Proposal:H.007175.6
Parish:Jefferson
Description:LAPALCO (VICTORY - WESTWOOD)
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE, AND RELATED WORK.
Estimated Construction Cost:$10,263,711.79
Maximum Number of Days Allowed for Construction:9999
Calculated Daily User Cost:$3,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $6,975,124.78 | 152.00 | $7,431,124.78 |
| 2 | 24901 | Hard Rock Construction LLC | $8,384,303.55 | 120.00 | $8,744,303.55 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $9,335,131.13 | 300.00 | $10,235,131.13 |
| 4 | 35678 | BEVERLY CONSTRUCTION CO. LLC | $8,737,219.00 | 620.00 | $10,597,219.00 |
| 5 | 00046 | Barber Bros. Contracting Co., L.L.C | $9,823,979.00 | 360.00 | $10,903,979.00 |
| 6 | 48896 | Command Construction Industries LLC | $11,088,888.00 | 303.00 | $11,997,888.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Hard Rock Construction LLC | - 3 - Boh Bros. Construction Co., LLC. | - 4 - BEVERLY CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 8.4 | LUMP | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 42,000.00 | 42,000.00 | 70,000.00 | 70,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 35,000.00 | 35,000.00 | 100,000.00 | 100,000.00 | 33,700.00 | 33,700.00 | 30,000.00 | 30,000.00 | | 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 5,666.1 | LNFT | 5.00 | 28,330.50 | 3.00 | 16,998.30 | 7.00 | 39,662.70 | 4.13 | 23,400.99 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,437 | SQYD | 15.00 | 21,555.00 | 11.00 | 15,807.00 | 13.50 | 19,399.50 | 6.26 | 8,995.62 | | 0005 | 202-02-14500 | Removal of Guard Rail | 490 | LNFT | 8.00 | 3,920.00 | 8.00 | 3,920.00 | 8.00 | 3,920.00 | 13.51 | 6,619.90 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,185.4 | SQYD | 10.00 | 11,854.00 | 13.00 | 15,410.20 | 16.00 | 18,966.40 | 6.73 | 7,977.74 | | 0007 | 202-03-38000 | Relocation of Sign (Welcome to Westwego) | 1 | EACH | 5,000.00 | 5,000.00 | 500.00 | 500.00 | 450.00 | 450.00 | 3,235.00 | 3,235.00 | | 0008 | 203-01-00100 | General Excavation | 21,418 | CUYD | 10.00 | 214,180.00 | 10.00 | 214,180.00 | 11.80 | 252,732.40 | 13.10 | 280,575.80 | | 0009 | 203-03-00100 | Embankment | 20,564 | CUYD | 1.00 | 20,564.00 | 17.00 | 349,588.00 | 21.00 | 431,844.00 | 24.30 | 499,705.20 | | 0010 | 203-04-00200 | Nonplastic Embankment (Sand) | 14,564 | CUYD | 10.50 | 152,922.00 | 30.00 | 436,920.00 | 24.00 | 349,536.00 | 16.90 | 246,131.60 | | 0011 | 203-08-00100 | Geotextile Fabric | 62,140 | SQYD | 0.10 | 6,214.00 | 1.00 | 62,140.00 | 1.00 | 62,140.00 | 1.09 | 67,732.60 | | 0012 | 204-02-00100 | Temporary Hay or Straw Bales | 1,156 | EACH | 5.00 | 5,780.00 | 10.00 | 11,560.00 | 22.00 | 25,432.00 | 23.50 | 27,166.00 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 150.00 | 450.00 | 135.00 | 405.00 | 275.00 | 825.00 | 219.00 | 657.00 | | 0014 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 1 | EACH | 500.00 | 500.00 | 500.00 | 500.00 | 1,100.00 | 1,100.00 | 1,725.00 | 1,725.