Proposal:H.003298.6
Parish:Lincoln
Routes:I-20
Description:ROAD INTERCHANGE AND I-20 FRONTAGE ROADS
Type Construction:GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, STEEL PLATE GIRDER SPANS BRIDGE, DRILLED SHAFT FOUNDATIONS, AND RELATED WORK.
Estimated Construction Cost:$17,904,033.76
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 39462 | JB JAMES CONSTRUCTION LLC | $25,572,547.07 | 2300.00 | $27,872,547.07 |
| 2 | 34567 | James Construction Group LLC | $25,573,120.82 | 4076.00 | $29,649,120.82 |
| 3 | 12312 | GILCHRIST CONSTRUCTION CO. LLC | $30,731,594.07 | 4500.00 | $35,231,594.07 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - JB JAMES CONSTRUCTION LLC | - 2 - James Construction Group LLC | - 3 - GILCHRIST CONSTRUCTION CO. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | 1,000,000.00 | 1,000,000.00 | 1,000,000.00 | 1,000,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 130,000.00 | 130,000.00 | 14,600.00 | 14,600.00 | 250,000.00 | 250,000.00 | | 0003 | 202-02-00010 | Removal of Cable Gated End Treatment | 8 | EACH | 500.00 | 4,000.00 | 500.00 | 4,000.00 | 500.00 | 4,000.00 | | 0004 | 202-02-00010 | Removal of I-20 Overpass Bridge (Sta. 322+37, 24' W X 247' L; 4 - Steel Girder Spans) | 1 | EACH | 120,000.00 | 120,000.00 | 100,000.00 | 100,000.00 | 120,000.00 | 120,000.00 | | 0005 | 202-02-00020 | Removal of Concrete Strip | 4,333 | SQYD | 10.00 | 43,330.00 | 7.00 | 30,331.00 | 5.00 | 21,665.00 | | 0006 | 202-02-00030 | Removal of High Tension Cable Barriers | 7,800 | LNFT | 2.00 | 15,600.00 | 1.00 | 7,800.00 | 9.00 | 70,200.00 | | 0007 | 202-02-02000 | Removal of Asphalt Drives Asphalt Drives | 691 | SQYD | 12.00 | 8,292.00 | 19.00 | 13,129.00 | 16.00 | 11,056.00 | | 0008 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 12,500.00 | 12,500.00 | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | | 0009 | 202-02-06100 | Removal of Concrete Walks and Drives | 813 | SQYD | 12.00 | 9,756.00 | 24.00 | 19,512.00 | 15.00 | 12,195.00 | | 0010 | 202-02-12000 | Removal of Fence | 5,232 | LNFT | 2.00 | 10,464.00 | 2.00 | 10,464.00 | 5.00 | 26,160.00 | | 0011 | 202-02-12020 | Removal of Fence (Chain Link) | 4,600 | LNFT | 2.00 | 9,200.00 | 2.00 | 9,200.00 | 5.00 | 23,000.00 | | 0012 | 202-02-14500 | Removal of Guard Rail | 1,400 | LNFT | 12.00 | 16,800.00 | 12.00 | 16,800.00 | 13.00 | 18,200.00 | | 0013 | 202-02-32000 | Removal of Paved Ditches | 3,826 | SQYD | 6.00 | 22,956.00 | 11.00 | 42,086.00 | 10.00 | 38,260.00 | | 0014 | 202-02-32100 | Removal of Pipe (Cross Drain) 15" CMP | 40 | LNFT | 11.00 | 440.00 | 20.00 | 800.00 | 26.00 | 1,040.00 | | 0015 | 202-02-32100 | Removal of Pipe (Cross Drain) 18" RCP | 60 | LNFT | 11.00 | 660.00 | 20.00 | 1,200.00 | 26.00 | 1,560.00 | | 0016 | 202-02-32100 | Removal of Pipe (Cross Drain) 66" CMP | 160 | LNFT | 10.00 | 1,600.00 | 75.00 | 12,000.00 | 26.00 | 4,160.00 | | 0017 | 202-02-32120 | Removal of Pipe (Side Drain) 12" RCP | 48 | LNFT | 