Proposal:H.000173.6
Parish:Ouachita
Routes:US 80
Description:US 80: MCQUILLER RD - BAYOU LAFOURCHE BR
Type Construction:CLEARING AND GRUBBING, EXCAVATION, EMBANKMENT, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$6,667,746.96
| Rank | License | Bidder | Construction Bid |
| 1 | 38936 | SOUTHERN INDUSTRIAL CONTRACTORS LLC | $4,572,771.99 |
| 2 | 30774 | Progressive Construction Co., LLC | $4,611,489.99 |
| 3 | 49239 | WL Bass Construction Inc. | $4,796,965.80 |
| 4 | 05789 | D & J CONSTRUCTION CO., LLC | $5,933,270.00 |
| 5 | 12487 | Diamond B Construction Co., L.L.C. | $6,070,089.32 |
| 6 | 06323 | Hemphill Construction Co., Inc. | $6,478,540.81 |
| 7 | 36936 | Dirtworks Inc Of Vicksburg | $7,092,986.26 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SOUTHERN INDUSTRIAL CONTRACTORS LLC | - 2 - Progressive Construction Co., LLC | - 3 - WL Bass Construction Inc. | - 4 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 10.259 | LUMP | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 206,000.00 | 206,000.00 | 75,000.00 | 75,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 563.6 | LNFT | 10.00 | 5,636.00 | 12.00 | 6,763.20 | 11.00 | 6,199.60 | 20.00 | 11,272.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) EXISTING 36" CMP | 61 | LNFT | 50.00 | 3,050.00 | 35.00 | 2,135.00 | 13.00 | 793.00 | 16.00 | 976.00 | | 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 27,211 | SQYD | 3.94 | 107,211.34 | 10.00 | 272,110.00 | 6.00 | 163,266.00 | 20.00 | 544,220.00 | | 0005 | 203-01-00100 | General Excavation | 74,000 | CUYD | 6.00 | 444,000.00 | 7.70 | 569,800.00 | 6.00 | 444,000.00 | 10.00 | 740,000.00 | | 0006 | 203-03-00100 | Embankment | 71,500 | CUYD | 8.50 | 607,750.00 | 15.00 | 1,072,500.00 | 11.00 | 786,500.00 | 15.00 | 1,072,500.00 | | 0007 | 203-04-00300 | Nonplastic Embankment (Stone) | 168 | CUYD | 80.00 | 13,440.00 | 93.00 | 15,624.00 | 100.00 | 16,800.00 | 200.00 | 33,600.00 | | 0008 | 203-08-00100 | Geotextile Fabric | 82,803 | SQYD | 0.75 | 62,102.25 | 1.00 | 82,803.00 | 1.00 | 82,803.00 | 2.00 | 165,606.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 16 | EACH | 150.00 | 2,400.00 | 194.00 | 3,104.00 | 250.00 | 4,000.00 | 250.00 | 4,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 20,700 | LNFT | 1.50 | 31,050.00 | 2.25 | 46,575.00 | 2.00 | 41,400.00 | 3.00 | 62,100.00 | | 0011 | 302-02-05000 | Class II Base Course (10" Thick) | 33,300 | SQYD | 12.46 | 414,918.00 | 12.50 | 416,250.00 | 17.00 | 566,100.00 | 15.00 | 499,500.00 | | 0012 | 304-01-00100 | Lime | 1,287.72 | TON | 200.00 | 257,544.00 | 225.00 | 289,737.00 | 275.00 | 354,123.00 | 300.00 | 386,316.00 | | 0013 | 304-04-00400 | Lime Treatment (Type D) (12" Thick) | 81,760 | SQYD | 3.00 | 245,280.00 | 2.75 | 224,840.00 | 2.60 | 212,576.00 | 8.00 | 654,080.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 634 | CUYD | 40.00 | 25,360.00 | 115.00 | 72,910.00 | 60.00 | 38,040.00 | 50.00 | 31,700.00 | | 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 6,000 | CUYD | 30.00 | 180,000.00 | 5.00 | 30,000.00 | 5.00 | 30,000.00 | 10.00 | 60,000.00 | | 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 6,953.9 | TON | 90.00 | 625,851.00 | 91.00 | 632,804.90 | 115.00 | 799,698.50 | 102.00 | 709,297.80 | | 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 491.3 | TON | 195.00 | 95,803.50 | 196.00 | 96,294.80 | 225.00 | 110,542.50 | 132.00 | 64,851.60 | | 0018 | 701-01-02080 | Cross Drain Pipe (36" RCP/PP or 42" CMP) | 144 | LNFT | 150.00 | 21,600.00 | 230.00 | 33,120.00 | 100.00 | 14,400.00 | 250.00 | 36,000.00 | | 0019 | 701-15-00100 | Concrete Collar | 4 | EACH | 2,500.00 | 10,000.00 | 1,200.00 | 4,800.00 | 2,500.00 | 10,000.00 | 1,000.00 | 4,000.00 | | 0020 | 704-03-00100 | Blocked Out Guard Rail | 262.6 | LNFT | 20.00 | 5,252.00 | 21.00 | 5,514.60 | 21.00 | 5,514.60 | 21.00 | 5,514.60 | | 0021 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 80 | LNFT | 80.00 | 6,400.00 | 40.00 | 3,200.00 | 38.00 | 3,040.00 | 40.00 | 3,200.00 | | 0022 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 80.00 | 8,000.00 | 60.00 | 6,000.00 | 60.00 | 6,000.00 | 60.00 | 6,000.00 | | 0023 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,300.00 | 9,200.00 | 2,500.00 | 10,000.00 | 2,500.00 | 10,000.00 | 2,500.00 | 10,000.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 9 | SQYD | 100.00 | 900.00 | 122.00 | 1,098.00 | 100.00 | 900.00 | 100.00 | 900.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 9 | SQYD | 100.00 | 900.00 | 2.00 | 18.00 | 5.00 | 45.00 | 5.00 | 45.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 450,000.00 | 450,000.00 | 8,200.00 | 8,200.00 | 100,000.00 | 100,000.00 | 175,000.00 | 175,000.00 | | 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.96 | MILE | 200.00 | 392.00 | 1,650.00 | 3,234.00 | 600.00 | 1,176.00 | 200.00 | 392.00 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.92 | MILE | 10,000.00 | 19,200.00 | 525.00 | 1,008.00 | 600.00 | 1,152.00 | 600.00 | 1,152.00 | | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 4.344 | MILE | 1,000.00 | 4,344.00 | 1,050.00 | 4,561.20 | 1,000.00 | 4,344.00 | 700.00 | 3,040.80 | | 0030 | 716-01-00100 | Mulch (Vegetative) | 51.4 | TON | 600.00 | 30,840.00 | 600.00 | 30,840.00 | 600.00 | 30,840.00 | 700.00 | 35,980.00 | | 0031 | 717-01-00100 | Seeding | 1,541 | LB | 15.00 | 23,115.00 | 10.50 | 16,180.50 | 10.00 | 15,410.00 | 10.00 | 15,410.00 | | 0032 | 718-01-00100 | Fertilizer | 25,686 | LB | 1.00 | 25,686.00 | 0.75 | 19,264.50 | 0.75 | 19,264.50 | 0.70 | 17,980.20 | | 0033 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 11,375.00 | 11,375.00 | 3,500.00 | 3,500.00 | 10,000.00 | 10,000.00 | | 0034 | 726-01-00100 | Bedding Material | 63.9 | CUYD | 40.00 | 2,556.00 | 93.00 | 5,942.70 | 100.00 | 6,390.00 | 100.00 | 6,390.00 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 488,400.00 | 488,400.00 | 300,000.00 | 300,000.00 | 480,000.00 | 480,000.00 | 250,000.00 | 250,000.00 | | 0036 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 500.00 | 1,000.00 | 70.00 | 140.00 | 70.00 | 140.00 | 100.00 | 200.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 200.00 | 800.00 | 80.00 | 320.00 | 80.00 | 320.00 | 100.00 | 400.00 | | 0038 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 927 | EACH | 5.00 | 4,635.00 | 5.25 | 4,866.75 | 12.00 | 11,124.00 | 6.00 | 5,562.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 265 | EACH | 7.50 | 1,987.50 | 8.00 | 2,120.00 | 8.00 | 2,120.00 | 6.00 | 1,590.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.344 | MILE | 5,500.00 | 23,892.00 | 6,000.00 | 26,064.00 | 4,100.00 | 17,810.40 | 4,500.00 | 19,548.00 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.92 | MILE | 1,500.00 | 2,880.00 | 1,650.00 | 3,168.00 | 1,600.00 | 3,072.00 | 2,000.00 | 3,840.00 | | 0042 | 732-05-00100 | Removal of Existing Markings | 0.068 | MILE | 10,000.00 | 680.00 | 10,500.00 | 714.00 | 5,250.00 | 357.00 | 25,000.00 | 1,700.