Proposal:H.011322.6
Parish:East Baton Rouge
Routes:US 61
Description:US 61-X: FLORIDA ST - PHLOX AVENUE
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$2,663,896.36
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,464,720.38 |
| 2 | 00481 | COASTAL BRIDGE CO., L.L.C. | $2,734,614.43 |
| 3 | 24901 | Hard Rock Construction LLC | $2,915,134.55 |
| 4 | 48896 | Command Construction Industries LLC | $3,064,254.02 |
| 5 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $3,648,984.85 |
| 6 | 21982 | Forby Contracting, Inc. | $3,760,430.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - COASTAL BRIDGE CO., L.L.C. | - 3 - Hard Rock Construction LLC | - 4 - Command Construction Industries LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,500.00 | 7,500.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 115,000.00 | 115,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 193 | SQYD | 15.00 | 2,895.00 | 42.00 | 8,106.00 | 10.00 | 1,930.00 | 25.00 | 4,825.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 170 | LNFT | 10.00 | 1,700.00 | 35.00 | 5,950.00 | 10.00 | 1,700.00 | 25.00 | 4,250.00 | | 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 4,360.9 | SQYD | 15.00 | 65,413.50 | 30.00 | 130,827.00 | 15.00 | 65,413.50 | 10.00 | 43,609.00 | | 0005 | 202-02-38300 | Removal of Sign and U-Channel Post | 13 | EACH | 30.00 | 390.00 | 25.00 | 325.00 | 30.00 | 390.00 | 250.00 | 3,250.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | 1,000.00 | 1,000.00 | | 0007 | 204-02-00100 | Temporary Hay or Straw Bales | 64 | EACH | 15.00 | 960.00 | 10.00 | 640.00 | 10.00 | 640.00 | 10.00 | 640.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 3,754 | LNFT | 2.00 | 7,508.00 | 1.60 | 6,006.40 | 2.00 | 7,508.00 | 3.00 | 11,262.00 | | 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 200 | CUYD | 30.00 | 6,000.00 | 5.00 | 1,000.00 | 35.00 | 7,000.00 | 1.00 | 200.00 | | 0011 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 60,292 | LNFT | 2.00 | 120,584.00 | 2.00 | 120,584.00 | 2.00 | 120,584.00 | 1.00 | 60,292.00 | | 0012 | 602-03-00100 | Cleaning and Sealing Random cracks | 9,044 | LNFT | 3.75 | 33,915.00 | 4.00 | 36,176.00 | 3.00 | 27,132.00 | 2.00 | 18,088.00 | | 0013 | 602-05-01360 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (14" Thick) | 544 | SQYD | 225.00 | 122,400.00 | 180.00 | 97,920.00 | 200.00 | 108,800.00 | 275.00 | 149,600.00 | | 0014 | 602-05-02360 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (14" Thick) | 773.3 | SQYD | 180.00 | 139,194.00 | 165.00 | 127,594.50 | 200.00 | 154,660.00 | 175.00 | 135,327.50 | | 0015 | 602-05-03360 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (14" Thick) | 3,493.3 | SQYD | 145.00 | 506,528.50 | 130.00 | 454,129.00 | 200.00 | 698,660.00 | 165.00 | 576,394.50 | | 0016 | 602-09-00100 | Grinding Isolated Joints | 242 | SQYD | 20.00 | 4,840.00 | 45.00 | 10,890.00 | 10.00 | 2,420.00 | 15.00 | 3,630.00 | | 0017 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 10 | LNFT | 250.00 | 2,500.00 | 150.00 | 1,500.00 | 275.00 | 2,750.00 | 250.00 | 2,500.00 | | 0018 | 701-14-00100 | Cleaning Existing Pipes | 1,196 | LNFT | 6.00 | 7,176.00 | 15.00 | 17,940.00 | 10.00 | 11,960.00 | 7.00 | 8,372.00 | | 0019 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 2,000.00 | 2,000.00 | 1,850.00 | 1,850.00 | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 | | 0020 | 702-03-00500 | Catch Basins (CB-06) | 8 | EACH | 3,800.00 | 30,400.00 | 2,800.00 | 22,400.00 | 13,000.00 | 104,000.00 | 10,000.00 | 80,000.00 | | 0021 | 702-04-00100 | Adjusting Manholes | 4 | EACH | 1,200.00 | 4,800.00 | 250.00 | 1,000.00 | 1,500.00 | 6,000.00 | 2,500.00 | 10,000.