9.00 | 432.00 | 20.00 | 960.00 | 26.00 | 1,248.00 | | 0018 | 202-02-32120 | Removal of Pipe (Side Drain) 15" RCP | 72 | LNFT | 11.00 | 792.00 | 20.00 | 1,440.00 | 26.00 | 1,872.00 | | 0019 | 202-02-32120 | Removal of Pipe (Side Drain) 18" RCP | 74 | LNFT | 11.00 | 814.00 | 20.00 | 1,480.00 | 26.00 | 1,924.00 | | 0020 | 202-02-32120 | Removal of Pipe (Side Drain) 24" RCP | 302 | LNFT | 11.00 | 3,322.00 | 20.00 | 6,040.00 | 26.00 | 7,852.00 | | 0021 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 5,870.34 | SQYD | 8.00 | 46,962.72 | 9.00 | 52,833.06 | 15.00 | 88,055.10 | | 0022 | 202-02-38500 | Removal of Surfacing and Stabilized Base | 13,246.07 | SQYD | 8.00 | 105,968.56 | 6.00 | 79,476.42 | 5.00 | 66,230.35 | | 0023 | 202-02-46000 | Removal of Walls | 840 | SQFT | 25.00 | 21,000.00 | 21.00 | 17,640.00 | 11.00 | 9,240.00 | | 0024 | 203-01-00100 | General Excavation | 86,311 | CUYD | 6.00 | 517,866.00 | 6.00 | 517,866.00 | 11.00 | 949,421.00 | | 0025 | 203-02-00100 | Drainage Excavation | 352.36 | CUYD | 14.00 | 4,933.04 | 25.00 | 8,809.00 | 30.00 | 10,570.80 | | 0026 | 203-03-00100 | Embankment | 174,256 | CUYD | 10.00 | 1,742,560.00 | 10.00 | 1,742,560.00 | 18.00 | 3,136,608.00 | | 0027 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,925 | CUYD | 14.00 | 26,950.00 | 7.00 | 13,475.00 | 13.00 | 25,025.00 | | 0028 | 204-02-00100 | Temporary Hay or Straw Bales | 288 | EACH | 16.00 | 4,608.00 | 16.00 | 4,608.00 | 40.00 | 11,520.00 | | 0029 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 141 | EACH | 800.00 | 112,800.00 | 300.00 | 42,300.00 | 400.00 | 56,400.00 | | 0030 | 204-06-00100 | Temporary Silt Fencing | 20,215 | LNFT | 3.20 | 64,688.00 | 2.30 | 46,494.50 | 3.25 | 65,698.75 | | 0031 | 302-02-02000 | Class II Base Course (6" Thick) | 13,356.26 | SQYD | 9.00 | 120,206.34 | 18.00 | 240,412.68 | 24.00 | 320,550.24 | | 0032 | 302-02-05121 | Class II Base Course (10" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 52,557.82 | SQYD | 30.00 | 1,576,734.60 | 27.00 | 1,419,061.14 | 36.00 | 1,892,081.52 | | 0033 | 304-05-00100 | Lime Treatment (Type E) | 239.32 | TON | 425.00 | 101,711.00 | 250.00 | 59,830.00 | 450.00 | 107,694.00 | | 0034 | 307-01-01040 | Permeable Base (4" Thick) (Concrete) | 13,356.26 | SQYD | 22.00 | 293,837.72 | 25.00 | 333,906.50 | 32.00 | 427,400.32 | | 0035 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 65.9 | CUYD | 200.00 | 13,180.00 | 125.00 | 8,237.50 | 100.00 | 6,590.00 | | 0036 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,500 | CUYD | 110.00 | 165,000.00 | 110.00 | 165,000.00 | 70.00 | 105,000.00 | | 0037 | 502-01-00100 | Superpave Asphaltic Concrete | 12,218.45 | TON | 105.00 | 1,282,937.25 | 104.00 | 1,270,718.80 | 100.00 | 1,221,845.00 | | 0038 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 264.36 | TON | 212.00 | 56,044.32 | 210.00 | 55,515.60 | 175.00 | 46,263.00 | | 0039 | 509-01-00100 | Cold Planing Asphaltic Pavement | 330 | SQYD | 