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 21,000.00 | 21,000.00 | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | | 0044 | NS-300-00060 | Geogrid | 81,760 | SQYD | 0.84 | 68,678.40 | 1.25 | 102,200.00 | 1.00 | 81,760.00 | 1.50 | 122,640.00 | | 0045 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 72 | LNFT | 100.00 | 7,200.00 | 5.00 | 360.00 | 50.00 | 3,600.00 | 2.00 | 144.00 | | 0046 | NS-724-00004 | Rumble Strips (Centerline) | 1.892 | MILE | 500.00 | 946.00 | 340.00 | 643.28 | 325.00 | 614.90 | 1,500.00 | 2,838.00 | | 0047 | NS-724-00005 | Rumble Strips (Shoulder) | 3.784 | MILE | 500.00 | 1,892.00 | 340.00 | 1,286.56 | 325.00 | 1,229.80 | 1,000.00 | 3,784.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,572,771.99 | | 4,611,489.99 | | 4,796,965.80 | | 5,933,270.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Diamond B Construction Co., L.L.C. | - 6 - Hemphill Construction Co., Inc. | - 7 - Dirtworks Inc Of Vicksburg | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 10.259 | LUMP | 85,000.00 | 85,000.00 | 475,000.00 | 475,000.00 | 300,000.00 | 300,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 563.6 | LNFT | 15.00 | 8,454.00 | 18.00 | 10,144.80 | 9.00 | 5,072.40 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) EXISTING 36" CMP | 61 | LNFT | 6.00 | 366.00 | 20.00 | 1,220.00 | 15.00 | 915.00 | | 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 27,211 | SQYD | 17.00 | 462,587.00 | 10.00 | 272,110.00 | 13.00 | 353,743.00 | | 0005 | 203-01-00100 | General Excavation | 74,000 | CUYD | 3.50 | 259,000.00 | 11.65 | 862,100.00 | 11.00 | 814,000.00 | | 0006 | 203-03-00100 | Embankment | 71,500 | CUYD | 25.50 | 1,823,250.00 | 14.50 | 1,036,750.00 | 18.00 | 1,287,000.00 | | 0007 | 203-04-00300 | Nonplastic Embankment (Stone) | 168 | CUYD | 370.00 | 62,160.00 | 100.00 | 16,800.00 | 120.00 | 20,160.00 | | 0008 | 203-08-00100 | Geotextile Fabric | 82,803 | SQYD | 1.50 | 124,204.50 | 1.45 | 120,064.35 | 1.40 | 115,924.20 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 16 | EACH | 115.00 | 1,840.00 | 300.00 | 4,800.00 | 115.00 | 1,840.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 20,700 | LNFT | 2.50 | 51,750.00 | 2.00 | 41,400.00 | 2.00 | 41,400.00 | | 0011 | 302-02-05000 | Class II Base Course (10" Thick) | 33,300 | SQYD | 28.00 | 932,400.00 | 29.00 | 965,700.00 | 30.00 | 999,000.00 | | 0012 | 304-01-00100 | Lime | 1,287.72 | TON | 225.00 | 289,737.00 | 200.00 | 257,544.00 | 308.00 | 396,617.76 | | 0013 | 304-04-00400 | Lime Treatment (Type D) (12" Thick) | 81,760 | SQYD | 3.00 | 245,280.00 | 3.00 | 245,280.00 | 7.75 | 633,640.00 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 634 | CUYD | 75.00 | 47,550.00 | 100.00 | 63,400.00 | 110.00 | 69,740.00 | | 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 6,000 | CUYD | 65.00 | 390,000.00 | 50.00 | 300,000.00 | 50.00 | 300,000.00 | | 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 6,953.9 | TON | 90.00 | 625,851.00 | 96.00 | 667,574.40 | 98.00 | 681,482.20 | | 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 491.3 | TON | 175.00 | 85,977.50 | 210.00 | 103,173.00 | 212.00 | 104,155.60 | | 0018 | 701-01-02080 | Cross Drain Pipe (36" RCP/PP or 42" CMP) | 144 | LNFT | 155.00 | 22,320.00 | 110.00 | 15,840.00 | 120.00 | 17,280.00 | | 0019 | 701-15-00100 | Concrete Collar | 4 | EACH | 700.00 | 2,800.00 | 1,000.00 | 4,000.00 | 1,200.00 | 4,800.00 | | 0020 | 704-03-00100 | Blocked Out Guard Rail | 262.6 | LNFT | 22.00 | 5,777.20 | 21.00 | 5,514.60 | 21.00 | 5,514.60 | | 0021 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 80 | LNFT | 48.00 | 3,840.00 | 37.00 | 2,960.00 | 85.00 | 6,800.00 | | 0022 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 65.00 | 6,500.00 | 75.00 | 7,500.00 | 85.00 | 8,500.00 | | 0023 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,750.00 | 11,000.00 | 2,650.00 | 10,600.00 | 2,500.00 | 10,000.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 9 | SQYD | 90.00 | 810.00 | 100.00 | 900.00 | 115.00 | 1,035.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 9 | SQYD | 2.50 | 22.50 | 5.00 | 45.00 | 50.00 | 450.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 | | 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.96 | MILE | 150.00 | 294.00 | 635.00 | 1,244.60 | 2,000.00 | 3,920.00 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.92 | MILE | 500.00 | 960.00 | 635.00 | 1,219.20 | 650.00 | 1,248.00 | | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 4.344 | MILE | 850.00 | 3,692.40 | 1,000.00 | 4,344.00 | 1,100.00 | 4,778.40 | | 0030 | 716-01-00100 | Mulch (Vegetative) | 51.4 | TON | 750.00 | 38,550.00 | 560.00 | 28,784.00 | 700.00 | 35,980.00 | | 0031 | 717-01-00100 | Seeding | 1,541 | LB | 14.00 | 21,574.00 | 9.60 | 14,793.60 | 13.00 | 20,033.00 | | 0032 | 718-01-00100 | Fertilizer | 25,686 | LB | 0.30 | 7,705.80 | 0.65 | 16,695.90 | 0.35 | 8,990.10 | | 0033 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 12,000.00 | 12,000.00 | | 0034 | 726-01-00100 | Bedding Material | 63.9 | CUYD | 110.00 | 7,029.00 | 100.00 | 6,390.00 | 110.00 | 7,029.00 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 560,000.00 | 560,000.00 | 611,000.00 | 611,000.00 | | 0036 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 75.00 | 150.00 | 48.00 | 96.00 | 100.00 | 200.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 80.00 | 320.00 | 100.00 | 400.00 | | 0038 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 927 | EACH | 12.00 | 11,124.00 | 11.50 | 10,660.50 | 13.00 | 12,051.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 265 | EACH | 8.00 | 2,120.00 | 7.50 | 1,987.50 | 9.00 | 2,385.00 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.344 | MILE | 4,200.00 | 18,244.80 | 4,150.00 | 18,027.60 | 4,100.00 | 17,810.40 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.92 | MILE | 1,600.00 | 3,072.00 | 1,650.00 | 3,168.00 | 1,700.00 | 3,264.00 | | 0042 | 732-05-00100 | Removal of Existing Markings | 0.068 | MILE | 4,800.00 | 326.40 | 5,320.00 | 361.76 | 10,000.00 | 680.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 60,000.00 | 60,000.00 | 75,000.00 | 75,000.00 | 30,000.00 | 30,000.00 | | 0044 | NS-300-00060 | Geogrid | 81,760 | SQYD | 2.50 | 204,400.00 | 1.70 | 138,992.00 | 1.40 | 114,464.00 | | 0045 | NS-701-00002 | Trench Excavation Safety Protection (Depth > 5 feet) | 72 | LNFT | 1.00 | 72.00 | 5.00 | 360.00 | 20.00 | 1,440.00 | | 0046 | NS-724-00004 | Rumble Strips (Centerline) | 1.892 | MILE | 335.00 | 633.82 | 1,000.00 | 1,892.00 | 1,100.00 | 2,081.20 | | 0047 | NS-724-00005 | Rumble Strips (Shoulder) | 3.784 | MILE | 350.00 | 1,324.40 | 1,000.00 | 3,784.00 | 1,100.00 | 4,162.40 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,070,089.32 | | 6,478,540.81 | | 7,092,986.26 |
|