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 4,356.3 | SQYD | 50.00 | 217,815.00 | 30.00 | 130,689.00 | 50.00 | 217,815.00 | 50.00 | 217,815.00 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 104 | SQYD | 115.00 | 11,960.00 | 50.00 | 5,200.00 | 80.00 | 8,320.00 | 75.00 | 7,800.00 | | 0024 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 31 | SQYD | 120.00 | 3,720.00 | 135.00 | 4,185.00 | 100.00 | 3,100.00 | 100.00 | 3,100.00 | | 0025 | 706-04-00100 | Handicapped Curb Ramps | 7 | EACH | 3,000.00 | 21,000.00 | 1,250.00 | 8,750.00 | 3,000.00 | 21,000.00 | 1,250.00 | 8,750.00 | | 0026 | 707-01-00200 | Concrete Curb (Barrier) | 4,051 | LNFT | 12.00 | 48,612.00 | 22.00 | 89,122.00 | 15.00 | 60,765.00 | 10.00 | 40,510.00 | | 0027 | 707-01-00300 | Concrete Curb (Mountable) | 1,632 | LNFT | 12.00 | 19,584.00 | 22.00 | 35,904.00 | 15.00 | 24,480.00 | 10.00 | 16,320.00 | | 0028 | 710-01-00100 | Flowable Fill | 3 | CUYD | 750.00 | 2,250.00 | 250.00 | 750.00 | 450.00 | 1,350.00 | 1,000.00 | 3,000.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 70,000.00 | 70,000.00 | 75,000.00 | 75,000.00 | 45,000.00 | 45,000.00 | 250,000.00 | 250,000.00 | | 0030 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 600 | LNFT | 0.30 | 180.00 | 0.50 | 300.00 | 1.00 | 600.00 | 1.00 | 600.00 | | 0031 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,188 | LNFT | 0.60 | 712.80 | 1.00 | 1,188.00 | 4.00 | 4,752.00 | 2.00 | 2,376.00 | | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.218 | MILE | 340.00 | 2,454.12 | 200.00 | 1,443.60 | 400.00 | 2,887.20 | 400.00 | 2,887.20 | | 0033 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 1.805 | MILE | 600.00 | 1,083.00 | 4,000.00 | 7,220.00 | 5,000.00 | 9,025.00 | 2,100.00 | 3,790.50 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.143 | MILE | 600.00 | 4,885.80 | 1,000.00 | 8,143.00 | 1,500.00 | 12,214.50 | 500.00 | 4,071.50 | | 0035 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 29 | EACH | 25.00 | 725.00 | 100.00 | 2,900.00 | 75.00 | 2,175.00 | 75.00 | 2,175.00 | | 0036 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 150.00 | 600.00 | 100.00 | 400.00 | 300.00 | 1,200.00 | 100.00 | 400.00 | | 0037 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 2,058 | SQYD | 7.50 | 15,435.00 | 2.50 | 5,145.00 | 7.00 | 14,406.00 | 7.00 | 14,406.00 | | 0038 | 717-01-00100 | Seeding | 5 | LB | 15.00 | 75.00 | 25.00 | 125.00 | 10.00 | 50.00 | 100.00 | 500.00 | | 0039 | 718-01-00100 | Fertilizer | 21 | LB | 1.50 | 31.50 | 25.00 | 525.00 | 1.00 | 21.00 | 100.00 | 2,100.00 | | 0040 | 726-01-00100 | Bedding Material | 29.1 | CUYD | 85.00 | 2,473.50 | 90.00 | 2,619.00 | 80.00 | 2,328.00 | 50.00 | 1,455.00 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 105,000.00 | 105,000.00 | 250,000.00 | 250,000.00 | 75,000.00 | 75,000.00 | 250,000.00 | 250,000.00 | | 0042 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 110 | SQFT | 25.00 | 2,750.00 | 20.00 | 2,200.00 | 21.00 | 2,310.00 | 25.00 | 2,750.00 | | 0043 | 729-01-00103 | Sign (Type A)(Relocate) | 27.8 | SQFT | 20.00 | 556.00 | 15.00 | 417.00 | 16.00 | 444.80 | 25.00 | 695.00 | | 0044 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor Painted Black | 13 | EACH | 150.00 | 1,950.00 | 125.00 | 1,625.00 | 135.00 | 1,755.00 | 250.00 | 3,250.