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 5,260 | LNFT | 3.00 | 15,780.00 | 2.00 | 10,520.00 | 4.00 | 21,040.00 | 2.50 | 13,150.00 | | 0016 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 29,123.9 | SQYD | 25.00 | 728,097.50 | 30.00 | 873,717.00 | 24.00 | 698,973.60 | 16.00 | 465,982.40 | | 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 100 | CUYD | 75.00 | 7,500.00 | 125.00 | 12,500.00 | 85.00 | 8,500.00 | 38.00 | 3,800.00 | | 0018 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,100 | CUYD | 1.00 | 1,100.00 | 10.00 | 11,000.00 | 50.00 | 55,000.00 | 15.38 | 16,918.00 | | 0019 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 2,100 | LNFT | 60.00 | 126,000.00 | 88.00 | 184,800.00 | 148.00 | 310,800.00 | 76.00 | 159,600.00 | | 0020 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 1,122 | LNFT | 65.00 | 72,930.00 | 97.00 | 108,834.00 | 163.00 | 182,886.00 | 93.29 | 104,671.38 | | 0021 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,774 | LNFT | 70.00 | 124,180.00 | 110.00 | 195,140.00 | 180.00 | 319,320.00 | 112.00 | 198,688.00 | | 0022 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 870 | LNFT | 100.00 | 87,000.00 | 170.00 | 147,900.00 | 163.00 | 141,810.00 | 149.23 | 129,830.10 | | 0023 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 322 | LNFT | 110.00 | 35,420.00 | 235.00 | 75,670.00 | 240.00 | 77,280.00 | 187.52 | 60,381.44 | | 0024 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 791 | LNFT | 170.00 | 134,470.00 | 250.00 | 197,750.00 | 335.00 | 264,985.00 | 222.00 | 175,602.00 | | 0025 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 1,121 | LNFT | 250.00 | 280,250.00 | 290.00 | 325,090.00 | 430.00 | 482,030.00 | 251.34 | 281,752.14 | | 0026 | 701-03-01160 | Storm Drain Pipe (72" RCP) | 44 | LNFT | 800.00 | 35,200.00 | 625.00 | 27,500.00 | 674.00 | 29,656.00 | 438.00 | 19,272.00 | | 0027 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 194 | LNFT | 70.00 | 13,580.00 | 99.00 | 19,206.00 | 184.00 | 35,696.00 | 83.18 | 16,136.92 | | 0028 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 153 | LNFT | 90.00 | 13,770.00 | 125.00 | 19,125.00 | 240.00 | 36,720.00 | 97.00 | 14,841.00 | | 0029 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 35 | LNFT | 110.00 | 3,850.00 | 160.00 | 5,600.00 | 270.00 | 9,450.00 | 133.12 | 4,659.20 | | 0030 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 147 | LNFT | 140.00 | 20,580.00 | 248.00 | 36,456.00 | 300.00 | 44,100.00 | 199.32 | 29,300.04 | | 0031 | 701-04-01180 | Storm Drain Pipe Arch (72" Equiv. RCPA) | 75 | LNFT | 400.00 | 30,000.00 | 600.00 | 45,000.00 | 670.00 | 50,250.00 | 440.65 | 33,048.75 | | 0032 | 701-15-00100 | Concrete Collar | 2 | EACH | 3,500.00 | 7,000.00 | 3,000.00 | 6,000.00 | 3,800.00 | 7,600.00 | 3,400.00 | 6,800.00 | | 0033 | 702-02-00100 | Manholes (MH-06) | 7 | EACH | 13,000.00 | 91,000.00 | 7,000.00 | 49,000.00 | 4,900.00 | 34,300.00 | 7,140.00 | 49,980.00 | | 0034 | 702-02-00200 | Manholes (R-CB-11) | 6 | EACH | 5,000.00 | 30,000.00 | 5,000.00 | 30,000.00 | 5,700.00 | 34,200.00 | 6,535.00 | 39,210.00 | | 0035 | 702-03-00100 | Catch Basins (CB-01) | 43 | EACH | 3,000.00 | 129,000.00 | 2,500.00 | 107,500.00 | 3,830.00 | 164,690.00 | 4,808.00 | 206,744.00 | | 0036 | 702-03-00200 | Catch Basins (CB-02) | 20 | EACH | 5,000.00 | 100,000.00 | 3,500.00 | 70,000.00 | 5,800.00 | 116,000.00 | 5,888.00 | 117,760.00 | | 0037 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 700.00 | 700.00 | 1,000.00 | 1,000.00 | 1,600.00 | 1,600.00 | 1,305.00 | 1,305.00 | | 0038 | 702-04-00200 | Adjusting Catch Basins | 8 | EACH | 700.00 | 5,600.00 | 1,000.00 | 8,000.00 | 1,600.00 | 12,800.00 | 1,284.00 | 10,272.00 | | 0039 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 835 | LNFT | 58.00 | 48,430.00 | 57.00 | 47,595.00 | 62.00 | 51,770.00 | 65.00 | 54,275.00 | | 0040 | 704-03-00100 | Blocked Out Guard Rail | 750 | LNFT | 23.00 | 17,250.00 | 20.00 | 15,000.00 | 22.00 | 16,500.00 | 22.00 | 16,500.00 | | 0041 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 56.25 | LNFT | 100.00 | 5,625.00 | 95.00 | 5,343.75 | 105.00 | 5,906.25 | 105.00 | 5,906.25 | | 0042 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 9 | EACH | 3,000.00 | 27,000.00 | 2,600.00 | 23,400.00 | 2,800.00 | 25,200.00 | 2,866.24 | 25,796.16 | | 0043 | 706-01-00100 | Concrete Walk (4" Thick) | 1,159.8 | SQYD | 50.00 | 57,990.00 | 60.00 | 69,588.00 | 79.00 | 91,624.20 | 39.65 | 45,986.07 | | 0044 | 706-02-00300 | Concrete Drive (8" Thick) | 1,011.5 | SQYD | 86.00 | 86,989.00 | 60.00 | 60,690.00 | 100.00 | 101,150.00 | 69.30 | 70,096.95 | | 0045 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 1,322.9 | SQYD | 80.00 | 105,832.00 | 85.00 | 112,446.50 | 89.00 | 117,738.10 | 56.65 | 74,942.29 | | 0046 | 706-04-00100 | Handicapped Curb Ramps | 28 | EACH | 600.00 | 16,800.00 | 1,500.00 | 42,000.00 | 1,700.00 | 47,600.00 | 2,017.00 | 56,476.00 | | 0047 | 707-01-00100 | Concrete Curb | 378.1 | LNFT | 15.00 | 5,671.50 | 12.00 | 4,537.20 | 20.00 | 7,562.00 | 7.85 | 2,968.09 | | 0048 | 707-03-00100 | Combination Concrete Curb and Gutter | 16,358.1 | LNFT | 20.00 | 327,162.00 | 30.00 | 490,743.00 | 20.00 | 327,162.00 | 16.47 | 269,417.91 | | 0049 | 711-02-00400 | Riprap (55 lb) | 14 | CUYD | 100.00 | 1,400.00 | 150.00 | 2,100.00 | 225.00 | 3,150.00 | 119.00 | 1,666.00 | | 0050 | 711-04-00100 | Geotextile Fabric | 130 | SQYD | 1.00 | 130.00 | 1.00 | 130.00 | 1.40 | 182.00 | 1.10 | 143.00 | | 0051 | 712-01-00400 | Concrete Cast-in-Place Revetment (7" Thick) | 114 | SQYD | 250.00 | 28,500.00 | 300.00 | 34,200.00 | 160.00 | 18,240.00 | 133.00 | 15,162.00 | | 0052 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | 99,000.00 | 99,000.00 | 301,360.00 | 301,360.00 | | 0053 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 1.796 | MILE | 1,000.00 | 1,796.00 | 7,000.00 | 12,572.00 | 2,000.00 | 3,592.00 | 6,725.00 | 12,078.10 | | 0054 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 3.748 | MILE | 2,000.00 | 7,496.00 | 11,000.00 | 41,228.00 | 9,800.00 | 36,730.40 | 13,450.00 | 50,410.60 | | 0055 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 231 | EACH | 5.00 | 1,155.00 | 5.00 | 1,155.00 | 7.00 | 1,617.00 | 7.72 | 1,783.32 | | 0056 | 717-01-00100 | Seeding | 360 | LB | 10.00 | 3,600.00 | 11.00 | 3,960.00 | 30.00 | 10,800.00 | 12.20 | 4,392.00 | | 0057 | 