Proposal:H.010390.6
Parish:East Carroll
Routes:US 65
Description:US 65: PANOLA PLANT ROAD TO ARK. LINE
Type Construction:CLEARING AND GRUBBING, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,456,403.66
| Rank | License | Bidder | Construction Bid |
| 1 | 05789 | D & J CONSTRUCTION CO., LLC | $2,285,760.20 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,505,205.52 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - D & J CONSTRUCTION CO., LLC | - 2 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) Approximately 2.645 Acres | 2.645 | LUMP | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | | 0002 | 502-01-00100 | Superpave Asphaltic Concrete | 13,367.1 | TON | 90.00 | 1,203,039.00 | 105.00 | 1,403,545.50 | | 0003 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 72.1 | TON | 90.00 | 6,489.00 | 350.00 | 25,235.00 | | 0004 | 509-01-00100 | Cold Planing Asphaltic Pavement | 121,428 | SQYD | 1.50 | 182,142.00 | 2.50 | 303,570.00 | | 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -3,374 | CUYD | 1.00 | -3,374.00 | 1.00 | -3,374.00 | | 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 905 | SQYD | 120.00 | 108,600.00 | 100.00 | 90,500.00 | | 0007 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,162 | SQYD | 135.00 | 156,870.00 | 125.00 | 145,250.00 | | 0008 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 17,500.00 | 17,500.00 | | 0009 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 10.296 | MILE | 200.00 | 2,059.20 | 170.00 | 1,750.32 | | 0010 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 9.848 | MILE | 100.00 | 984.80 | 425.00 | 4,185.40 | | 0011 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 21.016 | MILE | 100.00 | 2,101.60 | 650.00 | 13,660.40 | | 0012 | 716-01-00100 | Mulch (Vegetative) | 5 | TON | 700.00 | 3,500.00 | 950.00 | 4,750.00 | | 0013 | 717-01-00100 | Seeding | 150 | LB | 11.00 | 1,650.00 | 17.00 | 2,550.00 | | 0014 | 718-01-00100 | Fertilizer | 2,500 | LB | 0.50 | 1,250.00 | 0.55 | 1,375.00 | | 0015 | 727-01-00100 | Mobilization | 1 | LUMP | 150,000.00 | 150,000.00 | 65,000.00 | 65,000.00 | | 0016 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 100.00 | 1,200.00 | 85.00 | 1,020.00 | | 0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | 680 | EACH | 7.00 | 4,760.00 | 6.50 | 4,420.00 | | 0018 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.508 | MILE | 4,500.00 | 47,286.00 | 4,500.00 | 47,286.00 | | 0019 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.924 | MILE | 1,600.00 | 7,878.40 | 1,100.00 | 5,416.40 | | 0020 | 735-01-00100 | Mailboxes | 5 | EACH | 5.00 | 25.00 | 5.00 | 25.00 | | 0021 | 735-02-00100 | Mailbox Supports (Single) | 5 | EACH | 225.00 | 1,125.00 | 225.00 | 1,125.00 | | 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,000.00 | 14,000.00 | 10,500.00 | 10,500.00 | | 0023 | NS-201-00002 | Tree and Stump Removal (Over 36" - 48" Diameter) | 1 | EACH | 3,000.00 | 3,000.00 | 2,000.00 | 2,000.00 | | 0024 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 81,540 | LNFT | 1.40 | 114,156.00 | 1.65 | 134,541.00 | | 0025 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 32,616 | LNFT | 1.60 | 52,185.60 | 1.75 | 57,078.00 | | 0026 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 114,156 | LNFT | 1.10 | 125,571.60 | 1.25 | 142,695.00 | | 0027 | NS-724-00005 | Rumble Strips (Shoulder) | 10.29 | MILE | 900.00 | 9,261.00 | 350.00 | 3,601.50 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,285,760.20 | | 2,505,205.52 |
|