Proposal:H.010278.6
Parish:Caddo
Routes:LA 173
Description:LA 173: JCT HEARNE AVE TO JCT I-220
Type Construction:GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, IN-PLACE CEMENT TREATED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$1,555,050.70
| Rank | License | Bidder | Construction Bid |
| 1 | 36374 | Best-Yet Builders, Llc | $1,499,264.65 |
| 2 | 17464 | Benton & Brown, LLC. | $1,726,247.06 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Best-Yet Builders, Llc | - 2 - Benton & Brown, LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 35,000.00 | 35,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 544 | LNFT | 5.00 | 2,720.00 | 5.50 | 2,992.00 | | 0003 | 203-06-00100 | Excavation and Embankment | 200 | LNFT | 125.00 | 25,000.00 | 100.00 | 20,000.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 655 | CUYD | 25.00 | 16,375.00 | 30.00 | 19,650.00 | | 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 16 | EACH | 10.00 | 160.00 | 29.00 | 464.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 200 | LNFT | 2.50 | 500.00 | 3.50 | 700.00 | | 0007 | 302-02-02080 | Class II Base Course (6" Thick) (Stone) | 143.3 | SQYD | 30.00 | 4,299.00 | 55.00 | 7,881.50 | | 0008 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 20,040 | SQYD | 8.70 | 174,348.00 | 12.50 | 250,500.00 | | 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 150 | CUYD | 60.00 | 9,000.00 | 20.00 | 3,000.00 | | 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 6,143.2 | TON | 100.00 | 614,320.00 | 100.00 | 614,320.00 | | 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 60 | TON | 110.00 | 6,600.00 | 125.00 | 7,500.00 | | 0012 | 509-01-00100 | Cold Planing Asphaltic Pavement | 55,559 | SQYD | 2.00 | 111,118.00 | 2.00 | 111,118.00 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,314 | CUYD | 0.10 | -231.40 | 0.01 | -23.14 | | 0014 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 144 | SQYD | 104.20 | 15,004.80 | 200.00 | 28,800.00 | | 0015 | 510-04-00100 | Pavement Patching | 73.6 | TON | 150.00 | 11,040.00 | 200.00 | 14,720.00 | | 0016 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 325 | LNFT | 60.00 | 19,500.00 | 69.00 | 22,425.00 | | 0017 | 704-03-00100 | Blocked Out Guard Rail | 325 | LNFT | 22.00 | 7,150.00 | 24.00 | 7,800.00 | | 0018 | 704-11-00300 | Guard Rail End Treatment (Bi-Directional) | 2 | EACH | 5,500.00 | 11,000.00 | 6,000.00 | 12,000.00 | | 0019 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 330 | SQYD | 100.00 | 33,000.00 | 65.00 | 21,450.00 | | 0020 | 711-04-00100 | Geotextile Fabric | 330 | SQYD | 2.00 | 660.00 | 3.00 | 990.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 103,500.00 | 103,500.00 | | 0022 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,760 | LNFT | 0.50 | 1,880.00 | 0.50 | 1,880.00 | | 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 4,440 | LNFT | 1.00 | 4,440.00 | 1.00 | 4,440.00 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.437 | MILE | 500.00 | 1,718.50 | 350.00 | 1,202.95 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.437 | MILE | 500.00 | 1,718.50 | 500.00 | 1,718.50 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 13.764 | MILE | 500.00 | 6,882.00 | 500.00 | 6,882.00 | | 0027 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 26 | EACH | 100.00 | 2,600.00 | 100.00 | 2,600.00 | | 0028 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 24 | EACH | 100.00 | 2,400.00 | 100.00 | 2,400.00 | | 0029 | 726-01-00100 | Bedding Material | 17.2 | CUYD | 100.00 | 1,720.00 | 120.00 | 2,064.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 103,500.00 | 103,500.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 110.00 | 440.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,319 | EACH | 7.00 | 9,233.00 | 7.00 | 9,233.00 | | 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 2,220 | LNFT | 7.00 | 15,540.00 | 7.00 | 15,540.00 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.882 | MILE | 5,000.00 | 34,410.00 | 5,000.00 | 34,410.00 | | 0035 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.356 | MILE | 10,000.00 | 3,560.00 | 10,000.00 | 3,560.00 | | 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.719 | MILE | 2,000.00 | 3,438.00 | 2,000.00 | 3,438.00 | | 0037 | 732-03-02040 | Plastic Pvmt Strip (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.181 | MILE | 10,000.00 | 1,810.00 | 10,000.00 | 1,810.00 | | 0038 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 300.00 | 1,200.00 | 300.00 | 1,200.00 | | 0039 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 9 | EACH | 300.00 | 2,700.00 | 300.00 | 2,700.00 | | 0040 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 12 | EACH | 400.00 | 4,800.00 | 400.00 | 4,800.00 | | 0041 | 732-05-00100 | Removal of Existing Markings | 0.17 | MILE | 20,000.00 | 3,400.00 | 20,000.00 | 3,400.00 | | 0042 | 739-01-00100 | Hydro-Seeding | 4.9 | ACRE | 2,000.00 | 9,800.00 | 2,800.00 | 13,720.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 16,385.25 | 16,385.25 | | 0044 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 57.44 | CUYD | 500.00 | 28,720.00 | 1,350.00 | 77,544.00 | | 0045 | 805-12-39000 | Reinforced Concrete Box Culverts (10' x 10') (Extension) | 6 | LNFT | 2,000.00 | 12,000.00 | 2,800.00 | 16,800.00 | | 0046 | 806-01-00100 | Deformed Reinforcing Steel | 4,993 | LB | 1.00 | 4,993.00 | 1.50 | 7,489.50 | | 0047 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 14,235 | LNFT | 3.15 | 44,840.25 | 2.65 | 37,722.75 | | 0048 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 16,366 | LNFT | 3.15 | 51,552.90 | 2.75 | 45,006.50 | | 0049 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 33,065 | INLF | 0.50 | 16,532.50 | 0.25 | 8,266.25 | | 0050 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 3,960 | INLF | 1.55 | 6,138.00 | 0.25 | 990.00 | | 0051 | NS-724-00004 | Rumble Strips (Centerline) | 1.35 | MILE | 1,000.00 | 1,350.00 | 3,000.00 | 4,050.00 | | 0052 | NS-724-00005 | Rumble Strips (Shoulder) | 4.178 | MILE | 700.00 | 2,924.60 | 1,500.00 | 6,267.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,499,264.65 | | 1,726,247.06 |
|