35.00 | 11,550.00 | 36.00 | 11,880.00 | 15.00 | 4,950.00 | | 0040 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -26.27 | CUYD | 1.00 | -26.27 | 1.00 | -26.27 | 0.10 | -2.63 | | 0041 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 19,417.99 | SQYD | 68.00 | 1,320,423.32 | 70.00 | 1,359,259.30 | 80.00 | 1,553,439.20 | | 0042 | 601-01-01100 | Portland Cement Concrete Pavement (13" Thick) | 7,454.61 | SQYD | 83.00 | 618,732.63 | 84.00 | 626,187.24 | 86.00 | 641,096.46 | | 0043 | 601-03-01100 | Portland Cement Concrete Shoulder (10" Thick) | 9,710.52 | SQYD | 60.00 | 582,631.20 | 71.00 | 689,446.92 | 80.00 | 776,841.60 | | 0044 | 601-03-01700 | Portland Cement Concrete Shoulder (13" Thick) | 6,638.4 | SQYD | 74.00 | 491,241.60 | 85.00 | 564,264.00 | 86.00 | 570,902.40 | | 0045 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 54 | EACH | 65.00 | 3,510.00 | 50.00 | 2,700.00 | 250.00 | 13,500.00 | | 0046 | 602-11-00100 | Removal of Existing Shoulder Underdrain Systems | 4,911 | LNFT | 5.00 | 24,555.00 | 5.00 | 24,555.00 | 4.00 | 19,644.00 | | 0047 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 234 | LNFT | 90.00 | 21,060.00 | 95.00 | 22,230.00 | 72.00 | 16,848.00 | | 0048 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 392 | LNFT | 105.00 | 41,160.00 | 102.00 | 39,984.00 | 92.00 | 36,064.00 | | 0049 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 204 | LNFT | 110.00 | 22,440.00 | 131.00 | 26,724.00 | 120.00 | 24,480.00 | | 0050 | 701-01-01061 | Cross Drain Pipe (42" RCP) | 190 | LNFT | 115.00 | 21,850.00 | 325.00 | 61,750.00 | 180.00 | 34,200.00 | | 0051 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 340 | LNFT | 75.00 | 25,500.00 | 90.00 | 30,600.00 | 50.00 | 17,000.00 | | 0052 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,118 | LNFT | 80.00 | 89,440.00 | 113.00 | 126,334.00 | 52.00 | 58,136.00 | | 0053 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 130 | LNFT | 100.00 | 13,000.00 | 145.00 | 18,850.00 | 85.00 | 11,050.00 | | 0054 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 586 | LNFT | 130.00 | 76,180.00 | 245.00 | 143,570.00 | 125.00 | 73,250.00 | | 0055 | 701-03-01120 | Storm Drain Pipe (54" RCP) | 126 | LNFT | 175.00 | 22,050.00 | 325.00 | 40,950.00 | 175.00 | 22,050.00 | | 0056 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 754 | LNFT | 125.00 | 94,250.00 | 190.00 | 143,260.00 | 110.00 | 82,940.00 | | 0057 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 304 | LNFT | 75.00 | 22,800.00 | 90.00 | 27,360.00 | 50.00 | 15,200.00 | | 0058 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 238 | LNFT | 80.00 | 19,040.00 | 113.00 | 26,894.00 | 65.00 | 15,470.00 | | 0059 | 701-15-00100 | Concrete Collar | 18 | EACH | 900.00 | 16,200.00 | 1,900.00 | 34,200.00 | 1,400.00 | 25,200.00 | | 0060 | 702-02-00800 | Manholes (R-CB-38) | 4 | EACH | 8,000.00 | 32,000.00 | 11,500.00 | 46,000.00 | 7,000.00 | 28,000.00 | | 0061 | 702-03-00100 | Catch Basins (CB-01) | 8 | EACH | 4,500.00 | 36,000.00 | 3,200.00 | 25,600.00 | 4,000.00 | 32,000.00 | | 0062 | 702-03-00200 | Catch Basins (CB-02) | 4 | EACH | 6,000.00 | 24,000.00 | 5,400.00 | 21,600.00 | 4,200.00 | 16,800.00 | | 0063 | 702-03-00600 | Catch Basins (CB-07) | 11 | EACH | 4,000.00 | 44,000.00 | 7,500.00 | 82,500.00 | 6,000.00 | 66,000.00 | | 0064 | 702-07-00200 | Cross Drain Safety End (Type 2) | 1 | EACH | 7,200.00 | 7,200.00 | 1,500.00 | 1,500.00 | 12,000.00 | 12,000.00 | | 0065 | 703-01-00100 | Shoulder Underdrain Systems | 20,109 | LNFT | 12.00 | 241,308.00 | 9.00 | 180,981.00 | 20.00 | 402,180.00 | | 0066 | 703-02-00100 | Shoulder Outlet Underdrains | 83 | EACH | 1,000.00 | 83,000.00 | 650.00 | 53,950.00 | 750.00 | 62,250.00 | | 0067 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 206.3 | LNFT | 48.00 | 9,902.40 | 55.00 | 11,346.50 | 52.00 | 10,727.60 | | 0068 | 704-03-00100 | Blocked Out Guard Rail | 262.5 | LNFT | 20.00 | 5,250.00 | 20.00 | 5,250.00 | 22.00 | 5,775.00 | | 0069 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 12.5 | LNFT | 111.00 | 1,387.50 | 100.00 | 1,250.00 | 120.00 | 1,500.00 | | 0070 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 61.00 | 6,100.00 | 70.00 | 7,000.00 | 65.00 | 6,500.00 | | 0071 | 704-11-00100 | Guard Rail End Treatment (Flared) | 6 | EACH | 2,100.00 | 12,600.00 | 2,500.00 | 15,000.00 | 2,300.00 | 13,800.00 | | 0072 | 705-06-00200 | Chain Link Fence (5-Foot Height) | 10,193.44 | LNFT | 13.64 | 139,038.52 | 18.00 | 183,481.92 | 20.00 | 203,868.80 | | 0073 | 706-02-00200 | Concrete Drive (6" Thick) | 534.66 | SQYD | 78.00 | 41,703.48 | 72.00 | 38,495.52 | 67.00 | 35,822.22 | | 0074 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 1,167.7 | SQYD | 55.00 | 64,223.50 | 62.00 | 72,397.40 | 45.00 | 52,546.50 | | 0075 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 5,722.1 | SQYD | 75.00 | 429,157.50 | 65.00 | 371,936.50 | 50.00 | 286,105.00 | | 0076 | 707-01-00300 | Concrete Curb (Mountable) | 3,137 | LNFT | 15.00 | 47,055.00 | 5.00 | 15,685.00 | 15.00 | 47,055.00 | | 0077 | 707-03-00100 | Combination Concrete Curb and Gutter | 5,613 | LNFT | 44.00 | 246,972.00 | 30.00 | 168,390.00 | 34.00 | 190,842.00 | | 0078 | 708-01-00100 | Right-of-Way Monument | 68 | EACH | 150.00 | 10,200.00 | 150.00 | 10,200.00 | 250.00 | 17,000.00 | | 0079 | 708-02-00100 | Right-of-Way Monument Witness Post | 68 | EACH | 150.00 | 10,200.00 | 65.00 | 4,420.00 | 250.00 | 17,000.00 | | 0080 | 711-02-00300 | Riprap (30 lb) | 27 | CUYD | 310.00 | 8,370.00 | 130.00 | 3,510.00 | 480.00 | 12,960.00 | | 0081 | 711-02-00400 | Riprap (55 lb) | 55 | CUYD | 135.00 | 7,425.00 | 145.00 | 7,975.00 | 170.00 | 9,350.00 | | 0082 | 711-02-00500 | Riprap (130 lb) | 62 | CUYD | 400.00 | 24,800.00 | 200.00 | 12,400.00 | 280.00 | 17,360.00 | | 0083 | 711-04-00100 | Geotextile Fabric | 12,093 | SQYD | 1.25 | 15,116.25 | 2.00 | 24,186.00 | 2.00 | 24,186.00 | | 0084 