Proposal:H.009749.6-R1
Parish:Livingston
Routes:LA 447
Description:WALKER SIDEWALK, PH 3
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$550,835.59
| Rank | License | Bidder | Construction Bid |
| 1 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $396,408.40 |
| 2 | 34263 | La Contracting Enterprise LLC | $398,000.00 |
| 3 | 38466 | Gulf States Contractors LLC | $459,462.90 |
| 4 | 42360 | L. King Company LLC | $485,737.97 |
| 5 | 48896 | Command Construction Industries LLC | $488,888.88 |
| 6 | 60022 | D. O'BRIAN CONSTRUCTION, LLC | $490,029.12 |
| 7 | 45794 | DIEUDONNE ENTERPRISES, INC. | $522,538.00 |
| 8 | 12031 | R.J. Daigle & Sons Contractors, Inc | $547,357.78 |
| 9 | 05693 | Industrial Enterprises, Inc. | $548,603.88 |
| 10 | 57931 | KCR CONTRACTORS, LLC | $587,540.73 |
| 11 | 55950 | Brown Industrial Construction, LLC | $653,939.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - KORT's CONSTRUCTION SERVICES, INC. | - 2 - La Contracting Enterprise LLC | - 3 - Gulf States Contractors LLC | - 4 - L. King Company LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 5,000.00 | 5,000.00 | 3,500.00 | 3,500.00 | 2,500.00 | 2,500.00 | 6,056.80 | 6,056.80 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 6,400.00 | 6,400.00 | 5,000.00 | 5,000.00 | 6,337.10 | 6,337.10 | | 0003 | 202-02-00010 | Removal of Pedestrian Bridge (Sta. 327+44 Rt) | 1 | EACH | 1,500.00 | 1,500.00 | 750.00 | 750.00 | 1,000.00 | 1,000.00 | 377.50 | 377.50 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 393 | SQYD | 19.75 | 7,761.75 | 9.00 | 3,537.00 | 18.00 | 7,074.00 | 14.30 | 5,619.90 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 12 | LNFT | 1.00 | 12.00 | 20.00 | 240.00 | 20.00 | 240.00 | 1.00 | 12.00 | | 0006 | 203-01-00100 | General Excavation | 125 | CUYD | 5.00 | 625.00 | 50.00 | 6,250.00 | 30.00 | 3,750.00 | 37.70 | 4,712.50 | | 0007 | 203-03-00100 | Embankment | 364 | CUYD | 15.00 | 5,460.00 | 25.00 | 9,100.00 | 35.00 | 12,740.00 | 47.70 | 17,362.80 | | 0008 | 204-02-00100 | Temporary Hay or Straw Bales | 154 | EACH | 12.25 | 1,886.50 | 10.00 | 1,540.00 | 12.00 | 1,848.00 | 21.30 | 3,280.20 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 3,148 | LNFT | 1.50 | 4,722.00 | 1.50 | 4,722.00 | 0.50 | 1,574.00 | 2.40 | 7,555.20 | | 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 35 | CUYD | 75.00 | 2,625.00 | 60.00 | 2,100.00 | 110.00 | 3,850.00 | 130.10 | 4,553.50 | | 0011 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 886 | LNFT | 50.00 | 44,300.00 | 50.00 | 44,300.00 | 65.00 | 57,590.00 | 30.60 | 27,111.60 | | 0012 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 488 | LNFT | 55.00 | 26,840.00 | 56.00 | 27,328.00 | 70.00 | 34,160.00 | 37.50 | 18,300.00 | | 0013 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 164 | LNFT | 60.00 | 9,840.00 | 80.00 | 13,120.00 | 100.00 | 16,400.00 | 51.20 | 8,396.80 | | 0014 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 61 | LNFT | 55.00 | 3,355.00 | 52.00 | 3,172.00 | 100.00 | 6,100.00 | 43.40 | 2,647.40 | | 0015 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 27 | LNFT | 60.00 | 1,620.00 | 69.00 | 1,863.00 | 150.00 | 4,050.00 | 76.30 | 2,060.10 | | 0016 | 701-05-01000 | Side Drain Pipe (12" RCP/PP/CMP) | 50 | LNFT | 50.00 | 2,500.00 | 31.00 | 1,550.00 | 75.00 | 3,750.00 | 38.60 | 1,930.00 | | 0017 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 32 | LNFT | 50.00 | 1,600.00 | 40.00 | 1,280.00 | 60.00 | 1,920.00 | 41.10 | 1,315.20 | | 0018 | 701-05-01120 | Side Drain Pipe (42" RCP/PP/CMP) | 34 | LNFT | 75.00 | 2,550.00 | 94.00 | 3,196.00 | 210.00 | 7,140.00 | 90.20 | 3,066.80 | | 0019 | 701-06-01000 | Side Drain Pipe Arch (15" Equiv. RCPA/CMPA) | 32 | LNFT | 55.00 | 1,760.00 | 55.00 | 1,760.00 | 75.00 | 2,400.00 | 59.00 | 1,888.00 | | 0020 | 701-11-01080 | Reinforced Concrete Pipe Arch (Extension) (36" Equiv.) | 18 | LNFT | 70.00 | 1,260.00 | 150.00 | 2,700.00 | 185.00 | 3,330.00 | 190.20 | 3,423.60 | | 0021 | 701-15-00100 | Concrete Collar | 5 | EACH | 1,500.00 | 7,500.00 | 750.00 | 3,750.00 | 1,000.00 | 5,000.00 | 1,488.70 | 7,443.50 | | 0022 | 701-16-01000 | Plastic Pipe (Extension) (12" RPVCP) | 56 | LNFT | 50.00 | 2,800.00 | 25.00 | 1,400.00 | 75.00 | 4,200.00 | 35.70 | 1,999.20 | | 0023 | 702-03-00100 | Catch Basins (CB-01) | 22 | EACH | 2,000.00 | 44,000.00 | 2,400.00 | 52,800.00 | 2,500.00 | 55,000.00 | 2,345.80 | 51,607.60 | | 0024 | 706-01-00100 | Concrete Walk (4" Thick) | 1,436.9 | SQYD | 40.00 | 57,476.00 | 40.00 | 57,476.00 | 52.00 | 74,718.80 | 62.90 | 90,381.01 | | 0025 | 706-02-00200 | Concrete Drive (6" Thick) | 697.7 | SQYD | 60.00 | 41,862.00 | 50.00 | 34,885.00 | 66.00 | 46,048.20 | 79.70 | 55,606.69 | | 0026 | 706-02-00300 | Concrete Drive (8" Thick) | 418.4 | SQYD | 65.00 | 27,196.00 | 60.00 | 25,104.00 | 78.00 | 32,635.20 | 98.90 | 41,379.76 | | 0027 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 57 | SQYD | 65.00 | 3,705.00 | 75.00 | 4,275.00 | 80.00 | 4,560.00 | 80.70 | 4,599.90 | | 0028 | 711-04-00100 | Geotextile Fabric | 57 | SQYD | 150.00 | 8,550.00 | 4.00 | 228.00 | 5.00 | 285.00 | 5.10 | 290.70 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 16,206.90 | 16,206.90 | | 0030 | 716-01-00100 | Mulch (Vegetative) | 0.1 | TON | 2,800.00 | 280.00 | 5,000.00 | 500.00 | 2,500.00 | 250.00 | 2,803.60 | 280.36 | | 0031 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 116 | SQYD | 1.40 | 162.40 | 4.00 | 464.00 | 1.35 | 156.60 | 1.50 | 174.00 | | 0032 | 726-01-00100 | Bedding Material | 181.7 | CUYD | 25.00 | 4,542.50 | 50.00 | 9,085.00 | 1.00 | 181.70 | 91.70 | 16,661.89 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | 27,000.00 | 27,000.00 | 15,000.00 | 15,000.00 | 35,000.00 | 35,000.00 | | 0034 | 739-01-00100 | Hydro-Seeding | 1.31 | ACRE | 1,275.00 | 1,670.25 | 1,000.00 | 1,310.00 | 1,250.00 | 1,637.50 | 1,401.80 | 1,836.36 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 4,819.90 | 4,819.90 | | 0036 | 741-11-00200 | Adjusting Water Valve and Meter Box | 1 | EACH | 600.00 | 600.00 | 800.00 | 800.00 | 250.00 | 250.00 | 925.50 | 925.50 | | 0037 | 807-08-00100 | Structural Metalwork Sidewalk Drain Cover | 5,400 | LUMP | 15,000.00 | 15,000.00 | 14,553.00 | 14,553.00 | 15,000.00 | 15,000.00 | 25,227.30 | 25,227.30 | | 0038 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,498 | INLF | 1.50 | 5,247.00 | 2.00 | 6,996.00 | 0.55 | 1,923.90 | 1.10 | 3,847.80 | | 0039 | NS-MSC-00120 | Drainage Structure 15" x 18" Storm Drain Tee | 1 | EACH | 600.00 | 600.00 | 966.00 | 966.00 | 1,200.00 | 1,200.00 | 1,442.60 | 1,442.60 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 396,408.40 | | 398,000.00 | | 459,462.90 | | 485,737.97 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Command Construction Industries LLC | - 6 - D. O'BRIAN CONSTRUCTION, LLC | - 7 - DIEUDONNE ENTERPRISES, INC. | - 8 - R.J. Daigle & Sons Contractors, Inc | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 25,000.00 | 25,000.00 | 11,645.00 | 11,645.00 | 20,000.00 | 20,000.00 | 12,684.00 | 12,684.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 9,450.00 | 9,450.00 | 6,600.00 | 6,600.00 | 6,000.00 | 6,000.00 | | 0003 | 202-02-00010 | Removal of Pedestrian Bridge (Sta. 327+44 Rt) | 1 | EACH | 1,000.00 | 1,000.00 | 2,560.00 | 2,560.00 | 2,500.00 | 2,500.00 | 1,200.00 | 1,200.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 393 | SQYD | 10.00 | 3,930.00 | 14.00 | 5,502.00 | 12.00 | 4,716.00 | 9.60 | 3,772.80 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 12 | LNFT | 10.00 | 120.00 | 20.00 | 240.00 | 5.00 | 60.00 | 24.00 | 288.00 | | 0006 | 203-01-00100 | General Excavation | 125 | CUYD | 20.00 | 2,500.00 | 12.00 | 1,500.00 | 60.00 | 7,500.00 | 92.14 | 11,517.50 | | 0007 | 203-03-00100 | Embankment | 364 | CUYD | 20.00 | 7,280.00 | 28.00 | 10,192.00 | 60.00 | 21,840.00 | 74.31 | 27,048.84 | | 0008 | 204-02-00100 | Temporary Hay or Straw Bales | 154 | EACH | 1.00 | 154.00 | 12.00 | 1,848.00 | 12.00 | 1,848.00 | 13.20 | 2,032.80 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 3,148 | LNFT | 3.00 | 9,444.00 | 3.00 | 9,444.00 | 1.50 | 4,722.00 | 1.79 | 5,634.92 | | 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 35 | CUYD | 50.00 | 1,750.00 | 115.00 | 4,025.00 | 50.00 | 1,750.00 | 72.00 | 2,520.00 | | 0011 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 886 | LNFT | 65.00 | 57,590.00 | 56.00 | 49,616.00 | 50.00 | 44,300.00 | 60.00 | 53,160.00 | | 0012 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 488 | LNFT | 75.00 | 36,600.00 | 58.00 | 28,304.00 | 60.00 | 29,280.00 | 72.00 | 35,136.00 | | 0013 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 164 | LNFT | 85.00 | 13,940.00 | 87.00 | 14,268.00 | 70.00 | 11,480.00 | 96.00 | 15,744.00 | | 0014 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 61 | LNFT | 75.00 | 4,575.00 | 71.00 | 4,331.00 | 80.00 | 4,880.00 | 66.00 | 4,026.00 | | 0015 