718-01-00100 | Fertilizer | 12,000 | LB | 1.00 | 12,000.00 | 1.00 | 12,000.00 | 2.00 | 24,000.00 | 0.88 | 10,560.00 | | 0058 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 50,000.00 | 50,000.00 | 16,000.00 | 16,000.00 | 25,000.00 | 25,000.00 | 58,180.00 | 58,180.00 | | 0059 | 723-02-00100 | Granular Material (Vehicular Measurement) | 8,951 | CUYD | 7.00 | 62,657.00 | 1.00 | 8,951.00 | 15.00 | 134,265.00 | 14.00 | 125,314.00 | | 0060 | 726-01-00100 | Bedding Material | 5,732.5 | CUYD | 50.00 | 286,625.00 | 1.00 | 5,732.50 | 52.00 | 298,090.00 | 57.76 | 331,109.20 | | 0061 | 727-01-00100 | Mobilization | 1 | LUMP | 454,000.00 | 454,000.00 | 625,000.00 | 625,000.00 | 376,600.00 | 376,600.00 | 587,100.51 | 587,100.51 | | 0062 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 100.00 | 600.00 | 85.00 | 510.00 | 93.00 | 558.00 | 93.70 | 562.20 | | 0063 | 731-02-00100 | Reflectorized Raised Pavement Markers | 941 | EACH | 9.00 | 8,469.00 | 6.00 | 5,646.00 | 7.60 | 7,151.60 | 7.72 | 7,264.52 | | 0064 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 3,305 | LNFT | 3.00 | 9,915.00 | 2.00 | 6,610.00 | 3.30 | 10,906.50 | 2.48 | 8,196.40 | | 0065 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.171 | MILE | 4,000.00 | 12,684.00 | 4,200.00 | 13,318.20 | 3,800.00 | 12,049.80 | 4,630.00 | 14,681.73 | | 0066 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.19 | MILE | 1,700.00 | 5,423.00 | 1,800.00 | 5,742.00 | 1,630.00 | 5,199.70 | 1,985.00 | 6,332.15 | | 0067 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.256 | MILE | 5,500.00 | 1,408.00 | 4,000.00 | 1,024.00 | 5,530.00 | 1,415.68 | 4,410.00 | 1,128.96 | | 0068 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 30 | EACH | 350.00 | 10,500.00 | 200.00 | 6,000.00 | 327.00 | 9,810.00 | 220.00 | 6,600.00 | | 0069 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 350.00 | 350.00 | 225.00 | 225.00 | 435.00 | 435.00 | 248.00 | 248.00 | | 0070 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 9 | EACH | 350.00 | 3,150.00 | 225.00 | 2,025.00 | 327.00 | 2,943.00 | 248.00 | 2,232.00 | | 0071 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 350.00 | 1,050.00 | 225.00 | 675.00 | 327.00 | 981.00 | 248.00 | 744.00 | | 0072 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 350.00 | 2,800.00 | 300.00 | 2,400.00 | 327.00 | 2,616.00 | 331.00 | 2,648.00 | | 0073 | 732-05-00100 | Removal of Existing Markings | 1.619 | MILE | 5,000.00 | 8,095.00 | 6,000.00 | 9,714.00 | 5,400.00 | 8,742.60 | 6,615.00 | 10,709.69 | | 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 60,000.00 | 60,000.00 | 100,000.00 | 100,000.00 | 64,350.00 | 64,350.00 | | 0075 | 741-11-00100 | Adjusting Water Valve | 7 | EACH | 200.00 | 1,400.00 | 250.00 | 1,750.00 | 1,100.00 | 7,700.00 | 1,185.00 | 8,295.00 | | 0076 | 806-01-00100 | Deformed Reinforcing Steel | 5,027 | LB | 1.00 | 5,027.00 | 1.00 | 5,027.00 | 1.00 | 5,027.00 | 2.43 | 12,215.61 | | 0077 | NS-203-00006 | Exploratory Excavation | 100 | CUYD | 150.00 | 15,000.00 | 50.00 | 5,000.00 | 100.00 | 10,000.00 | 36.00 | 3,600.00 | | 0078 | NS-300-00060 | Geogrid | 29,124 | SQYD | 2.00 | 58,248.00 | 2.00 | 58,248.00 | 1.40 | 40,773.60 | 1.23 | 35,822.52 | | 0079 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 25,682 | SQYD | 8.00 | 205,456.00 | 6.50 | 166,933.00 | 8.00 | 205,456.00 | 8.82 | 226,515.24 | | 0080 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 151,866 | INLF | 0.50 | 75,933.00 | 1.00 | 151,866.00 | 0.65 | 98,712.90 | 0.99 | 150,347.34 | | 0081 | NS-502-01000 | Asphalt Concrete | 19,337.8 | TON | 71.00 | 1,372,983.80 | 75.50 | 1,460,003.90 | 77.00 | 1,489,010.60 | 85.34 | 1,650,287.85 | | 0082 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,833.5 | TON | 88.00 | 249,348.00 | 92.00 | 260,682.00 | 77.00 | 218,179.50 | 102.53 | 290,518.76 | | 0083 | NS-507-00003 | Clean and Seal Ran Cracks in Asph Conc Pave (Hot Poured) | 12,800 | LNFT | 1.20 | 15,360.00 | 2.00 | 25,600.00 | 1.25 | 16,000.00 | 2.50 | 32,000.00 | | 0084 | NS-509-01000 | Milling Asphalt Pavement | 25,682 | SQYD | 2.00 | 51,364.00 | 2.00 | 51,364.00 | 1.75 | 44,943.50 | 2.21 | 56,757.22 | | 0085 | NS-510-01700 | Pavement Patching (18" Minimum Thickness) | 290 | SQYD | 100.00 | 29,000.00 | 100.00 | 29,000.00 | 100.00 | 29,000.00 | 110.25 | 31,972.50 | | 0086 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,088 | INLF | 1.00 | 2,088.00 | 1.00 | 2,088.00 | 0.70 | 1,461.60 | 1.10 | 2,296.80 | | 0087 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 8,748 | LNFT | 0.01 | 87.48 | 3.00 | 26,244.00 | 8.00 | 69,984.00 | 25.63 | 224,211.24 | | 0088 | NS-P26-02007 | Jefferson Parish Standard Catch Basin (CB-06) (Brick) | 4 | EACH | 8,000.00 | 32,000.00 | 7,000.00 | 28,000.00 | 9,900.00 | 39,600.00 | 5,747.00 | 22,988.00 | | 0089 | NS-P26-02008 | Jefferson Parish Standard Catch Basin (CB-07) (Brick) | 30 | EACH | 9,000.00 | 270,000.00 | 8,000.00 | 240,000.00 | 12,650.00 | 379,500.00 | 5,901.00 | 177,030.00 | | 0090 | NS-P26-02009 | Jefferson Parish Standard Catch Basin (CB-08) (Brick) | 18 | EACH | 10,000.00 | 180,000.00 | 11,000.00 | 198,000.00 | 14,250.00 | 256,500.00 | 7,078.50 | 127,413.00 | | 0091 | NS-P26-23020 | Waterline (12" DI) (Jefferson Parish) | 20 | LNFT | 500.00 | 10,000.00 | 300.00 | 6,000.00 | 780.00 | 15,600.00 | 200.00 | 4,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,975,124.78 | | 8,384,303.55 | | 9,335,131.13 | | 8,737,219.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Barber Bros. Contracting Co., L.L.C | - 6 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 8.4 | LUMP | 35,000.00 | 35,000.00 | 250,000.00 | 250,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 65,000.00 | 65,000.00 | 101,596.00 | 101,596.00 | | 0003 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 5,666.1 | LNFT | 13.00 | 73,659.30 | 10.00 | 56,661.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,437 | SQYD | 16.00 | 22,992.00 | 10.00 | 14,370.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 490 | LNFT | 7.35 | 3,601.50 | 10.00 | 4,900.