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 7,438.34 | SQYD | 65.00 | 483,492.10 | 55.00 | 409,108.70 | 70.00 | 520,683.80 | | 0085 | 712-01-00300 | Concrete Cast-in-Place Revetment (6" Thick) Paved Ditch | 429 | SQYD | 80.00 | 34,320.00 | 56.00 | 24,024.00 | 80.00 | 34,320.00 | | 0086 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 500,000.00 | 500,000.00 | 300,000.00 | 300,000.00 | 400,000.00 | 400,000.00 | | 0087 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.157 | MILE | 1,000.00 | 3,157.00 | 1,000.00 | 3,157.00 | 900.00 | 2,841.30 | | 0088 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 17.299 | MILE | 13,000.00 | 224,887.00 | 12,800.00 | 221,427.20 | 14,000.00 | 242,186.00 | | 0089 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 598 | EACH | 700.00 | 418,600.00 | 525.00 | 313,950.00 | 675.00 | 403,650.00 | | 0090 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 3,480 | EACH | 23.00 | 80,040.00 | 60.00 | 208,800.00 | 100.00 | 348,000.00 | | 0091 | 716-01-00100 | Mulch (Vegetative) | 37 | TON | 550.00 | 20,350.00 | 550.00 | 20,350.00 | 600.00 | 22,200.00 | | 0092 | 717-01-00100 | Seeding | 740 | LB | 11.00 | 8,140.00 | 11.00 | 8,140.00 | 12.00 | 8,880.00 | | 0093 | 718-01-00100 | Fertilizer | 15,144 | LB | 0.42 | 6,360.48 | 0.50 | 7,572.00 | 0.45 | 6,814.80 | | 0094 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 119,169 | SQYD | 1.00 | 119,169.00 | 1.00 | 119,169.00 | 1.20 | 143,002.80 | | 0095 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 65,000.00 | 65,000.00 | 46,000.00 | 46,000.00 | 25,000.00 | 25,000.00 | | 0096 | 725-01-00100 | Temporary Detour Roads | 11,910 | SQYD | 98.00 | 1,167,180.00 | 120.00 | 1,429,200.00 | 115.00 | 1,369,650.00 | | 0097 | 726-01-00100 | Bedding Material | 2,559.38 | CUYD | 80.00 | 204,750.40 | 80.00 | 204,750.40 | 100.00 | 255,938.00 | | 0098 | 727-01-00100 | Mobilization | 1 | LUMP | 2,500,000.00 | 2,500,000.00 | 2,500,000.00 | 2,500,000.00 | 3,000,000.00 | 3,000,000.00 | | 0099 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 804.6 | SQFT | 20.00 | 16,092.00 | 25.00 | 20,115.00 | 24.00 | 19,310.40 | | 0100 | 729-02-00102 | Sign (Type B)(Furnish and Install) | 9 | SQFT | 21.00 | 189.00 | 31.00 | 279.00 | 25.00 | 225.00 | | 0101 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 1,567.5 | SQFT | 22.00 | 34,485.00 | 31.00 | 48,592.50 | 26.00 | 40,755.00 | | 0102 | 729-05-00102 | Sign (Type E)(Furnish and Install) | 133 | SQFT | 29.00 | 3,857.00 | 35.00 | 4,655.00 | 32.00 | 4,256.00 | | 0103 | 729-08-00100 | Mounting (2 1/2" Size Post) | 75 | EACH | 935.00 | 70,125.00 | 950.00 | 71,250.00 | 1,100.00 | 82,500.00 | | 0104 | 729-08-00200 | Mounting (3 1/2" Size Post) | 13 | EACH | 1,200.00 | 15,600.00 | 1,500.00 | 19,500.00 | 1,400.00 | 18,200.00 | | 0105 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 20 | EACH | 1,400.00 | 28,000.00 | 1,400.00 | 28,000.00 | 1,600.00 | 32,000.00 | | 0106 | 729-08-00800 | Mounting (W8 x 24 Size Post) | 