Proposal:H.002631.6
Parish:Morehouse
Routes:LA 834
Description:LA 834: OVERFLOW CREEK BRIDGE
Type Construction:REMOVAL OF BRIDGE, CLEARING AND GRUBBING, GRADING, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE, PRECAST CONCRETE PILES, AND RELATED WORK.
Estimated Construction Cost:$1,827,144.98
| Rank | License | Bidder | Construction Bid |
| 1 | 14788 | Louisiana Bridge, Inc. | $1,485,852.00 |
| 2 | 23112 | BEN ALLEN, INC. | $1,766,954.85 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $1,800,000.00 |
| 4 | 49239 | WL Bass Construction Inc. | $1,896,753.27 |
| 5 | 38936 | SOUTHERN INDUSTRIAL CONTRACTORS LLC | $2,254,448.00 |
| 6 | 55519 | Key, LLC Of Mississippi | $2,458,731.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Louisiana Bridge, Inc. | - 2 - BEN ALLEN, INC. | - 3 - JB JAMES CONSTRUCTION LLC | - 4 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.75 | LUMP | 38,000.00 | 38,000.00 | 42,000.00 | 42,000.00 | 78,758.00 | 78,758.00 | 48,000.00 | 48,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 | | 0003 | 202-02-04000 | Removal of Bridge 27.4 ft x 211 ft Concrete Precast Slab Unit Bridge | 1 | EACH | 40,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | | 0004 | 202-02-12000 | Removal of Fence | 295 | LNFT | 3.00 | 885.00 | 5.00 | 1,475.00 | 3.00 | 885.00 | 1.50 | 442.50 | | 0005 | 202-02-14500 | Removal of Guard Rail | 631 | LNFT | 6.00 | 3,786.00 | 8.00 | 5,048.00 | 3.00 | 1,893.00 | 3.50 | 2,208.50 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,279.9 | SQYD | 6.00 | 7,679.40 | 7.00 | 8,959.30 | 11.00 | 14,078.90 | 2.30 | 2,943.77 | | 0007 | 203-02-00100 | Drainage Excavation | 304 | CUYD | 10.00 | 3,040.00 | 15.00 | 4,560.00 | 29.00 | 8,816.00 | 12.00 | 3,648.00 | | 0008 | 203-04-00100 | Nonplastic Embankment | 2.33 | CUYD | 100.00 | 233.00 | 1,000.00 | 2,330.00 | 270.00 | 629.10 | 230.00 | 535.90 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 28,000.00 | 28,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,380 | LNFT | 3.50 | 4,830.00 | 3.00 | 4,140.00 | 2.00 | 2,760.00 | 2.50 | 3,450.00 | | 0011 | 302-02-04000 | Class II Base Course (8 1/2" Thick) | 1,329.9 | SQYD | 29.00 | 38,567.10 | 27.00 | 35,907.30 | 40.00 | 53,196.00 | 32.00 | 42,556.80 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 10 | TON | 250.00 | 2,500.00 | 600.00 | 6,000.00 | 1,200.00 | 12,000.00 | 150.00 | 1,500.00 | | 0013 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 40 | CUYD | 60.00 | 2,400.00 | 75.00 | 3,000.00 | 250.00 | 10,000.00 | 70.00 | 2,800.00 | | 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 269.5 | TON | 209.00 | 56,325.50 | 175.00 | 47,162.50 | 156.00 | 42,042.00 | 158.00 | 42,581.00 | | 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 165.6 | TON | 230.00 | 38,088.00 | 185.00 | 30,636.00 | 175.00 | 28,980.00 | 177.00 | 29,311.20 | | 0016 | 704-03-00100 | Blocked Out Guard Rail | 75 | LNFT | 23.00 | 1,725.00 | 25.00 | 1,875.00 | 20.00 | 1,500.00 | 20.00 | 1,500.00 | | 0017 | 704-06-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 125.00 | 787.50 | 115.00 | 724.50 | 110.00 | 693.00 | 110.00 | 693.00 | | 0018 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 75 | LNFT | 70.00 | 5,250.00 | 68.00 | 5,100.00 | 62.00 | 4,650.00 | 63.00 | 4,725.00 | | 0019 | 704-11-00100 | Guard Rail End Treatment (Flared) | 2 | EACH | 2,500.00 | 5,000.00 | 2,250.00 | 4,500.00 | 2,150.00 | 4,300.00 | 2,200.00 | 4,400.00 | | 0020 | 705-01-00100 | Barbed Wire Fence | 295 | LNFT | 15.00 | 4,425.00 | 18.00 | 5,310.00 | 10.00 | 2,950.00 | 11.00 | 3,245.00 | | 0021 | 705-05-00100 | Double Swinging Driveway Gates | 1 | DBGT | 800.00 | 800.00 | 1,500.00 | 1,500.00 | 750.00 | 750.00 | 1,000.00 | 1,000.00 | | 0022 | 708-01-00100 | Right-of-Way Monument | 4 | EACH | 200.00 | 800.00 | 250.00 | 1,000.00 | 313.00 | 1,252.00 | 175.00 | 700.00 | | 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 4 | EACH | 200.00 | 800.00 | 250.00 | 1,000.00 | 312.00 | 1,248.00 | 150.00 | 600.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,414 | SQYD | 75.00 | 106,050.00 | 70.00 | 98,980.00 | 85.00 | 120,190.00 | 75.00 | 106,050.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 1,414 | SQYD | 3.00 | 4,242.00 | 3.00 | 4,242.00 | 1.00 | 1,414.00 | 2.00 | 2,828.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 13,000.00 | 13,000.00 | 40,000.00 | 40,000.00 | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 1 | TON | 3,000.00 | 3,000.00 | 1,200.00 | 1,200.00 | 1,800.00 | 1,800.00 | 1,970.00 | 1,970.00 | | 0028 | 717-01-00100 | Seeding | 28 | LB | 28.00 | 784.00 | 20.00 | 560.00 | 25.00 | 700.00 | 16.00 | 448.00 | | 0029 | 718-01-00100 | Fertilizer | 612 | LB | 1.50 | 918.00 | 5.00 | 3,060.00 | 2.50 | 1,530.00 | 2.00 | 1,224.00 | | 0030 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 500 | SQYD | 7.00 | 3,500.00 | 8.00 | 4,000.00 | 2.00 | 1,000.00 | 1.50 | 750.00 | | 0031 | 725-01-00100 | Temporary Detour Roads | 165.3 | SQYD | 50.00 | 8,265.00 | 100.00 | 16,530.00 | 70.00 | 11,571.00 | 190.00 | 31,407.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 168,000.00 | 168,000.00 | 170,000.00 | 170,000.00 | 189,000.00 | 189,000.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 85.00 | 340.00 | 75.00 | 300.00 | 75.00 | 300.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 36 | EACH | 46.00 | 1,656.00 | 45.00 | 1,620.00 | 25.00 | 900.00 | 25.00 | 900.00 | | 0035 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 1,380 | LNFT | 9.00 | 12,420.00 | 5.00 | 6,900.00 | 5.50 | 7,590.00 | 5.55 | 7,659.00 | | 0036 | 735-01-00100 | Mailboxes | 2 | EACH | 25.00 | 50.00 | 150.00 | 300.00 | 1.00 | 2.00 | 10.00 | 20.00 | | 0037 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 200.00 | 400.00 | 150.00 | 300.00 | 135.00 | 270.00 | 150.00 | 300.00 | | 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 38,000.00 | 38,000.00 | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | | 0039 | 804-01-00600 | Precast Concrete Piles (24") | 2,520 | LNFT | 135.00 | 340,200.00 | 160.00 | 403,200.00 | 140.00 | 352,800.00 | 125.00 | 315,000.00 | | 0040 | 804-13-00100 | Precast Concrete Indicator Piles | 1 | EACH | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 75,000.00 | 75,000.00 | 12,000.00 | 12,000.00 | | 0041 | 804-17-00100 | Dynamic Monitoring | 7 | EACH | 500.00 | 3,500.00 | 5,000.00 | 35,000.00 | 1,000.00 | 7,000.00 | 100.00 | 700.00 | | 0042 | 805-01-00700 | Class A Concrete (Bents) | 112.92 | CUYD | 950.00 | 107,274.00 | 1,100.00 | 124,212.00 | 1,200.00 | 135,504.00 | 1,900.00 | 214,548.00 | | 0043 | 805-04-00100 | Class