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,242 | EACH | 7.00 | 8,694.00 | 8.00 | 9,936.00 | 7.00 | 8,694.00 | 12.00 | 14,904.00 | | 0046 | 732-01-04080 | Plastic Pavement Striping (24" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 594 | LNFT | 14.00 | 8,316.00 | 25.00 | 14,850.00 | 20.00 | 11,880.00 | 20.00 | 11,880.00 | | 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.143 | MILE | 4,000.00 | 32,572.00 | 4,500.00 | 36,643.50 | 4,700.00 | 38,272.10 | 4,500.00 | 36,643.50 | | 0048 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.057 | MILE | 14,000.00 | 798.00 | 15,000.00 | 855.00 | 13,000.00 | 741.00 | 20,000.00 | 1,140.00 | | 0049 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.17 | MILE | 30,000.00 | 5,100.00 | 30,000.00 | 5,100.00 | 43,000.00 | 7,310.00 | 25,000.00 | 4,250.00 | | 0050 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.609 | MILE | 1,200.00 | 4,330.80 | 1,500.00 | 5,413.50 | 2,000.00 | 7,218.00 | 1,700.00 | 6,135.30 | | 0051 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.137 | MILE | 10,000.00 | 1,370.00 | 5,000.00 | 685.00 | 3,000.00 | 411.00 | 7,000.00 | 959.00 | | 0052 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 26 | EACH | 400.00 | 10,400.00 | 400.00 | 10,400.00 | 400.00 | 10,400.00 | 500.00 | 13,000.00 | | 0053 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 400.00 | 1,200.00 | 550.00 | 1,650.00 | 400.00 | 1,200.00 | 500.00 | 1,500.00 | | 0054 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 11 | EACH | 500.00 | 5,500.00 | 550.00 | 6,050.00 | 500.00 | 5,500.00 | 500.00 | 5,500.00 | | 0055 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 850.00 | 3,400.00 | 550.00 | 2,200.00 | 1,500.00 | 6,000.00 | 1,200.00 | 4,800.00 | | 0056 | 732-05-00100 | Removal of Existing Markings Reflectorized Raised Markers ONLY | 1 | MILE | 3,000.00 | 3,000.00 | 2,500.00 | 2,500.00 | 5,500.00 | 5,500.00 | 5,000.00 | 5,000.00 | | 0057 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 150,000.00 | 150,000.00 | | 0058 | 741-11-00100 | Adjusting Water Valve | 4 | EACH | 175.00 | 700.00 | 250.00 | 1,000.00 | 300.00 | 1,200.00 | 500.00 | 2,000.00 | | 0059 | 805-09-00100 | Expansion Joint Seal | 401 | LNFT | 6.00 | 2,406.00 | 3.00 | 1,203.00 | 10.00 | 4,010.00 | 25.00 | 10,025.00 | | 0060 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 33,392 | LNFT | 1.50 | 50,088.00 | 1.25 | 41,740.00 | 2.00 | 66,784.00 | 1.00 | 33,392.00 | | 0061 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 61,113 | LNFT | 0.50 | 30,556.50 | 0.50 | 30,556.50 | 0.35 | 21,389.55 | 0.01 | 611.13 | | 0062 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 57,088.6 | INLF | 0.10 | 5,708.86 | 0.50 | 28,544.30 | 1.00 | 57,088.60 | 0.01 | 570.89 | | 0063 | NS-502-01000 | Asphalt Concrete | 5,750.8 | TON | 70.00 | 402,556.00 | 76.00 | 437,060.80 | 80.00 | 460,064.00 | 75.00 | 431,310.00 | | 0064 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 172.3 | TON | 130.00 | 22,399.00 | 150.00 | 25,845.00 | 135.00 | 23,260.50 | 300.00 | 51,690.00 | | 0065 | NS-509-01000 | Milling Asphalt Pavement | 29,801 | SQYD | 3.00 | 89,403.00 | 5.00 | 149,005.00 | 3.00 | 89,403.00 | 3.00 | 89,403.00 | | 0066 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -1,392 | CUYD | 0.00 | 0.00 | 0.01 | -13.92 | 0.10 | -139.20 | 1.00 | -1,392.00 | | 0067 | NS-510-01600 | Pavement Patching (16" Minimum Thickness) | 63.9 | SQYD | 120.00 | 7,668.00 | 250.00 | 15,975.00 | 135.00 | 8,626.50 | 200.00 | 12,780.00 | | 0068 | NS-510-03000 | Pavement Joint Repair | 10 | TON | 350.00 | 3,500.00 | 300.00 | 3,000.00 | 50.00 | 500.00 | 300.00 | 3,000.00 | | 0069 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 204 | INLF | 1.00 | 204.00 | 2.00 | 408.00 | 3.00 | 612.00 | 10.00 | 2,040.00 | | 0070 | NS-602-00001 | Milling Concrete Pavement | 455.6 | SQYD | 20.00 | 9,112.00 | 30.00 | 13,668.00 | 20.00 | 9,112.00 | 25.00 | 11,390.00 | | 0071 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 10 | LNFT | 50.00 | 500.00 | 750.00 | 7,500.00 | 1,500.00 | 15,000.00 | 1.00 | 10.00 | | 0072 | NS-713-00008 | Portable Changeable Message Sign | 4 | EACH | 2,000.00 | 8,000.00 | 2,500.00 | 10,000.00 | 13,000.00 | 52,000.00 | 10,000.00 | 40,000.00 | | 0073 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 9 | EACH | 300.00 | 2,700.00 | 500.00 | 4,500.00 | 330.00 | 2,970.00 | 500.00 | 4,500.00 | | 0074 | NS-MSC-00120 | Drainage Structure ADA Compliant Grate | 8 | EACH | 2,800.00 | 22,400.00 | 1,250.00 | 10,000.00 | 3,000.00 | 24,000.00 | 2,500.00 | 20,000.00 | | 0075 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 27,721 | LNFT | 1.50 | 41,581.50 | 1.25 | 34,651.25 | 1.50 | 41,581.50 | 1.00 | 27,721.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,464,720.38 | | 2,734,614.43 | | 2,915,134.55 | | 3,064,254.02 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - KORT's CONSTRUCTION SERVICES, INC. | - 6 - Forby Contracting, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 193 | SQYD | 30.00 | 5,790.00 | 25.00 | 4,825.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 170 | LNFT | 10.00 | 1,700.00 | 15.00 | 2,550.00 | | 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 4,360.9 | SQYD | 35.00 | 152,631.50 | 40.00 | 174,436.00 | | 0005 | 202-02-38300 | Removal of Sign and U-Channel Post | 13 | EACH | 25.00 | 325.00 | 25.00 | 325.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 175,000.00 | 175,000.00 | 150,000.00 | 150,000.00 | | 0007 | 204-02-00100 | Temporary Hay or Straw Bales | 64 | EACH | 12.00 | 768.00 | 15.00 | 960.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 3,754 | LNFT | 1.75 | 6,569.50 | 1.50 | 5,631.00 | | 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 200 | CUYD | 65.00 | 13,000.00 | 100.00 | 20,000.00 | | 0011 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 60,292 | LNFT | 1.85 | 111,540.20 | 1.75 | 105,511.00 | | 0012 | 602-03-00100 | Cleaning and Sealing Random cracks | 9,044 | LNFT | 2.75 | 24,871.00 | 3.50 | 31,654.00 | | 0013 | 602-05-01360 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (14" Thick) | 544 | SQYD | 225.00 | 122,400.00 | 270.00 | 146,880.00 | | 0014 | 602-05-02360 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (14" Thick) | 773.3 | SQYD | 200.00 | 154,660.00 | 240.00 | 185,592.00 | | 0015 | 602-05-03360 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (14" Thick) | 