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,185.4 | SQYD | 12.00 | 14,224.80 | 10.00 | 11,854.00 | | 0007 | 202-03-38000 | Relocation of Sign (Welcome to Westwego) | 1 | EACH | 5,250.00 | 5,250.00 | 2,500.00 | 2,500.00 | | 0008 | 203-01-00100 | General Excavation | 21,418 | CUYD | 17.00 | 364,106.00 | 1.00 | 21,418.00 | | 0009 | 203-03-00100 | Embankment | 20,564 | CUYD | 30.00 | 616,920.00 | 1.00 | 20,564.00 | | 0010 | 203-04-00200 | Nonplastic Embankment (Sand) | 14,564 | CUYD | 27.50 | 400,510.00 | 30.00 | 436,920.00 | | 0011 | 203-08-00100 | Geotextile Fabric | 62,140 | SQYD | 1.25 | 77,675.00 | 0.01 | 621.40 | | 0012 | 204-02-00100 | Temporary Hay or Straw Bales | 1,156 | EACH | 37.50 | 43,350.00 | 1.00 | 1,156.00 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 262.50 | 787.50 | 250.00 | 750.00 | | 0014 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 1 | EACH | 2,350.00 | 2,350.00 | 1,000.00 | 1,000.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 5,260 | LNFT | 5.00 | 26,300.00 | 5.00 | 26,300.00 | | 0016 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 29,123.9 | SQYD | 29.00 | 844,593.10 | 30.00 | 873,717.00 | | 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 100 | CUYD | 70.00 | 7,000.00 | 100.00 | 10,000.00 | | 0018 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,100 | CUYD | 65.00 | 71,500.00 | 25.00 | 27,500.00 | | 0019 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 2,100 | LNFT | 90.00 | 189,000.00 | 125.00 | 262,500.00 | | 0020 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 1,122 | LNFT | 98.00 | 109,956.00 | 150.00 | 168,300.00 | | 0021 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,774 | LNFT | 119.00 | 211,106.00 | 200.00 | 354,800.00 | | 0022 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 870 | LNFT | 142.00 | 123,540.00 | 225.00 | 195,750.00 | | 0023 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 322 | LNFT | 159.00 | 51,198.00 | 250.00 | 80,500.00 | | 0024 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 791 | LNFT | 177.00 | 140,007.00 | 350.00 | 276,850.00 | | 0025 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 1,121 | LNFT | 252.00 | 282,492.00 | 400.00 | 448,400.00 | | 0026 | 701-03-01160 | Storm Drain Pipe (72" RCP) | 44 | LNFT | 597.00 | 26,268.00 | 600.00 | 26,400.00 | | 0027 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 194 | LNFT | 119.00 | 23,086.00 | 150.00 | 29,100.00 | | 0028 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 153 | LNFT | 135.00 | 20,655.00 | 175.00 | 26,775.00 | | 0029 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 35 | LNFT | 119.00 | 4,165.00 | 225.00 | 7,875.00 | | 0030 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 147 | LNFT | 147.00 | 21,609.00 | 275.00 | 40,425.00 | | 0031 | 701-04-01180 | Storm Drain Pipe Arch (72" Equiv. RCPA) | 75 | LNFT | 546.00 | 40,950.00 | 650.00 | 48,750.00 | | 0032 | 701-15-00100 | Concrete Collar | 2 | EACH | 3,654.00 | 7,308.00 | 2,500.00 | 5,000.00 | | 0033 | 702-02-00100 | Manholes (MH-06) | 7 | EACH | 7,560.00 | 52,920.00 | 10,000.00 | 70,000.00 | | 0034 | 702-02-00200 | Manholes (R-CB-11) | 6 | EACH | 6,405.00 | 38,430.00 | 10,000.00 | 60,000.00 | | 0035 | 702-03-00100 | Catch Basins (CB-01) | 43 | EACH | 3,360.00 | 144,480.00 | 5,000.00 | 