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 27 | LNFT | 100.00 | 2,700.00 | 89.00 | 2,403.00 | 100.00 | 2,700.00 | 84.00 | 2,268.00 | | 0016 | 701-05-01000 | Side Drain Pipe (12" RCP/PP/CMP) | 50 | LNFT | 60.00 | 3,000.00 | 62.00 | 3,100.00 | 40.00 | 2,000.00 | 42.00 | 2,100.00 | | 0017 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 32 | LNFT | 65.00 | 2,080.00 | 64.00 | 2,048.00 | 70.00 | 2,240.00 | 54.00 | 1,728.00 | | 0018 | 701-05-01120 | Side Drain Pipe (42" RCP/PP/CMP) | 34 | LNFT | 175.00 | 5,950.00 | 156.00 | 5,304.00 | 150.00 | 5,100.00 | 120.00 | 4,080.00 | | 0019 | 701-06-01000 | Side Drain Pipe Arch (15" Equiv. RCPA/CMPA) | 32 | LNFT | 75.00 | 2,400.00 | 72.00 | 2,304.00 | 120.00 | 3,840.00 | 72.00 | 2,304.00 | | 0020 | 701-11-01080 | Reinforced Concrete Pipe Arch (Extension) (36" Equiv.) | 18 | LNFT | 150.00 | 2,700.00 | 144.89 | 2,608.02 | 220.00 | 3,960.00 | 198.00 | 3,564.00 | | 0021 | 701-15-00100 | Concrete Collar | 5 | EACH | 500.00 | 2,500.00 | 850.00 | 4,250.00 | 1,500.00 | 7,500.00 | 1,080.00 | 5,400.00 | | 0022 | 701-16-01000 | Plastic Pipe (Extension) (12" RPVCP) | 56 | LNFT | 48.51 | 2,716.56 | 64.00 | 3,584.00 | 60.00 | 3,360.00 | 42.00 | 2,352.00 | | 0023 | 702-03-00100 | Catch Basins (CB-01) | 22 | EACH | 2,250.00 | 49,500.00 | 2,450.00 | 53,900.00 | 2,500.00 | 55,000.00 | 3,000.00 | 66,000.00 | | 0024 | 706-01-00100 | Concrete Walk (4" Thick) | 1,436.9 | SQYD | 55.00 | 79,029.50 | 61.00 | 87,650.90 | 55.00 | 79,029.50 | 59.06 | 84,863.31 | | 0025 | 706-02-00200 | Concrete Drive (6" Thick) | 697.7 | SQYD | 58.00 | 40,466.60 | 68.00 | 47,443.60 | 60.00 | 41,862.00 | 61.70 | 43,048.09 | | 0026 | 706-02-00300 | Concrete Drive (8" Thick) | 418.4 | SQYD | 60.00 | 25,104.00 | 74.50 | 31,170.80 | 65.00 | 27,196.00 | 67.11 | 28,078.82 | | 0027 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 57 | SQYD | 75.00 | 4,275.00 | 120.00 | 6,840.00 | 70.00 | 3,990.00 | 96.00 | 5,472.00 | | 0028 | 711-04-00100 | Geotextile Fabric | 57 | SQYD | 5.00 | 285.00 | 8.00 | 456.00 | 2.00 | 114.00 | 6.00 | 342.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 18,640.00 | 18,640.00 | 25,000.00 | 25,000.00 | 16,877.70 | 16,877.70 | | 0030 | 716-01-00100 | Mulch (Vegetative) | 0.1 | TON | 2,500.00 | 250.00 | 100.00 | 10.00 | 2,500.00 | 250.00 | 3,000.00 | 300.00 | | 0031 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 116 | SQYD | 3.00 | 348.00 | 6.00 | 696.00 | 1.50 | 174.00 | 1.62 | 187.92 | | 0032 | 726-01-00100 | Bedding Material | 181.7 | CUYD | 50.00 | 9,085.00 | 54.00 | 9,811.80 | 45.00 | 8,176.50 | 60.00 | 10,902.