Proposal:H.002281.6-R1
Parish:West Feliciana
Routes:LA 66
Description:LA 66: BIG BAYOU SARA BRIDGE REHAB
Type Construction:CLEARING AND GRUBBING, GRADING, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, TEMPORARY DETOUR BRIDGING (LADOTD SUPPLIED), STRUCTURAL METALWORK,BRIDGE REPAIRS, AND RELATED WORK.
Estimated Construction Cost:$3,823,537.20
| Rank | License | Bidder | Construction Bid |
| 1 | 49239 | WL Bass Construction Inc. | $7,089,179.10 |
| 2 | 00481 | COASTAL BRIDGE CO., L.L.C. | $7,945,683.57 |
| 3 | 26435 | C.E.C., Inc. | $9,471,819.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - WL Bass Construction Inc. | - 2 - COASTAL BRIDGE CO., L.L.C. | - 3 - C.E.C., Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 7 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,000.00 | 2,000.00 | 7,500.00 | 7,500.00 | 5,500.00 | 5,500.00 | | 0003 | 202-02-00030 | Removal of ABANDONED WATER LINE FROM BRIDGE | 416 | LNFT | 12.00 | 4,992.00 | 18.00 | 7,488.00 | 13.00 | 5,408.00 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 138 | SQYD | 5.00 | 690.00 | 37.00 | 5,106.00 | 15.00 | 2,070.00 | | 0005 | 202-02-04024 | Removal of Bridge Components (STEEL BEAM, CONNECTIONS, AND RAILING) | 1 | LUMP | 150,000.00 | 150,000.00 | 225,000.00 | 225,000.00 | 175,000.00 | 175,000.00 | | 0006 | 202-02-04025 | Removal of Bridge Deck | 136,800 | SFIN | 0.50 | 68,400.00 | 0.52 | 71,136.00 | 2.50 | 342,000.00 | | 0007 | 202-02-04030 | Removal of Bridge Joints | 262 | LNFT | 87.00 | 22,794.00 | 37.00 | 9,694.00 | 125.00 | 32,750.00 | | 0008 | 202-02-06000 | Removal of Concrete Approach Slabs | 107 | SQYD | 70.00 | 7,490.00 | 90.00 | 9,630.00 | 40.00 | 4,280.00 | | 0009 | 202-02-14500 | Removal of Guard Rail | 384 | LNFT | 1.00 | 384.00 | 11.00 | 4,224.00 | 11.00 | 4,224.00 | | 0010 | 202-02-32120 | Removal of Pipe (Side Drain) (Side Drain) | 37 | LNFT | 15.00 | 555.00 | 78.00 | 2,886.00 | 34.00 | 1,258.00 | | 0011 | 203-01-00100 | General Excavation | 57 | CUYD | 31.00 | 1,767.00 | 37.00 | 2,109.00 | 30.00 | 1,710.00 | | 0012 | 204-02-00100 | Temporary Hay or Straw Bales | 20 | EACH | 30.00 | 600.00 | 12.00 | 240.00 | 30.00 | 600.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 1,050 | LNFT | 3.00 | 3,150.00 | 1.84 | 1,932.00 | 5.00 | 5,250.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 39.71 | CUYD | 50.00 | 1,985.50 | 100.00 | 3,971.00 | 120.00 | 4,765.20 | | 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 45.00 | 4,500.00 | 50.00 | 5,000.00 | 115.00 | 11,500.00 | | 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 86.6 | TON | 145.00 | 12,557.00 | 125.00 | 10,825.00 | 160.00 | 13,856.00 | | 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 127.34 | TON | 175.00 | 22,284.50 | 185.00 | 23,557.90 | 200.00 | 25,468.00 | | 0018 | 509-01-00100 | Cold Planing Asphaltic Pavement | 920.8 | SQYD | 12.00 | 11,049.60 | 6.00 | 5,524.80 | 12.00 | 11,049.60 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -38.4 | CUYD | 1.00 | -38.40 | 0.01 | -0.38 | 1.00 | -38.40 | | 0020 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 36 | LNFT | 120.00 | 4,320.00 | 205.00 | 7,380.00 | 140.00 | 5,040.00 | | 0021 | 704-03-00100 | Blocked Out Guard Rail | 225 | LNFT | 22.00 | 4,950.00 | 23.00 | 5,175.00 | 24.00 | 5,400.00 | | 0022 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 40.00 | 4,000.00 | 45.00 | 4,500.00 | 96.00 | 9,600.00 | | 0023 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,600.00 | 10,400.00 | 2,685.00 | 10,740.00 | 2,880.00 | 11,520.00 | | 0024 | 711-02-00500 | Riprap (130 lb) | 1,792 | CUYD | 120.00 | 215,040.00 | 111.00 | 198,912.00 | 230.00 | 412,160.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 1,218 | SQYD | 6.00 | 7,308.00 | 2.50 | 3,045.00 | 5.00 | 6,090.