3,493.3 | SQYD | 175.00 | 611,327.50 | 220.00 | 768,526.00 | | 0016 | 602-09-00100 | Grinding Isolated Joints | 242 | SQYD | 30.00 | 7,260.00 | 50.00 | 12,100.00 | | 0017 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 10 | LNFT | 250.00 | 2,500.00 | 100.00 | 1,000.00 | | 0018 | 701-14-00100 | Cleaning Existing Pipes | 1,196 | LNFT | 6.00 | 7,176.00 | 25.00 | 29,900.00 | | 0019 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | | 0020 | 702-03-00500 | Catch Basins (CB-06) | 8 | EACH | 3,500.00 | 28,000.00 | 6,500.00 | 52,000.00 | | 0021 | 702-04-00100 | Adjusting Manholes | 4 | EACH | 1,000.00 | 4,000.00 | 1,500.00 | 6,000.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 4,356.3 | SQYD | 50.00 | 217,815.00 | 65.00 | 283,159.50 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 104 | SQYD | 90.00 | 9,360.00 | 85.00 | 8,840.00 | | 0024 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 31 | SQYD | 62.00 | 1,922.00 | 125.00 | 3,875.00 | | 0025 | 706-04-00100 | Handicapped Curb Ramps | 7 | EACH | 5,500.00 | 38,500.00 | 2,300.00 | 16,100.00 | | 0026 | 707-01-00200 | Concrete Curb (Barrier) | 4,051 | LNFT | 20.00 | 81,020.00 | 18.00 | 72,918.00 | | 0027 | 707-01-00300 | Concrete Curb (Mountable) | 1,632 | LNFT | 18.50 | 30,192.00 | 15.00 | 24,480.00 | | 0028 | 710-01-00100 | Flowable Fill | 3 | CUYD | 600.00 | 1,800.00 | 250.00 | 750.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 125,000.00 | 125,000.00 | | 0030 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 600 | LNFT | 1.00 | 600.00 | 0.25 | 150.00 | | 0031 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,188 | LNFT | 4.00 | 4,752.00 | 0.50 | 594.00 | | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.218 | MILE | 150.00 | 1,082.70 | 1,000.00 | 7,218.00 | | 0033 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 1.805 | MILE | 5,000.00 | 9,025.00 | 10,000.00 | 18,050.00 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.143 | MILE | 1,400.00 | 11,400.20 | 600.00 | 4,885.80 | | 0035 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 29 | EACH | 70.00 | 2,030.00 | 25.00 | 725.00 | | 0036 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 300.00 | 1,200.00 | 150.00 | 600.00 | | 0037 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 2,058 | SQYD | 7.00 | 14,406.00 | 8.00 | 16,464.00 | | 0038 | 717-01-00100 | Seeding | 5 | LB | 25.00 | 125.00 | 20.00 | 100.00 | | 0039 | 718-01-00100 | Fertilizer | 21 | LB | 10.00 | 210.00 | 4.00 | 84.00 | | 0040 | 726-01-00100 | Bedding Material | 29.1 | CUYD | 35.00 | 1,018.50 | 150.00 | 4,365.00 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | 365,000.00 | 365,000.00 | | 0042 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 110 | SQFT | 20.00 | 2,200.00 | 20.00 | 2,200.00 | | 0043 | 729-01-00103 | Sign (Type A)(Relocate) | 27.8 | SQFT | 15.00 | 417.00 | 15.00 | 417.00 | | 0044 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor Painted Black | 13 | EACH | 125.00 | 1,625.00 | 125.00 | 1,625.