AA(M) Concrete | 299.09 | CUYD | 800.00 | 239,272.00 | 925.00 | 276,658.25 | 700.00 | 209,363.00 | 1,200.00 | 358,908.00 | | 0044 | 806-01-00100 | Deformed Reinforcing Steel | 74,160 | LB | 1.00 | 74,160.00 | 0.75 | 55,620.00 | 1.00 | 74,160.00 | 1.10 | 81,576.00 | | 0045 | 810-01-00100 | Concrete Railing (Standard Barrier) | 440 | LNFT | 85.00 | 37,400.00 | 92.00 | 40,480.00 | 95.00 | 41,800.00 | 67.00 | 29,480.00 | | 0046 | 813-01-00100 | Concrete Approach Slabs | 275.56 | SQYD | 250.00 | 68,890.00 | 250.00 | 68,890.00 | 250.00 | 68,890.00 | 285.00 | 78,534.60 | | 0047 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 58 | LNFT | 34.00 | 1,972.00 | 20.00 | 1,160.00 | 20.00 | 1,160.00 | 20.00 | 1,160.00 | | 0048 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 125 | INLF | 3.50 | 437.50 | 5.00 | 625.00 | 3.00 | 375.00 | 12.00 | 1,500.00 | | 0049 | NS-700-00220 | Impact Attenuator (Kinetic; Test Level 3) | 1 | EACH | 25,000.00 | 25,000.00 | 27,000.00 | 27,000.00 | 21,000.00 | 21,000.00 | 8,500.00 | 8,500.00 | | 0050 | NS-804-00001 | Vibration Monitoring | 21 | EACH | 200.00 | 4,200.00 | 850.00 | 17,850.00 | 800.00 | 16,800.00 | 150.00 | 3,150.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,485,852.00 | | 1,766,954.85 | | 1,800,000.00 | | 1,896,753.27 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - SOUTHERN INDUSTRIAL CONTRACTORS LLC | - 6 - Key, LLC Of Mississippi | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.75 | LUMP | 100,000.00 | 100,000.00 | 45,000.00 | 45,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50,000.00 | 50,000.00 | 3,500.00 | 3,500.00 | | 0003 | 202-02-04000 | Removal of Bridge 27.4 ft x 211 ft Concrete Precast Slab Unit Bridge | 1 | EACH | 200,000.00 | 200,000.00 | 65,000.00 | 65,000.00 | | 0004 | 202-02-12000 | Removal of Fence | 295 | LNFT | 10.00 | 2,950.00 | 10.00 | 2,950.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 631 | LNFT | 10.00 | 6,310.00 | 10.00 | 6,310.00 | | 0006 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 1,279.9 | SQYD | 10.00 | 12,799.00 | 7.50 | 9,599.25 | | 0007 | 203-02-00100 | Drainage Excavation | 304 | CUYD | 30.00 | 9,120.00 | 30.00 | 9,120.00 | | 0008 | 203-04-00100 | Nonplastic Embankment | 2.33 | CUYD | 100.00 | 233.00 | 500.00 | 1,165.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 200,000.00 | 200,000.00 | 35,000.00 | 35,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,380 | LNFT | 5.00 | 6,900.00 | 5.00 | 6,900.00 | | 0011 | 302-02-04000 | Class II Base Course (8 1/2" Thick) | 1,329.9 | SQYD | 35.00 | 46,546.50 | 45.00 | 59,845.50 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 10 | TON | 250.00 | 2,500.00 | 650.00 | 6,500.00 | | 0013 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 40 | CUYD | 75.00 | 3,000.00 | 215.00 | 8,600.00 | | 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 269.5 | TON | 185.00 | 49,857.50 | 155.00 | 41,772.50 | | 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 165.6 | TON | 210.00 | 34,776.00 | 175.00 | 28,980.00 | | 0016 | 704-03-00100 | Blocked Out Guard Rail | 75 | LNFT | 20.00 | 1,500.00 | 25.00 | 1,875.00 | | 0017 | 704-06-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 100.00 | 630.00 | 250.00 | 1,575.00 | | 0018 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 75 | LNFT | 100.00 | 7,500.00 | 85.00 | 6,375.00 | | 0019 | 704-11-00100 | Guard Rail End Treatment (Flared) | 2 | EACH | 3,000.00 | 6,000.00 | 2,500.00 | 5,000.00 | | 0020 | 705-01-00100 | Barbed Wire Fence | 295 | LNFT | 10.00 | 2,950.00 | 10.00 | 2,950.00 | | 0021 | 705-05-00100 | Double Swinging Driveway Gates | 1 | DBGT | 1,000.00 | 1,000.00 | 750.00 | 750.00 | | 0022 | 708-01-00100 | Right-of-Way Monument | 4 | EACH | 300.00 | 1,200.00 | 185.00 | 740.00 | | 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 4 | EACH | 300.00 | 1,200.00 | 185.00 | 740.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,414 | SQYD | 75.00 | 106,050.00 | 115.00 | 162,610.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 1,414 | SQYD | 1.00 | 1,414.00 | 3.25 | 4,595.50 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 1 | TON | 1,000.00 | 1,000.00 | 1,800.00 | 1,800.00 | | 0028 | 717-01-00100 | Seeding | 28 | LB | 20.00 | 560.00 | 25.00 | 700.00 | | 0029 | 718-01-00100 | Fertilizer | 612 | LB | 2.00 | 1,224.00 | 2.50 | 1,530.00 | | 0030 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 500 | SQYD | 2.00 | 1,000.00 | 2.00 | 1,000.00 | | 0031 | 725-01-00100 | Temporary Detour Roads | 165.3 | SQYD | 200.00 | 33,060.00 | 180.00 | 29,754.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | 615,000.00 | 615,000.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 250.00 | 1,000.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 36 | EACH | 25.00 | 900.00 | 35.00 | 1,260.00 | | 0035 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 1,380 | LNFT | 5.00 | 6,900.00 | 2.50 | 3,450.00 | | 0036 | 735-01-00100 | Mailboxes | 2 | EACH | 250.00 | 500.00 | 500.00 | 1,000.00 | | 0037 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 250.00 | 500.00 | 500.00 | 1,000.00 | | 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 75,000.00 | 75,000.00 | | 0039 | 804-01-00600 | Precast Concrete Piles (24") | 2,520 | LNFT | 140.00 | 352,800.00 | 190.00 | 478,800.00 | | 0040 | 804-13-00100 | Precast Concrete Indicator Piles | 1 | EACH | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0041 | 804-17-00100 | Dynamic Monitoring | 7 | EACH | 1,500.00 | 10,500.00 | 4,500.00 | 31,500.00 | | 0042 | 805-01-00700 | Class A Concrete (Bents) | 112.92 | CUYD | 1,000.00 | 112,920.00 | 1,050.00 | 118,566.00 | | 0043 | 805-04-00100 | Class AA(M) Concrete | 299.09 | CUYD | 1,000.00 | 299,090.00 | 925.00 | 276,658.25 | | 0044 | 806-01-00100 | Deformed Reinforcing Steel | 74,160 | LB | 1.00 | 74,160.00 | 0.95 | 70,452.00 | | 0045 | 810-01-00100 | Concrete Railing (Standard Barrier) | 440 | LNFT | 100.00 | 44,000.00 | 135.00 | 59,400.00 | | 0046 | 813-01-00100 | Concrete Approach Slabs | 275.56 | SQYD | 300.00 | 82,668.00 | 300.00 | 82,668.00 | | 0047 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 58 | LNFT | 10.00 | 580.00 | 30.00 | 1,740.00 | | 0048 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 125 | INLF | 10.00 | 1,250.00 | 10.00 | 1,250.00 | | 0049 | NS-700-00220 | Impact Attenuator (Kinetic; Test Level 3) | 1 | EACH | 25,000.00 | 25,000.00 | 22,000.00 | 22,000.00 | | 0050 | NS-804-00001 | Vibration Monitoring | 21 | EACH | 1,000.00 | 21,000.00 | 750.00 | 15,750.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,254,448.00 | | 2,458,731.00 |
|