215,000.00 | | 0036 | 702-03-00200 | Catch Basins (CB-02) | 20 | EACH | 5,229.00 | 104,580.00 | 7,500.00 | 150,000.00 | | 0037 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,260.00 | 1,260.00 | 1,000.00 | 1,000.00 | | 0038 | 702-04-00200 | Adjusting Catch Basins | 8 | EACH | 1,575.00 | 12,600.00 | 1,000.00 | 8,000.00 | | 0039 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 835 | LNFT | 53.00 | 44,255.00 | 51.00 | 42,585.00 | | 0040 | 704-03-00100 | Blocked Out Guard Rail | 750 | LNFT | 21.00 | 15,750.00 | 20.00 | 15,000.00 | | 0041 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 56.25 | LNFT | 105.00 | 5,906.25 | 100.00 | 5,625.00 | | 0042 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 9 | EACH | 2,625.00 | 23,625.00 | 2,500.00 | 22,500.00 | | 0043 | 706-01-00100 | Concrete Walk (4" Thick) | 1,159.8 | SQYD | 50.00 | 57,990.00 | 60.00 | 69,588.00 | | 0044 | 706-02-00300 | Concrete Drive (8" Thick) | 1,011.5 | SQYD | 65.00 | 65,747.50 | 65.00 | 65,747.50 | | 0045 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 1,322.9 | SQYD | 110.00 | 145,519.00 | 60.00 | 79,374.00 | | 0046 | 706-04-00100 | Handicapped Curb Ramps | 28 | EACH | 1,750.00 | 49,000.00 | 1,500.00 | 42,000.00 | | 0047 | 707-01-00100 | Concrete Curb | 378.1 | LNFT | 45.00 | 17,014.50 | 15.00 | 5,671.50 | | 0048 | 707-03-00100 | Combination Concrete Curb and Gutter | 16,358.1 | LNFT | 22.00 | 359,878.20 | 25.00 | 408,952.50 | | 0049 | 711-02-00400 | Riprap (55 lb) | 14 | CUYD | 400.00 | 5,600.00 | 500.00 | 7,000.00 | | 0050 | 711-04-00100 | Geotextile Fabric | 130 | SQYD | 1.50 | 195.00 | 2.00 | 260.00 | | 0051 | 712-01-00400 | Concrete Cast-in-Place Revetment (7" Thick) | 114 | SQYD | 200.00 | 22,800.00 | 200.00 | 22,800.00 | | 0052 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 250,000.00 | 250,000.00 | | 0053 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 1.796 | MILE | 4,000.00 | 7,184.00 | 5,000.00 | 8,980.00 | | 0054 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 3.748 | MILE | 9,000.00 | 33,732.00 | 5,000.00 | 18,740.00 | | 0055 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 231 | EACH | 6.50 | 1,501.50 | 5.00 | 1,155.00 | | 0056 | 717-01-00100 | Seeding | 360 | LB | 91.00 | 32,760.00 | 1.00 | 360.00 | | 0057 | 718-01-00100 | Fertilizer | 12,000 | LB | 0.50 | 6,000.00 | 0.01 | 120.00 | | 0058 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | | 0059 | 723-02-00100 | Granular Material (Vehicular Measurement) | 8,951 | CUYD | 25.00 | 223,775.00 | 10.00 | 89,510.00 | | 0060 | 726-01-00100 | Bedding Material | 5,732.5 | CUYD | 71.00 | 407,007.50 | 70.00 | 401,275.00 | | 0061 | 727-01-00100 | Mobilization | 1 | LUMP | 800,000.00 | 800,000.00 | 1,000,000.00 | 1,000,000.00 | | 0062 | 729-16-00300 | Object Marker Assembly (Type 3) | 6 | EACH | 105.00 | 630.00 | 250.00 | 1,500.00 | | 0063 | 731-02-00100 | Reflectorized Raised Pavement Markers | 941 | EACH | 7.00 | 6,587.00 | 5.00 | 4,705.00 | | 0064 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 3,305 | LNFT | 3.00 | 9,915.00 | 2.00 | 6,610.00 | | 0065 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.171 | MILE | 3,500.00 | 11,098.50 | 3,200.00 | 10,147.20 | | 0066 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.19 | MILE | 1,575.00 | 5,024.25 | 1,750.00 | 5,582.50 | | 0067 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.256 | MILE | 5,000.00 | 1,280.00 | 3,000.00 | 768.00 | | 0068 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 30 | EACH | 315.00 | 9,450.00 | 300.00 | 9,000.00 | | 0069 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 420.00 | 420.00 | 450.00 | 450.00 | | 0070 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 9 | EACH | 315.00 | 2,835.00 | 300.00 | 2,700.00 | | 0071 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 315.00 | 945.00 | 300.00 | 900.00 | | 0072 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 8 | EACH | 315.00 | 2,520.00 | 400.00 | 3,200.00 | | 0073 | 732-05-00100 | Removal of Existing Markings | 1.619 | MILE | 5,000.00 | 8,095.00 | 4,600.00 | 7,447.40 | | 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 80,000.00 | 80,000.00 | 250,000.00 | 250,000.00 | | 0075 | 741-11-00100 | Adjusting Water Valve | 7 | EACH | 1,155.00 | 8,085.00 | 750.00 | 5,250.00 | | 0076 | 806-01-00100 | Deformed Reinforcing Steel | 5,027 | LB | 5.00 | 25,135.00 | 2.00 | 10,054.00 | | 0077 | NS-203-00006 | Exploratory Excavation | 100 | CUYD | 70.00 | 7,000.00 | 200.00 | 20,000.00 | | 0078 | NS-300-00060 | Geogrid | 29,124 | SQYD | 1.50 | 43,686.00 | 3.00 | 87,372.00 | | 0079 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 25,682 | SQYD | 7.50 | 192,615.00 | 5.00 | 128,410.00 | | 0080 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 151,866 | INLF | 0.40 | 60,746.40 | 1.00 | 151,866.00 | | 0081 | NS-502-01000 | Asphalt Concrete | 19,337.8 | TON | 85.00 | 1,643,713.00 | 100.00 | 1,933,780.00 | | 0082 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,833.5 | TON | 95.00 | 269,182.50 | 100.00 | 283,350.00 | | 0083 | NS-507-00003 | Clean and Seal Ran Cracks in Asph Conc Pave (Hot Poured) | 12,800 | LNFT | 1.10 | 14,080.00 | 2.00 | 25,600.00 | | 0084 | NS-509-01000 | Milling Asphalt Pavement | 25,682 | SQYD | 2.25 | 57,784.50 | 2.00 | 51,364.00 | | 0085 | NS-510-01700 | Pavement Patching (18" Minimum Thickness) | 290 | SQYD | 125.00 | 36,250.00 | 150.00 | 43,500.00 | | 0086 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,088 | INLF | 0.65 | 1,357.20 | 1.00 | 2,088.00 | | 0087 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 8,748 | LNFT | 3.75 | 32,805.00 | 1.00 | 8,748.00 | | 0088 | NS-P26-02007 | Jefferson Parish Standard Catch Basin (CB-06) (Brick) | 4 | EACH | 8,190.00 | 32,760.00 | 15,000.00 | 60,000.00 | | 0089 | NS-P26-02008 | Jefferson Parish Standard Catch Basin (CB-07) (Brick) | 30 | EACH | 8,505.00 | 255,150.00 | 20,000.00 | 600,000.00 | | 0090 | NS-P26-02009 | Jefferson Parish Standard Catch Basin (CB-08) (Brick) | 18 | EACH | 13,020.00 | 234,360.00 | 25,000.00 | 450,000.00 | | 0091 | NS-P26-23020 | Waterline (12" DI) (Jefferson Parish) | 20 | LNFT | 340.00 | 6,800.00 | 1,000.00 | 20,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,823,979.00 | | 11,088,888.00 |
|