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,242 | EACH | 7.00 | 8,694.00 | 6.00 | 7,452.00 | | 0046 | 732-01-04080 | Plastic Pavement Striping (24" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) | 594 | LNFT | 18.00 | 10,692.00 | 12.00 | 7,128.00 | | 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.143 | MILE | 4,400.00 | 35,829.20 | 3,800.00 | 30,943.40 | | 0048 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.057 | MILE | 12,000.00 | 684.00 | 15,000.00 | 855.00 | | 0049 | 732-02-02060 | Plastic Pavement Striping (Solid Line) (12" Width) (Thermoplastic 90 mil) | 0.17 | MILE | 40,000.00 | 6,800.00 | 25,000.00 | 4,250.00 | | 0050 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.609 | MILE | 2,200.00 | 7,939.80 | 1,000.00 | 3,609.00 | | 0051 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.137 | MILE | 2,500.00 | 342.50 | 10,000.00 | 1,370.00 | | 0052 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 26 | EACH | 400.00 | 10,400.00 | 350.00 | 9,100.00 | | 0053 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 400.00 | 1,200.00 | 350.00 | 1,050.00 | | 0054 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 11 | EACH | 450.00 | 4,950.00 | 450.00 | 4,950.00 | | 0055 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 1,200.00 | 4,800.00 | 750.00 | 3,000.00 | | 0056 | 732-05-00100 | Removal of Existing Markings Reflectorized Raised Markers ONLY | 1 | MILE | 5,000.00 | 5,000.00 | 2,500.00 | 2,500.00 | | 0057 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 50,000.00 | 50,000.00 | | 0058 | 741-11-00100 | Adjusting Water Valve | 4 | EACH | 900.00 | 3,600.00 | 350.00 | 1,400.00 | | 0059 | 805-09-00100 | Expansion Joint Seal | 401 | LNFT | 20.00 | 8,020.00 | 150.00 | 60,150.00 | | 0060 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 33,392 | LNFT | 2.25 | 75,132.00 | 1.40 | 46,748.80 | | 0061 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 61,113 | LNFT | 1.00 | 61,113.00 | 1.25 | 76,391.25 | | 0062 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 57,088.6 | INLF | 2.00 | 114,177.20 | 1.75 | 99,905.05 | | 0063 | NS-502-01000 | Asphalt Concrete | 5,750.8 | TON | 85.00 | 488,818.00 | 73.00 | 419,808.40 | | 0064 | NS-502-01100 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 172.3 | TON | 170.00 | 29,291.00 | 125.00 | 21,537.50 | | 0065 | NS-509-01000 | Milling Asphalt Pavement | 29,801 | SQYD | 5.00 | 149,005.00 | 2.50 | 74,502.50 | | 0066 | NS-509-02000 | Contractor Retained Reclaimed Asphalt Pavement | -1,392 | CUYD | 1.00 | -1,392.00 | 0.10 | -139.20 | | 0067 | NS-510-01600 | Pavement Patching (16" Minimum Thickness) | 63.9 | SQYD | 200.00 | 12,780.00 | 120.00 | 7,668.00 | | 0068 | NS-510-03000 | Pavement Joint Repair | 10 | TON | 400.00 | 4,000.00 | 450.00 | 4,500.00 | | 0069 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 204 | INLF | 2.75 | 561.00 | 2.75 | 561.00 | | 0070 | NS-602-00001 | Milling Concrete Pavement | 455.6 | SQYD | 28.00 | 12,756.80 | 21.00 | 9,567.60 | | 0071 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 10 | LNFT | 120.00 | 1,200.00 | 35.00 | 350.00 | | 0072 | NS-713-00008 | Portable Changeable Message Sign | 4 | EACH | 17,000.00 | 68,000.00 | 20,000.00 | 80,000.00 | | 0073 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 9 | EACH | 500.00 | 4,500.00 | 300.00 | 2,700.00 | | 0074 | NS-MSC-00120 | Drainage Structure ADA Compliant Grate | 8 | EACH | 2,500.00 | 20,000.00 | 500.00 | 4,000.00 | | 0075 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 27,721 | LNFT | 2.25 | 62,372.25 | 1.50 | 41,581.50 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,648,984.85 | | 3,760,430.10 |
|