP | 20,000.00 | 20,000.00 | 22,000.00 | 22,000.00 | 10,000.00 | 10,000.00 | 19,000.00 | 19,000.00 | | 0129 | NS-MSC-00120 | Drainage Structure CB-Adjust, Adjustment/Conversion | 42 | EACH | 5,100.00 | 214,200.00 | 7,500.00 | 315,000.00 | 2,500.00 | 105,000.00 | 5,800.00 | 243,600.00 | | 0130 | NS-MSC-00120 | Drainage Structure Paved Gutter Drain | 1 | EACH | 3,900.00 | 3,900.00 | 5,000.00 | 5,000.00 | 3,500.00 | 3,500.00 | 4,500.00 | 4,500.00 | | 0131 | NS-P17-00010 | Emergency Vehicle Preemption Phase Selector | 4 | EACH | 8,200.00 | 32,800.00 | 4,000.00 | 16,000.00 | 5,000.00 | 20,000.00 | 4,000.00 | 16,000.00 | | 0132 | NS-P17-00018 | Emergency Vehicle Preemption Detector | 16 | EACH | 1,100.00 | 17,600.00 | 800.00 | 12,800.00 | 1,000.00 | 16,000.00 | 800.00 | 12,800.00 | | 0133 | NS-P17-00030 | Signal Support (Mast Arm Standard w/30 ft Arm and 1 luminaire) | 2 | EACH | 18,000.00 | 36,000.00 | 12,000.00 | 24,000.00 | 15,000.00 | 30,000.00 | 12,000.00 | 24,000.00 | | 0134 | NS-P17-00033 | Signal Support (Mast Arm Standard w/35 ft Arm and 1 luminaire) | 1 | EACH | 25,000.00 | 25,000.00 | 14,000.00 | 14,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | | 0135 | NS-P17-00036 | Signal Support (Mast Arm Standard w/40 ft Arm and 1 luminaire) | 1 | EACH | 15,000.00 | 15,000.00 | 14,000.00 | 14,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | | 0136 | NS-P17-00038 | Signal Support (Mast Arm Standard w/45 ft Arm | 1 | EACH | 19,000.00 | 19,000.00 | 18,000.00 | 18,000.00 | 20,000.00 | 20,000.00 | 18,000.00 | 18,000.00 | | 0137 | NS-P17-00039 | Signal Support (Mast Arm Standard w/45 ft Arm and 1 luminaire) | 1 | EACH | 20,000.00 | 20,000.00 | 18,500.00 | 18,500.00 | 20,000.00 | 20,000.00 | 18,000.00 | 18,000.00 | | 0138 | NS-P17-00042 | Signal Support (Mast Arm Standard w/50 ft Arm and 1 luminaire) | 2 | EACH | 22,000.00 | 44,000.00 | 22,000.00 | 44,000.00 | 25,000.00 | 50,000.00 | 21,000.00 | 42,000.00 | | 0139 | NS-P17-00045 | Signal Support (Mast Arm Standard w/55 ft Arm and 1 luminaire) | 2 | EACH | 30,000.00 | 60,000.00 | 30,000.00 | 60,000.00 | 30,000.00 | 60,000.00 | 28,000.00 | 56,000.00 | | 0140 | NS-P17-00046 | Signal Support (Mast Arm Standard w/55 ft Arm and 2 luminaires) | 1 | EACH | 31,000.00 | 31,000.00 | 31,000.00 | 31,000.00 | 30,000.00 | 30,000.00 | 29,000.00 | 29,000.00 | | 0141 | NS-P17-00048 | Signal Support (Mast Arm Standard w/60 ft Arm and 1 luminaire) | 3 | EACH | 36,000.00 | 108,000.00 | 34,000.00 | 102,000.00 | 35,000.00 | 105,000.00 | 32,500.00 | 97,500.00 | | 0142 | NS-P17-00051 | Signal Support (Mast Arm Standard w/65 ft Arm and 1 luminaire) | 2 | EACH | 50,000.00 | 100,000.00 | 36,000.00 | 72,000.00 | 40,000.00 | 80,000.00 | 35,000.00 | 70,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,607,200.38 | | 7,066,633.55 | | 7,293,094.22 | | 9,288,527.05 |
|