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.538 | MILE | 1,500.00 | 2,307.00 | 1,250.00 | 1,922.50 | 1,200.00 | 1,845.60 | | 0028 | 725-01-00100 | Temporary Detour Roads | 2,792.8 | SQYD | 100.00 | 279,280.00 | 75.00 | 209,460.00 | 175.00 | 488,740.00 | | 0029 | 725-02-00200 | Temp Detour Bridging (Steel Panel Bridge, LADOTD Supplied) | 730 | LNFT | 3,000.00 | 2,190,000.00 | 3,650.00 | 2,664,500.00 | 4,200.00 | 3,066,000.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 710,000.00 | 710,000.00 | 550,000.00 | 550,000.00 | 800,000.00 | 800,000.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 75.00 | 300.00 | 85.00 | 340.00 | 100.00 | 400.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 27 | EACH | 12.00 | 324.00 | 15.00 | 405.00 | 12.00 | 324.00 | | 0033 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.542 | MILE | 5,000.00 | 7,710.00 | 5,500.00 | 8,481.00 | 6,000.00 | 9,252.00 | | 0034 | 735-01-00100 | Mailboxes | 1 | EACH | 1.00 | 1.00 | 1.00 | 1.00 | 700.00 | 700.00 | | 0035 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 100.00 | 100.00 | 110.00 | 110.00 | 200.00 | 200.00 | | 0036 | 739-01-00100 | Hydro-Seeding | 2.9 | ACRE | 1,300.00 | 3,770.00 | 1,250.00 | 3,625.00 | 4,300.00 | 12,470.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,000.00 | 22,000.00 | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | | 0038 | 804-17-00100 | Dynamic Monitoring | 6 | EACH | 700.00 | 4,200.00 | 3,000.00 | 18,000.00 | 1,680.00 | 10,080.00 | | 0039 | 805-04-00100 | Class AA(M) Concrete | 483.1 | CUYD | 1,700.00 | 821,270.00 | 1,515.00 | 731,896.50 | 1,600.00 | 772,960.00 | | 0040 | 805-11-00100 | Strip Seal Joints | 192 | LNFT | 94.00 | 18,048.00 | 220.00 | 42,240.00 | 150.00 | 28,800.00 | | 0041 | 806-01-00100 | Deformed Reinforcing Steel | 148,769 | LB | 0.90 | 133,892.10 | 1.25 | 185,961.25 | 1.60 | 238,030.40 | | 0042 | 807-08-00100 | Structural Metalwork (DIAPHRAGMS AND CONNECTION ANGLES) | 21,165 | LUMP | 38,000.00 | 38,000.00 | 174,000.00 | 174,000.00 | 90,000.00 | 90,000.00 | | 0043 | 807-08-00100 | Structural Metalwork (EXISTING STRUCTURE MODIFICATIONS) | 15,655 | LUMP | 135,000.00 | 135,000.00 | 400,000.00 | 400,000.00 | 130,000.00 | 130,000.00 | | 0044 | 807-08-00100 | Structural Metalwork (GIRDERS AND STRINGERS) | 218,392 | LUMP | 690,000.00 | 690,000.00 | 650,000.00 | 650,000.00 | 750,000.00 | 750,000.00 | | 0045 | 810-04-00100 | Steel and Concrete Railing | 1,422.8 | LNFT | 130.00 | 184,964.00 | 175.00 | 248,990.00 | 320.00 | 455,296.00 | | 0046 | 813-01-00100 | Concrete Approach Slabs | 113.88 | SQYD | 210.00 | 23,914.80 | 200.00 | 22,776.00 | 575.00 | 65,481.00 | | 0047 | 830-02-00100 | Bridge Substructure Repair (ABUTMENT WALL MODIFICATIONS) | 2 | EACH | 21,000.00 | 42,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | 60,000.00 | | 0048 | 830-10-00100 | Epoxy Injection | 120 | LNFT | 65.00 | 7,800.00 | 150.00 | 18,000.00 | 50.00 | 6,000.00 | | 0049 | 830-11-00100 | Bolt-Rivet Replacement (Structural Steel) | 100 | EACH | 55.00 | 5,500.00 | 106.00 | 10,600.00 | 70.00 | 7,000.00 | | 0050 | NS-202-00006 | Removal of Debris (Bridge Substructure) | 1 | LUMP | 15,000.00 | 15,000.00 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 | | 0051 | NS-203-00006 | Exploratory Excavation | 10 | CUYD | 150.00 | 1,500.00 | 1,000.00 | 10,000.00 | 350.00 | 3,500.00 | | 0052 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 46 | LNFT | 45.00 | 2,070.00 | 50.00 | 2,300.00 | 30.00 | 1,380.00 | | 0053 | NS-800-00020 | Cleaning, Painting and Disposal (Near White Finish) | 1 | LUMP | 1,100,000.00 | 1,100,000.00 | 1,195,000.00 | 1,195,000.00 | 1,200,000.00 | 1,200,000.00 | | 0054 | NS-800-00241 | Bearing Pads (Elastomeric) | 40 | EACH | 500.00 | 20,000.00 | 520.00 | 20,800.00 | 800.00 | 32,000.00 | | 0055 | NS-805-00006 | Class 2A, Special Surface Finish for Existing Concrete | 8,300 | SQFT | 3.50 | 29,050.00 | 4.00 | 33,200.00 | 3.00 | 24,900.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,089,179.10 | | 7,945,683.57 | | 9,471,819.40 |
|