14 | EACH | 2,200.00 | 30,800.00 | 2,500.00 | 35,000.00 | 2,400.00 | 33,600.00 | | 0107 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 75.00 | 600.00 | 100.00 | 800.00 | 80.00 | 640.00 | | 0108 | 729-17-00100 | Milepost Assembly (Ground Mounted) | 1 | EACH | 800.00 | 800.00 | 850.00 | 850.00 | 900.00 | 900.00 | | 0109 | 729-19-00100 | Dead End Road Installations (Type A) | 1 | EACH | 1,500.00 | 1,500.00 | 1,000.00 | 1,000.00 | 1,800.00 | 1,800.00 | | 0110 | 731-02-00100 | Reflectorized Raised Pavement Markers | 4,840 | EACH | 7.00 | 33,880.00 | 7.00 | 33,880.00 | 7.50 | 36,300.00 | | 0111 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 7,016 | LNFT | 2.50 | 17,540.00 | 2.50 | 17,540.00 | 2.25 | 15,786.00 | | 0112 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 315 | LNFT | 10.00 | 3,150.00 | 10.00 | 3,150.00 | 7.00 | 2,205.00 | | 0113 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,021 | LNFT | 13.00 | 13,273.00 | 13.00 | 13,273.00 | 9.00 | 9,189.00 | | 0114 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 17.615 | MILE | 4,100.00 | 72,221.50 | 4,000.00 | 70,460.00 | 3,489.00 | 61,458.74 | | 0115 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.659 | MILE | 1,700.00 | 9,620.30 | 1,700.00 | 9,620.30 | 2,675.00 | 15,137.83 | | 0116 | 732-03-02001 | Plast Pave Striping (Broken Line) (4" Width) (Thermo 90 mil)(Blk Cont) | 2.98 | MILE | 3,000.00 | 8,940.00 | 2,850.00 | 8,493.00 | 3,269.00 | 9,741.62 | | 0117 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.398 | MILE | 3,000.00 | 1,194.00 | 3,000.00 | 1,194.00 | 10,000.00 | 3,980.00 | | 0118 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 8 | EACH | 505.00 | 4,040.00 | 500.00 | 4,000.00 | 400.00 | 3,200.00 | | 0119 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 700.00 | 1,400.00 | 700.00 | 1,400.00 | 400.00 | 800.00 | | 0120 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 12 | EACH | 505.00 | 6,060.00 | 500.00 | 6,000.00 | 400.00 | 4,800.00 | | 0121 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 14 | EACH | 505.00 | 7,070.00 | 500.00 | 7,000.00 | 400.00 | 5,600.00 | | 0122 | 732-05-00100 | Removal of Existing Markings | 13.423 | MILE | 8,100.00 | 108,726.30 | 8,000.00 | 107,384.00 | 5,162.00 | 69,289.53 | | 0123 | 740-01-00100 | Construction Layout | 1 | LUMP | 150,000.00 | 150,000.00 | 250,000.00 | 250,000.00 | 300,000.00 | 300,000.00 | | 0124 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 25.25 | CUYD | 800.00 | 20,200.00 | 1,300.00 | 32,825.00 | 1,400.00 | 35,350.00 | | 0125 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 44 | CUYD | 1,200.00 | 52,800.00 | 1,300.00 | 57,200.00 | 1,400.00 | 61,600.00 | | 0126 | 805-01-00700 | Class A Concrete (Bents) | 264.55 | CUYD | 1,350.00 | 357,142.50 | 885.00 | 234,126.75 | 950.00 | 251,322.50 | | 0127 | 805-04-00100 | Class AA(M) Concrete | 553.98 | CUYD | 1,000.00 | 553,980.00 | 685.00 | 379,476.30 | 825.00 | 457,033.50 | | 0128 | 805-11-00100 | Strip Seal Joints | 148 | LNFT | 330.00 | 48,840.00 | 225.00 | 33,300.00 | 225.00 | 33,300.00 | | 0129 | 805-12-23000 | Reinforced Concrete Box Culverts (7' x 7') (Precast) | 402 | LNFT | 800.00 | 321,600.00 | 700.00 | 281,400.00 | 650.00 | 261,300.00 | | 0130 | 806-01-00100 | Deformed Reinforcing Steel | 198,635 | LB | 1.50 | 297,952.50 | 1.00 | 198,635.00 | 1.25 | 248,293.75 | | 0131 | 807-08-00100 | Structural Metalwork | 710,737 | LUMP | 1,400,000.00 | 1,400,000.00 | 1,275,000.00 | 1,275,000.00 | 2,000,000.00 | 2,000,000.00 | | 0132 | 810-01-00100 | Concrete Railing (Standard Barrier) | 630 | LNFT | 95.00 | 59,850.00 | 65.00 | 40,950.00 | 85.00 | 53,550.00 | | 0133 | 813-01-00100 | Concrete Approach Slabs | 656.4 | SQYD | 350.00 | 229,740.00 | 235.00 | 154,254.00 | 575.00 | 377,430.00 | | 0134 | 814-01-00400 | Drilled Shaft (36" Diameter) | 780 | LNFT | 400.00 | 312,000.00 | 325.00 | 253,500.00 | 450.00 | 351,000.00 | | 0135 | 814-01-00900 | Drilled Shaft (72"Diameter) | 284 | LNFT | 700.00 | 198,800.00 | 650.00 | 184,600.00 | 925.00 | 262,700.00 | | 0136 | 814-04-00400 | Crosshole Sonic Logging (36" Diameter) | 12 | EACH | 2,000.00 | 24,000.00 | 3,650.00 | 43,800.00 | 7,500.00 | 90,000.00 | | 0137 | 814-04-00900 | Crosshole Sonic Logging (72" Diameter) | 4 | EACH | 2,000.00 | 8,000.00 | 4,800.00 | 19,200.00 | 15,000.00 | 60,000.00 | | 0138 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 120 | INLF | 0.90 | 108.00 | 4.00 | 480.00 | 10.00 | 1,200.00 | | 0139 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 68,683.03 | INLF | 1.19 | 81,732.81 | 0.70 | 48,078.12 | 0.75 | 51,512.27 | | 0140 | NS-700-00180 | Impact Attenuator (Construction Zone) | 6 | EACH | 10,000.00 | 60,000.00 | 16,000.00 | 96,000.00 | 8,500.00 | 51,000.00 | | 0141 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 4,074 | LNFT | 10.00 | 40,740.00 | 2.50 | 10,185.00 | 6.00 | 24,444.00 | | 0142 | NS-704-00001 | High Tension Cable Barrier | 7,800 | LNFT | 13.00 | 101,400.00 | 13.14 | 102,492.00 | 10.00 | 78,000.00 | | 0143 | NS-704-00002 | Cable Barrier Gated End Terminal | 12 | EACH | 5,000.00 | 60,000.00 | 3,536.61 | 42,439.32 | 3,000.00 | 36,000.00 | | 0144 | NS-704-00003 | Concrete Strip | 4,333 | SQYD | 50.00 | 216,650.00 | 54.00 | 233,982.00 | 45.00 | 194,985.00 | | 0145 | NS-713-00006 | Glare Screen System (Complete Replacement) | 600 | LNFT | 40.00 | 24,000.00 | 25.00 | 15,000.00 | 30.00 | 18,000.00 | | 0146 | NS-713-00008 | Portable Changeable Message Sign | 4 | EACH | 25,000.00 | 100,000.00 | 15,000.00 | 60,000.00 | 22,000.00 | 88,000.00 | | 0147 | NS-813-00001 | Settlement Plate Installation & Monitoring | 12 | EACH | 1,000.00 | 12,000.00 | 1,800.00 | 21,600.00 | 1,600.00 | 19,200.00 | | 0148 | 203-04-00100 | Nonplastic Embankment | 53,420 | CUYD | 33.00 | 1,762,860.00 | 45.00 | 2,403,900.00 | 43.00 | 2,297,060.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 25,572,547.07 | | 25,573,120.82 | | 30,731,594.07 |
|