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 38,320.00 | 38,320.00 | 50,000.00 | 50,000.00 | 26,943.60 | 26,943.60 | | 0034 | 739-01-00100 | Hydro-Seeding | 1.31 | ACRE | 2,500.00 | 3,275.00 | 1,150.00 | 1,506.50 | 1,200.00 | 1,572.00 | 1,500.00 | 1,965.00 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,843.22 | 3,843.22 | 6,000.00 | 6,000.00 | 15,000.00 | 15,000.00 | 21,480.00 | 21,480.00 | | 0036 | 741-11-00200 | Adjusting Water Valve and Meter Box | 1 | EACH | 250.00 | 250.00 | 500.00 | 500.00 | 1,000.00 | 1,000.00 | 112.46 | 112.46 | | 0037 | 807-08-00100 | Structural Metalwork Sidewalk Drain Cover | 5,400 | LUMP | 20,000.00 | 20,000.00 | 1,840.00 | 1,840.00 | 18,000.00 | 18,000.00 | 30,555.58 | 30,555.58 | | 0038 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,498 | INLF | 1.00 | 3,498.00 | 1.25 | 4,372.50 | 1.00 | 3,498.00 | 1.38 | 4,827.24 | | 0039 | NS-MSC-00120 | Drainage Structure 15" x 18" Storm Drain Tee | 1 | EACH | 750.00 | 750.00 | 2,345.00 | 2,345.00 | 500.00 | 500.00 | 841.20 | 841.20 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 488,888.88 | | 490,029.12 | | 522,538.00 | | 547,357.78 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Industrial Enterprises, Inc. | - 10 - KCR CONTRACTORS, LLC | - 11 - Brown Industrial Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 2,300.00 | 2,300.00 | 1,725.00 | 1,725.00 | 75,000.00 | 75,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,900.00 | 6,900.00 | 1,150.00 | 1,150.00 | 30,000.00 | 30,000.00 | | 0003 | 202-02-00010 | Removal of Pedestrian Bridge (Sta. 327+44 Rt) | 1 | EACH | 1,150.00 | 1,150.00 | 1,437.50 | 1,437.50 | 15,000.00 | 15,000.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 393 | SQYD | 17.25 | 6,779.25 | 5.74 | 2,255.82 | 16.00 | 6,288.00 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 12 | LNFT | 11.50 | 138.00 | 7.67 | 92.04 | 12.00 | 144.00 | | 0006 | 203-01-00100 | General Excavation | 125 | CUYD | 57.50 | 7,187.50 | 12.36 | 1,545.00 | 80.00 | 10,000.00 | | 0007 | 203-03-00100 | Embankment | 364 | CUYD | 34.50 | 12,558.00 | 65.29 | 23,765.56 | 65.00 | 23,660.00 | | 0008 | 204-02-00100 | Temporary Hay or Straw Bales | 154 | EACH | 13.80 | 2,125.20 | 13.80 | 2,125.20 | 15.00 | 2,310.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 3,148 | LNFT | 1.71 | 5,383.08 | 1.71 | 5,383.08 | 1.50 | 4,722.00 | | 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 35 | CUYD | 69.00 | 2,415.00 | 223.36 | 7,817.60 | 200.00 | 7,000.00 | | 0011 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 886 | LNFT | 67.60 | 59,893.60 | 73.00 | 64,678.00 | 50.00 | 44,300.00 | | 0012 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 488 | LNFT | 76.82 | 37,488.16 | 77.01 | 37,580.88 | 55.00 | 26,840.00 | | 0013 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 164 | LNFT | 86.94 | 14,258.16 | 87.10 | 14,284.40 | 75.00 | 12,300.00 | | 0014 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 61 | LNFT | 70.78 | 4,317.58 | 77.02 | 4,698.22 | 80.00 | 4,880.00 | | 0015 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 27 | LNFT | 98.99 | 2,672.73 | 87.10 | 2,351.70 | 120.00 | 3,240.00 | | 0016 | 701-05-01000 | Side Drain Pipe (12" RCP/PP/CMP) | 50 | LNFT | 54.75 | 2,737.50 | 68.43 | 3,421.50 | 52.00 | 2,600.00 | | 0017 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 32 | LNFT | 54.33 | 1,738.56 | 72.99 | 2,335.68 | 56.00 | 1,792.00 | | 0018 | 701-05-01120 | Side Drain Pipe (42" RCP/PP/CMP) | 34 | LNFT | 72.73 | 2,472.82 | 126.81 | 4,311.54 | 170.00 | 5,780.00 | | 0019 | 701-06-01000 | Side Drain Pipe Arch (15" Equiv. RCPA/CMPA) | 32 | LNFT | 70.27 | 2,248.64 | 81.10 | 2,595.20 | 80.00 | 2,560.00 | | 0020 | 701-11-01080 | Reinforced Concrete Pipe Arch (Extension) (36" Equiv.) | 18 | LNFT | 138.69 | 2,496.42 | 184.64 | 3,323.52 | 185.00 | 3,330.00 | | 0021 | 701-15-00100 | Concrete Collar | 5 | EACH | 575.00 | 2,875.00 | 862.50 | 4,312.50 | 650.00 | 3,250.00 | | 0022 | 701-16-01000 | Plastic Pipe (Extension) (12" RPVCP) | 56 | LNFT | 42.91 | 2,402.96 | 77.02 | 4,313.12 | 90.00 | 5,040.00 | | 0023 | 702-03-00100 | Catch Basins (CB-01) | 22 | EACH | 1,926.25 | 42,377.50 | 4,125.53 | 90,761.66 | 2,500.00 | 55,000.00 | | 0024 | 706-01-00100 | Concrete Walk (4" Thick) | 1,436.9 | SQYD | 88.49 | 127,151.28 | 73.66 | 105,842.05 | 57.00 | 81,903.30 | | 0025 | 706-02-00200 | Concrete Drive (6" Thick) | 697.7 | SQYD | 92.00 | 64,188.40 | 87.31 | 60,916.19 | 60.00 | 41,862.00 | | 0026 | 706-02-00300 | Concrete Drive (8" Thick) | 418.4 | SQYD | 103.50 | 43,304.40 | 97.21 | 40,672.66 | 110.00 | 46,024.00 | | 0027 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 57 | SQYD | 86.25 | 4,916.25 | 51.75 | 2,949.75 | 200.00 | 11,400.00 | | 0028 | 711-04-00100 | Geotextile Fabric | 57 | SQYD | 2.30 | 131.10 | 1.15 | 65.55 | 4.00 | 228.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,900.00 | 6,900.00 | 8,625.00 | 8,625.00 | 8,500.00 | 8,500.00 | | 0030 | 716-01-00100 | Mulch (Vegetative) | 0.1 | TON | 2,875.00 | 287.50 | 2,875.00 | 287.50 | 2,500.00 | 250.00 | | 0031 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 116 | SQYD | 1.55 | 179.80 | 1.55 | 179.80 | 1.35 | 156.60 | | 0032 | 726-01-00100 | Bedding Material | 181.7 | CUYD | 80.50 | 14,626.85 | 74.75 | 13,582.08 | 85.00 | 15,444.50 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 26,102.50 | 26,102.50 | 52,704.60 | 52,704.60 | 64,000.00 | 64,000.00 | | 0034 | 739-01-00100 | Hydro-Seeding | 1.31 | ACRE | 1,437.50 | 1,883.13 | 1,437.50 | 1,883.13 | 1,250.00 | 1,637.50 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,625.00 | 8,625.00 | 5,750.00 | 5,750.00 | 7,500.00 | 7,500.00 | | 0036 | 741-11-00200 | Adjusting Water Valve and Meter Box | 1 | EACH | 230.00 | 230.00 | 1,150.00 | 1,150.00 | 2,000.00 | 2,000.00 | | 0037 | 807-08-00100 | Structural Metalwork Sidewalk Drain Cover | 5,400 | LUMP | 19,833.48 | 19,833.48 | 1,495.00 | 1,495.00 | 23,000.00 | 23,000.00 | | 0038 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 3,498 | INLF | 1.15 | 4,022.70 | 1.15 | 4,022.70 | 1.00 | 3,498.00 | | 0039 | NS-MSC-00120 | Drainage Structure 15" x 18" Storm Drain Tee | 1 | EACH | 1,305.83 | 1,305.83 | 1,150.00 | 1,150.00 | 1,500.00 | 1,500.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 548,603.88 | | 587,540.73 | | 653,939.90 |
|